{{#Wiki_filter:Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage 0174 of C413ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMSheet I of 4Status: YZ NEI ULISeismic Walkdown Checklist (SWC) SWELl- 049Equipment ID No. MO1400-24B Equip. Class, Motor-Operated  
{{#Wiki_filter:Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 0174 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NEI ULI Seismic Walkdown Checklist (SWC) SWELl- 049 Equipment ID No. MO1400-24B Equip. Class, Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection ValveLocation:
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve Location:
Bldg. RB Floor El. 51 RManufacturer, Model, Etc. (optional but recommended) oom, Area NORTH SIDEInstructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
Bldg. RB Floor El. 51 R Manufacturer, Model, Etc. (optional but recommended) oom, Area NORTH SIDE Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
Inline component, no anchorage.
Inline component, no anchorage.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[-] NE Y[-I NEi U[iE N/A[D YE! NE! UEl N/A[YEI NE-I Ur N/A[' Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?Y[-] NEY[-I NEi U[iE N/A[DYE! NE! UEl N/A[YEI NE-I Ur N/A[' Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page C175 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NF-Z U--Seismic Walkdown Checklist (SWC) SWELl- 049 Equipment ID No. M01400-24B Equip. Class Motor-Operated  
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1Attachment CPage C175 of C413ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 4Status: YZ NF-Z U--Seismic Walkdown Checklist (SWC) SWELl- 049Equipment ID No. M01400-24B Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve 5. Is the anchorage configuration consistent with plant documentation?
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve5. Is the anchorage configuration consistent with plant documentation?
YEI NE] U-] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YEI NE] U-] N/AZ(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of YZ N[] UE potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of YZ N[] UEpotentially adverse seismic conditions?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution  
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Masonry wall 64.4 (C942Sh 1, EO) is safety related, therefore seismically qualified and acceptable.
Masonry wall 64.4 (C942Sh 1, EO) is safety related, therefore seismically qualified and acceptable.
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?Scaffolding is currently being erected below to the valves to allowaccess to them. This is a work in progress and is tagged appropriately.
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Scaffolding is currently being erected below to the valves to allow access to them. This is a work in progress and is tagged appropriately.
All extra equipment in the area is properly secured and cart wheels arechoked.YZ NEJ uE1 N/AD-YZ NE- uEr N/A[-]YZ NEl U[-fl N/AEDYZ NEI UE-EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1Attachment CPage 0176 of C413AT'rACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 4Status: YZ NEI UM-Seismic Walkdown Checklist (SWC) SWELl- 049Equipment ID No. M01400-24B Equip. Class Motor-Operated  
All extra equipment in the area is properly secured and cart wheels are choked.YZ NEJ uE1 N/AD-YZ NE- uEr N/A[-]YZ NEl U[-fl N/AED YZ NEI UE-EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page 0176 of C413 AT'rACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YZ NEI UM-Seismic Walkdown Checklist (SWC) SWELl- 049 Equipment ID No. M01400-24B Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Iniection ValveOther Adverse Conditions
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Iniection Valve Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
YZ NUEI 1Comments (Additional pages may be added as necessary)
YZ NUEI 1 Comments (Additional pages may be added as necessary)
Area walk-by is AWC-019.4oj"Wacha Evaluated by: Laura MaclayV I(JDate: 10-15-1210-15-12QA, .A 1,hk , -AGarv SwederEN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C177 of C413SEISMIC WALKDOWN CHECKLIST FORMATTACHMEI Sheet 4 ofT 9.64Status: YZ N[- ULISeismic Walkdown Checklist (SWC) SWELl- 049Equipment ID No. M01400-24B Equip. Class Motor-Operated  
Area walk-by is AWC-019.4oj"Wacha Evaluated by: Laura Maclay V I (J Date: 10-15-12 10-15-12 QA, .A 1,hk , -A Garv Sweder EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C177 of C413 SEISMIC WALKDOWN CHECKLIST FORM ATTACHMEI Sheet 4 of T 9.6 4 Status: YZ N[- ULI Seismic Walkdown Checklist (SWC) SWELl- 049 Equipment ID No. M01400-24B Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection ValvePhotographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage 0 178 of 0413ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMSheet I of 5Status: Y[ NE] U-IIISeismic Walkdown Checklist (SWC) SWELl- 050Equipment ID No. MO1400-25B Equip. Classi Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 0 178 of 0413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: Y[ NE] U-III Seismic Walkdown Checklist (SWC) SWELl- 050 Equipment ID No. MO1400-25B Equip. Classi Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection ValveLocation:
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve Location:
Bldg. RB Floor El. 51 RiManufacturer, Model, Etc. (optional but recommended) oom, Area NORTH SIDEInstructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
Bldg. RB Floor El. 51 Ri Manufacturer, Model, Etc. (optional but recommended) oom, Area NORTH SIDE Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
Inline component, no anchorage.
Inline component, no anchorage.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[-] NZ Y[E] N[-] U-I N/AS Y[E] NEi ULE- NWAS YEI NEI UL-- N/A[I Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?Y[-] NZY[E] N[-] U-I N/ASY[E] NEi ULE- NWASYEI NEI UL-- N/A[I Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C179 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YN N-] Ur Seismic Walkdown Checklist (SWC) SWELl- 050 Equipment ID No. M01400-25B Equip. Class Motor-Operated  
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C179 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 5Status: YN N-] UrSeismic Walkdown Checklist (SWC) SWELl- 050Equipment ID No. M01400-25B Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve 5. Is the anchorage configuration consistent with plant documentation?
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve5. Is the anchorage configuration consistent with plant documentation?
Y[-] N[-] UF- N/A[(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Y[-] N[-] UF- N/A[(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Y] Nr] UiE]potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of Y] Nr] UiE]potentially adverse seismic conditions?
Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Noted a hanging light next to the valve is property restrained againstlateral movement, therefore not a seismic hazard.8. Are overhead equipment, distribution  
Noted a hanging light next to the valve is property restrained against lateral movement, therefore not a seismic hazard.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Masonry wall 64.4 (C942Sh 1, EO) is safety related, therefore seismically qualified and acceptable.
Masonry wall 64.4 (C942Sh 1, EO) is safety related, therefore seismically qualified and acceptable.
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?Scaffolding is currently being erected below to the valves to allowaccess to them. This is a work in progress and is tagged appropriately.
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Scaffolding is currently being erected below to the valves to allow access to them. This is a work in progress and is tagged appropriately.
All extra equipment in the area is properly secured and cart wheels arechoked.YZ NEI U[E] N/AE]Y0 NE'] u[-] NIAE]YZ NE] uE] NIAE]Y NE-I U-]EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1Attachment CPage C 180 of C413ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 5Status: Y[ NF U-ISeismic Walkdown Checklist (SWC) SWELl- 050Equipment ID No. M01400-25B Equip. Class Motor-Operated  
All extra equipment in the area is properly secured and cart wheels are choked.YZ NEI U[E] N/AE]Y0 NE'] u[-] NIAE]YZ NE] uE] NIAE]Y NE-I U-]EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C 180 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: Y[ NF U-I Seismic Walkdown Checklist (SWC) SWELl- 050 Equipment ID No. M01400-25B Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection ValveOther Adverse Conditions
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could YZ NEJ UL-Iadversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could YZ NEJ UL-I adversely affect the safety functions of the equipment?
Comments  
Comments .(Additional pages may be added as necessary)
.(Additional pages may be added as necessary)
Area walk-by is AWC-019.TSG" ." "k. ý, Evaluated by: Gary Sweder Date: 10-15-12 0 I Ltqd/qv 10-15-12 I aura MaClav %-kW 0,-ý ac -0(11 j VW ci EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page 0 181 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NE] U[--Seismic Walkdown Checklist (SWC) SWELl- 050 Equipment ID No. M01400-25B Equip. Class Motor-Operated  
Area walk-by is AWC-019.TSG" ." "k. ý,Evaluated by: Gary SwederDate: 10-15-120I Ltqd/qv10-15-12I aura MaClav %-kW 0,-ý ac -0(11 jVWciEN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1Attachment CPage 0 181 of C413ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 5Status: YZ NE] U[--Seismic Walkdown Checklist (SWC) SWELl- 050Equipment ID No. M01400-25B Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve Note: Equipment tag 1400-25B Note: Overall view of valve from side EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C182 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[ NFI U-Seismic Walkdown Checklist (SWC) SWELl- 050 Equipment ID No. M01400-25B Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection ValveNote: Equipment tag 1400-25BNote: Overall view of valve from sideEN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C182 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 5 of 5Status: Y[ NFI U-Seismic Walkdown Checklist (SWC) SWELl- 050Equipment ID No. M01400-25B Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve Note: Scaffold erection in progress Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C183 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: Y[ NFl UL-Seismic Walkdown Checklist (SWC) SWELl- 051 Equipment ID No. M01400-3A Equip. Class, Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection ValveNote: Scaffold erection in progressNote:EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C183 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet I of 4Status: Y[ NFl UL-Seismic Walkdown Checklist (SWC) SWELl- 051Equipment ID No. M01400-3A Equip. Class, Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description Core SprayA Supp Pool Suction Location:
& Solenoid-Operated Valves (08)Equipment Description Core SprayA Supp Pool SuctionLocation:
Bldg. RB Floor El. -17.5 Room, Area SE QD Manufacturer, Model, Etc. (optional but recommended)
Bldg. RB Floor El. -17.5 Room, Area SE QDManufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
Inline component, no anchorage.
Inline component, no anchorage.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YLI NZ YE-] N[-] UI-- N/AN YE] NE] U[-] N/AE YEr NE] U[:] N/A I Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?YLI NZYE-] N[-] UI-- N/ANYE] NE] U[-] N/AEYEr NE] U[:] N/AI Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0O01, Rev. 1 Attachment C Page C 184 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YN NEI U[--Seismic Walkdown Checklist (SWC) SWELl- 051 Equipment ID No. M01400-3A Equip. Class Motor-Operated  
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0O01, Rev. 1Attachment CPage C 184 of C413ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 4Status: YN NEI U[--Seismic Walkdown Checklist (SWC) SWELl- 051Equipment ID No. M01400-3A Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description Core Spray A Supp Pool Suction 5. Is the anchorage configuration consistent with plant documentation?
& Solenoid-Operated Valves (08)Equipment Description Core Spray A Supp Pool Suction5. Is the anchorage configuration consistent with plant documentation?
Y[-I NEi Ur1 N/A0 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Y[-I NEi Ur1 N/A0(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of YE NE] U[]potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of YE NE] U[]potentially adverse seismic conditions?
Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Overhead lighting adequately mounted at an angle over the valve, therefore not a seismic hazard.9. Do attached lines have adequate flexibility to avoid damage?Y[ NEI uEr N/AE-YZ NEI UE- N/A[-]Y[I NEI U[-] N/A[--10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C185 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YN NEO UEI Seismic Walkdown Checklist (SWC) SWELl- 051 Equipment ID No. M01400-3A Equip. Class Motor-Operated  
Overhead lighting adequately mounted at an angle over the valve,therefore not a seismic hazard.9. Do attached lines have adequate flexibility to avoid damage?Y[ NEI uEr N/AE-YZ NEI UE- N/A[-]Y[I NEI U[-] N/A[--10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C185 of C413ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 4Status: YN NEO UEISeismic Walkdown Checklist (SWC) SWELl- 051Equipment ID No. M01400-3A Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description Core Sorav A Suaw Pool Suction Other Adverse Conditions
& Solenoid-Operated Valves (08)Equipment Description Core Sorav A Suaw Pool SuctionOther Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?
YNNEI UEJ Comments (Additional pages may be added as necessary)
YNNEI UEJComments (Additional pages may be added as necessary)
Area walk-by is on AWC-032.Evaluated by: Gary Sweder Date: 10-9-12 qv""-Wac-Qý Laura Maclay 10-9-12 LauraMacla EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C 186 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YE NEI UD Seismic Walkdown Checklist (SWC) SWELl- 051 Equipment ID No. M01400-3A Equip. Class Motor-Operated  
Area walk-by is on AWC-032.Evaluated by: Gary Sweder Date: 10-9-12qv""-Wac-Qý Laura Maclay10-9-12LauraMacla EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1Attachment CPage C 186 of C413ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 4Status: YE NEI UDSeismic Walkdown Checklist (SWC) SWELl- 051Equipment ID No. M01400-3A Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description Core Spray A Supp Pool Suction Photographs Note: Equipment Tag EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OO001, Rev. 1 Attachment C Page 0 187 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YZ NF Ur-]Seismic Walkdown Checklist (SWC) SWELl- 052 Equipment ID No. VAC-202A Equip. Class' Fans (9), Air Handlers (10), Temp. Sensors (19)Equipment Description EAC RCIC Rm Cooling Location:
& Solenoid-Operated Valves (08)Equipment Description Core Spray A Supp Pool SuctionPhotographs Note: Equipment TagEN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OO001, Rev. 1Attachment CPage 0 187 of C413ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMSheet I of 5Status: YZ NF Ur-]Seismic Walkdown Checklist (SWC) SWELl- 052Equipment ID No. VAC-202A Equip. Class' Fans (9), Air Handlers (10), Temp. Sensors (19)Equipment Description EAC RCIC Rm CoolingLocation:
Bldg. RB Floor El. 2.75 Room, Area SW QD Manufacturer, Model, Etc. (optional but recommended)
Bldg. RB Floor El. 2.75 Room, Area SW QDManufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
Reference C359Sh 1, E1 (Detail 8)2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YE NFI Y[ NEI U[I N/AZ-Y; NEI ULI N/AZ" Y[ NEI UIE- N/AE-I Enter the equipment class name from Appendix B: Classes of Equipment.
: 1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 0188 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NE-] uIIL Seismic Walkdown Checklist (SWC) SWELl- 052 Equipment ID No. VAC-202A Equip. Class Fans (9), Air Handlers (10). Temp. Sensors (19)Equipment Description EAC RCIC Rm Coolinq 5. Is the anchorage configuration consistent with plant documentation?
Reference C359Sh 1, E1 (Detail 8)2. Is the anchorage free of bent, broken, missing or loose hardware?
YZ NEI UD- N/A[-](Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Reference drawing C359 SHI, detail 8. Anchorage for the steel frame on which VAC-202A is mounted was verified.6. Based on the above anchorage evaluations, is the anchorage free of YZ ND"] UD]potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?YE NFIY[ NEI U[I N/AZ-Y; NEI ULI N/AZ"Y[ NEI UIE- N/AE-I Enter the equipment class name from Appendix B: Classes of Equipment.
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage 0188 of C413ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 5Status: YZ NE-] uIILSeismic Walkdown Checklist (SWC) SWELl- 052Equipment ID No. VAC-202A Equip. Class Fans (9), Air Handlers (10). Temp. Sensors (19)Equipment Description EAC RCIC Rm Coolinq5. Is the anchorage configuration consistent with plant documentation?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
YZ NEI UD- N/A[-](Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ N[D] UD- N/AD-]YZ ND] U[-] N/AD-YZ NDl UD-- N/AD-YZ NF-D Ur EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C0189 of 0413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: Y[ NO Ur-I Seismic Walkdown Checklist (SWC) SWELl- 052 Equipment ID No. VAC-202A Equip. Class Fans (9). Air Handlers (10). Temp. Sensors (19)Equipment Description EAC RCIC Rm Cooling Other Adverse Conditions
Reference drawing C359 SHI, detail 8. Anchorage for the steel frameon which VAC-202A is mounted was verified.
: 6. Based on the above anchorage evaluations, is the anchorage free of YZ ND"] UD]potentially adverse seismic conditions?
Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YZ N[D] UD- N/AD-]YZ ND] U[-] N/AD-YZ NDl UD-- N/AD-YZ NF-D UrEN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1Attachment CPage C0189 of 0413ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 5Status: Y[ NO Ur-ISeismic Walkdown Checklist (SWC) SWELl- 052Equipment ID No. VAC-202A Equip. Class Fans (9). Air Handlers (10). Temp. Sensors (19)Equipment Description EAC RCIC Rm CoolingOther Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could YO N[: U-]adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could YO N[: U-]adversely affect the safety functions of the equipment?
Mild surface oxidation on the frame due to lack of paint after work wascompleted (See Picture).
Mild surface oxidation on the frame due to lack of paint after work was completed (See Picture).
Facilities Request 9477 has been made torequest painting of frame.Comments (Additional pages may be added as necessary)
Facilities Request 9477 has been made to request painting of frame.Comments (Additional pages may be added as necessary)
SEWs package for VAC-202A indicates neoprene vibration isolators need to be addressed to preventunacceptable horizontal or vertical displacements during a seismic event. FRN 98-01-33 providesdetails for the installation of limit stop devices.
SEWs package for VAC-202A indicates neoprene vibration isolators need to be addressed to prevent unacceptable horizontal or vertical displacements during a seismic event. FRN 98-01-33 provides details for the installation of limit stop devices. The walkdown verified the installation of the limit stop devices per the FRN documentation.
The walkdown verified the installation of the limit stopdevices per the FRN documentation.
Area Walk-By Checklist is A WC-006.Evaluated by: Gary Sweder )AdAO 4 N k .Date: 10/3/12 I-cu r,, (3 I RI~rR MAklv~I 10/3/12 Laura Maclav t/ .QJ EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C 190 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y[ Nr ] U--Seismic Walkdown Checklist (SWC) SWELl- 052 Equipment ID No. VAC-202A Equip. Class Fans (9). Air Handlers (10), Temp. Sensors (19)Equipment Description EAC RCIC Rm Cooling Photographs Note: Note: overall view of equipment EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C191 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ Nr-1 U--i Seismic Walkdown Checklist (SWC) SWELl- 052 Equipment ID No. VAC-202A Equip. Class Fans (9), Air Handlers (10), Temp. Sensors (19)Equipment Description EAC RCIC Rm Cooling Note: Limit stop device and lack of paint at locations of work area EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page 0192 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NF UD-'Seismic Walkdown Checklist (SWC) SWELl- 053 Equipment ID No. VAC-202B Equip. Classi Fans (9), Air Handlers (10), Temp. Sensors (19)Equipment Description EAC RCIC Rm Coolinq Location:
Area Walk-By Checklist is A WC-006.Evaluated by: Gary Sweder )AdAO 4 N k .Date: 10/3/12I-cu r,, (3I RI~rR MAklv~I10/3/12Laura Maclavt/ .QJEN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1Attachment CPage C 190 of C413ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 5Status: Y[ Nr ] U--Seismic Walkdown Checklist (SWC) SWELl- 052Equipment ID No. VAC-202A Equip. Class Fans (9). Air Handlers (10), Temp. Sensors (19)Equipment Description EAC RCIC Rm CoolingPhotographs Note:Note: overall view of equipment EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C191 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 5 of 5Status: YZ Nr-1 U--iSeismic Walkdown Checklist (SWC) SWELl- 052Equipment ID No. VAC-202A Equip. Class Fans (9), Air Handlers (10), Temp. Sensors (19)Equipment Description EAC RCIC Rm CoolingNote: Limit stop device and lack of paint atlocations of work areaEN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1Attachment CPage 0192 of C413ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMSheet I of 4Status: YZ NF UD-'Seismic Walkdown Checklist (SWC) SWELl- 053Equipment ID No. VAC-202B Equip. Classi Fans (9), Air Handlers (10), Temp. Sensors (19)Equipment Description EAC RCIC Rm CoolinqLocation:
Bldg. RB Floor El. 2.75 R Manufacturer, Model, Etc. (optional but recommended) oom, Area SWQD Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Bldg. RB Floor El. 2.75 RManufacturer, Model, Etc. (optional but recommended) oom, Area SWQDInstructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
C91, E2 Detail I used to verify anchorage 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YN N[-]YN NEl U[D] N/AD-Y[ ND U[-] N/ADl Y] NDI UED N/AD IEnter the equipment class name from Appendix B: Classes of Equipment.
: 1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C193 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NEi UrL Seismic Walkdown Checklist (SWC) SWELl- 053 Equipment ID No. VAC-202B Equip. Class Fans (9), Air Handlers (10), Temp. Sensors (19)Equipment Description EAC RCIC Rm Cooling 5. Is the anchorage configuration consistent with plant documentation?
C91, E2 Detail I used to verify anchorage
YZ ND] UF] N/AD](Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Dimensions were spot checked using C91, E2 and verified to be accurate.6. Based on the above anchorage evaluations, is the anchorage free of YZ ND- Ur-potentially adverse seismic conditions?
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?YN N[-]YN NEl U[D] N/AD-Y[ ND U[-] N/ADlY] NDI UED N/ADIEnter the equipment class name from Appendix B: Classes of Equipment.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C193 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 4Status: YZ NEi UrLSeismic Walkdown Checklist (SWC) SWELl- 053Equipment ID No. VAC-202B Equip. Class Fans (9), Air Handlers (10), Temp. Sensors (19)Equipment Description EAC RCIC Rm Cooling5. Is the anchorage configuration consistent with plant documentation?
VAC-202A overhead 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NDI uED N/AD]YN NDI uD-] N/AD-]YN N[D] UD- N/AD-YZ NDJ UD-EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C194 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: Y[ N[- UI-Seismic Walkdown Checklist (SWC) SWELl- 053 Equipment ID No. VAC-202B Equip. Class Fans (9). Air Handlers (10). Temp. Sensors (19)Equipment Description EAC RCIC Rm Cooling Other Adverse Conditions
YZ ND] UF] N/AD](Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Dimensions were spot checked using C91, E2 and verified to beaccurate.
: 6. Based on the above anchorage evaluations, is the anchorage free of YZ ND- Ur-potentially adverse seismic conditions?
Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
VAC-202A overhead9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YZ NDI uED N/AD]YN NDI uD-] N/AD-]YN N[D] UD- N/AD-YZ NDJ UD-EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C194 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 4Status: Y[ N[- UI-Seismic Walkdown Checklist (SWC) SWELl- 053Equipment ID No. VAC-202B Equip. Class Fans (9). Air Handlers (10). Temp. Sensors (19)Equipment Description EAC RCIC Rm CoolingOther Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could Y0 N[E] U[]adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could Y0 N[E] U[]adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
SEWs package for VAC-202B indicates neoprene vibration isolators need to be addressed to preventunacceptable horizontal or vertical displacements during a seismic event. FRN 98-01-33 providesdetails for the installation of limit stop devices.
SEWs package for VAC-202B indicates neoprene vibration isolators need to be addressed to prevent unacceptable horizontal or vertical displacements during a seismic event. FRN 98-01-33 provides details for the installation of limit stop devices. The walkdown verified the installation of the limit stop devices per the FRN documentation.
The walkdown verified the installation of the limit stopdevices per the FRN documentation.
Area Walk-By Checklist is A WC-006.Evaluated by: Gary Sweder ,dQ, ..o G Date: 10-03-12 Ym=7JAffa?~o aj Laura Maclav 10-03-12 Laura Maclav I (J EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C195 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ NIF U-Seismic Walkdown Checklist (SWC) SWELl- 053 Equipment ID No. VAC-202B Equip. Class Fans (9), Air Handlers (10), Temp. Sensors (19)Equipment Description EAC RCIC Rm Cooling Photographs EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C196 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YE NF-] Ur-D Seismic Walkdown Checklist (SWC) SWELl- 054 Equipment ID No. P208C Equip. Class' Vertical Pumps (06)Equipment Description SSW Pump C Location:
Area Walk-By Checklist is A WC-006.Evaluated by: Gary Sweder ,dQ, ..oGDate: 10-03-12Ym=7JAffa?~o ajLaura Maclav10-03-12Laura MaclavI(JEN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C195 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 4Status: YZ NIF U-Seismic Walkdown Checklist (SWC) SWELl- 053Equipment ID No. VAC-202B Equip. Class Fans (9), Air Handlers (10), Temp. Sensors (19)Equipment Description EAC RCIC Rm CoolingPhotographs EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C196 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet I of 5Status: YE NF-] Ur-DSeismic Walkdown Checklist (SWC) SWELl- 054Equipment ID No. P208C Equip. Class' Vertical Pumps (06)Equipment Description SSW Pump CLocation:
Bldg. IS Floor El. 25.5 Room, Area C COMP Manufacturer, Model, Etc. (optional but recommended)
Bldg. IS Floor El. 25.5 Room, Area C COMPManufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
YE Nil 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YZ NEI UiZ N/AZ--YZ N[-] Uil N/AZl YZ NEI U N/ARl Tight vertical crack (less than 1/8') on northwest comer of pedestal.Judged to be insignificant; therefore, it presents no seismic hazard. See attached photo.1 Enter the equipment class name from Appendix B: Classes of Equipment.
: 1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C197 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YM NE] Ur--Seismic Walkdown Checklist (SWC) SWELl- 054 Equipment ID No. P208C Equip. Class Vertical Pumps (06)Equipment Description SSWPump C 5. Is the anchorage configuration consistent with plant documentation?
YE Nil2. Is the anchorage free of bent, broken, missing or loose hardware?
YZ NEi UrI N/AE-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?YZ NEI UiZ N/AZ--YZ N[-] Uil N/AZlYZ NEI U N/ARlTight vertical crack (less than 1/8') on northwest comer of pedestal.
Judged to be insignificant; therefore, it presents no seismic hazard. Seeattached photo.1 Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C197 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 5Status: YM NE] Ur--Seismic Walkdown Checklist (SWC) SWELl- 054Equipment ID No. P208C Equip. Class Vertical Pumps (06)Equipment Description SSWPump C5. Is the anchorage configuration consistent with plant documentation?
YZ NEi UrI N/AE-(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Reference Calculation C15.0.2901, Rev. 1, and Drawing C-45, Rev.E18.6. Based on the above anchorage evaluations, is the anchorage free of YZ N-] Ur-]potentially adverse seismic conditions?
Reference Calculation C15.0.2901, Rev. 1, and Drawing C-45, Rev.E18.6. Based on the above anchorage evaluations, is the anchorage free of YZ N-] Ur-]potentially adverse seismic conditions?
Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Masonry block wall 45.2 is seismically qualified.
Masonry block wall 45.2 is seismically qualified.
See drawing C-939 SH1, Rev. EO.Fluorescent light fixture above the west side of the P208C cubicle issuspended by an open S-hook. The fixture does not pose a crediblethreat to P208C; however, it could possibly damage other instruments within the room if it were to swing/fall during a seismic event. SeeAWC-031 for details.9. Do attached lines have adequate flexibility to avoid damage?YZ NE] uiE] N/A[-]YZ N-] UE] N/AE]YN NE] u[-] N/AE]10. Based on the above seismic interaction evaluations, is equipment free YN NE]i UIEof potentially adverse seismic interaction effects?EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C198 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 5Status: Yo NE] Ur-]Seismic Walkdown Checklist (SWC) SWELl- 054Equipment ID No. P208C Equip. Class Vertical Pumos (06)Equipment Description SSW Pump COther Adverse Conditions
See drawing C-939 SH 1, Rev. EO.Fluorescent light fixture above the west side of the P208C cubicle is suspended by an open S-hook. The fixture does not pose a credible threat to P208C; however, it could possibly damage other instruments within the room if it were to swing/fall during a seismic event. See AWC-031 for details.9. Do attached lines have adequate flexibility to avoid damage?YZ NE] uiE] N/A[-]YZ N-] UE] N/AE]YN NE] u[-] N/AE]10. Based on the above seismic interaction evaluations, is equipment free YN NE]i UIE of potentially adverse seismic interaction effects?EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C198 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: Yo NE] Ur-]Seismic Walkdown Checklist (SWC) SWELl- 054 Equipment ID No. P208C Equip. Class Vertical Pumos (06)Equipment Description SSW Pump C Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could YN NE] U[]adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could YN NE] U[]adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
P208C was out of service at the time of inspection.
P208C was out of service at the time of inspection.
The motor was decoupled from the pump and thetop cover was removed from the motor. This was not noted as a concern, as the opening had theappropriate FME cover (see attached photo).SWEL 1-054 is on AWC-031.dn 2-P iiEvaluated by: David SmallDate: 10/03/2012 Halie Aroz d 1!)10/03/2012
The motor was decoupled from the pump and the top cover was removed from the motor. This was not noted as a concern, as the opening had the appropriate FME cover (see attached photo).SWEL 1-054 is on AWC-031.dn 2-P ii Evaluated by: David Small Date: 10/03/2012 Halie Aroz d 1!)10/03/2012
%</- IEN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C199 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 5Status: Y[ NMJ U'Seismic Walkdown Checklist (SWC) SWELl- 054Equipment ID No. P208C Equip. Class Vertical Pumps (06)Equipment Description SSWPump CPhotographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C200 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 5 of 5Status: YZ NI-] UD-Seismic Walkdown Checklist (SWC) SWELl- 054Equipment ID No. P208C Equip. Class Vertical Pumps (06)Equipment Description SSWPump CNote: Typical anchor bolts.Note: Tight vertical crack in pedestal.
%</- I EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C199 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y[ NMJ U'Seismic Walkdown Checklist (SWC) SWELl- 054 Equipment ID No. P208C Equip. Class Vertical Pumps (06)Equipment Description SSWPump C Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C200 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NI-] UD-Seismic Walkdown Checklist (SWC) SWELl- 054 Equipment ID No. P208C Equip. Class Vertical Pumps (06)Equipment Description SSWPump C Note: Typical anchor bolts.Note: Tight vertical crack in pedestal.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C201 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YE NFj UDl Seismic Walkdown Checklist (SWC) SWELl- 055 Equipment ID No. P208D Equip. Class, Vertical Pumps (06)Equipment Description SSWPump D Location:
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C201 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet I of 5Status: YE NFj UDlSeismic Walkdown Checklist (SWC) SWELl- 055Equipment ID No. P208D Equip. Class, Vertical Pumps (06)Equipment Description SSWPump DLocation:
Bldg. IS Floor El. 25.5 Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)
Bldg. IS Floor El. 25.5 Room, Area B COMPManufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
Y[ NEi 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YE NEi U[-] N/A[-]YE NEi U[L N/A'-YE NE] Ur- N/A[-]I Enter the equipment class name from Appendix B: Classes of Equipment.
: 1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C202 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NIT U[]Seismic Walkdown Checklist (SWC) SWELl- 055 Equipment ID No. P208D Equip. Class Vertical Pumps (06)Equipment Description SSWPump D 5. Is the anchorage configuration consistent with plant documentation?
Y[ NEi2. Is the anchorage free of bent, broken, missing or loose hardware?
Y[ NF] Ur- N/AR (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?YE NEi U[-] N/A[-]YE NEi U[L N/A'-YE NE] Ur- N/A[-]I Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C202 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 5Status: YZ NIT U[]Seismic Walkdown Checklist (SWC) SWELl- 055Equipment ID No. P208D Equip. Class Vertical Pumps (06)Equipment Description SSWPump D5. Is the anchorage configuration consistent with plant documentation?
Y[ NF] Ur- N/AR(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Reference Calculation C15.0.1869, Rev. 1, and Drawing C-45, Rev.E18.6. Based on the above anchorage evaluations, is the anchorage free of YM NEI U[potentially adverse seismic conditions?
Reference Calculation C15.0.1869, Rev. 1, and Drawing C-45, Rev.E18.6. Based on the above anchorage evaluations, is the anchorage free of YM NEI U[potentially adverse seismic conditions?
Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Masonry walls 45.2 and 45.3 are seismically qualified.
Masonry walls 45.2 and 45.3 are seismically qualified.
See drawing C-939 SH 1, Rev. EO.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?Y] N[D] Ul-- N/AD--Y[ NDJ U-- N/AD-]YO ND:] UDJ N/AD-]YZ ND:] urEN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C203 of C413Ar"ACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 5Status: YE NE] UF]Seismic Walkdown Checklist (SWC) SWELl- 055Equipment ID No. P208D Equip. Class Vertical Pumps (06)Equipment Description SSWPump DOther Adverse Conditions
See drawing C-939 SH 1, Rev. EO.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y] N[D] Ul-- N/AD--Y[ NDJ U-- N/AD-]YO ND:] UDJ N/AD-]YZ ND:] ur EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C203 of C413 Ar"ACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NE] UF]Seismic Walkdown Checklist (SWC) SWELl- 055 Equipment ID No. P208D Equip. Class Vertical Pumps (06)Equipment Description SSWPump D Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could Y[D NE] U[-Iadversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could Y[D NE] U[-I adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
SWEL 1-055 is on AWC-005.Evaluated by:David Small 2 9J AA44Halie ArozDate: 10/03/2012 10/03/2012 L.)EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C204 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 5Status: YZ No- UfiSeismic Walkdown Checklist (SWC) SWELl- 055Equipment ID No. P208D Equip. Class Vertical Pumps (06)Equipment Description SSWPump DPhotographs Note:Note:EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C205 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 5 of 5Status: YZ No UF']Seismic Walkdown Checklist (SWC) SWELl- 055Equipment ID No. P208D Equip. Class Vertical Pumps (06)Equipment Description SSWPump DEN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. IAttachment CPage C206 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet I of 4Status: YZ NE] UD--Seismic Walkdown Checklist (SWC) SWELl- 056Equipment ID No. P208E Equip. Class, Vertical Pumps (06)Equipment Description SSWPump ELocation:
SWEL 1-055 is on AWC-005.Evaluated by: David Small 2 9J AA44 Halie Aroz Date: 10/03/2012 10/03/2012 L.)EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C204 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ No- Ufi Seismic Walkdown Checklist (SWC) SWELl- 055 Equipment ID No. P208D Equip. Class Vertical Pumps (06)Equipment Description SSWPump D Photographs Note: Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C205 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ No UF']Seismic Walkdown Checklist (SWC) SWELl- 055 Equipment ID No. P208D Equip. Class Vertical Pumps (06)Equipment Description SSWPump D EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. I Attachment C Page C206 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NE] UD--Seismic Walkdown Checklist (SWC) SWELl- 056 Equipment ID No. P208E Equip. Class, Vertical Pumps (06)Equipment Description SSWPump E Location:
Bldg. IS Floor El. 25.5 Room, Area B COMPManufacturer, Model, Etc. (optional but recommended)
Bldg. IS Floor El. 25.5 Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Anchorage
YZ N[-]2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Pedestal is cut on southeast comer to accommodate piping. This looks deliberate and is not close to the bolt, so it is therefore not considered a seismic hazard.YO NE]I U11 N/AL]YE N[] ULI N/A[--YZ NF-] U-] N/A[I Enter the equipment class name from Appendix B: Classes of Equipment.
YZ N[-]2. Is the anchorage free of bent, broken, missing or loose hardware?
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C207 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NE U--Seismic Walkdown Checklist (SWC) SWELl- 056 Equipment ID No. P208E Equip. Class Vertical Pumps (06)Equipment Description SSWPump E 5. Is the anchorage configuration consistent with plant documentation?
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
YM NEI UI-- N/A--(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?Pedestal is cut on southeast comer to accommodate piping. This looksdeliberate and is not close to the bolt, so it is therefore not considered aseismic hazard.YO NE]I U11 N/AL]YE N[] ULI N/A[--YZ NF-] U-] N/A[I Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C207 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 4Status: YZ NE U--Seismic Walkdown Checklist (SWC) SWELl- 056Equipment ID No. P208E Equip. Class Vertical Pumps (06)Equipment Description SSWPump E5. Is the anchorage configuration consistent with plant documentation?
YM NEI UI-- N/A--(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Reference Calculation C15.0.1869, Rev. 1, and Drawing C-45, Rev.E18.6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UI-potentially adverse seismic conditions?
Reference Calculation C15.0.1869, Rev. 1, and Drawing C-45, Rev.E18.6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UI-potentially adverse seismic conditions?
Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Masonry walls 45.2 and 45.3 are seismically qualified.
Masonry walls 45.2 and 45.3 are seismically qualified.
See drawing C-939 SH 1, Rev. EO.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YZ NEI UE- N/A[--YZ NEi UI- N/AE--YN NR U[-- N/AE1YZ NEI UErEN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C208 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 4Status: Y[ NZ UEZSeismic Walkdown Checklist (SWC) SWELl- 056Equipment ID No. P208E Equip. Class Vertical Pumps (06)Equipment Description SSW Pump EOther Adverse Conditions
See drawing C-939 SH 1, Rev. EO.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NEI UE- N/A[--YZ NEi UI- N/AE--YN NR U[-- N/AE1 YZ NEI UEr EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C208 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: Y[ NZ UEZ Seismic Walkdown Checklist (SWC) SWELl- 056 Equipment ID No. P208E Equip. Class Vertical Pumps (06)Equipment Description SSW Pump E Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could Y0 NEI uEFadversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could Y0 NEI uEF adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
SWEL 1-056 is on A WC-005.D ,=J Li?Evaluated by: David SmallHalie ArozDate: 10/03/2012 10/03/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C209 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 4Status: YZ NRI UrLSeismic Walkdown Checklist (SWC) SWELl- 056Equipment ID No. P208E Equip. Class Vertical Pumps (06)Equipment Description SSWPump EPhotographs Note:Note: Typical anchor bolt.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C210 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet I of 5Status: Y[ NF Ul-'Seismic Walkdown Checklist (SWC) SWELl- 057Equipment ID No. P202D Equip. Class' Horizontal Pumps (05)Equipment Description RBCCWPump D Loop BLocation:
SWEL 1-056 is on A WC-005.D ,=J Li?Evaluated by: David Small Halie Aroz Date: 10/03/2012 10/03/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C209 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ NRI UrL Seismic Walkdown Checklist (SWC) SWELl- 056 Equipment ID No. P208E Equip. Class Vertical Pumps (06)Equipment Description SSWPump E Photographs Note: Note: Typical anchor bolt.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C210 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: Y[ NF Ul-'Seismic Walkdown Checklist (SWC) SWELl- 057 Equipment ID No. P202D Equip. Class' Horizontal Pumps (05)Equipment Description RBCCWPump D Loop B Location:
Bldg. AXBAY Floor El. 3 Room, Area B COMPManufacturer, Model, Etc. (optional but recommended)
Bldg. AXBAY Floor El. 3 Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Anchorage
YZ Nr-1 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YZ NEIl UEI N/A[-YZ NEil U[] N/Ar-Y[ N[] UEI N/AD IEnter the equipment class name from Appendix B: Classes of Equipment.
YZ Nr-12. Is the anchorage free of bent, broken, missing or loose hardware?
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C211 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YN NE] U--Seismic Walkdown Checklist (SWC) SWELl- 057 Equipment ID No. P202D Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump D Loop B 5. Is the anchorage configuration consistent with plant documentation?
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Y[E N[-] U[-I N/AD-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?YZ NEIl UEI N/A[-YZ NEil U[] N/Ar-Y[ N[] UEI N/ADIEnter the equipment class name from Appendix B: Classes of Equipment.
Reference Drawings C-185, Rev. E7 and C-186, Rev. E3.6. Based on the above anchorage evaluations, is the anchorage free of YN ND] U[-D potentially adverse seismic conditions?
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C211 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 5Status: YN NE] U--Seismic Walkdown Checklist (SWC) SWELl- 057Equipment ID No. P202D Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump D Loop B5. Is the anchorage configuration consistent with plant documentation?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Y[E N[-] U[-I N/AD-(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
There is some loose foam insulation secured with duct tape on the discharge valve for P202D. As the mass for the insulation is very low, it does not present an adverse seismic interaction.
Reference Drawings C-185, Rev. E7 and C-186, Rev. E3.6. Based on the above anchorage evaluations, is the anchorage free of YN ND] U[-Dpotentially adverse seismic conditions?
CR-PNP-2012-04405 was written to address this as a general plant housekeeping concern, and WR 286056 was initiated for repair.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NDl UD- N/AD-]YZ NDI UD- N/AD-YZ NDI UD- N/AD]YM N[-- Ur EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C212 of C413 ATTACHMENT 9.6 SEISMIC WALKOOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NEI UEI Seismic Walkdown Checklist (SWC) SWELl- 057 Equipment ID No. P202D Equip. Class Horizontal Pumps (05)Equipment Description RBCCW Pump D Loop B Other Adverse Conditions
There is some loose foam insulation secured with duct tape on thedischarge valve for P202D. As the mass for the insulation is very low, itdoes not present an adverse seismic interaction.
CR-PNP-2012-04405 was written to address this as a general plant housekeeping concern,and WR 286056 was initiated for repair.8. Are overhead equipment, distribution  
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YZ NDl UD- N/AD-]YZ NDI UD- N/AD-YZ NDI UD- N/AD]YM N[-- UrEN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C212 of C413ATTACHMENT 9.6 SEISMIC WALKOOWN CHECKLIST FORMSheet 3 of 5Status: YZ NEI UEISeismic Walkdown Checklist (SWC) SWELl- 057Equipment ID No. P202D Equip. Class Horizontal Pumps (05)Equipment Description RBCCW Pump D Loop BOther Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could YE NEI Ur-adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could YE NEI Ur-adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
SWEL1-057 is on AWC-003.00,w L4AEvaluated by: David SmallDate: 10/04/2012 Halie ArozIte010/04/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C213 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 5Status: YZ NR UrSeismic Walkdown Checklist (SWC) SWELl- 057Equipment ID No. P202D Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump D Loop BPhotographs Note:Note:EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C214 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 5 of 5Status: YZ NE] UD-Seismic Walkdown Checklist (SWC) SWELl- 057Equipment ID No. P202D Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump D Loop BNote: Typical anchor bolt.Note:EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C215 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 1 of 5Status: Y[ NI]I ULISeismic Walkdown Checklist (SWC) SWELl- 058Equipment ID No. P202E Equip. Classi Horizontal Pumps (05)Equipment Description RBCCWPump E Loop BLocation:
SWEL1-057 is on AWC-003.00,w L4A Evaluated by: David Small Date: 10/04/2012 Halie Aroz Ite0 10/04/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C213 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NR Ur Seismic Walkdown Checklist (SWC) SWELl- 057 Equipment ID No. P202D Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump D Loop B Photographs Note: Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C214 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NE] UD-Seismic Walkdown Checklist (SWC) SWELl- 057 Equipment ID No. P202D Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump D Loop B Note: Typical anchor bolt.Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C215 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: Y[ NI]I ULI Seismic Walkdown Checklist (SWC) SWELl- 058 Equipment ID No. P202E Equip. Classi Horizontal Pumps (05)Equipment Description RBCCWPump E Loop B Location:
Bldg. AXBAY Floor El. 3 Room, Area B COMPManufacturer, Model, Etc. (optional but recommended)
Bldg. AXBAY Floor El. 3 Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Anchorage
Y[ NEIl 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YZ NElI UL N/A[--Y[ Nj3 IEu N/AZ]Y[ NEJ Ur] N/AD-]I Enter the equipment class name from Appendix B: Classes of Equipment.
Y[ NEIl2. Is the anchorage free of bent, broken, missing or loose hardware?
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C216 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: Y[ NE] UW--Seismic Walkdown Checklist (SWC) SWELl- 058 Equipment ID No. P202E -Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump E Loop B 5. Is the anchorage configuration consistent with plant documentation?
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
YZ NEI Ur-] N/A[--(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?YZ NElI UL N/A[--Y[ Nj3 IEu N/AZ]Y[ NEJ Ur] N/AD-]I Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C216 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 5Status: Y[ NE] UW--Seismic Walkdown Checklist (SWC) SWELl- 058Equipment ID No. P202E -Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump E Loop B5. Is the anchorage configuration consistent with plant documentation?
YZ NEI Ur-] N/A[--(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Reference Drawings C-185, Rev. E7 and C-186, Rev. E3.6. Based on the above anchorage evaluations, is the anchorage free of YJZ NW UW-potentially adverse seismic conditions?
Reference Drawings C-185, Rev. E7 and C-186, Rev. E3.6. Based on the above anchorage evaluations, is the anchorage free of YJZ NW UW-potentially adverse seismic conditions?
Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
There is some loose foam insulation secured with duct tape on thedischarge valve for P202E. As the mass for the insulation is very low, itdoes not present an adverse seismic interaction.
There is some loose foam insulation secured with duct tape on the discharge valve for P202E. As the mass for the insulation is very low, it does not present an adverse seismic interaction.
CR-PNP-2012-04405 was written to address this as a general plant housekeeping concern,and WR 286056 was initiated for repair.8. Are overhead equipment, distribution  
CR-PNP-2012-04405 was written to address this as a general plant housekeeping concern, and WR 286056 was initiated for repair.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y[ NW1 UW1 N/AE-]YN NW UW N/A--YM NW U-] N/A EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C217 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NE] Ur]Seismic Walkdown Checklist (SWC) SWELl- 058 Equipment ID No. P202E Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump E Loop B Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?Y[ NW1 UW1 N/AE-]YN NW UW N/A--YM NW U-] N/A EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C217 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 5Status: YZ NE] Ur]Seismic Walkdown Checklist (SWC) SWELl- 058Equipment ID No. P202E Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump E Loop BOther Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could YN NEI Ur-W adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could YN NEI Ur-Wadversely affect the safety functions of the equipment?
One alignment (jacking) bolt on the southeast corner of P202E was missing from the motor. This screw has no function in the operation of the equipment after installation, so this is not considered an adverse seismic condition.
One alignment (jacking) bolt on the southeast corner of P202E wasmissing from the motor. This screw has no function in the operation ofthe equipment after installation, so this is not considered an adverseseismic condition.
Three alignment (jacking) bolts were observed to be in contact with the motor housing which is contrary to standard practice of backing out the alignment bolts after alignment is achieved and primary mounting hardware is secured. This condition was previously identified by CR-PNP-2011-3626.
Three alignment (jacking) bolts were observed to be in contact with themotor housing which is contrary to standard practice of backing out thealignment bolts after alignment is achieved and primary mountinghardware is secured.
Work Order 286700 is scheduled to correct this condition.
This condition was previously identified by CR-PNP-2011-3626.
See attached photo.Comments .(Additional pages may be added as necessary)
Work Order 286700 is scheduled to correct thiscondition.
The tag number on P202E was missing. Operations was notified, and an ESOMS label request was initiated.
See attached photo.Comments  
.(Additional pages may be added as necessary)
The tag number on P202E was missing.
Operations was notified, and an ESOMS label request wasinitiated.
See CR-PNP-2012-044  
See CR-PNP-2012-044  
: 11. The equipment was verified for the walkdown using auxiliary equipment tags (see attached photo).SWEL 1-058 is on A WC-003.[99 JL1Evaluated by: David SmallDate: 10/04/2012 Ha Aryi7U10/04/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C218 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 5Status: Y[ NEI U--Seismic Walkdown Checklist (SWC) SWELl- 058Equipment ID No. P202E Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump E Loop BPhotographs Note: Tag number of auxiliary equipment thatalso identifies P202E.Note:EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C219 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 5 of 5Status: YZ NI] U--Seismic Walkdown Checklist (SWC) SWELl- 058Equipment ID No. P202E Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPumj E Loo) BNote: Typical anchor bolt.Note: Alignment bolt in contact with motorhousing.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C220 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 1 of 5Status: YM NF] UISeismic Walkdown Checklist (SWC) SWELl- 059Equipment ID No. P202F Equip. Class' Horizontal Pumps (05)Equipment Description RBCCWPump F Loop BLocation:
: 11. The equipment was verified for the walkdown using auxiliary equipment tags (see attached photo).SWEL 1-058 is on A WC-003.[99 JL1 Evaluated by: David Small Date: 10/04/2012 Ha Aryi7 U 10/04/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C218 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y[ NEI U--Seismic Walkdown Checklist (SWC) SWELl- 058 Equipment ID No. P202E Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump E Loop B Photographs Note: Tag number of auxiliary equipment that also identifies P202E.Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C219 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NI] U--Seismic Walkdown Checklist (SWC) SWELl- 058 Equipment ID No. P202E Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPumj E Loo) B Note: Typical anchor bolt.Note: Alignment bolt in contact with motor housing.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C220 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YM NF] UI Seismic Walkdown Checklist (SWC) SWELl- 059 Equipment ID No. P202F Equip. Class' Horizontal Pumps (05)Equipment Description RBCCWPump F Loop B Location:
Bldg. AXBAY Floor El. 3 Room, Area B COMPManufacturer, Model, Etc. (optional but recommended)
Bldg. AXBAY Floor El. 3 Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Anchorage
YN NE]2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?There is a small chip out of the east end of the pedestal that is judged to be insignificant.
YN NE]2. Is the anchorage free of bent, broken, missing or loose hardware?
YZ N[] U-I N/AI3 YE N] U[-I] N/A-]YZ N[] U-] N/A[-]I Enter the equipment class name from Appendix B: Classes of Equipment.
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C221 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NR UD-Seismic Walkdown Checklist (SWC) SWELl- 059 Equipment ID No. P202F Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump F Loop B 5. Is the anchorage configuration consistent with plant documentation?
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?There is a small chip out of the east end of the pedestal that is judgedto be insignificant.
YZ N[l UiD N/A[-](Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YZ N[] U-I N/AI3YE N] U[-I] N/A-]YZ N[] U-] N/A[-]I Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C221 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 5Status: YZ NR UD-Seismic Walkdown Checklist (SWC) SWELl- 059Equipment ID No. P202F Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump F Loop B5. Is the anchorage configuration consistent with plant documentation?
YZ N[l UiD N/A[-](Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Reference Drawings C-185, Rev. E7 and C-186, Rev. E3.6. Based on the above anchorage evaluations, is the anchorage free of YZ NDI UD-potentially adverse seismic conditions?
Reference Drawings C-185, Rev. E7 and C-186, Rev. E3.6. Based on the above anchorage evaluations, is the anchorage free of YZ NDI UD-potentially adverse seismic conditions?
Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YZ NDI UD] N/AD-There is some partially detached foam insulation on the discharge valvefor P202F. As the mass for the insulation is very low, it does notpresent an adverse seismic interaction.
YZ NDI UD] N/AD-There is some partially detached foam insulation on the discharge valve for P202F. As the mass for the insulation is very low, it does not present an adverse seismic interaction.
CR-PNP-2012-04405 waswritten to address this as a general plant housekeeping  
CR-PNP-2012-04405 was written to address this as a general plant housekeeping concern, and WR 286056 was initiated for repair.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NDl UD-- N/AD and masonry block walls not likely to collapse onto the equipment?
: concern, andWR 286056 was initiated for repair.8. Are overhead equipment, distribution  
: 9. Do attached lines have adequate flexibility to avoid damage?Y[ NDI UD1 N/AD-10. Based on the above seismic interaction evaluations, is equipment free YZ NDl UDl of potentially adverse seismic interaction effects?EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C222 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: Y0I NEI Ur-Seismic Walkdown Checklist (SWC) SWELl- 059 Equipment ID No. P202F Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump F Loop B Other Adverse Conditions
: systems, ceiling tiles and lighting, YZ NDl UD-- N/ADand masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Y[ NDI UD1 N/AD-10. Based on the above seismic interaction evaluations, is equipment free YZ NDl UDlof potentially adverse seismic interaction effects?EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C222 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 5Status: Y0I NEI Ur-Seismic Walkdown Checklist (SWC) SWELl- 059Equipment ID No. P202F Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump F Loop BOther Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could Y0 NE] U[]adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could Y0 NE] U[]adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
SWEL1-059 is on AWC-003.Evaluated by: David Small .A /, e /dHalie Aroz jIDate: 10/04/2012 10/04/2012 C)EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C223 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 5Status: YZ NF Ur-Seismic Walkdown Checklist (SWC) SWELl- 059Equipment ID No. P202F Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump F Loop BPhotographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C224 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 5 of 5Status: Y[ N[-I U[IIISeismic Walkdown Checklist (SWC) SWELl- 059Equipment ID No. P202F Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump F Loop BNote: Typical anchor bolt.Note:EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C225 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 1 of 6Status: Y[ NE] U-DSeismic Walkdown Checklist (SWC) SWELl- 060Equipment ID No. E209B Equip. Class, Tanks and Heat Exchangers (21)Equipment Description RBCCW Loop B Heat Exchanger Location:
SWEL1-059 is on AWC-003.Evaluated by: David Small .A /, e /d Halie Aroz jI Date: 10/04/2012 10/04/2012 C)EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C223 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NF Ur-Seismic Walkdown Checklist (SWC) SWELl- 059 Equipment ID No. P202F Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump F Loop B Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C224 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[ N[-I U[III Seismic Walkdown Checklist (SWC) SWELl- 059 Equipment ID No. P202F Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump F Loop B Note: Typical anchor bolt.Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C225 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 6 Status: Y[ NE] U-D Seismic Walkdown Checklist (SWC) SWELl- 060 Equipment ID No. E209B Equip. Class, Tanks and Heat Exchangers (21)Equipment Description RBCCW Loop B Heat Exchanger Location:
Bldg. AXBAY Floor El. 3 Room, Area B COMPManufacturer, Model, Etc. (optional but recommended)
Bldg. AXBAY Floor El. 3 Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one Y[ NOI of the 50% of SWEL items requiring such verification)?
Anchorage
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Both anchors in the south pedestal and the east anchor in the north pedestal are slightly skewed, and the west anchor in the north pedestal is not engaged by a small amount (approx. Y2 thread). These conditions are judged to be acceptable, and are not considered a seismic hazard.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 1. Is the anchorage configuration verification required (i.e., is the item one Y[ NOIof the 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[ N[-] Ur-] N/Ar-YE ND] ul- N/AD-'YN NDI uF- N/ADI I Enter the equipment class name from Appendix B: Classes of Equipment.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C226 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 6 Status: YZ NE] U-Seismic Walkdown Checklist (SWC) SWELl- 060 Equipment ID No. E209B Equip. Class Tanks and Heat Exchangers (21)Equipment Description RBCCW Loop B Heat Exchanger 5. Is the anchorage configuration consistent with plant documentation?
Both anchors in the south pedestal and the east anchor in the northpedestal are slightly skewed, and the west anchor in the north pedestalis not engaged by a small amount (approx.
YZ NEi Ur- N/AF-](Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Y2 thread).
Reference Drawing C-185, Rev. E7, FRN 98-01-78, and FRN 95-01-60.6. Based on the above anchorage evaluations, is the anchorage free of YZ NE] UI-'potentially adverse seismic conditions?
These conditions are judged to be acceptable, and are not considered a seismic hazard.3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?Y[ N[-] Ur-] N/Ar-YE ND] ul- N/AD-'YN NDI uF- N/ADII Enter the equipment class name from Appendix B: Classes of Equipment.
There is scaffolding very close to E209B that has a seismic evaluation tag, so it is acceptable for interaction effects.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C226 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 6Status: YZ NE] U-Seismic Walkdown Checklist (SWC) SWELl- 060Equipment ID No. E209B Equip. Class Tanks and Heat Exchangers (21)Equipment Description RBCCW Loop B Heat Exchanger
The Marinite board separating cable trays in the southwest corner of the room has some pieces missing. There are currently no pieces that are hanging off or look ready to fall, so it does not present a seismic interaction hazard.9. Do attached lines have adequate flexibility to avoid damage?YZ NE] UE-- N/AE-YZ NE] UEr] N/AE]Y[ NE[] U[] N/AE1 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C227 of C413 ATrACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 6 Status: YZ NO UMI Seismic Walkdown Checklist (SWC) SWELl- 060 Equipment ID No. E209B Equip. Class Tanks and Heat Exchangers (21)Equipment Description RBCCW Loop B Heat Exchanger Other Adverse Conditions
: 5. Is the anchorage configuration consistent with plant documentation?
: 11. Have you looked for and found no other seismic conditions that could Y0 Nr-I UM adversely affect the safety functions of the equipment?
YZ NEi Ur- N/AF-](Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Reference Drawing C-185, Rev. E7, FRN 98-01-78, and FRN 95-01-60.
: 6. Based on the above anchorage evaluations, is the anchorage free of YZ NE] UI-'potentially adverse seismic conditions?
Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
There is scaffolding very close to E209B that has a seismic evaluation tag, so it is acceptable for interaction effects.8. Are overhead equipment, distribution  
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
The Marinite board separating cable trays in the southwest corner ofthe room has some pieces missing.
There are currently no pieces thatare hanging off or look ready to fall, so it does not present a seismicinteraction hazard.9. Do attached lines have adequate flexibility to avoid damage?YZ NE] UE-- N/AE-YZ NE] UEr] N/AE]Y[ NE[] U[] N/AE110. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C227 of C413ATrACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 6Status: YZ NO UMISeismic Walkdown Checklist (SWC) SWELl- 060Equipment ID No. E209B Equip. Class Tanks and Heat Exchangers (21)Equipment Description RBCCW Loop B Heat Exchanger Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could Y0 Nr-I UMadversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
A loose label for equipment  
A loose label for equipment  
# 29-HO-3840 was found on the west side of E209B on the northpedestal.
# 29-HO-3840 was found on the west side of E209B on the north pedestal.
This was reported to Operations and an ESOMS request has been initiated.
This was reported to Operations and an ESOMS request has been initiated.
See CR-PNP-2012-04411.
See CR-PNP-2012-04411.
SWEL 1-060 is on AWC-003.Evaluated by: David Small 22Date: 10/04/2012 Halie Aroz a10/04/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C228 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 6Status: YZ NF UFSeismic Walkdown Checklist (SWC) SWELl- 060Equipment ID No. E209B Equip. Class Tanks and Heat Exchangers (21)Equipment Description RBCCWLooo B Heat Exchanger Photographs Note:Note:EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C229 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 5 of 6Status: YE NE] UD--Seismic Walkdown Checklist (SWC) SWELl- 060Equipment ID No. E209B Equip. Class Tanks and Heat Exchangers (21)Equipment Description RBCCWLooo B Heat Exchanqer Note: Typical south pedestal anchor bolt.Note: Typical north pedestal anchor bolt.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C230 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 6 of 6Status: Y[ NEI UIrSeismic Walkdown Checklist (SWC) SWELl- 060Equipment ID No. E209B Equip. Class Tanks and Heat Exchangers (21)Equipment Description RBCCW Loop B Heat Exchanger Note: North pedestal modification.
SWEL 1-060 is on AWC-003.Evaluated by: David Small 2 2 Date: 10/04/2012 Halie Aroz a 10/04/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C228 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 6 Status: YZ NF UF Seismic Walkdown Checklist (SWC) SWELl- 060 Equipment ID No. E209B Equip. Class Tanks and Heat Exchangers (21)Equipment Description RBCCWLooo B Heat Exchanger Photographs Note: Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C229 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 6 Status: YE NE] UD--Seismic Walkdown Checklist (SWC) SWELl- 060 Equipment ID No. E209B Equip. Class Tanks and Heat Exchangers (21)Equipment Description RBCCWLooo B Heat Exchanqer Note: Typical south pedestal anchor bolt.Note: Typical north pedestal anchor bolt.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C230 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 6 Status: Y[ NEI UIr Seismic Walkdown Checklist (SWC) SWELl- 060 Equipment ID No. E209B Equip. Class Tanks and Heat Exchangers (21)Equipment Description RBCCW Loop B Heat Exchanger Note: North pedestal modification.
Note: North pedestal modification.
Note: North pedestal modification.
EN-DC-168 REV 0 Engineering ReportNo. PNPS-CS-12-00001, Rev. 1Attachment CPage C231 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet I of 5Status: YZ NIF UI-ISeismic Walkdown Checklist (SWC) SWELl- 061Equipment ID No. C2205A Equip. Class, Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr RackLocation:
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C231 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YZ NIF UI-I Seismic Walkdown Checklist (SWC) SWELl- 061 Equipment ID No. C2205A Equip. Class, Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Location:
Bldg. RB Floor El. 51 Room, Area EastManufacturer, Model, Etc. (optional but recommended)
Bldg. RB Floor El. 51 Room, Area East Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Anchorage
The SEWs package for this component conservatively evaluates one of four various instrument rack anchorages.
: 1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
This rack was not evaluated, and therefore configuration can not be verified by the package. All bolts are visible, so the remainder of this section is applicable.
The SEWs package for this component conservatively evaluates one offour various instrument rack anchorages.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
This rack was not evaluated, and therefore configuration can not be verified by the package.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[-] YN NDJ UEI N/AL:]Y[ NDJ U-- N/AD YN NDI U-- N/AD1 Enter the equipment class name from Appendix B: Classes of Equipment.
Allbolts are visible, so the remainder of this section is applicable.
EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C232 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE NEI UD Seismic Walkdown Checklist (SWC) SWELl- 061 Equipment ID No. C2205A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack 5. Is the anchorage configuration consistent with plant documentation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Y[-- NO UI- N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Refer to response to question #1.6. Based on the above anchorage evaluations, is the anchorage free of YZ ND UD potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?Y[-] YN NDJ UEI N/AL:]Y[ NDJ U-- N/ADYN NDI U-- N/AD1Enter the equipment class name from Appendix B: Classes of Equipment.
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C232 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 5Status: YE NEI UDSeismic Walkdown Checklist (SWC) SWELl- 061Equipment ID No. C2205A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack5. Is the anchorage configuration consistent with plant documentation?
C2205A is bolted to C2205B, so this is not a seismic interaction concern. C2205A is also adjacent to but not bolted to A TWS rack 2275;however, there is sufficient clearance ( > 2") between the racks.Therefore, this is not considered a potentially adverse seismic interaction.
Y[-- NO UI- N/AE(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
One set screw is missing on the fence enclosing the racks. This is not a seismic hazard since the fence is judged to still be securely mounted to the floor, but CR-PNP-2012-04659 was written and WR 287549 initiated to address the concern. See attached photo.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Refer to response to question  
: 9. Do attached lines have adequate flexibility to avoid damage?YN NW UW N/A[D]YN ND u[:] N/AD-I YS NW UD:] N/AD-I 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C233 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YoI NEI ur]Seismic Walkdown Checklist (SWC) SWELl- 061 Equipment ID No. C2205A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Other Adverse Conditions
#1.6. Based on the above anchorage evaluations, is the anchorage free of YZ ND UDpotentially adverse seismic conditions?
Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
C2205A is bolted to C2205B, so this is not a seismic interaction concern.
C2205A is also adjacent to but not bolted to A TWS rack 2275;however, there is sufficient clearance  
( > 2") between the racks.Therefore, this is not considered a potentially adverse seismicinteraction.
One set screw is missing on the fence enclosing the racks. This is not aseismic hazard since the fence is judged to still be securely mounted tothe floor, but CR-PNP-2012-04659 was written and WR 287549initiated to address the concern.
See attached photo.8. Are overhead equipment, distribution  
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?YN NW UW N/A[D]YN ND u[:] N/AD-IYS NW UD:] N/AD-I10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C233 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 5Status: YoI NEI ur]Seismic Walkdown Checklist (SWC) SWELl- 061Equipment ID No. C2205A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr RackOther Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could Y[ NE] UI-adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could Y[ NE] UI-adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
SWEL 1-061 is on AWC-021.Evaluated by: Laura Maclay & AQL-2& "Halie Aroz 11 KDate: 10/17/2012 10/17/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C234 of C413ATnACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 5Status: Y] NF- UD--Seismic Walkdown Checklist (SWC) SWELl- 061Equipment ID No. C2205A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr RackPhotographs Note:Note:EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C235 of C413AT-IACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 5 of 5Status: Y[ NE] U[--Seismic Walkdown Checklist (SWC) SWELl- 061Equipment ID No. C2205A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr RackNote: Missing set screw on fence.Note:EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C236 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 1 of 4Status: YZ NR- U[--Seismic Walkdown Checklist (SWC) SWELl- 062Equipment ID No. C2205B Equip. Class, Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr RackLocation:
SWEL 1-061 is on AWC-021.Evaluated by: Laura Maclay & AQL-2& " Halie Aroz 11 K Date: 10/17/2012 10/17/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C234 of C413 ATnACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y] NF- UD--Seismic Walkdown Checklist (SWC) SWELl- 061 Equipment ID No. C2205A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Photographs Note: Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C235 of C413 AT-IACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[ NE] U[--Seismic Walkdown Checklist (SWC) SWELl- 061 Equipment ID No. C2205A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Note: Missing set screw on fence.Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C236 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 4 Status: YZ NR- U[--Seismic Walkdown Checklist (SWC) SWELl- 062 Equipment ID No. C2205B Equip. Class, Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Location:
Bldg. RB Floor El. 51 Room, Area EastManufacturer, Model, Etc. (optional but recommended)
Bldg. RB Floor El. 51 Room, Area East Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Anchorage
The SEWs package for this component conservatively evaluates one of four various instrument rack anchorages.
: 1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
This rack was not evaluated, and therefore configuration can not be verified by the package. All bolts are visible, so the remainder of this section is applicable.
The SEWs package for this component conservatively evaluates one offour various instrument rack anchorages.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
This rack was not evaluated, and therefore configuration can not be verified by the package.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[--] NO: YEE NEJ URL N/AD--YO NE] U[] N/AL]YN N[] U-- N/Ar-' Enter the equipment class name from Appendix B: Classes of Equipment.
Allbolts are visible, so the remainder of this section is applicable.
EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C237 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NIEj U[-']Seismic Walkdown Checklist (SWC) SWELl- 062 Equipment ID No. C2205B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack 5. Is the anchorage configuration consistent with plant documentation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
YrI NR] U[I N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Refer to response to question #1.6. Based on the above anchorage evaluations, is the anchorage free of YE NEI UrI potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?Y[--] NO:YEE NEJ URL N/AD--YO NE] U[] N/AL]YN N[] U-- N/Ar-' Enter the equipment class name from Appendix B: Classes of Equipment.
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C237 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 4Status: YZ NIEj U[-']Seismic Walkdown Checklist (SWC) SWELl- 062Equipment ID No. C2205B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack5. Is the anchorage configuration consistent with plant documentation?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
YrI NR] U[I N/AZ(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YN NI] u[-] N/A[-]YN NE] U-I] N/A--Y[ NEI UL-] N/Ar]Y[ NE] U[-EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C238 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YO] NnZur U]Seismic Walkdown Checklist (SWC) SWELl- 062 Equipment ID No. C2205B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Other Adverse Conditions
Refer to response to question  
#1.6. Based on the above anchorage evaluations, is the anchorage free of YE NEI UrIpotentially adverse seismic conditions?
Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YN NI] u[-] N/A[-]YN NE] U-I] N/A--Y[ NEI UL-] N/Ar]Y[ NE] U[-EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C238 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 4Status: YO] NnZur U]Seismic Walkdown Checklist (SWC) SWELl- 062Equipment ID No. C2205B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr RackOther Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could Y0 NEI U[:]adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could Y0 NEI U[:]adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
SWEL1-062 is on AWC-021.Evaluated Date: 10/17/2012 10/17/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C239 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 4Status: Y[ NF- U--Seismic Walkdown Checklist (SWC) SWELl- 062Equipment ID No. C2205B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr RackPhotographs Note: Equipment tagNote: Overall view of instrument rack fromoutside of fencing.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C240 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet I of 6Status: YE NDI U-Seismic Walkdown Checklist (SWC) SWELl- 063Equipment ID No. C2206A Equip. Class, Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr RackLocation:
SWEL1-062 is on AWC-021.Evaluated Date: 10/17/2012 10/17/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C239 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: Y[ NF- U--Seismic Walkdown Checklist (SWC) SWELl- 062 Equipment ID No. C2205B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Photographs Note: Equipment tag Note: Overall view of instrument rack from outside of fencing.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C240 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 6 Status: YE NDI U-Seismic Walkdown Checklist (SWC) SWELl- 063 Equipment ID No. C2206A Equip. Class, Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Location:
Bldg. RB Floor El. 51 Room, Area WestManufacturer, Model, Etc. (optional but recommended)
Bldg. RB Floor El. 51 Room, Area West Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Anchorage
The SEWs package conservatively evaluates similar rack C2206B, which has only six anchors, and comparatively accepts the eight anchorage configuration for rack C2206A. Therefore, since a drawing does not specify the eight bolt configuration, this component was not chosen for the 50% verification.
: 1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
The SEWs package conservatively evaluates similar rack C2206B,which has only six anchors, and comparatively accepts the eightanchorage configuration for rack C2206A. Therefore, since a drawingdoes not specify the eight bolt configuration, this component was notchosen for the 50% verification.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[-] NZ YE NI UE-I N/A[--YE ND UD N/AD YE NDI U' N/AD' Enter the equipment class name from Appendix B: Classes of Equipment.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C241 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 6 Status: YZ NIF U-Seismic Walkdown Checklist (SWC) SWELl- 063 Equipment ID No. C2206A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack 5. Is the anchorage configuration consistent with plant documentation?
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
YrI NR UI- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?Y[-] NZYE NI UE-I N/A[--YE ND UD N/ADYE NDI U' N/AD' Enter the equipment class name from Appendix B: Classes of Equipment.
Refer to response to question #1.6. Based on the above anchorage evaluations, is the anchorage free of YZ NEi UIZ potentially adverse seismic conditions?
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C241 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 6Status: YZ NIF U-Seismic Walkdown Checklist (SWC) SWELl- 063Equipment ID No. C2206A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack5. Is the anchorage configuration consistent with plant documentation?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YrI NR UI- N/AZ(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Racks C2206A and C2206B are bolted together and therefore do not pose a seismic risk to each other.The robust barrier fence around Racks C2206A & C2206B has set screws missing from the base brackets of three of the vertical posts.The fence consists of an interconnected framework of light support members and wire mesh. The weight and mass of the assembly is relatively low. The remaining posts (approx 5) have the set screws installed.
Refer to response to question  
The base brackets with the missing set screws still function to resist lateral loads. Since vertical seismic accelerations are less than Ig (Ref Spec C114ERQ), there is no expected uplift at the post locations.
#1.6. Based on the above anchorage evaluations, is the anchorage free of YZ NEi UIZpotentially adverse seismic conditions?
Based on these considerations, the identified condition does not represent a potential adverse seismic interaction.
Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
CR-PNP-2012-04627 was written to replace missing screws.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Racks C2206A and C2206B are bolted together and therefore do notpose a seismic risk to each other.The robust barrier fence around Racks C2206A & C2206B has setscrews missing from the base brackets of three of the vertical posts.The fence consists of an interconnected framework of light supportmembers and wire mesh. The weight and mass of the assembly isrelatively low. The remaining posts (approx 5) have the set screwsinstalled.
The west masonry block walls next to the rack, 65.9 and 65.10 are safety related.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NDI UD- N/AD-]YZ NDl UD- N/AD-'YZ NDI Ur- N/AD-Y[ NDl UD1 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C242 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 6 Status: YZ NE] ULI Seismic Walkdown Checklist (SWC) SWELl- 063 Equipment ID No. C2206A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Other Adverse Conditions
The base brackets with the missing set screws still function toresist lateral loads. Since vertical seismic accelerations are less than Ig(Ref Spec C114ERQ),
there is no expected uplift at the post locations.
Based on these considerations, the identified condition does notrepresent a potential adverse seismic interaction.
CR-PNP-2012-04627 was written to replace missing screws.8. Are overhead equipment, distribution  
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
The west masonry block walls next to the rack, 65.9 and 65.10 aresafety related.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YZ NDI UD- N/AD-]YZ NDl UD- N/AD-'YZ NDI Ur- N/AD-Y[ NDl UD1EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C242 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 6Status: YZ NE] ULISeismic Walkdown Checklist (SWC) SWELl- 063Equipment ID No. C2206A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr RackOther Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could YZ N[-] Ur-adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could YZ N[-] Ur-adversely affect the safety functions of the equipment?
The cover for pressure transmitter 36-PT-654 is missing one of fourbolts which keep the cover secured to the equipment.
The cover for pressure transmitter 36-PT-654 is missing one of four bolts which keep the cover secured to the equipment.
This is not aseismic concern due the redundancy of the other three bolts. CR-PNP-2012-04629 was written to address this item and calls for replacement of the missing fastener.
This is not a seismic concern due the redundancy of the other three bolts. CR-PNP-2012-04629 was written to address this item and calls for replacement of the missing fastener.Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Area walk-by is A WC-020.~&]flAcA~~?fYJ~ic  
Area walk-by is A WC-020.~&]flAcA~~?fYJ~ic  
~Evaluated by. Laura Ma .Date: 10-16-12,&#xfd;"ma-Wac OamAq I A. 16-12IJUI V !dUSwg'Jg  
~Evaluated by. Laura Ma .Date: 10-16-12 ,&#xfd;"ma-Wac Oam Aq I A. 16-12 IJUI V !dUSwg'Jg  
'.1A.4 %-1LJ AjEN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C243 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 6Status: YZ NR UDSeismic Walkdown Checklist (SWC) SWELl- 063Equipment ID No. C2206A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr RackPhotographs Note: Equipment tagNote: Overall view of rack outside of fencingEN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1Attachment CPage C244 of C413ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMSheet 5 of 6Status: Y[ NI I U[--Seismic Walkdown Checklist (SWC) SWELl- 063Equipment ID No. C2206A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr RackNote: Typical anchorsNote: Back of cover for pressure transmitter ismissing a bolt (CR-PNP-2012-04629).
'.1A.4 %-1LJ Aj EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C243 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 6 Status: YZ NR UD Seismic Walkdown Checklist (SWC) SWELl- 063 Equipment ID No. C2206A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Photographs Note: Equipment tag Note: Overall view of rack outside of fencing EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C244 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 6 Status: Y[ NI I U[--Seismic Walkdown Checklist (SWC) SWELl- 063 Equipment ID No. C2206A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Note: Typical anchors Note: Back of cover for pressure transmitter is missing a bolt (CR-PNP-2012-04629).
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C245 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 6 of 6Status: Y[ NI U-Seismic Walkdown Checklist (SWC) SWELl- 063Equipment ID No. C2206A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr RackNote: Missing screw in fence base bracket(CR-PNP-2012-04627).
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C245 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 6 Status: Y[ NI U-Seismic Walkdown Checklist (SWC) SWELl- 063 Equipment ID No. C2206A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Note: Missing screw in fence base bracket (CR-PNP-2012-04627).
Note:EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C246 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 1 of 5Status: YZ NE] U--Seismic Walkdown Checklist (SWC) SWELl- 064Equipment ID No. C2206B Equip. Class, Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr RackLocation:
Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C246 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YZ NE] U--Seismic Walkdown Checklist (SWC) SWELl- 064 Equipment ID No. C2206B Equip. Class, Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Location:
Bldg. RB Floor El. 51 Room, Area WestManufacturer, Model, Etc. (optional but recommended)
Bldg. RB Floor El. 51 Room, Area West Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Anchorage
Y[ NE]2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YE NE] ULI N/AEl YE NE] UE] N/AE]YE NE] UE] N/Ar-I Enter the equipment class name from Appendix B: Classes of Equipment.
Y[ NE]2. Is the anchorage free of bent, broken, missing or loose hardware?
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C247 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YN NE] U--Seismic Walkdown Checklist (SWC) SWELl- 064 Equipment ID No. C2206B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack 5. Is the anchorage configuration consistent with plant documentation?
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
YN NEI U[r] N/A[-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?YE NE] ULI N/AElYE NE] UE] N/AE]YE NE] UE] N/Ar-I Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C247 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 5Status: YN NE] U--Seismic Walkdown Checklist (SWC) SWELl- 064Equipment ID No. C2206B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack5. Is the anchorage configuration consistent with plant documentation?
YN NEI U[r] N/A[-(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Refer to SEWs package dated 6/19/95 for anchorage configuration.
Refer to SEWs package dated 6/19/95 for anchorage configuration.
: 6. Based on the above anchorage evaluations, is the anchorage free of YO NEI ULIpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of YO NEI ULI potentially adverse seismic conditions?
Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Racks C2206A and C2206B are bolted together and therefore do notpose a seismic risk to each other.There is a 3" gap between C2276 and C2206B. However, both racksare well anchored.
Racks C2206A and C2206B are bolted together and therefore do not pose a seismic risk to each other.There is a 3" gap between C2276 and C2206B. However, both racks are well anchored.The robust barrier fence around Racks C2206A & C2206B has set screws missing from the base brackets of three of the vertical posts.The fence consists of an interconnected framework of light support members and wire mesh. The weight and mass of the assembly is relatively low. The remaining posts (approx 5) have the set screws installed.
The robust barrier fence around Racks C2206A & C2206B has setscrews missing from the base brackets of three of the vertical posts.The fence consists of an interconnected framework of light supportmembers and wire mesh. The weight and mass of the assembly isrelatively low. The remaining posts (approx 5) have the set screwsinstalled.
The base brackets with the missing set screws still function to resist lateral loads. Since vertical seismic accelerations are less than Ig (Ref Spec C1 14ERQ), there is no expected uplift at the post locations.
The base brackets with the missing set screws still function toresist lateral loads. Since vertical seismic accelerations are less than Ig(Ref Spec C1 14ERQ), there is no expected uplift at the post locations.
Based on these considerations, the identified condition does not represent a potential adverse seismic interaction.
Based on these considerations, the identified condition does notrepresent a potential adverse seismic interaction.
CR-PNP-2012-04627 was written to replace missing screws.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
CR-PNP-2012-04627 was written to replace missing screws.8. Are overhead equipment, distribution  
The west masonry block walls next to the rack, 65.9 and 65.10 are safety related.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YN NEI UE- N/A[-]YZ NEI U[-] N/A[-]YN NEI UE] N/AE-YN NE ]UE]EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C248 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NEI UD&#xfd;Seismic Walkdown Checklist (SWC) SWELl- 064 Equipment ID No. C2206B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Other Adverse Conditions
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
The west masonry block walls next to the rack, 65.9 and 65.10 aresafety related.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YN NEI UE- N/A[-]YZ NEI U[-] N/A[-]YN NEI UE] N/AE-YN NE ]UE]EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C248 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 5Status: YZ NEI UD&#xfd;Seismic Walkdown Checklist (SWC) SWELl- 064Equipment ID No. C2206B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr RackOther Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could YZ NE]i Ur]adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could YZ NE]i Ur]adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Area walk-by is A WC-020.Evaluated by: Laura Maly '~aA A kCkQVLGary Sweder Aal~ \~.tL.o_(3 -Date: 10-16-1210-16-12EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C249 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 5Status: YN Nn--I UI-Seismic Walkdown Checklist (SWC) SWELl- 064Equipment ID No. C2206B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr RackPhotographs Note: Equipment tagNote: Overall view of both racks C2206A andC2206B.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1Attachment CPage C250 of C413ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 5 of 5Status: Y[ NR UrSeismic Walkdown Checklist (SWC) SWELl- 064Equipment ID No. C2206B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr RackNote: Missing set screw in surrounding fencing (CR-PNP-2012-04627)
Area walk-by is A WC-020.Evaluated by: Laura Maly '~aA A kCkQVL Gary Sweder Aal~ \~.tL.o_(3 -Date: 10-16-12 10-16-12 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C249 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YN Nn--I UI-Seismic Walkdown Checklist (SWC) SWELl- 064 Equipment ID No. C2206B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Photographs Note: Equipment tag Note: Overall view of both racks C2206A and C2206B.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C250 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[ NR Ur Seismic Walkdown Checklist (SWC) SWELl- 064 Equipment ID No. C2206B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Note: Missing set screw in surrounding fencing (CR-PNP-2012-04627)
Note:EN-DC-168 REV 0}}
Note: EN-DC-168 REV 0}}

Revision as of 01:02, 14 July 2018

PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C174 of C413 Through Page C250 of C413
ML13232A134
Person / Time
Site: Pilgrim
Issue date: 06/17/2013
From: Maclay L
Entergy Nuclear Operations
To:
Office of Nuclear Reactor Regulation
References
2.13.056 PNPS-CS-12-00001, Rev 1
Download: ML13232A134 (77)


Text

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 0174 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NEI ULI Seismic Walkdown Checklist (SWC) SWELl- 049 Equipment ID No. MO1400-24B Equip. Class, Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve Location:

Bldg. RB Floor El. 51 R Manufacturer, Model, Etc. (optional but recommended) oom, Area NORTH SIDE Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Inline component, no anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[-] NE Y[-I NEi U[iE N/A[D YE! NE! UEl N/A[YEI NE-I Ur N/A[' Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page C175 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NF-Z U--Seismic Walkdown Checklist (SWC) SWELl- 049 Equipment ID No. M01400-24B Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve 5. Is the anchorage configuration consistent with plant documentation?

YEI NE] U-] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YZ N[] UE potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Masonry wall 64.4 (C942Sh 1, EO) is safety related, therefore seismically qualified and acceptable.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Scaffolding is currently being erected below to the valves to allow access to them. This is a work in progress and is tagged appropriately.

All extra equipment in the area is properly secured and cart wheels are choked.YZ NEJ uE1 N/AD-YZ NE- uEr N/A[-]YZ NEl U[-fl N/AED YZ NEI UE-EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page 0176 of C413 AT'rACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YZ NEI UM-Seismic Walkdown Checklist (SWC) SWELl- 049 Equipment ID No. M01400-24B Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description Core Spray B Iniection Valve Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YZ NUEI 1 Comments (Additional pages may be added as necessary)

Area walk-by is AWC-019.4oj"Wacha Evaluated by: Laura Maclay V I (J Date: 10-15-12 10-15-12 QA, .A 1,hk , -A Garv Sweder EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C177 of C413 SEISMIC WALKDOWN CHECKLIST FORM ATTACHMEI Sheet 4 of T 9.6 4 Status: YZ N[- ULI Seismic Walkdown Checklist (SWC) SWELl- 049 Equipment ID No. M01400-24B Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 0 178 of 0413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: Y[ NE] U-III Seismic Walkdown Checklist (SWC) SWELl- 050 Equipment ID No. MO1400-25B Equip. Classi Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve Location:

Bldg. RB Floor El. 51 Ri Manufacturer, Model, Etc. (optional but recommended) oom, Area NORTH SIDE Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Inline component, no anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[-] NZ Y[E] N[-] U-I N/AS Y[E] NEi ULE- NWAS YEI NEI UL-- N/A[I Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C179 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YN N-] Ur Seismic Walkdown Checklist (SWC) SWELl- 050 Equipment ID No. M01400-25B Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve 5. Is the anchorage configuration consistent with plant documentation?

Y[-] N[-] UF- N/A[(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Y] Nr] UiE]potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Noted a hanging light next to the valve is property restrained against lateral movement, therefore not a seismic hazard.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Masonry wall 64.4 (C942Sh 1, EO) is safety related, therefore seismically qualified and acceptable.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Scaffolding is currently being erected below to the valves to allow access to them. This is a work in progress and is tagged appropriately.

All extra equipment in the area is properly secured and cart wheels are choked.YZ NEI U[E] N/AE]Y0 NE'] u[-] NIAE]YZ NE] uE] NIAE]Y NE-I U-]EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C 180 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: Y[ NF U-I Seismic Walkdown Checklist (SWC) SWELl- 050 Equipment ID No. M01400-25B Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEJ UL-I adversely affect the safety functions of the equipment?

Comments .(Additional pages may be added as necessary)

Area walk-by is AWC-019.TSG" ." "k. ý, Evaluated by: Gary Sweder Date: 10-15-12 0 I Ltqd/qv 10-15-12 I aura MaClav %-kW 0,-ý ac -0(11 j VW ci EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page 0 181 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NE] U[--Seismic Walkdown Checklist (SWC) SWELl- 050 Equipment ID No. M01400-25B Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve Note: Equipment tag 1400-25B Note: Overall view of valve from side EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C182 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[ NFI U-Seismic Walkdown Checklist (SWC) SWELl- 050 Equipment ID No. M01400-25B Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve Note: Scaffold erection in progress Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C183 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: Y[ NFl UL-Seismic Walkdown Checklist (SWC) SWELl- 051 Equipment ID No. M01400-3A Equip. Class, Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description Core SprayA Supp Pool Suction Location:

Bldg. RB Floor El. -17.5 Room, Area SE QD Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Inline component, no anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?YLI NZ YE-] N[-] UI-- N/AN YE] NE] U[-] N/AE YEr NE] U[:] N/A I Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0O01, Rev. 1 Attachment C Page C 184 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YN NEI U[--Seismic Walkdown Checklist (SWC) SWELl- 051 Equipment ID No. M01400-3A Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description Core Spray A Supp Pool Suction 5. Is the anchorage configuration consistent with plant documentation?

Y[-I NEi Ur1 N/A0 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YE NE] U[]potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead lighting adequately mounted at an angle over the valve, therefore not a seismic hazard.9. Do attached lines have adequate flexibility to avoid damage?Y[ NEI uEr N/AE-YZ NEI UE- N/A[-]Y[I NEI U[-] N/A[--10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C185 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YN NEO UEI Seismic Walkdown Checklist (SWC) SWELl- 051 Equipment ID No. M01400-3A Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description Core Sorav A Suaw Pool Suction Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YNNEI UEJ Comments (Additional pages may be added as necessary)

Area walk-by is on AWC-032.Evaluated by: Gary Sweder Date: 10-9-12 qv""-Wac-Qý Laura Maclay 10-9-12 LauraMacla EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C 186 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YE NEI UD Seismic Walkdown Checklist (SWC) SWELl- 051 Equipment ID No. M01400-3A Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description Core Spray A Supp Pool Suction Photographs Note: Equipment Tag EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OO001, Rev. 1 Attachment C Page 0 187 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YZ NF Ur-]Seismic Walkdown Checklist (SWC) SWELl- 052 Equipment ID No. VAC-202A Equip. Class' Fans (9), Air Handlers (10), Temp. Sensors (19)Equipment Description EAC RCIC Rm Cooling Location:

Bldg. RB Floor El. 2.75 Room, Area SW QD Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Reference C359Sh 1, E1 (Detail 8)2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?YE NFI Y[ NEI U[I N/AZ-Y; NEI ULI N/AZ" Y[ NEI UIE- N/AE-I Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 0188 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NE-] uIIL Seismic Walkdown Checklist (SWC) SWELl- 052 Equipment ID No. VAC-202A Equip. Class Fans (9), Air Handlers (10). Temp. Sensors (19)Equipment Description EAC RCIC Rm Coolinq 5. Is the anchorage configuration consistent with plant documentation?

YZ NEI UD- N/A[-](Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference drawing C359 SHI, detail 8. Anchorage for the steel frame on which VAC-202A is mounted was verified.6. Based on the above anchorage evaluations, is the anchorage free of YZ ND"] UD]potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ N[D] UD- N/AD-]YZ ND] U[-] N/AD-YZ NDl UD-- N/AD-YZ NF-D Ur EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C0189 of 0413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: Y[ NO Ur-I Seismic Walkdown Checklist (SWC) SWELl- 052 Equipment ID No. VAC-202A Equip. Class Fans (9). Air Handlers (10). Temp. Sensors (19)Equipment Description EAC RCIC Rm Cooling Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could YO N[: U-]adversely affect the safety functions of the equipment?

Mild surface oxidation on the frame due to lack of paint after work was completed (See Picture).

Facilities Request 9477 has been made to request painting of frame.Comments (Additional pages may be added as necessary)

SEWs package for VAC-202A indicates neoprene vibration isolators need to be addressed to prevent unacceptable horizontal or vertical displacements during a seismic event. FRN 98-01-33 provides details for the installation of limit stop devices. The walkdown verified the installation of the limit stop devices per the FRN documentation.

Area Walk-By Checklist is A WC-006.Evaluated by: Gary Sweder )AdAO 4 N k .Date: 10/3/12 I-cu r,, (3 I RI~rR MAklv~I 10/3/12 Laura Maclav t/ .QJ EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C 190 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y[ Nr ] U--Seismic Walkdown Checklist (SWC) SWELl- 052 Equipment ID No. VAC-202A Equip. Class Fans (9). Air Handlers (10), Temp. Sensors (19)Equipment Description EAC RCIC Rm Cooling Photographs Note: Note: overall view of equipment EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C191 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ Nr-1 U--i Seismic Walkdown Checklist (SWC) SWELl- 052 Equipment ID No. VAC-202A Equip. Class Fans (9), Air Handlers (10), Temp. Sensors (19)Equipment Description EAC RCIC Rm Cooling Note: Limit stop device and lack of paint at locations of work area EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page 0192 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NF UD-'Seismic Walkdown Checklist (SWC) SWELl- 053 Equipment ID No. VAC-202B Equip. Classi Fans (9), Air Handlers (10), Temp. Sensors (19)Equipment Description EAC RCIC Rm Coolinq Location:

Bldg. RB Floor El. 2.75 R Manufacturer, Model, Etc. (optional but recommended) oom, Area SWQD Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

C91, E2 Detail I used to verify anchorage 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?YN N[-]YN NEl U[D] N/AD-Y[ ND U[-] N/ADl Y] NDI UED N/AD IEnter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C193 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NEi UrL Seismic Walkdown Checklist (SWC) SWELl- 053 Equipment ID No. VAC-202B Equip. Class Fans (9), Air Handlers (10), Temp. Sensors (19)Equipment Description EAC RCIC Rm Cooling 5. Is the anchorage configuration consistent with plant documentation?

YZ ND] UF] N/AD](Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Dimensions were spot checked using C91, E2 and verified to be accurate.6. Based on the above anchorage evaluations, is the anchorage free of YZ ND- Ur-potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

VAC-202A overhead 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NDI uED N/AD]YN NDI uD-] N/AD-]YN N[D] UD- N/AD-YZ NDJ UD-EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C194 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: Y[ N[- UI-Seismic Walkdown Checklist (SWC) SWELl- 053 Equipment ID No. VAC-202B Equip. Class Fans (9). Air Handlers (10). Temp. Sensors (19)Equipment Description EAC RCIC Rm Cooling Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y0 N[E] U[]adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

SEWs package for VAC-202B indicates neoprene vibration isolators need to be addressed to prevent unacceptable horizontal or vertical displacements during a seismic event. FRN 98-01-33 provides details for the installation of limit stop devices. The walkdown verified the installation of the limit stop devices per the FRN documentation.

Area Walk-By Checklist is A WC-006.Evaluated by: Gary Sweder ,dQ, ..o G Date: 10-03-12 Ym=7JAffa?~o aj Laura Maclav 10-03-12 Laura Maclav I (J EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C195 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ NIF U-Seismic Walkdown Checklist (SWC) SWELl- 053 Equipment ID No. VAC-202B Equip. Class Fans (9), Air Handlers (10), Temp. Sensors (19)Equipment Description EAC RCIC Rm Cooling Photographs EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C196 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YE NF-] Ur-D Seismic Walkdown Checklist (SWC) SWELl- 054 Equipment ID No. P208C Equip. Class' Vertical Pumps (06)Equipment Description SSW Pump C Location:

Bldg. IS Floor El. 25.5 Room, Area C COMP Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

YE Nil 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?YZ NEI UiZ N/AZ--YZ N[-] Uil N/AZl YZ NEI U N/ARl Tight vertical crack (less than 1/8') on northwest comer of pedestal.Judged to be insignificant; therefore, it presents no seismic hazard. See attached photo.1 Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C197 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YM NE] Ur--Seismic Walkdown Checklist (SWC) SWELl- 054 Equipment ID No. P208C Equip. Class Vertical Pumps (06)Equipment Description SSWPump C 5. Is the anchorage configuration consistent with plant documentation?

YZ NEi UrI N/AE-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference Calculation C15.0.2901, Rev. 1, and Drawing C-45, Rev.E18.6. Based on the above anchorage evaluations, is the anchorage free of YZ N-] Ur-]potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Masonry block wall 45.2 is seismically qualified.

See drawing C-939 SH 1, Rev. EO.Fluorescent light fixture above the west side of the P208C cubicle is suspended by an open S-hook. The fixture does not pose a credible threat to P208C; however, it could possibly damage other instruments within the room if it were to swing/fall during a seismic event. See AWC-031 for details.9. Do attached lines have adequate flexibility to avoid damage?YZ NE] uiE] N/A[-]YZ N-] UE] N/AE]YN NE] u[-] N/AE]10. Based on the above seismic interaction evaluations, is equipment free YN NE]i UIE of potentially adverse seismic interaction effects?EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C198 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: Yo NE] Ur-]Seismic Walkdown Checklist (SWC) SWELl- 054 Equipment ID No. P208C Equip. Class Vertical Pumos (06)Equipment Description SSW Pump C Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NE] U[]adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

P208C was out of service at the time of inspection.

The motor was decoupled from the pump and the top cover was removed from the motor. This was not noted as a concern, as the opening had the appropriate FME cover (see attached photo).SWEL 1-054 is on AWC-031.dn 2-P ii Evaluated by: David Small Date: 10/03/2012 Halie Aroz d 1!)10/03/2012

%</- I EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C199 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y[ NMJ U'Seismic Walkdown Checklist (SWC) SWELl- 054 Equipment ID No. P208C Equip. Class Vertical Pumps (06)Equipment Description SSWPump C Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C200 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NI-] UD-Seismic Walkdown Checklist (SWC) SWELl- 054 Equipment ID No. P208C Equip. Class Vertical Pumps (06)Equipment Description SSWPump C Note: Typical anchor bolts.Note: Tight vertical crack in pedestal.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C201 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YE NFj UDl Seismic Walkdown Checklist (SWC) SWELl- 055 Equipment ID No. P208D Equip. Class, Vertical Pumps (06)Equipment Description SSWPump D Location:

Bldg. IS Floor El. 25.5 Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Y[ NEi 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?YE NEi U[-] N/A[-]YE NEi U[L N/A'-YE NE] Ur- N/A[-]I Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C202 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NIT U[]Seismic Walkdown Checklist (SWC) SWELl- 055 Equipment ID No. P208D Equip. Class Vertical Pumps (06)Equipment Description SSWPump D 5. Is the anchorage configuration consistent with plant documentation?

Y[ NF] Ur- N/AR (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference Calculation C15.0.1869, Rev. 1, and Drawing C-45, Rev.E18.6. Based on the above anchorage evaluations, is the anchorage free of YM NEI U[potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Masonry walls 45.2 and 45.3 are seismically qualified.

See drawing C-939 SH 1, Rev. EO.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y] N[D] Ul-- N/AD--Y[ NDJ U-- N/AD-]YO ND:] UDJ N/AD-]YZ ND:] ur EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C203 of C413 Ar"ACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NE] UF]Seismic Walkdown Checklist (SWC) SWELl- 055 Equipment ID No. P208D Equip. Class Vertical Pumps (06)Equipment Description SSWPump D Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[D NE] U[-I adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

SWEL 1-055 is on AWC-005.Evaluated by: David Small 2 9J AA44 Halie Aroz Date: 10/03/2012 10/03/2012 L.)EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C204 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ No- Ufi Seismic Walkdown Checklist (SWC) SWELl- 055 Equipment ID No. P208D Equip. Class Vertical Pumps (06)Equipment Description SSWPump D Photographs Note: Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C205 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ No UF']Seismic Walkdown Checklist (SWC) SWELl- 055 Equipment ID No. P208D Equip. Class Vertical Pumps (06)Equipment Description SSWPump D EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. I Attachment C Page C206 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NE] UD--Seismic Walkdown Checklist (SWC) SWELl- 056 Equipment ID No. P208E Equip. Class, Vertical Pumps (06)Equipment Description SSWPump E Location:

Bldg. IS Floor El. 25.5 Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

YZ N[-]2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?Pedestal is cut on southeast comer to accommodate piping. This looks deliberate and is not close to the bolt, so it is therefore not considered a seismic hazard.YO NE]I U11 N/AL]YE N[] ULI N/A[--YZ NF-] U-] N/A[I Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C207 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NE U--Seismic Walkdown Checklist (SWC) SWELl- 056 Equipment ID No. P208E Equip. Class Vertical Pumps (06)Equipment Description SSWPump E 5. Is the anchorage configuration consistent with plant documentation?

YM NEI UI-- N/A--(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference Calculation C15.0.1869, Rev. 1, and Drawing C-45, Rev.E18.6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UI-potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Masonry walls 45.2 and 45.3 are seismically qualified.

See drawing C-939 SH 1, Rev. EO.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NEI UE- N/A[--YZ NEi UI- N/AE--YN NR U[-- N/AE1 YZ NEI UEr EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C208 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: Y[ NZ UEZ Seismic Walkdown Checklist (SWC) SWELl- 056 Equipment ID No. P208E Equip. Class Vertical Pumps (06)Equipment Description SSW Pump E Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y0 NEI uEF adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

SWEL 1-056 is on A WC-005.D ,=J Li?Evaluated by: David Small Halie Aroz Date: 10/03/2012 10/03/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C209 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ NRI UrL Seismic Walkdown Checklist (SWC) SWELl- 056 Equipment ID No. P208E Equip. Class Vertical Pumps (06)Equipment Description SSWPump E Photographs Note: Note: Typical anchor bolt.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C210 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: Y[ NF Ul-'Seismic Walkdown Checklist (SWC) SWELl- 057 Equipment ID No. P202D Equip. Class' Horizontal Pumps (05)Equipment Description RBCCWPump D Loop B Location:

Bldg. AXBAY Floor El. 3 Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

YZ Nr-1 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?YZ NEIl UEI N/A[-YZ NEil U[] N/Ar-Y[ N[] UEI N/AD IEnter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C211 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YN NE] U--Seismic Walkdown Checklist (SWC) SWELl- 057 Equipment ID No. P202D Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump D Loop B 5. Is the anchorage configuration consistent with plant documentation?

Y[E N[-] U[-I N/AD-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference Drawings C-185, Rev. E7 and C-186, Rev. E3.6. Based on the above anchorage evaluations, is the anchorage free of YN ND] U[-D potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

There is some loose foam insulation secured with duct tape on the discharge valve for P202D. As the mass for the insulation is very low, it does not present an adverse seismic interaction.

CR-PNP-2012-04405 was written to address this as a general plant housekeeping concern, and WR 286056 was initiated for repair.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NDl UD- N/AD-]YZ NDI UD- N/AD-YZ NDI UD- N/AD]YM N[-- Ur EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C212 of C413 ATTACHMENT 9.6 SEISMIC WALKOOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NEI UEI Seismic Walkdown Checklist (SWC) SWELl- 057 Equipment ID No. P202D Equip. Class Horizontal Pumps (05)Equipment Description RBCCW Pump D Loop B Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could YE NEI Ur-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

SWEL1-057 is on AWC-003.00,w L4A Evaluated by: David Small Date: 10/04/2012 Halie Aroz Ite0 10/04/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C213 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NR Ur Seismic Walkdown Checklist (SWC) SWELl- 057 Equipment ID No. P202D Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump D Loop B Photographs Note: Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C214 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NE] UD-Seismic Walkdown Checklist (SWC) SWELl- 057 Equipment ID No. P202D Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump D Loop B Note: Typical anchor bolt.Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C215 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: Y[ NI]I ULI Seismic Walkdown Checklist (SWC) SWELl- 058 Equipment ID No. P202E Equip. Classi Horizontal Pumps (05)Equipment Description RBCCWPump E Loop B Location:

Bldg. AXBAY Floor El. 3 Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Y[ NEIl 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?YZ NElI UL N/A[--Y[ Nj3 IEu N/AZ]Y[ NEJ Ur] N/AD-]I Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C216 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: Y[ NE] UW--Seismic Walkdown Checklist (SWC) SWELl- 058 Equipment ID No. P202E -Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump E Loop B 5. Is the anchorage configuration consistent with plant documentation?

YZ NEI Ur-] N/A[--(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference Drawings C-185, Rev. E7 and C-186, Rev. E3.6. Based on the above anchorage evaluations, is the anchorage free of YJZ NW UW-potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

There is some loose foam insulation secured with duct tape on the discharge valve for P202E. As the mass for the insulation is very low, it does not present an adverse seismic interaction.

CR-PNP-2012-04405 was written to address this as a general plant housekeeping concern, and WR 286056 was initiated for repair.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y[ NW1 UW1 N/AE-]YN NW UW N/A--YM NW U-] N/A EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C217 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NE] Ur]Seismic Walkdown Checklist (SWC) SWELl- 058 Equipment ID No. P202E Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump E Loop B Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could YN NEI Ur-W adversely affect the safety functions of the equipment?

One alignment (jacking) bolt on the southeast corner of P202E was missing from the motor. This screw has no function in the operation of the equipment after installation, so this is not considered an adverse seismic condition.

Three alignment (jacking) bolts were observed to be in contact with the motor housing which is contrary to standard practice of backing out the alignment bolts after alignment is achieved and primary mounting hardware is secured. This condition was previously identified by CR-PNP-2011-3626.

Work Order 286700 is scheduled to correct this condition.

See attached photo.Comments .(Additional pages may be added as necessary)

The tag number on P202E was missing. Operations was notified, and an ESOMS label request was initiated.

See CR-PNP-2012-044

11. The equipment was verified for the walkdown using auxiliary equipment tags (see attached photo).SWEL 1-058 is on A WC-003.[99 JL1 Evaluated by: David Small Date: 10/04/2012 Ha Aryi7 U 10/04/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C218 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y[ NEI U--Seismic Walkdown Checklist (SWC) SWELl- 058 Equipment ID No. P202E Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump E Loop B Photographs Note: Tag number of auxiliary equipment that also identifies P202E.Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C219 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NI] U--Seismic Walkdown Checklist (SWC) SWELl- 058 Equipment ID No. P202E Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPumj E Loo) B Note: Typical anchor bolt.Note: Alignment bolt in contact with motor housing.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C220 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YM NF] UI Seismic Walkdown Checklist (SWC) SWELl- 059 Equipment ID No. P202F Equip. Class' Horizontal Pumps (05)Equipment Description RBCCWPump F Loop B Location:

Bldg. AXBAY Floor El. 3 Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

YN NE]2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?There is a small chip out of the east end of the pedestal that is judged to be insignificant.

YZ N[] U-I N/AI3 YE N] U[-I] N/A-]YZ N[] U-] N/A[-]I Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C221 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NR UD-Seismic Walkdown Checklist (SWC) SWELl- 059 Equipment ID No. P202F Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump F Loop B 5. Is the anchorage configuration consistent with plant documentation?

YZ N[l UiD N/A[-](Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference Drawings C-185, Rev. E7 and C-186, Rev. E3.6. Based on the above anchorage evaluations, is the anchorage free of YZ NDI UD-potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

YZ NDI UD] N/AD-There is some partially detached foam insulation on the discharge valve for P202F. As the mass for the insulation is very low, it does not present an adverse seismic interaction.

CR-PNP-2012-04405 was written to address this as a general plant housekeeping concern, and WR 286056 was initiated for repair.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NDl UD-- N/AD and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?Y[ NDI UD1 N/AD-10. Based on the above seismic interaction evaluations, is equipment free YZ NDl UDl of potentially adverse seismic interaction effects?EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C222 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: Y0I NEI Ur-Seismic Walkdown Checklist (SWC) SWELl- 059 Equipment ID No. P202F Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump F Loop B Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could Y0 NE] U[]adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

SWEL1-059 is on AWC-003.Evaluated by: David Small .A /, e /d Halie Aroz jI Date: 10/04/2012 10/04/2012 C)EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C223 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NF Ur-Seismic Walkdown Checklist (SWC) SWELl- 059 Equipment ID No. P202F Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump F Loop B Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C224 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[ N[-I U[III Seismic Walkdown Checklist (SWC) SWELl- 059 Equipment ID No. P202F Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump F Loop B Note: Typical anchor bolt.Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C225 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 6 Status: Y[ NE] U-D Seismic Walkdown Checklist (SWC) SWELl- 060 Equipment ID No. E209B Equip. Class, Tanks and Heat Exchangers (21)Equipment Description RBCCW Loop B Heat Exchanger Location:

Bldg. AXBAY Floor El. 3 Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one Y[ NOI of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?Both anchors in the south pedestal and the east anchor in the north pedestal are slightly skewed, and the west anchor in the north pedestal is not engaged by a small amount (approx. Y2 thread). These conditions are judged to be acceptable, and are not considered a seismic hazard.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[ N[-] Ur-] N/Ar-YE ND] ul- N/AD-'YN NDI uF- N/ADI I Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C226 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 6 Status: YZ NE] U-Seismic Walkdown Checklist (SWC) SWELl- 060 Equipment ID No. E209B Equip. Class Tanks and Heat Exchangers (21)Equipment Description RBCCW Loop B Heat Exchanger 5. Is the anchorage configuration consistent with plant documentation?

YZ NEi Ur- N/AF-](Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference Drawing C-185, Rev. E7, FRN 98-01-78, and FRN 95-01-60.6. Based on the above anchorage evaluations, is the anchorage free of YZ NE] UI-'potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

There is scaffolding very close to E209B that has a seismic evaluation tag, so it is acceptable for interaction effects.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

The Marinite board separating cable trays in the southwest corner of the room has some pieces missing. There are currently no pieces that are hanging off or look ready to fall, so it does not present a seismic interaction hazard.9. Do attached lines have adequate flexibility to avoid damage?YZ NE] UE-- N/AE-YZ NE] UEr] N/AE]Y[ NE[] U[] N/AE1 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C227 of C413 ATrACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 6 Status: YZ NO UMI Seismic Walkdown Checklist (SWC) SWELl- 060 Equipment ID No. E209B Equip. Class Tanks and Heat Exchangers (21)Equipment Description RBCCW Loop B Heat Exchanger Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y0 Nr-I UM adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

A loose label for equipment

  1. 29-HO-3840 was found on the west side of E209B on the north pedestal.

This was reported to Operations and an ESOMS request has been initiated.

See CR-PNP-2012-04411.

SWEL 1-060 is on AWC-003.Evaluated by: David Small 2 2 Date: 10/04/2012 Halie Aroz a 10/04/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C228 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 6 Status: YZ NF UF Seismic Walkdown Checklist (SWC) SWELl- 060 Equipment ID No. E209B Equip. Class Tanks and Heat Exchangers (21)Equipment Description RBCCWLooo B Heat Exchanger Photographs Note: Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C229 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 6 Status: YE NE] UD--Seismic Walkdown Checklist (SWC) SWELl- 060 Equipment ID No. E209B Equip. Class Tanks and Heat Exchangers (21)Equipment Description RBCCWLooo B Heat Exchanqer Note: Typical south pedestal anchor bolt.Note: Typical north pedestal anchor bolt.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C230 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 6 Status: Y[ NEI UIr Seismic Walkdown Checklist (SWC) SWELl- 060 Equipment ID No. E209B Equip. Class Tanks and Heat Exchangers (21)Equipment Description RBCCW Loop B Heat Exchanger Note: North pedestal modification.

Note: North pedestal modification.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C231 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YZ NIF UI-I Seismic Walkdown Checklist (SWC) SWELl- 061 Equipment ID No. C2205A Equip. Class, Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Location:

Bldg. RB Floor El. 51 Room, Area East Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

The SEWs package for this component conservatively evaluates one of four various instrument rack anchorages.

This rack was not evaluated, and therefore configuration can not be verified by the package. All bolts are visible, so the remainder of this section is applicable.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[-] YN NDJ UEI N/AL:]Y[ NDJ U-- N/AD YN NDI U-- N/AD1 Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C232 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE NEI UD Seismic Walkdown Checklist (SWC) SWELl- 061 Equipment ID No. C2205A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack 5. Is the anchorage configuration consistent with plant documentation?

Y[-- NO UI- N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Refer to response to question #1.6. Based on the above anchorage evaluations, is the anchorage free of YZ ND UD potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

C2205A is bolted to C2205B, so this is not a seismic interaction concern. C2205A is also adjacent to but not bolted to A TWS rack 2275;however, there is sufficient clearance ( > 2") between the racks.Therefore, this is not considered a potentially adverse seismic interaction.

One set screw is missing on the fence enclosing the racks. This is not a seismic hazard since the fence is judged to still be securely mounted to the floor, but CR-PNP-2012-04659 was written and WR 287549 initiated to address the concern. See attached photo.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?YN NW UW N/A[D]YN ND u[:] N/AD-I YS NW UD:] N/AD-I 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C233 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YoI NEI ur]Seismic Walkdown Checklist (SWC) SWELl- 061 Equipment ID No. C2205A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could Y[ NE] UI-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

SWEL 1-061 is on AWC-021.Evaluated by: Laura Maclay & AQL-2& " Halie Aroz 11 K Date: 10/17/2012 10/17/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C234 of C413 ATnACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y] NF- UD--Seismic Walkdown Checklist (SWC) SWELl- 061 Equipment ID No. C2205A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Photographs Note: Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C235 of C413 AT-IACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[ NE] U[--Seismic Walkdown Checklist (SWC) SWELl- 061 Equipment ID No. C2205A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Note: Missing set screw on fence.Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C236 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 4 Status: YZ NR- U[--Seismic Walkdown Checklist (SWC) SWELl- 062 Equipment ID No. C2205B Equip. Class, Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Location:

Bldg. RB Floor El. 51 Room, Area East Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

The SEWs package for this component conservatively evaluates one of four various instrument rack anchorages.

This rack was not evaluated, and therefore configuration can not be verified by the package. All bolts are visible, so the remainder of this section is applicable.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[--] NO: YEE NEJ URL N/AD--YO NE] U[] N/AL]YN N[] U-- N/Ar-' Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C237 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NIEj U[-']Seismic Walkdown Checklist (SWC) SWELl- 062 Equipment ID No. C2205B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack 5. Is the anchorage configuration consistent with plant documentation?

YrI NR] U[I N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Refer to response to question #1.6. Based on the above anchorage evaluations, is the anchorage free of YE NEI UrI potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YN NI] u[-] N/A[-]YN NE] U-I] N/A--Y[ NEI UL-] N/Ar]Y[ NE] U[-EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C238 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YO] NnZur U]Seismic Walkdown Checklist (SWC) SWELl- 062 Equipment ID No. C2205B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could Y0 NEI U[:]adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

SWEL1-062 is on AWC-021.Evaluated Date: 10/17/2012 10/17/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C239 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: Y[ NF- U--Seismic Walkdown Checklist (SWC) SWELl- 062 Equipment ID No. C2205B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Photographs Note: Equipment tag Note: Overall view of instrument rack from outside of fencing.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C240 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 6 Status: YE NDI U-Seismic Walkdown Checklist (SWC) SWELl- 063 Equipment ID No. C2206A Equip. Class, Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Location:

Bldg. RB Floor El. 51 Room, Area West Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

The SEWs package conservatively evaluates similar rack C2206B, which has only six anchors, and comparatively accepts the eight anchorage configuration for rack C2206A. Therefore, since a drawing does not specify the eight bolt configuration, this component was not chosen for the 50% verification.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[-] NZ YE NI UE-I N/A[--YE ND UD N/AD YE NDI U' N/AD' Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C241 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 6 Status: YZ NIF U-Seismic Walkdown Checklist (SWC) SWELl- 063 Equipment ID No. C2206A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack 5. Is the anchorage configuration consistent with plant documentation?

YrI NR UI- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Refer to response to question #1.6. Based on the above anchorage evaluations, is the anchorage free of YZ NEi UIZ potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Racks C2206A and C2206B are bolted together and therefore do not pose a seismic risk to each other.The robust barrier fence around Racks C2206A & C2206B has set screws missing from the base brackets of three of the vertical posts.The fence consists of an interconnected framework of light support members and wire mesh. The weight and mass of the assembly is relatively low. The remaining posts (approx 5) have the set screws installed.

The base brackets with the missing set screws still function to resist lateral loads. Since vertical seismic accelerations are less than Ig (Ref Spec C114ERQ), there is no expected uplift at the post locations.

Based on these considerations, the identified condition does not represent a potential adverse seismic interaction.

CR-PNP-2012-04627 was written to replace missing screws.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

The west masonry block walls next to the rack, 65.9 and 65.10 are safety related.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NDI UD- N/AD-]YZ NDl UD- N/AD-'YZ NDI Ur- N/AD-Y[ NDl UD1 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C242 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 6 Status: YZ NE] ULI Seismic Walkdown Checklist (SWC) SWELl- 063 Equipment ID No. C2206A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ N[-] Ur-adversely affect the safety functions of the equipment?

The cover for pressure transmitter 36-PT-654 is missing one of four bolts which keep the cover secured to the equipment.

This is not a seismic concern due the redundancy of the other three bolts. CR-PNP-2012-04629 was written to address this item and calls for replacement of the missing fastener.Comments (Additional pages may be added as necessary)

Area walk-by is A WC-020.~&]flAcA~~?fYJ~ic

~Evaluated by. Laura Ma .Date: 10-16-12 ,ý"ma-Wac Oam Aq I A. 16-12 IJUI V !dUSwg'Jg

'.1A.4 %-1LJ Aj EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C243 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 6 Status: YZ NR UD Seismic Walkdown Checklist (SWC) SWELl- 063 Equipment ID No. C2206A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Photographs Note: Equipment tag Note: Overall view of rack outside of fencing EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C244 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 6 Status: Y[ NI I U[--Seismic Walkdown Checklist (SWC) SWELl- 063 Equipment ID No. C2206A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Note: Typical anchors Note: Back of cover for pressure transmitter is missing a bolt (CR-PNP-2012-04629).

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C245 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 6 Status: Y[ NI U-Seismic Walkdown Checklist (SWC) SWELl- 063 Equipment ID No. C2206A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Note: Missing screw in fence base bracket (CR-PNP-2012-04627).

Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C246 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YZ NE] U--Seismic Walkdown Checklist (SWC) SWELl- 064 Equipment ID No. C2206B Equip. Class, Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Location:

Bldg. RB Floor El. 51 Room, Area West Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Y[ NE]2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?YE NE] ULI N/AEl YE NE] UE] N/AE]YE NE] UE] N/Ar-I Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C247 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YN NE] U--Seismic Walkdown Checklist (SWC) SWELl- 064 Equipment ID No. C2206B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack 5. Is the anchorage configuration consistent with plant documentation?

YN NEI U[r] N/A[-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Refer to SEWs package dated 6/19/95 for anchorage configuration.

6. Based on the above anchorage evaluations, is the anchorage free of YO NEI ULI potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Racks C2206A and C2206B are bolted together and therefore do not pose a seismic risk to each other.There is a 3" gap between C2276 and C2206B. However, both racks are well anchored.The robust barrier fence around Racks C2206A & C2206B has set screws missing from the base brackets of three of the vertical posts.The fence consists of an interconnected framework of light support members and wire mesh. The weight and mass of the assembly is relatively low. The remaining posts (approx 5) have the set screws installed.

The base brackets with the missing set screws still function to resist lateral loads. Since vertical seismic accelerations are less than Ig (Ref Spec C1 14ERQ), there is no expected uplift at the post locations.

Based on these considerations, the identified condition does not represent a potential adverse seismic interaction.

CR-PNP-2012-04627 was written to replace missing screws.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

The west masonry block walls next to the rack, 65.9 and 65.10 are safety related.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YN NEI UE- N/A[-]YZ NEI U[-] N/A[-]YN NEI UE] N/AE-YN NE ]UE]EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C248 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NEI UDýSeismic Walkdown Checklist (SWC) SWELl- 064 Equipment ID No. C2206B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NE]i Ur]adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Area walk-by is A WC-020.Evaluated by: Laura Maly '~aA A kCkQVL Gary Sweder Aal~ \~.tL.o_(3 -Date: 10-16-12 10-16-12 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C249 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YN Nn--I UI-Seismic Walkdown Checklist (SWC) SWELl- 064 Equipment ID No. C2206B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Photographs Note: Equipment tag Note: Overall view of both racks C2206A and C2206B.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C250 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[ NR Ur Seismic Walkdown Checklist (SWC) SWELl- 064 Equipment ID No. C2206B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Note: Missing set screw in surrounding fencing (CR-PNP-2012-04627)

Note: EN-DC-168 REV 0