Robert C. Mecredy Vice President Always at Your Servke Nuclear Operations August 7,2003 Mr. Robert L. Clark Office of Nuclear Regulatory Regulation U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

Special Report, Containment Area Radiation (High Range) Instrumentation Inoperable For More Than 30 Days Rochester Gas and Electric Corporation R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Radiation monitor R-30, Containment Area Radiation (High Range) Instrumentation, has been inoperable for greater than 30 days. This special report is submitted in accordance with R.E.

Ginna Technical Specification LCO 3.3.3, Post Accident Monitoring (PAM) Instrumentation, Required Action B.1.

On July 2, 2003, at 0931 hours0.0108 days <br />0.259 hours <br />0.00154 weeks <br />3.542455e-4 months <br />, the R-30 Containment Area Radiation (High Range) Instrument was removed from service to allow for troubleshooting of an intermittent erratic meter indication.

The redundant channel, R-29, was in service prior to removing R-30 from service. It was determined that the instrument should be returned to the vendor for evaluation and re-certification.

The vendor determined that there was a defective contact on the Alert alarm pushbutton switch which was causing the erratic meter indication. The vendor replaced the defective switch.

Following the return of the instrument to Ginna, and prior to installation, bench testing of the unit was performed and it was identified that there was a wiring discrepancy. The wiring discrepancy did not affect the operation of the instrument, but to maintain configuration consistency it was decided to return the unit to the vendor for rework.

The instrument is currently expected to be returned to service prior to August 22, 2003.

An equal opportunity employer 89 East Avenue I Rochester, NY 14649 tel (585) 646-2700 www.rge.com 30ergyEast 1IO0006

""J". . I If you should have any questions regarding this submittal, please contact Mr. Thomas Harding, 585-771-3384.

Veryliy yours, Robert C. Mecredy xc: Mr. Robert Clark (Mail Stop 0-8-C2)

Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector