R. E. Ginna - Supplemental Report on Reportable Occurrence 76-12, 30-Day Report, Containment Personnel Airlock Handwheel Shaft Seal Excessive Leakage During Testing
ML18143A960
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/25/1976
From: White L
Rochester Gas & Electric Corp
To: O'Reilly J
NRC/IE, NRC Region 1
References
LER 1976-012-00
Download: ML18143A960 (4)


Text

V.S. NUCLEAR REGULATORY MISSION DOCKET NUMIIER htRC Fud<<," 195,,<

(~iM) 5a- k FILL'UMBER NRC fllSTR(BUTION FDR PART 50 DOCKET MATERIAL XNCXDENT REPORT TO: FROM: ROCHESTER GAS ELEC CORP DATE OF DOCUMENT MR~ O'TEILLY ROCHESTER'Y 8o s-"t t L D WHITE, JR DATE RECEIVE~

NVMOEB OF COPIES RECEIVE D

'TTEB ABORIGINAL COPY QNOTOBIZED

/UNCLASSIFIED PROP INPUT FORM

~ sic uzb DESCRIPTION ENCLOSURE LTR REF THEIR 4-23-76 RO 76-l2 30-DAY REPORT...

ADVISING CORRECTIVE ACTION IS PLANNED TO PLACE KEEPERS ON THE PACKING GLAND NUTS - TO PREVXZPP ROTATION@ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

...,DO NOT REMOVE ZCZZOV/LEDGE0 I

PLANT NAME~ NOTE: IF PERSONNEL EXPOSURE IS INVOI.VED SEND DIRECTLY TO KREGER/J. COLLINS SAFETY FOR ACTION/INFORMATION ENVXRO BRANCH CHIEF:

W 3 CYS FOR ACTION LICE ASST:

W/ CYS ACRS Lg,CYS HOLDING ENT TO LA INTERNAL D IST Rl BUTION RE FX NRC PDR X &E 2 c'

SCHROEDER/XPPOLXTO NOVAK CHECK GAS jS"~

hhEQlF~

L'DL'SC~OMACCARY F .. I BARR SIIAO OI.L? IERQBIINCH RHCzEI<JQ~OIj. NS C. eSTL=R Q5 EXTERNAL OISTRIBUTION CONTROL NUMBFR LPDR:

iX(

NSXC ggof

S te '

~

4

~ ~ ~ t ~ ~ ~ ~ C <<4

r r r rr I

~

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE. JR, TELEu+ONE VICE uAESIDENT AREA COOE 7ld 546.-2700 Regulatory Docket Fite'ay 25, 1976

~g/

Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement qo~"

Region I ~gu~

631 Park Avenue King of Prussia, Pennsylvania 19406

~b

Subject:

Supplemental Report on Reportable e 76-12, 30-day report, dated April 23, 1976 R. E. Ginna Nuclear Power Plant, Unit No. 1 Docket No. 50-244

Dear Mr. O'Reilly:

On April 23, 1976 we submitted Reportable Occurrence 76-12, 30-day report, Containment Personnel Airlock Handwheel Shaft Seal Excessive Leak-age During Testing. In that report the statement was made that action to prevent a recurrence of that event was being investigated.

This is to inform you that the corrective action planned is to place keepers on the packing gland nuts to prevent them from rotating with the shaft, precluding their loosening and permitting leakage through the packing.

These keepers will be installed at a future plant outage when the door assemblies can be dismantled for this maintenance.

In addition, procedure changes have been submitted to require as initial conditions that a mechanic verify proper seating of the packing gland nut prior to performing the applicable tests.

Two additional copies of this letter are enclosed to conform to the original submittal of Reportable Occurrence 76-12, 30-day report.

Very truly yours,

" " /J'.

D. White, Jr.

cc: Dr. Ernst Volgenau (30)