Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:From:Michael Mulligan To:NRC Allegation | | {{#Wiki_filter:From: Michael Mulligan To: NRC Allegation |
|
| |
|
| ==Subject:== | | ==Subject:== |
| 2.206: Belgium Nuclear Plant Vessel Cracks in USA Plants Date:Thursday, March 26, 2015 10:56:12 AM Attachments: | | 2.206: Belgium Nuclear Plant Vessel Cracks in USA Plants Date: Thursday, March 26, 2015 10:56:12 AM Attachments: |
| Final Version 2.206 Belgian Cracks in USA Nuclear Power Plants.docx | | Final Version 2.206 Belgian Cracks in USA Nuclear Power Plants.docx |
|
| |
|
| ==Dear Sir,== | | ==Dear Sir,== |
|
| |
| In the attachment to this e-mail I am requesting a 2.206 on events surrounding the Belgium Doel 3 and Tihange 2 nuclear | | In the attachment to this e-mail I am requesting a 2.206 on events surrounding the Belgium Doel 3 and Tihange 2 nuclear |
|
| |
|
Line 38: |
Line 37: |
|
| |
|
| six months. | | six months. |
| Sincerely, | | Sincerely, Mike Mulligan |
| | |
| Mike Mulligan | |
|
| |
|
| Hinsdale, NH | | Hinsdale, NH |
Line 84: |
Line 81: |
| "However, as Belgian continues to debate the fate of the reactors, prolonged studies on the steel used in the construction of the reactors revealed unprecedented embrittlement | | "However, as Belgian continues to debate the fate of the reactors, prolonged studies on the steel used in the construction of the reactors revealed unprecedented embrittlement |
| - unusual swelling | | - unusual swelling |
| - that can compromise the integrity of the plant and possibly cause ruptures, spewing dangerous radioactive material equivalent to an atomic bomb." | | - that can compromise the integrity of the plant and possibly cause ruptures, spewing dangerous radioactive material equivalent to an atomic bomb." 9) I understand all US nuclear plants have coupons and I consider them irrelevant to this problem. |
| : 9) I understand all US nuclear plants have coupons and I consider them irrelevant to this problem.
| |
| : 10) Request the NRC coordinate with the Belgian Federal Agency for Nuclear Control (FANC). 11) Request detailed inspection on the condition of the reactor cladding and a explanation of any defects. | | : 10) Request the NRC coordinate with the Belgian Federal Agency for Nuclear Control (FANC). 11) Request detailed inspection on the condition of the reactor cladding and a explanation of any defects. |
| Sincerely, Mike Mulligan Hinsdale NH | | Sincerely, Mike Mulligan Hinsdale NH |
|
| |
|
| 1-603-336-8320 steamshovel2002@yahoo.com}} | | 1-603-336-8320 steamshovel2002@yahoo.com}} |
|
---|
Category:E-Mail
MONTHYEARML24030A0672024-01-26026 January 2024 Email EA Fonsi Notice to Kewaunee Solutions for Exemptions on Site Restoration Activities ML23268A4362023-09-21021 September 2023 Extension Date Approval for Request for Additional Information for Exemptions on Site Restoration Activities ML23134A0012023-05-0909 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No. 50-305) ML23129A0672023-05-0505 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request for Low-Level Radioactive Waste Transport Change from 20 to 45 Days Acknowledgement ML23100A0032023-04-0404 April 2023 Solutions - Acknowledgement Email Regarding Exemption Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No 50-305) ML23094A1442023-03-31031 March 2023 Solutions - Acknowledgement Email Regarding Exemption for Low-Level Radioactive Waste Transport within 20 Days (Docket No. 50-305) ML22108A1762022-04-14014 April 2022 E-mail: Proposed Order Conditions for In-Direct Transfer of Licenses Held by Energysolutions, LLC (Zion, TMI Unit-2, La Crosse Boiling Water Reactor, Kewaunee, Energysolutions Radioactive Materials License, and Energysolutions Export Licens ML22053A2992022-02-18018 February 2022 Email - Additional Time for Request for Additional Information Response Regarding Kewaunee Solutions Decommissioning Quality Assurance Program; NRC Response Included; (EPID L-2021-LLO-0002 and L-2021-DP3-0000) ML22027A3642022-01-26026 January 2022 KPS: CY2022 Inspection Plan, Docket No. 05000305, License No. DPR-43 ML22007A3182022-01-0707 January 2022 E-mail from C. Adams, State of Wisconsin, to K. Sturzebecher, NRC, Notification and Request Kewaunee Power Station License Transfer (L-2021-LLO-002) ML21348A0522021-12-0303 December 2021 E-mail to P. Schmidt, State of Wisconsin, from K. Sturzebecher, NRC - Notification and Request Kewaunee Power Station License Transfer ML21096A1332021-04-0606 April 2021 E-mail for Approval of Proprietary Withholding for Dominion Energy Exemptions for the Magnastor Storage Cask ML21075A1582021-03-15015 March 2021 E-mail from T. Silko to J. Parrott, NMSS, Vermont Yankee on the State of Vermont Comments on the Review of the Draft Final SER and EA for 20.2002 Alternate Disposal Request ML21006A0242020-12-22022 December 2020 E-mail from J. Parrott to J. Tierney and N. Creed Vermont Yankee Request to NRC for Alternate Disposal of Wastewater ML20358A0702020-12-22022 December 2020 E-mail Acceptance Review for Request for Indirect License Transfer (License DPR-28, Docket No. 50-271) ML20175A2122020-06-23023 June 2020 Acceptance Review of Request for Alternate Disposal of Wastes Under 10 CFR 20.2002 (License DPR-28, Docket No. 50-271) ML20015A3002020-01-14014 January 2020 KPS: CY2020 Master Inspection Plan ML19288A0292019-10-11011 October 2019 NRC Acceptance Review - Northstar Request for Exemption from 10 CFR 20, App G, Section Iii.E (License DPR-28, Docket No. 50-271) ML19289A1292019-10-11011 October 2019 Email from Daniel Doyle to Mark Leyse Status of PRM-50-93 and PRM-50-95 ML19198A2512019-06-20020 June 2019 Alternate Disposal Request - Rail Shipments (License DPR-28, Docket No. 50-271) ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19072A0652019-03-0606 March 2019 Conversation Record with T. Szymanski/Dominion Energy Response to 10 CFR 72.30(c)(3) in Triennial Update for Kewaunee ML19070A2642019-03-0505 March 2019 Email Conversation with T. Szymanski/Dominion Energy Decommissioning Funding Plan (Dfp): Kewaunee ML19059A1782019-02-28028 February 2019 Acceptance Review Results for Relief Request No. EN-19-RR-1 to Use ASME Code Case N-831-1 for Entergy Fleet ML18351A2742018-12-17017 December 2018 KPS: CY2019 Master Inspection Plan ML18289A3622018-10-11011 October 2018 Email from Daniel Doyle to Mark Leyse Status of PRM-50-93 and PRM-50-95 ML18127A5582018-04-25025 April 2018 Email to State of Vermont on Vermont Yankee Nuclear Power Station - Forthcoming Issuance of a License Amendment Regarding the Requirement for the VYNPS to Have a Cyber Security Plan ML18045A0862018-01-25025 January 2018 Email Request for Review of the Draft Safety Evaluation for Implementation of a Revised Emergency Plan at Vermont Yankee to Reflect an ISFSI-only Configuration ML17354A9382017-12-20020 December 2017 CY2018 Master Inspection Plan ML17353A0092017-12-18018 December 2017 E-Mail from William Irwin, Vermont Department of Health to Y. Chen/Dsfm Response: Draft Environmental Assessment: Exemption Request for Vermont Yankee Independent Spent Fuel Storage Installation ML17289A4222017-10-16016 October 2017 E-Mail from Y. J. Chen to W. Irwin Draft Environmental Assessment Exemption Request for Vermont Yankee Independent Spent Fuel Storage Installation ML17257A0022017-09-14014 September 2017 Email to VY Shpo W Ltr Re VYNPS Exemption Load Campaign - Sept 2017 ML17229B4842017-08-16016 August 2017 Request for Supplemental Documentation to Support Review of the Physical Security Plan ML17219A0472017-08-0303 August 2017 8/03/2017, E-Mail from Y. J. Chen/Nmss to T. B. Silko/Vermont Yankee Regarding Need for Additional Information Entergy'S Exemption Request for Vermont Yankee ISFSI, Dated May 16, 2017 (ML17142A358) ML17156A0032017-06-0202 June 2017 NRR E-mail Capture - Acceptance for Review of Revision 24 to the Dominion Nuclear Facility Quality Assurance Program Description (QAPD) Topical Report (CAC Nos. MF9732-MF9739) ML17144A0452017-05-23023 May 2017 5/23/2017, E-Mail to I. William/Vermont Dept. of Health from Y. Chen/Nrc Response: Draft Environment Assessment: Exemption Request for Vermont Yankee Independent Spent Fuel Storage Installation (W/Attachment Ltr to Address Comments on EA) ML17080A4752017-03-16016 March 2017 3/16/2017, E-Mail from I. William/Vermont Department of Health to Yen-Ju Chen/Dsfm/Sflb, Providing Comments on Draft Environmental Assessment for Entergy/Vermont Yankee'S Exemption from Requirement of 10 CFR 72.7 for CoC No. 72-1014, Amendm ML17055A6262017-02-24024 February 2017 Cover Email from VY Shpo W Concurrence on No Effects Determination ML17040A3372017-02-0909 February 2017 Email and Letter to Vermont Shpo ISFSI Exemption No Effects Determination ML17038A4682017-02-0707 February 2017 2/07/2017, E-mail from Yen-Ju Chen/NRC-DSFM to W. Irwin/Vermont Dept. of Health Draft Environment Assessment for Entergy/Vermont Yankee'S Exemption from Requirement of 10 CFR 72.7 for Certificate of Compliance No. 72-1014, Amendment 10 ML17012A2472017-01-11011 January 2017 E-mail - State of Vermont Comments Regarding Vermont Yankee'S 10 CFR 20.2002 Request ML16349A2492016-12-13013 December 2016 E-Mail to T. B. Silko/Entergy from Yen-Ju Chen/Dsfm Regarding Need for Supplemental Information for Entergy'S Exemption Request for Vermont Yankee ISFSI, Dated November 9, 2016 (ML16319A102) ML17013A2502016-12-12012 December 2016 Email Requesting Review of Draft EA and SER for Vermont Yankee Request to NRC for Alternate Disposal of Waste ML17040A0222016-10-18018 October 2016 Wisconsin State Notification (LAR259-L53082) ML16287A7142016-10-13013 October 2016 E-mail - Request for Additional Information: Dominion Energy Kewaunee, Dominion Nuclear Connecticut and Virginia Electric Power Company Nuclear Facility Quality Assurance Program Description Topical Report ML16231A0282016-08-11011 August 2016 Response to NRC Questions Related to Request for 20.2002 Disposal of Contaminated Water ML16231A2192016-07-28028 July 2016 Follow-up Questions Related to Entergy Request for 20.2002 Disposal of Contaminated Water ML16069A0952016-03-0303 March 2016 Request for 20.2002 Disposal, Request for Additional Information ML16053A5152016-02-17017 February 2016 Comment (037) of Emma Stamas on ANPR-26, 50, 52, 73, and 140 - Regulatory Improvements for Decommissioning Power Reactors ML16041A2732016-02-10010 February 2016 Final RAIs Regarding LAR 259 2024-01-26
[Table view] Category:Letter
MONTHYEARIR 05000305/20240032024-11-0606 November 2024 NRC Inspection Report No. 05000305/2024003 BVY 24-028, Pre-Notice of Disbursement from Decommissioning Trust2024-10-31031 October 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-10-30030 October 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-026, Pre-Notice of Disbursement from Decommissioning Trust2024-10-0202 October 2024 Pre-Notice of Disbursement from Decommissioning Trust ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000305/20240022024-08-22022 August 2024 NRC Inspection Report 05000305/2024002 BVY 24-024, Pre-Notice of Disbursement from Decommissioning Trust2024-07-30030 July 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-023, Pre-Notice of Disbursement from Decommissioning Trust2024-07-0202 July 2024 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20240012024-06-28028 June 2024 NRC Inspection Report No. 05000271/2024001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities BVY 24-022, Pre-Notice of Disbursement from Decommissioning Trust2024-05-30030 May 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-020, Biennial Update of Quality Assurance Program Manual2024-05-22022 May 2024 Biennial Update of Quality Assurance Program Manual ML24136A1952024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report ML24130A0022024-05-0909 May 2024 Summary of Facility Changes, Tests and Experiments and Commitment Changes BVY 24-019, 2023 Radiological Environmental Operating Report2024-05-0909 May 2024 2023 Radiological Environmental Operating Report BVY 24-017, Pre-Notice of Disbursement from Decommissioning Trust2024-05-0606 May 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-018, 2023 Radiological Effluent Release Report2024-05-0505 May 2024 2023 Radiological Effluent Release Report IR 05000305/20240012024-05-0202 May 2024 NRC Inspection Report No. 05000305/2024001 ML24121A2472024-04-29029 April 2024 And Three Mile Island, Unit 2 - 2023 Occupational Radiation Exposure Annual Report ML24101A0422024-04-22022 April 2024 Solutions Inc. – Exemption from Select Requirements of 10 CFR Part 73 ((Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) BVY 24-016, 2023 Individual Monitoring NRC Form 5 Report2024-04-18018 April 2024 2023 Individual Monitoring NRC Form 5 Report ML24106A0492024-04-15015 April 2024 2023 Annual Radioactive Effluent Release Report BVY 24-015, Pre-Notice of Disbursement from Decommissioning Trust2024-04-0101 April 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-014, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-04-0101 April 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-013, Status of Decommissioning and Spent Fuel Management Fund for the Year Ending 20232024-03-27027 March 2024 Status of Decommissioning and Spent Fuel Management Fund for the Year Ending 2023 ML24080A0702024-03-20020 March 2024 Decommissioning Trust Fund Annual Report ML24079A0162024-03-19019 March 2024 Annual Property Insurance Status Report BVY 24-012, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-03-14014 March 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G ML24073A2312024-03-13013 March 2024 And Three Mile Island Nuclear Station, Unit 2 - Management Change BVY 24-011, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-03-0606 March 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-010, Pre-Notice of Disbursement from Decommissioning Trust2024-03-0505 March 2024 Pre-Notice of Disbursement from Decommissioning Trust ML24053A2572024-03-0101 March 2024 Withdrawal of Requested Licensing Action for a License Amendment Submitted for Approval of the License Termination Plan BVY 24-009, Withdrawal of License Amendment Request to Add License Condition 3.K, License Termination Plan; Proposed Change No. 3172024-02-27027 February 2024 Withdrawal of License Amendment Request to Add License Condition 3.K, License Termination Plan; Proposed Change No. 317 BVY 24-007, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-02-26026 February 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-008, ISFSI, Annual Radioactive Effluent Release Report2024-02-26026 February 2024 ISFSI, Annual Radioactive Effluent Release Report IR 05000271/20230022024-02-20020 February 2024 NRC Inspection Report Nos. 05000271/2023002 and 07200059/2023001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont ML24061A0202024-02-15015 February 2024 (Ksp) ISFSI, Submittal of Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 6 BVY 24-006, Pre-Notice of Disbursement from Decommissioning Trust2024-02-0606 February 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-005, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-30030 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G ML23339A1332024-01-26026 January 2024 Exemption from the Req of 10 CFR Part 50.82(a)(8)(i)(A) to Use the Kewaunee Decommissioning Trust Fund for the Management of Site Restoration Activities BVY 24-004, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-23023 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-003, Nuclear Onsite Property Damage Insurance2024-01-0404 January 2024 Nuclear Onsite Property Damage Insurance BVY 24-001, Pre-Notice of Disbursement from Decommissioning Trust2024-01-0202 January 2024 Pre-Notice of Disbursement from Decommissioning Trust IR 05000305/20230022023-12-27027 December 2023 NRC Inspection Report 05000305/2023002 (Drss); 07200064/2023001 (Drss) BVY 23-030, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-12-20020 December 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-029, Proof of Financial Protection2023-12-12012 December 2023 Proof of Financial Protection BVY 23-028, Pre-Notice of Disbursement from Decommissioning Trust2023-11-28028 November 2023 Pre-Notice of Disbursement from Decommissioning Trust ML23332A1922023-11-28028 November 2023 Solutions, Inc., Request for Exemptions from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation BVY 23-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-21021 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-026, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-13013 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G 2024-09-18
[Table view] |
Text
From: Michael Mulligan To: NRC Allegation
Subject:
2.206: Belgium Nuclear Plant Vessel Cracks in USA Plants Date: Thursday, March 26, 2015 10:56:12 AM Attachments:
Final Version 2.206 Belgian Cracks in USA Nuclear Power Plants.docx
Dear Sir,
In the attachment to this e-mail I am requesting a 2.206 on events surrounding the Belgium Doel 3 and Tihange 2 nuclear
power plants. I am asking for an emergency inspection on the
Kewaunee Power Station and Vermont Yankee vessels. I am
requesting a preliminary notification in this of all dockets
and if serious flaws are discovered I am requesting all
domestic USA nuclear power plant's vessels be inspected within
six months.
Sincerely, Mike Mulligan
Hinsdale, NH
1-603-336-8320 steamshovel2002@yahoo.com
March 25, 2014 Mr. Mark A. Satorius Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555
-0001
Dear Mr. Satorius:
SUBJECT:
10 CFR 2.206 Petition requesting emergency ultrasonic inspection test or best available flaw detection technology for USA reactor plants similar to the thousands of cracks discovered in Belgium nuclear power plants.
"The discovery of the cracks in the reactors "could be a problem for the entire global nuclear industry," says Jan Bens, general director of the Belgian Federal Agency for Nuclear Control (FANC), speaking on." This is a 2.206 on all US nuclear plants. Please place on all plant dockets especially Vermont Yankee and Kewaunee Power Station.
I don't even think a LOCA in a vessel is even a consideration in plant licensing and this could be our Fukushima style accident in the USA.
Doel 3 and Tihange 2 "Cracks appear in the nuclear industry Cracks discovered in the walls of Belgian nuclear reactors are causing unease among experts. The reason: a previously unknown phenomenon
- material fatigue. There are fears that many more reactors could be affected.
Several thousand cracks have been discovered by corrosion experts in the pressure vessels of two reactors at the Belgian nuclear power stations Doel 3 and Tihange
- 2. Caused by a previously unknown phenomenon, material fatigue, it is feared the finding could have implications outside of Belgium.
The discovery of the cracks in the reactors "could be a problem for the entire global nuclear industry," says Jan Bens, general director of the Belgian Federal Agency for Nuclear Control (FANC), speaking on. Examination of nuclear reactors demanded Of most concern are the cracks that have been found in the walls of pressure vessels, the part of reactors where the highly radioactive chain reaction takes place. During such a process, the vessel is under extreme stress and instability caused by the cracks could cause a potentially catastrophic release of radioactive contamination.
It is already known that pressure vessels can become fatigued as a result of stress caused by pressure, temperature and radioactive materials. But the Belgian Nuclear Research Center in Mol has only just found out "that the material is mechanically weakened through radiation much more than previously thought," says Heinz Smital, nuclear physicist and expert at Greenpeace.
Nuclear material corrosion expert Walter Bogaerts, of Belgium's University of Leuven says that corrosion factors have until now been "underestimated", globally. He adds: "I would be really surprised if it had not also occurred elsewhere."
Reactors could be shut down Digby MacDonald, an expert in corrosion at the University of California, Berkley, analyzed the cracks together with Bogaerts and has advised nuclear reactor operators and government regulators that they should use ultrasound equipment to carefully examine reactors for cracks. "All reactor operators should be require under the leadership of regulatory authorities," says MacDonald. He adds that the results of such detailed investigations "could be insignificant, or so strong that all the reactors must be shut down."
According to nuclear experts, hydrogen from the reactor can penetrate the reactor wall and there in the steel increase the interior pressure causing small bubble and cracks from just a few millimeters in size "up to seven centimeters", says Smital.
Using special ultrasound equipment, experts discovered 13,047 cracks in total in the Belgian reactor Doel 3 and 3,149 in Tihange 2. The reactors have been shut down, as a result. Whether they will once again be connected to the network is, as of yet, unclear. Danger for the nuclear industry The appearance of the cracks as a result of material fatigue has caused a tide of reaction. Safety checks are being demanded all over world and "could lead to a wave of reactor closures", says Smital.
Greenpeace successfully sued the Belgian nuclear authority FANC in January following the publication of the detailed investigative documents. "It's a very delicate matter and could indeed have a huge impact on the whole nuclear industry," says Smital. Greenpeace is demanding that all reactors worldwide are closely examined.
The German Environment Ministry has also reacted and is seeking to have immediate contact with the Belgian authorities to see whether the findings could be applicable to German reactors.
But according to Greenpeace, the Belgian findings confirm the growing threat posed by old nuclear power plants. The world's reactors now have an average age of 29 years. "That is no longer state
-of-the-art, which can be dangerous, even when you upgrade," says Smital. "What are now needed are scenarios for a shut down of plants. Every country needs a get
-out plan."
" 1) I request exigent and immediate full scale ultrasonic inspections similar or with better technology (as was done on the Belgian Doel 3 and Tihange 2 nuclear plant discovering 13,047 recent cracks) on the following US nuclear power plant:
BWR: Vermont Yankee (June 1974)
PWR: Kewaunee Power Station (Nov 1972) (preferred to be first) Both these plants are permanently shut down so it won't disrupt plant operations.
An emergency ultrasonic inspection could occur very quickly based on the plants permanently shut down status and the Kewaunee plant is similar to the Belgium PWRs and its age.
The nuclear fuel is out of the core and the surroundings would have lower doses. You could quickly strip off the vessel insulation and you wouldn't need to replace it for lower doses.
You wouldn't have to replace the core interior components either? 2) I request large bore holes samples be cut out of both vessel at the worst place similar to the "Davis Besse hole in the reactor head
" event. Then transport the vessel specimens to a respected metallurgic laboratory for comprehensive off site testing.
- 3) Request an immediate NRC report and public meeting on the vulnera bilities with US reactor cracking and these mysterious weakened vessels.
- 4) If distressing and unsafe results are discovered at Vermont Yankee or Kewaunee, I request that within six months all USA plants be ultrasonically tested or better technology.
- 5) How has the average concentration of hydrogen in th e coolant changed over the recent decades? Would an increasing concentration of hydrogen in the coolant lead to more hydrogen ions getting injected into the vessel iron? 6) Does noble chemistry increase or decrease this kind of corrosion?
- 7) Are there other chemicals added to the coolant that could make this kind corrosion worst? 8) What are they talking about here:
"However, as Belgian continues to debate the fate of the reactors, prolonged studies on the steel used in the construction of the reactors revealed unprecedented embrittlement
- unusual swelling
- that can compromise the integrity of the plant and possibly cause ruptures, spewing dangerous radioactive material equivalent to an atomic bomb." 9) I understand all US nuclear plants have coupons and I consider them irrelevant to this problem.
- 10) Request the NRC coordinate with the Belgian Federal Agency for Nuclear Control (FANC). 11) Request detailed inspection on the condition of the reactor cladding and a explanation of any defects.
Sincerely, Mike Mulligan Hinsdale NH