Line 28: |
Line 28: |
| On September 5, 2018, the U.S. Nuclear Regulatory Commission (NRC) staff held a conference call with members of your staff to discuss insufficiencies identified during the acceptance review of the amendment request. By letter dated September 6, 2018 (ADAMS Accession No. ML 18242A 162), you were informed of the insufficiencies and informed that the LAR would need to be supplemented by September 24, 2018. By letter dated September 24, 2018 (ADAMS Accession No. ML 18267A102), supplemental information was submitted by Duke Energy. The NRC staff has reviewed the supplemental information and concluded that it does provide technical information in sufficient detail to enable the staff to (1) perform its detailed technical review, and (2) make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of the public health and safety and environment. | | On September 5, 2018, the U.S. Nuclear Regulatory Commission (NRC) staff held a conference call with members of your staff to discuss insufficiencies identified during the acceptance review of the amendment request. By letter dated September 6, 2018 (ADAMS Accession No. ML 18242A 162), you were informed of the insufficiencies and informed that the LAR would need to be supplemented by September 24, 2018. By letter dated September 24, 2018 (ADAMS Accession No. ML 18267A102), supplemental information was submitted by Duke Energy. The NRC staff has reviewed the supplemental information and concluded that it does provide technical information in sufficient detail to enable the staff to (1) perform its detailed technical review, and (2) make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of the public health and safety and environment. |
| Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified, despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence. | | Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified, despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence. |
| Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately [[estimated NRC review hours::720 hours]] to complete. | | Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 720 hours to complete. |
| The NRC staff expects to complete this review in October 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes T. Hamilton in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. These estimates are based on the NRC staff's initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. | | The NRC staff expects to complete this review in October 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes T. Hamilton in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. These estimates are based on the NRC staff's initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. |
| Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications. | | Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications. |
Revision as of 21:17, 6 November 2018
Letter Sequence Acceptance Review |
---|
|
|
|
|
---|
Category:Acceptance Review Letter
MONTHYEARML24094A3282024-04-17017 April 2024 Acceptance of Exemption Request from Certain Requirements in 10 CFR 50.55a(h)(2) ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23058A0562023-02-27027 February 2023 Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System Instrumentation ML23048A1512023-02-16016 February 2023 Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003) ML21006A4302021-01-0606 January 2021 Acceptance Review - Duke Fleet RA-20-0207 Request to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML20157A1062020-06-24024 June 2020 Review of the Fall 2019 Steam Generator Tube Inspections During Refueling Outage No. 22 ML20133K0722020-05-12012 May 2020 Acceptance of Requested Licensing Action Technical Specifications Related to Reducing the Minimum Required Reactor Coolant System Flow Rate and Update the List of Analytical Methods Used in the Determination of Core Operating Limits ML19311C3412019-11-0707 November 2019 Acceptance Review: Shearon Harris License Amendment Request for TSTF-505 ML18270A1292018-10-0404 October 2018 Acceptance of Requested Licensing Action ML17319A5012017-11-21021 November 2017 Acceptance Review Letter, License Amendment Request to Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis ML17261A7272017-09-20020 September 2017 Shearon Harris Nuclear Power Plant, Unit 1 - Acceptance of Requested Licensing Action Regarding Spent Fuel Storage Pool Criticality Analyses (CAC No. MF9996) ML16308A3702016-11-0707 November 2016 Results of Acceptance Review of Requested Licensing Action Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0 (CAC Nos. MF8422-MF8429) ML16152A5962016-06-0303 June 2016 NRC Acceptance of Requested Licensing Action Amendment Request ML15309A7282015-12-0101 December 2015 Acceptance of Requested Licensing Action Regarding Duke Energy Progress, Inc. Application to Revise Technical Specifications to Adopt Methodology Report ML14157A0552014-06-13013 June 2014 Acceptance of Requested Relief Request I3R-14-Deferral of Reactor Vessel Inspections Inservice Inspection Program-Third 10-Year Interval ML13329A4572013-11-25025 November 2013 Accepted for Review Shearon Harris--Acceptance Review for Relief Request I3R-13 Reactor Vessel Closure Head Nozzle 37 ML13324B0812013-11-20020 November 2013 E-mail Re. Acceptance Review for Relief Request I3R-12 Repair of Accumulator Fill Valve Piping Weld ML11181A0162011-07-0101 July 2011 Acceptance for Review of Measurement Uncertainty Recapture Power Uprate License Amendment Request ML1105300792011-02-18018 February 2011 E-mail, Acceptance Review of ME5410, Application for Exemption for M5 Cladding: 1/19/11 ML1018707202010-07-0909 July 2010 Acceptance Review Regarding a Relief Request for Approval of an Alternative Inservice Inspection Method for Six Pressure Retaining Dissimilar Metal Welds in the Reactor Pressure Vessel Nozzles ML0935801382009-12-30030 December 2009 Acceptance Review Regarding Request for Exemption from the Requirements of 10 CFR Part 73, Section 73.55 ML0912705692009-05-15015 May 2009 Acceptance Review Re Amendment to Adopt Tech Spec Task Force (TSTF) Standard Tech Spec Change Traveler, TSTF-447, Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors ML0903603132009-02-0606 February 2009 Acceptance Review Regarding Amendment to Remove Credit for Boraflex in Boiling Water Reactor Spent Fuel Pool Storage Racks ML0903000302009-01-30030 January 2009 Acceptance Review Regarding Amendment to Adopt National Fire Protection Association 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition ML0902100672009-01-29029 January 2009 Acceptance Review Regarding Relief Request to Defer an ASME Code Repair of an Emergency Service Water System Weld Until the Next Refueling Outage ML0902100112009-01-27027 January 2009 Acceptance Review Regarding Amendment to Remove Credit for Boraflex in BWR Spent Fuel Pool Storage Racks ML0827011582008-09-26026 September 2008 Acceptance Review Regarding the License Amendment Request to Transition to NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants. 2024-04-17
[Table view] Category:Letter
MONTHYEARIR 05000400/20240032024-11-0707 November 2024 Integrated Inspection Report 05000400/2024003 ML24290A1102024-10-24024 October 2024 Notification of Licensed Operator Initial Examination 05000400/2025301 05000400/LER-2024-001-01, Automatic Reactor Trip Due to Main Generator Lock-Out2024-10-23023 October 2024 Automatic Reactor Trip Due to Main Generator Lock-Out IR 05000400/20240112024-09-10010 September 2024 NRC Inspection Report 05000400/2024011 IR 05000400/20240052024-08-26026 August 2024 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400-2024005) Rev 1 ML24059A4252024-08-14014 August 2024 Issuance of Amendment No. 202 Regarding Alignment of Certain Technical Specifications with Improved Standard Technical Specifications ML24213A0522024-08-0202 August 2024 Issuance of Amendment No. 201 to Extend Completion Time of Inoperable Reactor Coolant System Accumulator Using Consolidated Line Item Improvement Process ML24212A3412024-07-31031 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24170A7312024-07-29029 July 2024 – Exemption from the Requirements of 10 CFR 50.55a(H)(2) Using the Risk-Informed Process for Evaluations Letter IR 05000400/20240022024-07-29029 July 2024 – Integrated Inspection Report 05000400/2024002 05000400/LER-2024-001, Automatic Reactor Trip Due to Main Generator Lock-Out2024-07-22022 July 2024 Automatic Reactor Trip Due to Main Generator Lock-Out ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000400/20243022024-06-27027 June 2024 – NRC Operator Licensing Examination Approval 05000400/2024302 IR 05000400/20244012024-06-25025 June 2024 – Security Baseline Inspection Report05000400/2024401 ML24162A1372024-06-24024 June 2024 – Regulatory Audit Summary Related to the Review of Exemption Request from Certain Requirements in 10 CFR 50.55a(h)(2)(EPID L-2024-LLE-00040) ML24136A1382024-05-20020 May 2024 – Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000400/2024011) and Request for Information (RFI) ML24116A2592024-05-14014 May 2024 Staff Evaluation Related to Aging Management Plan and Inspection Plan for Reactor Vessel Internals ML24127A1592024-05-0808 May 2024 – Notification of Licensed Operator Initial Examination 05000400/2024302 IR 05000400/20240012024-05-0505 May 2024 Integrated Inspection Report 05000400/2024001 ML24100A0912024-04-10010 April 2024 Operator License Examination Report ML24058A2462024-03-18018 March 2024 – Supplemental Information Needed for Using the Risk-Informed Process for Evaluations for the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) IR 05000400/20230062024-02-28028 February 2024 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2023006 ML24032A2632024-02-23023 February 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0044 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000400/20243012024-02-21021 February 2024 – NRC Operator Licensing Examination Approval 05000400/2024301 IR 05000400/20230042024-01-30030 January 2024 Integrated Inspection Report 05000400/2023004 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230032023-11-0909 November 2023 Integrated Inspection Report 05000400/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23234A1702023-10-0303 October 2023 Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230052023-08-23023 August 2023 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400/2023005) ML23234A2542023-08-22022 August 2023 RQ Inspection Notification Letter IR 05000400/20234022023-07-26026 July 2023 Security Baseline Inspection Report 05000400/2023402 IR 05000400/20230022023-07-24024 July 2023 Integrated Inspection Report 05000400/2023002 IR 05000400/20234402023-07-17017 July 2023 Special Inspection Report 05000400/2023440 and Preliminary Greater than Green Finding and Apparent Violation Cover Letter 05000400/LER-2022-006-02, Auxiliary Feedwater Pump Inoperability2023-07-11011 July 2023 Auxiliary Feedwater Pump Inoperability IR 05000400/20230012023-05-10010 May 2023 – Integrated Inspection Report 05000400 2023001 IR 05000400/20234042023-05-0404 May 2023 Cyber Security Inspection Report 05000400/2023404 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23118A1392023-04-28028 April 2023 Submittal of Updated Final Safety Analysis Report (Amendment 65), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes IR 05000400/20234032023-04-0505 April 2023 Security Baseline Inspection Report 05000400/2023403 IR 05000400/20230102023-03-15015 March 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000400/2023010 05000400/LER-1922-006-01, Auxiliary Feedwater Pump Inoperability2023-03-10010 March 2023 Auxiliary Feedwater Pump Inoperability ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000400/20220062023-03-0101 March 2023 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2022006 ML23033A5272023-02-0808 February 2023 Correction of Typographical Errors Incurred During Issuance of License Amendment No. 196 IR 05000400/20220042023-02-0707 February 2023 Integrated Inspection Report 05000400/2022004 05000400/LER-2022-007-01, Automatic Reactor Trip Due to Loss of Power from the a Auxiliary Bus2023-01-26026 January 2023 Automatic Reactor Trip Due to Loss of Power from the a Auxiliary Bus ML23020A1252023-01-23023 January 2023 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000400/2023403) 2024-09-10
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Ms. Tanya M. Hamilton Site Vice President Shearon Harris Nuclear Power Plant 5413 Shearon Harris Rd. M/C HNP01 New Hill, NC 27562-0165 October 4, 2018
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 -ACCEPTANCE OF REQUESTED LICENSING ACTION REGARDING MODIFICATION TO REACTOR TRIP SYSTEM AND ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS LICENSE AMENDMENT REQUEST (EPID NO. L-2018-LLA-0203)
Dear Ms. Hamilton:
By letter dated July 30, 2018 (Agencywide Documents Access and Management System Accession No. ML 18211A546), Duke Energy Progress, LLC (Duke Energy) requested an amendment to the Technical Specifications of Renewed Facility Operating License No. NPF-63 for Shearon Harris Nuclear Power Plant, Unit 1. The proposed license amendment would revise specific reactor trip system and engineered safety features actuation system instrumentation trip setpoints in Tables 2.2-1 and 3.3-4 of the Technical Specifications.
On September 5, 2018, the U.S. Nuclear Regulatory Commission (NRC) staff held a conference call with members of your staff to discuss insufficiencies identified during the acceptance review of the amendment request. By letter dated September 6, 2018 (ADAMS Accession No. ML 18242A 162), you were informed of the insufficiencies and informed that the LAR would need to be supplemented by September 24, 2018. By letter dated September 24, 2018 (ADAMS Accession No. ML 18267A102), supplemental information was submitted by Duke Energy. The NRC staff has reviewed the supplemental information and concluded that it does provide technical information in sufficient detail to enable the staff to (1) perform its detailed technical review, and (2) make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of the public health and safety and environment.
Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified, despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> to complete.
The NRC staff expects to complete this review in October 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes T. Hamilton in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. These estimates are based on the NRC staff's initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.
Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
If you have any questions, please contact me at (301) 415-2760 or Martha.Barillas@nrc.gov.
Docket No. 50-400 cc: via Listserv Sincerely, ~.-:las, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation T. Hamilton
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 -ACCEPTANCE OF REQUESTED LICENSING ACTION REGARDING MODIFICATION TO REACTOR TRIP SYSTEM AND ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS LICENSE AMENDMENT REQUEST (EPID NO. L-2018-LLA-0203)
DATED OCTOBER 4, 2018 DISTRIBUTION:
PUBLIC RidsNrrLABClayton
RidsNrrDeEicb RidsNrrDorl RidsNrrDorlLpl2-2 RidsNrrPMShearonHarris RidsRgn2MailCenter RidsACRS MailCTR MHamm, N-RR RidsNrrDssSrxb ADAMS Accession No.: ML 18270A129 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NAME MBarillas BClavton DATE 9/27/18 9/27/18 OFFICE NRR/DE/EICB NRR/DORL/LPL2-2/BC NAME MWaters UShoop DATE 10/01/18 10/03/18 OFFICIAL RECORD COPY NRR/DSS/SRXB JWhitman 9/27/18 NRR/DORL/LPL2-2/PM MBarillas 10/04/18