IR 05000440/2016403: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML16097A621
| number = ML16097A621
| issue date = 04/06/2016
| issue date = 04/06/2016
| title = Perry Nuclear Power Plant - NRC Security Baseline Inspection Report 05000440/2016403 (Cover Letter Only)
| title = NRC Security Baseline Inspection Report 05000440/2016403 (Cover Letter Only)
| author name = Orth S K
| author name = Orth S K
| author affiliation = NRC/RGN-III/DRS/PSB
| author affiliation = NRC/RGN-III/DRS/PSB

Revision as of 03:46, 3 April 2019

NRC Security Baseline Inspection Report 05000440/2016403 (Cover Letter Only)
ML16097A621
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 04/06/2016
From: Orth S K
Plant Support Branch II
To: Hamilton D
FirstEnergy Nuclear Operating Co
References
IR 2016403
Download: ML16097A621 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532

-4352 April 6, 2016 Mr. David Hamilton Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A

-PY-A290 Perry, OH 44081

-0097

SUBJECT: PERRY NUCLEAR POWER PLANT

- NRC SECURITY BASELINE INSPECTION REPORT 05000440/201 6 40 3

Dear Mr. Hamilton:

On March 10, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Perry Nuclear Power Plant, Unit 1. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on March 10, 2016, with you and other members of your staff.

One NRC-identified finding of very low security significance (i.e., Green as determined by the Baseline Security Significance Determination Process) was identified during this inspection. The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector s left the site. This finding was determined to involve a violation of NRC requirements. The NRC is treating this violation as a Non

-Cited Violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the subject or severity of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S.

Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555

-0001, with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555

-0001; and the NRC Resident Inspector at the Perry Nuclear Power Plant.

The finding had a cross

-cutting aspect in the area of Human Performance

- Teamwork (H.4), because individuals associated with the violation failed to communicate and coordinate their activities within and across organizational boundaries to ensure nuclear safety was maintained.

In addition, if you disagree with the cross

-cutting aspect assigned to any finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Regi on III, and the NRC Resident Inspector at the Perry Nuclear Power Plant

.Enclosure contains Sensitive Unclassified Non

-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security

-Related Information in accordance with 10 CFR 2.390(d)(1)

and its disclosure to unauthorized individuals could present a security vulnerability.

Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security

-Related Information is necessary to provide an acceptable response, please mark your entire response "Security

-Related Information

-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,/RA/ Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50

-440 License No. NPF

-58 Nonpublic

Enclosure:

IR 05000440/201 6 40 3 cc: M. Bear , Radiological Branch

, Ohio Emergency Management Agency cc w/o encl:

Distribution via LISTSERV - SECURITY-RELATED INFORMATIO N