| Q | CCA | Title |
---|
05000440/FIN-2015007-01 | 2015Q3 | | ASME Code Pressure Tests of Reactor Vessel Flange Seal Leak-Off Line Were Not Performed |
05000440/FIN-2015003-02 | 2015Q3 | H.12 | Failure to Properly Implement Steps Outlined in a Technical Specification Surveillance Proce |
05000440/FIN-2015003-01 | 2015Q3 | H.6 | Inadequate Operating Procedure for Diesel Generator Building Ventilation System |
05000440/FIN-2015007-02 | 2015Q3 | H.12 | Failure to Adequately Evaluate Damaged CRD Flange |
05000440/FIN-2015403-04 | 2015Q4 | | Security |
05000440/FIN-2015004-02 | 2015Q4 | | Liquid Effluent Calibration |
05000440/FIN-2015004-03 | 2015Q4 | P.3 | Failure to Properly Implement System Operating Instructions to Restore RHR B to Service |
05000440/FIN-2015004-01 | 2015Q4 | | Failure to Ensure Required 3 Hour Fire Barriers (gypsum board walls) Were In-Place |
05000440/FIN-2015008-03 | 2015Q4 | | Failure to Provide Adequate Guidance to Override Spurious CO2 Initiation Signal in the Diesel Generator Rooms |
05000440/FIN-2015008-02 | 2015Q4 | H.5 | Failure to Inspect Penetration Seals Within the Required Time Frequency |
05000440/FIN-2015008-01 | 2015Q4 | | Failure to Ensure that Systems, Structures, and Components Necessary to Achieve and Maintain Hot Shutdown Conditions were Free of Fire Damage without Repair Actions |
05000440/FIN-2015403-03 | 2015Q4 | | Security |
05000440/FIN-2015403-02 | 2015Q4 | | Security |
05000440/FIN-2015403-01 | 2015Q4 | | Security |
05000440/FIN-2015008-04 | 2015Q4 | H.7 | Failure to Perform Fire Watches |
05000440/FIN-2015010-01 | 2015Q4 | H.3 | Unqualified Radiation Protection Manager |
05000440/FIN-2016403-01 | 2016Q1 | H.4 | Security |
05000440/FIN-2016008-04 | 2016Q1 | H.7 | Failure to Maintain Traceability of Safety Related Fuses |
05000440/FIN-2016008-03 | 2016Q1 | H.11 | Hardcard Development Failed to Follow Procedure Change Process |
05000440/FIN-2016008-02 | 2016Q1 | H.14 | Failure to Provide Instructions to Completely Vent Reference Legs |
05000440/FIN-2016001-03 | 2016Q1 | H.12 | Failure to Take Actions to Prevent a Loss of Safety Function during Reactor Recirculation Pump Downshift |
05000440/FIN-2016008-01 | 2016Q1 | | Coincidence Logic to Preclude Spurious Trips of the Offsite Power Source |
05000440/FIN-2016001-02 | 2016Q1 | H.1 | Failure to Control Welding and Inspection Activities to Maintain Reactor Coolant System Integrity |
05000440/FIN-2016001-01 | 2016Q1 | H.1 | Failure to Properly Implement System Operating Instructions to Maintain Control of Reactor Pressure Vessel Level |