| {{#Wiki_filter:Bill Carsky Plant Manager Exelon Generation° R.E. Ginna Nuclear Power Plant 1503 Lake Rd.Ontario, NY 14519 315 791 5205 Office 215 605 9364 Mobile www.exeloncorp.com William~carsky@exeloncorp.corn September 24, 2015 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: | | {{#Wiki_filter:Bill Carsky Plant Manager R.E. Ginna Nuclear Power Plant 1503 Lake Rd. |
| Document Control Desk | | Exelon Generation° Ontario, NY 14519 315 791 5205 Office 215 605 9364 Mobile www.exeloncorp.com William~carsky@exeloncorp.corn September 24, 2015 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: Document Control Desk |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| R.E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-1 8 Docket No. 50-244 Thirty (30) Day Special Report In accordance with Section 3.3 and Table 3.3-1, Action 1, of the R.E. Ginna Nuclear Power Plant Offsite Dose Calculation Manual (ODCM), Revision 30, this special report is being submitted due to a radiation monitor being inoperable for greater than 30 days. Section 3.3 of the ODCM requires that the radiation monitor be operable during all modes of operation. | | R.E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-1 8 Docket No. 50-244 Thirty (30) Day Special Report In accordance with Section 3.3 and Table 3.3-1, Action 1, of the R.E. Ginna Nuclear Power Plant Offsite Dose Calculation Manual (ODCM), Revision 30, this special report is being submitted due to a radiation monitor being inoperable for greater than 30 days. Section 3.3 of the ODCM requires that the radiation monitor be operable during all modes of operation. |
| However, radiation monitor RM-14A, Plant Vent Accident Range Radiation Monitor, was inoperable for greater than 30 days. This report outlines the action taken, the cause of the inoperability, and period of time the monitor was inoperable. | | However, radiation monitor RM-14A, Plant Vent Accident Range Radiation Monitor, was inoperable for greater than 30 days. This report outlines the action taken, the cause of the inoperability, and period of time the monitor was inoperable. |
| Radiation monitor RM-14A, was taken out of service on 8/12/15 at 0236 for replacement of upgraded equipment under ECP 13-000030. | | Radiation monitor RM-14A, was taken out of service on 8/12/15 at 0236 for replacement of upgraded equipment under ECP 13-000030. However, due to challenges to the work schedule presented by unusually high temperatures in the Intermediate Building from unseasonably hot weather, the modification was not completed within 30 days. Installation and testing have been completed and the radiation monitor was returned to operable status on 9/23/1 5. During the time that RM-14A was Out of Service, compensatory measures were in place. |
| However, due to challenges to the work schedule presented by unusually high temperatures in the Intermediate Building from unseasonably hot weather, the modification was not completed within 30 days. Installation and testing have been completed and the radiation monitor was returned to operable status on 9/23/1 5. During the time that RM-14A was Out of Service, compensatory measures were in place.Return to service of the radiation monitor was delayed based on worker safety issues with heat stress. Corrective Action Program issue report 2555033 was opened to document the radiation monitor being inoperable for greater than 30 days.There are no regulatory commitments contained in this letter. Should you have any questions regarding this submittal, please contact Thomas Harding at 315-791-5219. | | Return to service of the radiation monitor was delayed based on worker safety issues with heat stress. Corrective Action Program issue report 2555033 was opened to document the radiation monitor being inoperable for greater than 30 days. |
| Sincerely, ,, L WC/kc J cc: NRC Re ~ isftor, RE NRC Project Manager, Ginna NRC Resident Inspector, Ginna egion I AJ~?Z wOPLAf _- /00 301"5}} | | There are no regulatory commitments contained in this letter. Should you have any questions regarding this submittal, please contact Thomas Harding at 315-791-5219. |
| | WC/kc J Sincerely, ,, L cc: NRC Re ~ isftor, RE egion I NRC Project Manager, Ginna NRC Resident Inspector, Ginna AJ~?Z wOPLAf _-/00 301"5}} |
Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, “Revise Risk Informed Completion Time (RICT) Program” Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 and Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. 2024-08-09
[Table view] Category:Licensee 30-Day Written Event Report
MONTHYEARML15275A2732015-09-24024 September 2015 Submits Thirty (30) Day Special Report Due to a Radiation Monitor Being Inoperable for Greater than 30 Days ML12233A6212012-08-16016 August 2012 ECCS 30-Day Report for the Thermal Conductivity Degradation Impact on Large Break Loss of Coolant Accident Analysis with Astrum ML11347A1952011-12-0606 December 2011 R. E. Ginna Nuclear Power Plant - Thirty (30) Day Special Report - Inoperable Radiation Monitors ML11221A0232011-08-0202 August 2011 Thirty (30) Day Special Report ML0720603692007-07-0505 July 2007 Follow-up Summary of Close-Out of July 4, 2007 Unusual Event Classification ML0420802562004-07-20020 July 2004 Thirty (30) Day Special Report Inoperable Fire Barrier Component, Due to Door Blocked Open for Ginna Nuclear Power Plant ML0322506402003-08-0707 August 2003 Special Report, Containment Area Radiation (High Range) Instrumentation Inoperable for More than 30 Days ML18143A9601976-05-25025 May 1976 R. E. Ginna - Supplemental Report on Reportable Occurrence 76-12, 30-Day Report, Containment Personnel Airlock Handwheel Shaft Seal Excessive Leakage During Testing 2015-09-24
[Table view] |
Text
Bill Carsky Plant Manager R.E. Ginna Nuclear Power Plant 1503 Lake Rd.
Exelon Generation° Ontario, NY 14519 315 791 5205 Office 215 605 9364 Mobile www.exeloncorp.com William~carsky@exeloncorp.corn September 24, 2015 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: Document Control Desk
SUBJECT:
R.E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-1 8 Docket No. 50-244 Thirty (30) Day Special Report In accordance with Section 3.3 and Table 3.3-1, Action 1, of the R.E. Ginna Nuclear Power Plant Offsite Dose Calculation Manual (ODCM), Revision 30, this special report is being submitted due to a radiation monitor being inoperable for greater than 30 days. Section 3.3 of the ODCM requires that the radiation monitor be operable during all modes of operation.
However, radiation monitor RM-14A, Plant Vent Accident Range Radiation Monitor, was inoperable for greater than 30 days. This report outlines the action taken, the cause of the inoperability, and period of time the monitor was inoperable.
Radiation monitor RM-14A, was taken out of service on 8/12/15 at 0236 for replacement of upgraded equipment under ECP 13-000030. However, due to challenges to the work schedule presented by unusually high temperatures in the Intermediate Building from unseasonably hot weather, the modification was not completed within 30 days. Installation and testing have been completed and the radiation monitor was returned to operable status on 9/23/1 5. During the time that RM-14A was Out of Service, compensatory measures were in place.
Return to service of the radiation monitor was delayed based on worker safety issues with heat stress. Corrective Action Program issue report 2555033 was opened to document the radiation monitor being inoperable for greater than 30 days.
There are no regulatory commitments contained in this letter. Should you have any questions regarding this submittal, please contact Thomas Harding at 315-791-5219.