ML082401708: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML082401708
| number = ML082401708
| issue date = 09/03/2008
| issue date = 09/03/2008
| title = Beaver Valley, Units 1 and 2, Request for Additional Information, License Renewal Application
| title = Request for Additional Information, License Renewal Application
| author name = Howard K L
| author name = Howard K L
| author affiliation = NRC/NRR/DLR/RPB2
| author affiliation = NRC/NRR/DLR/RPB2

Revision as of 00:37, 10 February 2019

Request for Additional Information, License Renewal Application
ML082401708
Person / Time
Site: Beaver Valley
Issue date: 09/03/2008
From: Howard K L
License Renewal Projects Branch 2
To: Sena P P
FirstEnergy Nuclear Operating Co
Howard K, NRR/DLR/RLRB, 415-2989
References
Download: ML082401708 (8)


Text

September 3, 2008 Mr. Peter P. Sena III Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-BV-SEB-1 P.O. Box 4, Route 168 Shippingport, PA 15077

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION

Dear Mr. Sena:

By letter dated August 27, 2007, FirstEnergy Nuclear Operating Company submitted an application pursuant to Title 10 of the Code of Federal Regulation Part 54 (10 CFR Part 54), to renew the operating licenses for Beaver Valley Power Station, Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. Further requests for additional information may be issued in the future.

Items in the enclosure were discussed with Mr. Clifford I. Custer of your staff, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-2989 or by e-mail at Kent.Howard@nrc.gov. Sincerely, \RA\ Kent L. Howard, Sr., Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412

Enclosure:

As stated cc w/encl: See next page

ML082401708 OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR NAME IKing KHoward RFranovich DATE 8/29/08 9/3/08 9/3/08 BEAVER VALLEY POWER STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION REQUEST FOR ADDITIONAL INFORMATION RAI 3.3-A In license renewal application (LRA) Tables 3.3.2-1, 3.3.2-2, 3.3.2-11 and 3.3.2-12, the applicant has credited the Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components Program, to manage the aging effects of cracking and reduction of heat transfer of stainless steel, aluminum, and copper alloy <15% Zn moisture separators and heat exchangers.

The applicant has described this program in LRA Section B2.22 and stated that it is consistent with the generic aging lessons learned (GALL) aging management program (AMP) XI.M38. However, the GALL AMP XI.M38 is credited for managing the aging effect of loss of material due to corrosion for steel components only.

(a) Please justify how this program will manage the aging effect of reduction of heat transfer or provide a plant-specific program.

(b) Please justify how this program will manage the aging effect of cracking of moisture separator or provide a plant-specific program.

RAI 3.5-A In LRA Table 3.5.2-36, the applicant states in line 229 that for fire wraps, there is no aging effect requiring management. However, the applicant is proposing to use the Fire Protection Program. The applicant has referenced footnote 524 for this line item. Footnote 524 states that the Fire Protection (B.2.16) Program supplements aging effects management for fire barrier cable trays, conduits, ductwork and structural members.

Please clarify what you mean by "supplements aging effects management," when there is no aging effect requiring management.

RAI 3.2.2.3.2 - 1

In LRA Table 3.2.2.-2, aging management review lines 25 and 36 describe that for reduction of heat transfer, the Water Chemistry Program will be used.

The staff noted that the One-Time Inspection Program is not identified to verify the effectiveness of the Water Chemistry Program in ensuring that the aging effect is being managed.

Explain how verification of the Water Chemistry Program is accomplished to ensure that the aging effect is managed.

RAI B.2.17-2 follow-up In RAI B2.17-2, since the frequency of inspections of fire hydrant gaskets of once every 18 months in the LRA is different than the recommended frequency of once every 12 months in the GALL AMP, the staff asked the applicant to justify why this was not an exception.

In its letter dated July 24, 2008, the applicant stated that although these gaskets perform no license renewal intended function, their condition is monitored by the Fire Water System Program and they are replaced as necessary. However, the frequency of inspection is still different than what the GALL AMP recommends and no justification was provided why this is not an exception.

Please provide justification why this is not an exception.

RAI B.2.17-3 follow-up In RAI B.2.17-3, since the fire hydrant hose hydraulic tests are performed at various frequencies different than the GALL AMP recommended frequency of once every 12 months, the staff asked the applicant to justify why this was not an exception.

In its letter dated July 24, 2008, the applicant responded that fire hoses are consumables, and are routinely tested, inspected, and replaced when necessary. Criteria for inspection and replacement are based on accepted industry standards (e.g.,NFPA-1962). Therefore, while these consumables are within the scope of license renewal, they do not require an aging management review. However, the frequency of hydraulic testing is still different than what the GALL AMP recommends and no justification was provided why this is not an exception.

Please provide justification why this is not an exception.

Letter to P. Sena III from K. Howard, dated September 3, 2008 DISTRIBUTION

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDciCvib RidsNrrDciCpnb RidsNrrDraAfpb RidsNrrDeEmcb RidsNrrDeEeeb RidsNrrDssSbwb RidsNrrDssSbpb RidsNrrDssScvb RidsOgcMailCenter


KHoward ESayoc NMorgan MModes, RI PCataldo, RI DWerkheiser, RI

Beaver Valley Power Station, Units 1 and 2 cc: Joseph J. Hagan President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 76 South Main Street Akron, OH 44308

James H. Lash Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308

Paul A. Harden Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 David W. Jenkins, Attorney FirstEnergy Corporation Mail Stop A-GO-15 76 South Main Street Akron, OH 44308

Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308

Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-A P.O. Box 4, Route 168 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406

Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077

Cliff Custer FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077

Steve Dort FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077 Mike Banko FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077