ML17214A502: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ATTACHMENT f1Page1of9EMERGENCY PROCEDURE 1-OO3O142, REV.(DRAFT)ASFLORIDAPOWER6LIGHTCOMPANYSTeLUCIEUNIT1EMERGENCY OPERATING PROCEDURE 1&030142REVISION(DRAFT)ALTERNATE SHUTDOWNASTOTALNOiOFPAGES983105.70224 831007PDRADQCK05000335FPDR Page2of9FLORIDAPOWER6LIGHTCOMPANYST+LUCIEUNIT1EMERGENCY OPERATING PROCEDURE 1-0030142, REVI$ION(DRAFT)ALTERNATE SHUTDOWNI0SCOPE:Thisprocedure providesinstructions forplacingtheplantinasafecondition whenoperations cannotsafelybeconducted fromtheControlRoomduetoafireintheControlRoomand/orCableSpreading Room20SYMPTOMS:
{{#Wiki_filter:ATTACHMENT f 1 Page 1 of 9 EMERGENCY PROCEDURE 1-OO3O142, REV.(DRAFT)AS FLORIDA POWER 6 LIGHT COMPANY STe LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1&030142 REVISION (DRAFT)ALTERNATE SHUTDOWN AS TOTAL NOi OF PAGES 9 83105.70224 831007 PDR ADQCK 05000335 F PDR Page 2 of 9 FLORIDA POWER 6 LIGHT COMPANY ST+LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1-0030142, REVI$ION (DRAFT)ALTERNATE SHUTDOWN I 0 SCOPE: This procedure provides instructions for placing the plant in a safe condition when operations cannot safely be conducted from the Control Room due to a fire in the Control Room and/or Cable Spreading Room 2 0 SYMPTOMS: Conditions exist such that operations cannot be safely-conducted from the Contxol Room due to a fire, 3e0 AUTOMATIC ACZIONS: None 4o0 IMMEDIATE OPERATOR ACTION: ACTION 4~1 Manually trip the Reactor, Turbine, and Reactor Coolant Pumps prior to leaving the Control Room, if possiblei NOTE S 4~1 Push buttons and control switches on RTGB-101, 103 and 104'i2 Announce evacuation of the Control Room over the P A~system~4i3 Implement the Emergency Plan, as necessary, in accordance with EPIP 3100021E,"Duties and Responsibilities of the Emergency Coordinator"~4i4 Evacuate all personnel from the Control Roomi ST~LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION (DRAFT)ALTERNATE SHUTDOWN Page 3 of 9 AS 5>>0 SUBSE UENT ACTIONS: 5~1 Man and take control of stations as follows: CHECK 1~Reactor Control 0 erator"A"-Hot Shutdown Panel>>A>>Establish communications on the Sound Power Phone System>>BE Monitor available plant parameters on the Hot Shutdown Panel>>" NOTE If the fire is in the Cable Spreading Room, control of the reactor and other plant components must be done utilizing only"B" train components C>>Start motor or steam-driven AFW Pumps and feed the S/Gs as required>>CAUTION Slowly open AFW valves to S/Gs to prevent decreasing Pressurizer level due to excessive cooldown D>>Control Pressurizer pressure and level by manual control of Pressurizer heaters, auxiliary spray valves, and letdown valves>>
Conditions existsuchthatoperations cannotbesafely-conducted fromtheContxolRoomduetoafire,3e0AUTOMATIC ACZIONS:None4o0IMMEDIATE OPERATORACTION:ACTION4~1ManuallytriptheReactor,Turbine,andReactorCoolantPumpspriortoleavingtheControlRoom,ifpossiblei NOTES4~1PushbuttonsandcontrolswitchesonRTGB-101, 103and104'i2Announceevacuation oftheControlRoomoverthePA~system~4i3Implement theEmergency Plan,asnecessary, inaccordance withEPIP3100021E, "DutiesandResponsibilities oftheEmergency Coordinator"
STo LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION (DRAFg)ALTERNATE SHUTDOWN Page 4 of 9 AS 5<<0 SUBSE GENT ACTIONS: (continued) 5~1 (continued) 2~Assistant Nuclear Plant Su rvisor-Electrical Equipment Room, Reactor Auxiliary Building-43" Elevation Ai Open or check open Reactor Trip Breakers TCB-1'hrough 8, if possible~BE Place isolation switches in the ISOLATE position on the following switchgear in the order listed: NOTE Isolation switch lists are posted on respective switchgear cabinets throughout plant 480V Bus 1A3 Pressurizer heaters 8 480V Bus 1B3 Pressurizer heaters 8 480V LoCo 1A2 4160V Bus 1A3 480V MCC 1A5 480V MCC 1A6 480V LeC~1B2 4160V Bus 1B3 480V MCC 1B6 480V MCC 1B5 480V MCC lAB Isolation Panel 1AB Isolation Panel IA Isolation Panel 1B Evacuation Alarm Isolate Panel Ce Assist Reactor Control Operator"A" in monitoring unit parameters from the Hot Shutdown Panels 8 Only if accessible (due to location of fire)~
~4i4Evacuateallpersonnel fromtheControlRoomi ST~LUCIEUNIT1EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION(DRAFT)ALTERNATE SHUTDOWNPage3of9AS5>>0SUBSEUENTACTIONS:5~1Manandtakecontrolofstationsasfollows:CHECK1~ReactorControl0erator"A"-HotShutdownPanel>>A>>Establish communications ontheSoundPowerPhoneSystem>>BEMonitoravailable plantparameters ontheHotShutdownPanel>>"NOTEIfthefireisintheCableSpreading Room,controlofthereactorandotherplantcomponents mustbedoneutilizing only"B"traincomponents C>>Startmotororsteam-driven AFWPumpsandfeedtheS/Gsasrequired>>
yA e e Page 5 of 9 AS ST>>LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION (DRAPT)ALTERNATE SHUTDOWN 5,0 SUBSE UENT ACTIONS: (continued) 5>>l (continued) 3~Reactor Control 0 rator"B"-Turbine Operating Level>>A>>Locally trip or verify the Turbine has tripped CNECK B>>Verify Turbine Stop Valves and Control Valves are shut If not, initiate Turbine Trip from Turbine front standard>>C~Proceed to Turbine Building Switchgear Room and establish communications on the Sound Powered Phone circuit>>D>>Place isolation switches in the ISOLATE position for bus feeder breakers as follows: NOTE Isolation switch lists are posted on respective switchgear cabinets>>4160V Swgr, lA2 4160V Swgr>>1B2 6900V Swgr>>1A1 6900V Swgr>>1Bl E>>Stop 1A and 1B Main Peedwater Pumps, 1A and 1B Heater Drain Pumps and one Condensate Pump by opening their respective breakers>>CAUTION Ensure that one Condensate Pump remains in service if off-site power available>>
CAUTIONSlowlyopenAFWvalvestoS/Gstopreventdecreasing Pressurizer levelduetoexcessive cooldownD>>ControlPressurizer pressureandlevelbymanualcontrolofPressurizer heaters,auxiliary sprayvalves,andletdownvalves>>
ST>>LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION (DRAFT)ALTERNATE SHUTDOWN Page 6 of 9 AS 5,0 SUBSE UENT ACTIONS: (continued) 5 1 (continued) 4, Nuclear 0 rator-Reactor Auxiliary Building>>A>>Place isolate switches in ISOLATE/LOCAL position on the following switchgear:
SToLUCIEUNIT1EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION(DRAFg)ALTERNATE SHUTDOWNPage4of9AS5<<0SUBSEGENTACTIONS:(continued) 5~1(continued) 2~Assistant NuclearPlantSurvisor-Electrical Equipment Room,ReactorAuxiliary Building-43"Elevation AiOpenorcheckopenReactorTripBreakersTCB-1'hrough 8,ifpossible~
NOTE Isolation switch lists are posted on respective switchgear cabinets>>4160V Swgr, 1AB 480V.Load Center lAB BE Proceed to the Diesel Generator Building and place isolation switches on 1A and 1B Diesel Control Panels in ISOLATE position OTE Isolation switch lists are posted on respective switchgear cabinets C>>Proceed to the Charging Pump area and establish communications on the Sound Powered Phone circuit, A>>Muster the Fire Team comprised of at least five (5)individuals from the following classifications:
BEPlaceisolation switchesintheISOLATEpositiononthefollowing switchgear intheorderlisted:NOTEIsolation switchlistsarepostedonrespective switchgear cabinetsthroughout plant480VBus1A3Pressurizer heaters8480VBus1B3Pressurizer heaters8480VLoCo1A24160VBus1A3480VMCC1A5480VMCC1A6480VLeC~1B24160VBus1B3480VMCC1B6480VMCC1B5480VMCClABIsolation Panel1ABIsolation PanelIAIsolation Panel1BEvacuation AlarmIsolatePanelCeAssistReactorControlOperator"A"inmonitoring unitparameters fromtheHotShutdownPanels8Onlyifaccessible (duetolocationoffire)~
Watch Engineer Nuclear Turbine Operator (Unit.1)Nuclear Turbine Operator (Unit 2)Associate Nuclear Plant Operator (ANPO)Radiation Protection Man (RPM)BE Proceed to fight the fire in accordance with plant procedures and fire fighting strategies>>
yAeePage5of9ASST>>LUCIEUNIT1EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION(DRAPT)ALTERNATE SHUTDOWN5,0SUBSEUENTACTIONS:(continued) 5>>l(continued) 3~ReactorControl0rator"B"-TurbineOperating Level>>A>>LocallytriporverifytheTurbinehastrippedCNECKB>>VerifyTurbineStopValvesandControlValvesareshutIfnot,initiateTurbineTripfromTurbinefrontstandard>>
5,2 Maintain Pressurizer level at approximately 33K indicated levels STe LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION (DRAFT)ALTERNATE SHUTDOWN Page 7 of 9 AS 5,0 SUBSE UENT ACTIONS: (continued) 5i3 Maintain Pressurizer pressure at approximately 2100 psia by use of auxiliary spraysi NOTE If Pressurizer auxiliary spray actuates with Pressurizer/spray line temperature 5T>200oF, record as per AP 0010134'4 Verify natural circulation cooling of RCS by maintaining RCS temperature at or below 532 F (lA cold leg temperature) by use of Atmospheric Steam Dumps, Sf operable, 5,5 When conditions have stabilized after the plant trip, maintain or~slowl increase N/G levels by operation of the AFW Pumps and discharge valves to the S/Gs+CAUTION If decreasing RCS temperature and/or Pressurizer level occurs, consider decreasing AFW flow to the S/Gs, Si6 Isolate S/G blowdown by manually closing isolation valves at the Closed Blowdown Heat Exchangersi 5+7 When Turbine speed decreases to"0" RPM, verify that the Turning Gear Oil Pump and the turning gear are in operation 5,8 When conditions permit, reoccupy the Control Roomi Return isolation switches to NORMAL.for switches and controls that are operational and maintain the Unit at Hot Standby until a complete evaluation has been madee 5m9 If control cannot be restored to the Control Room, make preparations to place the Unit in a Cold Shutdown condition by utilizing OP 1-0030127,"Reactor Plant Cooldown-Hot Standby to Cold Shutdown," as a guide and substituting local manual operations where requirede~NOTE Prior to depressurization below 1600 psia, a manual blocking of all equipment associated with SIAS must be accomplished to prevent SIAS actuationi ST, LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION (DRAFT)ALTERNATE SHUTDOWN Page 8 of 9 AS 6oO PURPOSE AND DISCUSSION:
C~ProceedtoTurbineBuildingSwitchgear Roomandestablish communications ontheSoundPoweredPhonecircuit>>D>>Placeisolation switchesintheISOLATEpositionforbusfeederbreakersasfollows:NOTEIsolation switchlistsarepostedonrespective switchgear cabinets>>
This procedure provides instructions for placing the plant in a safe condition when operations cannot safely be conducted from the Control Room due to a fire in the Control Room and/or Cable Spreading Room The Reactor, Turbine, and Reactor Coolant Pumps are manually tripped prior to leaving the Control Room, if possible, or locally from the Reactor Trip Switchgear, Turbine front standard, and 6i9KV Switchgeari A heat sink is provided by automatic steam dump to the Condenser and/or to atmosphere Level is maintained in the'S/Gs by manual control of auxiliary feedwater valves with flow furnished by the AFW Pumps~Pressurizer level and pressure are maintained by manual control of Pressurizer heaters, auxiliary spray valves, and letdown valves, and are monitored at the Hot Shutdown Panel+Isolation switches located in the Reactor Auxiliary Building Electrical Equipment Room, Turbine Building Switchgear Room, Diesel Generator Rooms, and Reactor Auxiliary Building are manually selected to the ISOLATE position to prevent inadvertant operation of vital equipment due to possible electrical malfunction in the unattended Control Room A copy of this procedure will be posted at each manned operating station required for plant shutdown from outside the Control Room~A listing of isolation switches will be posted on each of the following panels, MCCs, and distribution buses 2~3~4~5~6~7~Load Centers lA2, 1B2, 1A5, 1B9, lAB, 1A6, 1B6 Isolation Panels lA, 1B, IAB MCC lA5, 1A6, 1B5, 1B&4160V Buses 1A3, 1B3, lAB 4160V Buses 1A2, IB2 6900V Buses lA1, 1Bl Diesel Generator lA and 1B Control Panels The Nuclear Plant Supervisor will utilize additional personnel as available to assist in required subsequent actionso ST+LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION (DRAFT)ALTERNATE SHUTDOWN Page 9 of 9 AS 7,0  
4160VSwgr,lA24160VSwgr>>1B26900VSwgr>>1A16900VSwgr>>1BlE>>Stop1Aand1BMainPeedwater Pumps,1Aand1BHeaterDrainPumpsandoneCondensate Pumpbyopeningtheirrespective breakers>>
CAUTIONEnsurethatoneCondensate Pumpremainsinserviceifoff-sitepoweravailable>>
ST>>LUCIEUNIT1EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION(DRAFT)ALTERNATE SHUTDOWNPage6of9AS5,0SUBSEUENTACTIONS:(continued) 51(continued) 4,Nuclear0rator-ReactorAuxiliary Building>>
A>>PlaceisolateswitchesinISOLATE/LOCAL positiononthefollowing switchgear:
NOTEIsolation switchlistsarepostedonrespective switchgear cabinets>>
4160VSwgr,1AB480V.LoadCenterlABBEProceedtotheDieselGenerator Buildingandplaceisolation switcheson1Aand1BDieselControlPanelsinISOLATEpositionOTEIsolation switchlistsarepostedonrespective switchgear cabinetsC>>ProceedtotheChargingPumpareaandestablish communications ontheSoundPoweredPhonecircuit,A>>MustertheFireTeamcomprised ofatleastfive(5)individuals fromthefollowing classifications:
WatchEngineerNuclearTurbineOperator(Unit.1)NuclearTurbineOperator(Unit2)Associate NuclearPlantOperator(ANPO)Radiation Protection Man(RPM)BEProceedtofightthefireinaccordance withplantprocedures andfirefightingstrategies>>
5,2MaintainPressurizer levelatapproximately 33Kindicated levels STeLUCIEUNIT1EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION(DRAFT)ALTERNATE SHUTDOWNPage7of9AS5,0SUBSEUENTACTIONS:(continued) 5i3MaintainPressurizer pressureatapproximately 2100psiabyuseofauxiliary spraysiNOTEIfPressurizer auxiliary sprayactuateswithPressurizer/spray linetemperature 5T>200oF,recordasperAP0010134'4Verifynaturalcirculation coolingofRCSbymaintaining RCStemperature atorbelow532F(lAcoldlegtemperature) byuseofAtmospheric SteamDumps,Sfoperable, 5,5Whenconditions havestabilized aftertheplanttrip,maintainor~slowlincreaseN/Glevelsbyoperation oftheAFWPumpsanddischarge valvestotheS/Gs+CAUTIONIfdecreasing RCStemperature and/orPressurizer leveloccurs,considerdecreasing AFWflowtotheS/Gs,Si6IsolateS/Gblowdownbymanuallyclosingisolation valvesattheClosedBlowdownHeatExchangersi 5+7WhenTurbinespeeddecreases to"0"RPM,verifythattheTurningGearOilPumpandtheturninggearareinoperation 5,8Whenconditions permit,reoccupytheControlRoomiReturnisolation switchestoNORMAL.forswitchesandcontrolsthatareoperational andmaintaintheUnitatHotStandbyuntilacompleteevaluation hasbeenmadee5m9IfcontrolcannotberestoredtotheControlRoom,makepreparations toplacetheUnitinaColdShutdowncondition byutilizing OP1-0030127, "ReactorPlantCooldown-HotStandbytoColdShutdown,"
asaguideandsubstituting localmanualoperations whererequirede
~NOTEPriortodepressurization below1600psia,amanualblockingofallequipment associated withSIASmustbeaccomplished topreventSIASactuationi ST,LUCIEUNIT1EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION(DRAFT)ALTERNATE SHUTDOWNPage8of9AS6oOPURPOSEANDDISCUSSION:
Thisprocedure providesinstructions forplacingtheplantinasafecondition whenoperations cannotsafelybeconducted fromtheControlRoomduetoafireintheControlRoomand/orCableSpreading RoomTheReactor,Turbine,andReactorCoolantPumpsaremanuallytrippedpriortoleavingtheControlRoom,ifpossible, orlocallyfromtheReactorTripSwitchgear, Turbinefrontstandard, and6i9KVSwitchgeari Aheatsinkisprovidedbyautomatic steamdumptotheCondenser and/ortoatmosphere Levelismaintained inthe'S/Gsbymanualcontrolofauxiliary feedwater valveswithflowfurnished bytheAFWPumps~Pressurizer levelandpressurearemaintained bymanualcontrolofPressurizer heaters,auxiliary sprayvalves,andletdownvalves,andaremonitored attheHotShutdownPanel+Isolation switcheslocatedintheReactorAuxiliary BuildingElectrical Equipment Room,TurbineBuildingSwitchgear Room,DieselGenerator Rooms,andReactorAuxiliary BuildingaremanuallyselectedtotheISOLATEpositiontopreventinadvertant operation ofvitalequipment duetopossibleelectrical malfunction intheunattended ControlRoomAcopyofthisprocedure willbepostedateachmannedoperating stationrequiredforplantshutdownfromoutsidetheControlRoom~Alistingofisolation switcheswillbepostedoneachofthefollowing panels,MCCs,anddistribution buses2~3~4~5~6~7~LoadCenterslA2,1B2,1A5,1B9,lAB,1A6,1B6Isolation PanelslA,1B,IABMCClA5,1A6,1B5,1B&4160VBuses1A3,1B3,lAB4160VBuses1A2,IB26900VBuseslA1,1BlDieselGenerator lAand1BControlPanelsTheNuclearPlantSupervisor willutilizeadditional personnel asavailable toassistinrequiredsubsequent actionso ST+LUCIEUNIT1EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION(DRAFT)ALTERNATE SHUTDOWNPage9of9AS7,0


==REFERENCES:==
==REFERENCES:==


7elEOP10030141,"ControlRoomInaccessibility"
7 el EOP 1 0030141,"Control Room Inaccessibility">>7 2 St~Lucie Unit 1 Technical Specificationsi 7.3 10 CFR 50, Appendix R.8 0 RECORDS: 8~1 A completed, initialed copy of this procedure shall be retained in the plant filesi 9'REVIEW AND APPROVAL: Reviewed by Facility Review Group Approved by Revision Reviewed by PRG Approved by lant Manager Plant Manager 19 19 19 EP 1-0030142 Revision (draft)Total No of Pages 9 TABLE 1 PAGE 1 OF 4 ISOLATION SWITCHES AVAILABLE FOR ALTERNATE SHUTDOWN-ST LUCIF.UNIT NO 1 PANEL OR POWER CENTER Isolation Panel 1A Isolation Panel lB PLANT LOCATION A-Swgr Room B-Swgr Room FIRE 70NE 60 SWITCH DES IGNAT ION SS/189-1 SS/158 SS-3/603 Ss-l/603 Ss-l/380 SS/130 SS-1/157 SS/189-2 SS-2/157 SS-4/604 SS-2/603 SS-2/380 COMPONENT Auxil fary Spray Valve Letdown&Spray Va1ves Control SG lA Press&Level Indfcatfon SG 1A Atm Steam Dump Control SG 1A Level (Wfde Range>Pressurfzer level&Press Ind T.etdown Isolatfon Valve V-1402, PORV I-SF.-02-01, Charging Lfne Iso Auxflfary Spray Valve Letdown Stop Valve SG 18 Press&T.evel Indfcatfon SG 18 Atm Steam Pump Control SG 18 Level (Wide Range>Pressurfzer Level&Press Ind V-1404, PORV e Isolation Panel lAB Isolation Panel Cable Spread Room Communications Room 57 73 SS/631 SS/632 AFW Pump lC Turbfne Ind AFW Pump 1C Stop Valve Ffre Alarm/Sf te Fvac-Control Control Room PA Code Call DG lA Control Panel DG Buf1ding lA Voltage Control Frequency Control Start Cfrcuft DG lB Control Panel DG Buf 1 d ing 1B Vol tage Control Frequency Control Start Cfrcuft MCC lA5 A-Swgr Boom 60 V-2514, BAMP to Cbrgr Pumps MV-14-6, Fan Coo>er CCW Inlet MV-4-8, Fan Cooler CCW Outlet MV-09-9, AFW Pump lA Dfscharge in>nn w o A mr.v r PAGE 2 OF 4~~0 TABLE 1 ISOLATION SWITCHES AVAILABLE FOR ALTERNATE SHUTDOWN (Cont'd)ST LUCIE UNIT NO 1 PANEL OR POWER CENTER MCC 1B5 MCCC 1A6 MCC lB6 MCC-1AB PLANT LOCATION B-Swgr Room A-Swgr Room B-Swgr Room Cable Spread Room FIRE 70NE 56 60 57 SWITCH DES IGNAT ION COMPONFNT V-2508, 8AMT 18 Gravity Feed V-250~, BAMT lA Gravity Feed MV-14-5, Fan Cooler CCW Inlet MV-14-7, Fan Cooler CCW Outlet MV-OO-10, AFW Pump 18 Discharge MV-09-14, AFW Cross Tie V-2504, RWT to Charging Pumps V-1405, PORV Block BAMP 1A BAMP 1B HVA-3A, Control Room AC HVA-6A, Shield Building Exh HVE-'13A, Cont Room Booster HVA-38, Cont Room AC HVF.-68, Shield 8uilding Fxh HVE-138, Cont Room Booster HVA-3C, Cont Room AC MV-0'l-ll, AFW pump lC Discharge MV-QO-17, AFW Pump 1C Discharge MV-08-1'1, AFW Pump>urb Supply MV-08-14, AIW Pump Turb Supply MV-14-1, C(W Discharge MV-14-2, CCW Discharge MV-14-3, CCW Di scbarge MV-14-4, COP Discharge 480V Swgr 1A2 A-Swgr Room 60 SS Transformer 1A2 Bus Tie to 480 V 1A8 Air Recirc Fan HVS 1A Air Recirc Fan HVS 18 Charging Pump 1A TABLE 1 PAGE 3 OF 4~~ISOLATION SWITCHES AVAILABLE FOR ALTERNATE SHUTDOWN (Cont'd)ST LUCIF.UNIT NO 1 PANEL OR POWER CENTER 480 V Swgr 1B2 480 V Swgr lAB 480 U Bus 1A3 480 V Bus 1B3 4.16 kV Bus lA3 PLANT LOCATION B-Swgr Room AB-Swgr Room Cable Spread Room Cable Spread Room A-Swgr Room FIRE ZONE 47 57 57 60 SWITCH DES IGNAT ION COMPONENT SS Transformer 1H2 Hus Tfe to 480 V lAB Afr Recfrc Fan 1C Afr Recfrc Fan 19 Cbargfng Pump 1H Hus Tfe to 480 V Swgr 1A2 Hus<fe to 480 V Swgr 182 Cbargfng Pump lC Heater.Hank P-1 Heater Bank B-1 Heater Ban'k H-2 Heater Hank H-3 Heater Bank P-2 Heater Hank H-4 Heater Hank H-5 Heater Bank B-6 A HPSI Pump A LPSI Pump A Cont Spray Pump Feed to Press Htr Trans 1A A Comp Coolfng Wtr Pump A Intake Cool.fng Wtr Pump Feed to 4.16 kV Swgr lAB Feed From 4.16 kU Hus 1A2 Feed to 4.16 kV Sta Ser Trans 1A2 Feed from Fmerg Dfese1 A A Auxflfary Feedwater Pump TABLE 1 PAGF.4 OF 4~~t~ISOLATION SWITCHES AVAILABLE FOR ALTERNATF.
>>72St~LucieUnit1Technical Specificationsi 7.310CFR50,AppendixR.80RECORDS:8~1Acompleted, initialed copyofthisprocedure shallberetainedintheplantfilesi9'REVIEWANDAPPROVAL:
SHUTDOWN (Cont'd'l ST LUCIE UNIT NO 1 PANEL OR POWER CENTER 4.16 kV Bus 183 4.16 kV Bus lAB 4.16 kV Bus 1A2 4.16 kV Bus 182 6.9 kV Bus 1Al 6.'9 kV Bus 181 PLANT LOCATION 8-Swgr Room AB-Swgr Room Turbine Bufldfng Turbine Building Turbine Buflding Turbine Building FIRE 7.0NE 56 47 21 22 21 22 SWITCH DES IGNAT TON 8 HPSI Pump 8 LPSI Pump 8 Cont Spray Pump Feed to Press Htr Trans 18 8 Comp Cooling Wtr Pump 8 Intake Cool fng-Wtr Pump Feed to 4.16 kV Swgr 1AB Feed from 4.16 kV Bus 182 Feed to 4.16 kV Sta Ser Trans 182 Feed from Emerg Dfesel 8 8 Auxflfary Feedwater Pump C HPSI Pump C Comp Coolfng Wtr Pump C Intake Cooling Wtr Pump'eed from 4.16 kV Bus lA3 Feed from 4.16 kV Bus 183 Feed to 4.16 kV Sta Ser Trans 1Al Feed from SU Trans lA Feed to 4.16 kV Swgr lA3 Feed to 4.16 kV Sta Ser Trans 181 Feed from SU Trans 18 Feed to 4.16 kV Swgr 183 Feed from SU Trans 1A Feed from SU Trans 18 0502s e FLORIDA POWER 6 LIGHT COMPANY ST LUCIE PLANT-UNIT NO~1 ALTERNATIVE SHUTDOWN e)Attachment l outlines the basic steps required to bring the plant to cold shutdown from outside the Control Room.This procedure has been developed to instruct plant operators in the specifi'c tasks required to effect safe shutdown.f)'he manpower available to perform safe shutdown functions as well fires is described in Attachment l..~r.(y-c-5 g)Tests will be performed periodically and that the equipment-cannot
ReviewedbyFacilityReviewGroupApprovedbyRevisionReviewedbyPRGApprovedbylantManagerPlantManager191919EP1-0030142 Revision(draft)TotalNoofPages9 TABLE1PAGE1OF4ISOLATION SWITCHESAVAILABLE FORALTERNATE SHUTDOWN-STLUCIF.UNITNO1PANELORPOWERCENTERIsolation Panel1AIsolation PanellBPLANTLOCATIONA-SwgrRoomB-SwgrRoomFIRE70NE60SWITCHDESIGNATIONSS/189-1SS/158SS-3/603Ss-l/603Ss-l/380SS/130SS-1/157SS/189-2SS-2/157SS-4/604SS-2/603SS-2/380COMPONENT AuxilfarySprayValveLetdown&SprayVa1vesControlSGlAPress&LevelIndfcatfon SG1AAtmSteamDumpControlSG1ALevel(WfdeRange>Pressurfzer level&PressIndT.etdownIsolatfon ValveV-1402,PORVI-SF.-02-01, ChargingLfneIsoAuxflfary SprayValveLetdownStopValveSG18Press&T.evelIndfcatfon SG18AtmSteamPumpControlSG18Level(WideRange>Pressurfzer Level&PressIndV-1404,PORVeIsolation PanellABIsolation PanelCableSpreadRoomCommunications Room5773SS/631SS/632AFWPumplCTurbfneIndAFWPump1CStopValveFfreAlarm/SfteFvac-ControlControlRoomPACodeCallDGlAControlPanelDGBuf1dinglAVoltageControlFrequency ControlStartCfrcuftDGlBControlPanelDGBuf1ding1BVoltageControlFrequency ControlStartCfrcuftMCClA5A-SwgrBoom60V-2514,BAMPtoCbrgrPumpsMV-14-6,FanCoo>erCCWInletMV-4-8,FanCoolerCCWOutletMV-09-9,AFWPumplADfscharge in>nnwoAmr.vr PAGE2OF4~~0TABLE1ISOLATION SWITCHESAVAILABLE FORALTERNATE SHUTDOWN(Cont'd)STLUCIEUNITNO1PANELORPOWERCENTERMCC1B5MCCC1A6MCClB6MCC-1ABPLANTLOCATIONB-SwgrRoomA-SwgrRoomB-SwgrRoomCableSpreadRoomFIRE70NE566057SWITCHDESIGNATIONCOMPONFNT V-2508,8AMT18GravityFeedV-250~,BAMTlAGravityFeedMV-14-5,FanCoolerCCWInletMV-14-7,FanCoolerCCWOutletMV-OO-10, AFWPump18Discharge MV-09-14, AFWCrossTieV-2504,RWTtoChargingPumpsV-1405,PORVBlockBAMP1ABAMP1BHVA-3A,ControlRoomACHVA-6A,ShieldBuildingExhHVE-'13A, ContRoomBoosterHVA-38,ContRoomACHVF.-68,Shield8uildingFxhHVE-138,ContRoomBoosterHVA-3C,ContRoomACMV-0'l-ll, AFWpumplCDischarge MV-QO-17, AFWPump1CDischarge MV-08-1'1, AFWPump>urbSupplyMV-08-14, AIWPumpTurbSupplyMV-14-1,C(WDischarge MV-14-2,CCWDischarge MV-14-3,CCWDiscbargeMV-14-4,COPDischarge 480VSwgr1A2A-SwgrRoom60SSTransformer 1A2BusTieto480V1A8AirRecircFanHVS1AAirRecircFanHVS18ChargingPump1A TABLE1PAGE3OF4~~ISOLATION SWITCHESAVAILABLE FORALTERNATE SHUTDOWN(Cont'd)STLUCIF.UNITNO1PANELORPOWERCENTER480VSwgr1B2480VSwgrlAB480UBus1A3480VBus1B34.16kVBuslA3PLANTLOCATIONB-SwgrRoomAB-SwgrRoomCableSpreadRoomCableSpreadRoomA-SwgrRoomFIREZONE47575760SWITCHDESIGNATIONCOMPONENT SSTransformer 1H2HusTfeto480VlABAfrRecfrcFan1CAfrRecfrcFan19CbargfngPump1HHusTfeto480VSwgr1A2Hus<feto480VSwgr182CbargfngPumplCHeater.HankP-1HeaterBankB-1HeaterBan'kH-2HeaterHankH-3HeaterBankP-2HeaterHankH-4HeaterHankH-5HeaterBankB-6AHPSIPumpALPSIPumpAContSprayPumpFeedtoPressHtrTrans1AACompCoolfngWtrPumpAIntakeCool.fngWtrPumpFeedto4.16kVSwgrlABFeedFrom4.16kUHus1A2Feedto4.16kVStaSerTrans1A2FeedfromFmergDfese1AAAuxflfary Feedwater Pump TABLE1PAGF.4OF4~~t~ISOLATION SWITCHESAVAILABLE FORALTERNATF.
-be-operated-from-th ,that-the-equipmen~
SHUTDOWN(Cont'd'l STLUCIEUNITNO1PANELORPOWERCENTER4.16kVBus1834.16kVBuslAB4.16kVBus1A24.16kVBus1826.9kVBus1Al6.'9kVBus181PLANTLOCATION8-SwgrRoomAB-SwgrRoomTurbineBufldfngTurbineBuildingTurbineBufldingTurbineBuildingFIRE7.0NE564721222122SWITCHDESIGNATTON8HPSIPump8LPSIPump8ContSprayPumpFeedtoPressHtrTrans188CompCoolingWtrPump8IntakeCoolfng-WtrPumpFeedto4.16kVSwgr1ABFeedfrom4.16kVBus182Feedto4.16kVStaSerTrans182FeedfromEmergDfesel88Auxflfary Feedwater PumpCHPSIPumpCCompCoolfngWtrPumpCIntakeCoolingWtrPump'eedfrom4.16kVBuslA3Feedfrom4.16kVBus183Feedto4.16kVStaSerTrans1AlFeedfromSUTranslAFeedto4.16kVSwgrlA3Feedto4.16kVStaSerTrans181FeedfromSUTrans18Feedto4.16kVSwgr183FeedfromSUTrans1AFeedfromSUTrans18 0502seFLORIDAPOWER6LIGHTCOMPANYSTLUCIEPLANT-UNITNO~1ALTERNATIVE SHUTDOWNe)Attachment loutlinesthebasicstepsrequiredtobringtheplanttocoldshutdownfromoutsidetheControlRoom.Thisprocedure hasbeendeveloped toinstructplantoperators inthespecifi'c tasksrequiredtoeffectsafeshutdown.
t o crate fr from the Hot Shutdown-.Panel-when.
f)'hemanpoweravailable toperformsafeshutdownfunctions aswellfiresisdescribed inAttachment l..~r.(y-c-5g)Testswillbeperformed periodically andthattheequipment-cannot
transfer-swah position.on (gg~(+F~)y PP)I as fight C h h)Technical Specifications will be prepared to cover all new isolation/
-be-operated-from-th
transfer switches added for alternative shutdown.~i)Only existing components and systems will be employed for alternative shutdown.As such, verification of system capabilities is not required.Circuitry modifications will be consistent with existing design criteria.j)No credit is taken for repair of damaged cold shutdown equipment.
,that-the-equipmen~
0 0~~\l l/l/}}
tocratefrfromtheHotShutdown-.Panel-when.
transfer-swah position.
on(gg~(+F~)yPP)IasfightChh)Technical Specifications willbepreparedtocoverallnewisolation/
transferswitchesaddedforalternative shutdown.
~i)Onlyexistingcomponents andsystemswillbeemployedforalternative shutdown.
Assuch,verification ofsystemcapabilities isnotrequired.
Circuitry modifications willbeconsistent withexistingdesigncriteria.
j)Nocreditistakenforrepairofdamagedcoldshutdownequipment.
00~~\ll/l/}}

Revision as of 18:34, 7 July 2018

Draft Emergency Operating Procedure 1-0030142, Alternate Shutdown.
ML17214A502
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/27/1983
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17214A501 List:
References
1-0030142-DRFT, 1-30142-DRFT, NUDOCS 8310170224
Download: ML17214A502 (15)


Text

ATTACHMENT f 1 Page 1 of 9 EMERGENCY PROCEDURE 1-OO3O142, REV.(DRAFT)AS FLORIDA POWER 6 LIGHT COMPANY STe LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1&030142 REVISION (DRAFT)ALTERNATE SHUTDOWN AS TOTAL NOi OF PAGES 9 83105.70224 831007 PDR ADQCK 05000335 F PDR Page 2 of 9 FLORIDA POWER 6 LIGHT COMPANY ST+LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1-0030142, REVI$ION (DRAFT)ALTERNATE SHUTDOWN I 0 SCOPE: This procedure provides instructions for placing the plant in a safe condition when operations cannot safely be conducted from the Control Room due to a fire in the Control Room and/or Cable Spreading Room 2 0 SYMPTOMS: Conditions exist such that operations cannot be safely-conducted from the Contxol Room due to a fire, 3e0 AUTOMATIC ACZIONS: None 4o0 IMMEDIATE OPERATOR ACTION: ACTION 4~1 Manually trip the Reactor, Turbine, and Reactor Coolant Pumps prior to leaving the Control Room, if possiblei NOTE S 4~1 Push buttons and control switches on RTGB-101, 103 and 104'i2 Announce evacuation of the Control Room over the P A~system~4i3 Implement the Emergency Plan, as necessary, in accordance with EPIP 3100021E,"Duties and Responsibilities of the Emergency Coordinator"~4i4 Evacuate all personnel from the Control Roomi ST~LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION (DRAFT)ALTERNATE SHUTDOWN Page 3 of 9 AS 5>>0 SUBSE UENT ACTIONS: 5~1 Man and take control of stations as follows: CHECK 1~Reactor Control 0 erator"A"-Hot Shutdown Panel>>A>>Establish communications on the Sound Power Phone System>>BE Monitor available plant parameters on the Hot Shutdown Panel>>" NOTE If the fire is in the Cable Spreading Room, control of the reactor and other plant components must be done utilizing only"B" train components C>>Start motor or steam-driven AFW Pumps and feed the S/Gs as required>>CAUTION Slowly open AFW valves to S/Gs to prevent decreasing Pressurizer level due to excessive cooldown D>>Control Pressurizer pressure and level by manual control of Pressurizer heaters, auxiliary spray valves, and letdown valves>>

STo LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION (DRAFg)ALTERNATE SHUTDOWN Page 4 of 9 AS 5<<0 SUBSE GENT ACTIONS: (continued) 5~1 (continued) 2~Assistant Nuclear Plant Su rvisor-Electrical Equipment Room, Reactor Auxiliary Building-43" Elevation Ai Open or check open Reactor Trip Breakers TCB-1'hrough 8, if possible~BE Place isolation switches in the ISOLATE position on the following switchgear in the order listed: NOTE Isolation switch lists are posted on respective switchgear cabinets throughout plant 480V Bus 1A3 Pressurizer heaters 8 480V Bus 1B3 Pressurizer heaters 8 480V LoCo 1A2 4160V Bus 1A3 480V MCC 1A5 480V MCC 1A6 480V LeC~1B2 4160V Bus 1B3 480V MCC 1B6 480V MCC 1B5 480V MCC lAB Isolation Panel 1AB Isolation Panel IA Isolation Panel 1B Evacuation Alarm Isolate Panel Ce Assist Reactor Control Operator"A" in monitoring unit parameters from the Hot Shutdown Panels 8 Only if accessible (due to location of fire)~

yA e e Page 5 of 9 AS ST>>LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION (DRAPT)ALTERNATE SHUTDOWN 5,0 SUBSE UENT ACTIONS: (continued) 5>>l (continued) 3~Reactor Control 0 rator"B"-Turbine Operating Level>>A>>Locally trip or verify the Turbine has tripped CNECK B>>Verify Turbine Stop Valves and Control Valves are shut If not, initiate Turbine Trip from Turbine front standard>>C~Proceed to Turbine Building Switchgear Room and establish communications on the Sound Powered Phone circuit>>D>>Place isolation switches in the ISOLATE position for bus feeder breakers as follows: NOTE Isolation switch lists are posted on respective switchgear cabinets>>4160V Swgr, lA2 4160V Swgr>>1B2 6900V Swgr>>1A1 6900V Swgr>>1Bl E>>Stop 1A and 1B Main Peedwater Pumps, 1A and 1B Heater Drain Pumps and one Condensate Pump by opening their respective breakers>>CAUTION Ensure that one Condensate Pump remains in service if off-site power available>>

ST>>LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION (DRAFT)ALTERNATE SHUTDOWN Page 6 of 9 AS 5,0 SUBSE UENT ACTIONS: (continued) 5 1 (continued) 4, Nuclear 0 rator-Reactor Auxiliary Building>>A>>Place isolate switches in ISOLATE/LOCAL position on the following switchgear:

NOTE Isolation switch lists are posted on respective switchgear cabinets>>4160V Swgr, 1AB 480V.Load Center lAB BE Proceed to the Diesel Generator Building and place isolation switches on 1A and 1B Diesel Control Panels in ISOLATE position OTE Isolation switch lists are posted on respective switchgear cabinets C>>Proceed to the Charging Pump area and establish communications on the Sound Powered Phone circuit, A>>Muster the Fire Team comprised of at least five (5)individuals from the following classifications:

Watch Engineer Nuclear Turbine Operator (Unit.1)Nuclear Turbine Operator (Unit 2)Associate Nuclear Plant Operator (ANPO)Radiation Protection Man (RPM)BE Proceed to fight the fire in accordance with plant procedures and fire fighting strategies>>

5,2 Maintain Pressurizer level at approximately 33K indicated levels STe LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION (DRAFT)ALTERNATE SHUTDOWN Page 7 of 9 AS 5,0 SUBSE UENT ACTIONS: (continued) 5i3 Maintain Pressurizer pressure at approximately 2100 psia by use of auxiliary spraysi NOTE If Pressurizer auxiliary spray actuates with Pressurizer/spray line temperature 5T>200oF, record as per AP 0010134'4 Verify natural circulation cooling of RCS by maintaining RCS temperature at or below 532 F (lA cold leg temperature) by use of Atmospheric Steam Dumps, Sf operable, 5,5 When conditions have stabilized after the plant trip, maintain or~slowl increase N/G levels by operation of the AFW Pumps and discharge valves to the S/Gs+CAUTION If decreasing RCS temperature and/or Pressurizer level occurs, consider decreasing AFW flow to the S/Gs, Si6 Isolate S/G blowdown by manually closing isolation valves at the Closed Blowdown Heat Exchangersi 5+7 When Turbine speed decreases to"0" RPM, verify that the Turning Gear Oil Pump and the turning gear are in operation 5,8 When conditions permit, reoccupy the Control Roomi Return isolation switches to NORMAL.for switches and controls that are operational and maintain the Unit at Hot Standby until a complete evaluation has been madee 5m9 If control cannot be restored to the Control Room, make preparations to place the Unit in a Cold Shutdown condition by utilizing OP 1-0030127,"Reactor Plant Cooldown-Hot Standby to Cold Shutdown," as a guide and substituting local manual operations where requirede~NOTE Prior to depressurization below 1600 psia, a manual blocking of all equipment associated with SIAS must be accomplished to prevent SIAS actuationi ST, LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION (DRAFT)ALTERNATE SHUTDOWN Page 8 of 9 AS 6oO PURPOSE AND DISCUSSION:

This procedure provides instructions for placing the plant in a safe condition when operations cannot safely be conducted from the Control Room due to a fire in the Control Room and/or Cable Spreading Room The Reactor, Turbine, and Reactor Coolant Pumps are manually tripped prior to leaving the Control Room, if possible, or locally from the Reactor Trip Switchgear, Turbine front standard, and 6i9KV Switchgeari A heat sink is provided by automatic steam dump to the Condenser and/or to atmosphere Level is maintained in the'S/Gs by manual control of auxiliary feedwater valves with flow furnished by the AFW Pumps~Pressurizer level and pressure are maintained by manual control of Pressurizer heaters, auxiliary spray valves, and letdown valves, and are monitored at the Hot Shutdown Panel+Isolation switches located in the Reactor Auxiliary Building Electrical Equipment Room, Turbine Building Switchgear Room, Diesel Generator Rooms, and Reactor Auxiliary Building are manually selected to the ISOLATE position to prevent inadvertant operation of vital equipment due to possible electrical malfunction in the unattended Control Room A copy of this procedure will be posted at each manned operating station required for plant shutdown from outside the Control Room~A listing of isolation switches will be posted on each of the following panels, MCCs, and distribution buses 2~3~4~5~6~7~Load Centers lA2, 1B2, 1A5, 1B9, lAB, 1A6, 1B6 Isolation Panels lA, 1B, IAB MCC lA5, 1A6, 1B5, 1B&4160V Buses 1A3, 1B3, lAB 4160V Buses 1A2, IB2 6900V Buses lA1, 1Bl Diesel Generator lA and 1B Control Panels The Nuclear Plant Supervisor will utilize additional personnel as available to assist in required subsequent actionso ST+LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION (DRAFT)ALTERNATE SHUTDOWN Page 9 of 9 AS 7,0

REFERENCES:

7 el EOP 1 0030141,"Control Room Inaccessibility">>7 2 St~Lucie Unit 1 Technical Specificationsi 7.3 10 CFR 50, Appendix R.8 0 RECORDS: 8~1 A completed, initialed copy of this procedure shall be retained in the plant filesi 9'REVIEW AND APPROVAL: Reviewed by Facility Review Group Approved by Revision Reviewed by PRG Approved by lant Manager Plant Manager 19 19 19 EP 1-0030142 Revision (draft)Total No of Pages 9 TABLE 1 PAGE 1 OF 4 ISOLATION SWITCHES AVAILABLE FOR ALTERNATE SHUTDOWN-ST LUCIF.UNIT NO 1 PANEL OR POWER CENTER Isolation Panel 1A Isolation Panel lB PLANT LOCATION A-Swgr Room B-Swgr Room FIRE 70NE 60 SWITCH DES IGNAT ION SS/189-1 SS/158 SS-3/603 Ss-l/603 Ss-l/380 SS/130 SS-1/157 SS/189-2 SS-2/157 SS-4/604 SS-2/603 SS-2/380 COMPONENT Auxil fary Spray Valve Letdown&Spray Va1ves Control SG lA Press&Level Indfcatfon SG 1A Atm Steam Dump Control SG 1A Level (Wfde Range>Pressurfzer level&Press Ind T.etdown Isolatfon Valve V-1402, PORV I-SF.-02-01, Charging Lfne Iso Auxflfary Spray Valve Letdown Stop Valve SG 18 Press&T.evel Indfcatfon SG 18 Atm Steam Pump Control SG 18 Level (Wide Range>Pressurfzer Level&Press Ind V-1404, PORV e Isolation Panel lAB Isolation Panel Cable Spread Room Communications Room 57 73 SS/631 SS/632 AFW Pump lC Turbfne Ind AFW Pump 1C Stop Valve Ffre Alarm/Sf te Fvac-Control Control Room PA Code Call DG lA Control Panel DG Buf1ding lA Voltage Control Frequency Control Start Cfrcuft DG lB Control Panel DG Buf 1 d ing 1B Vol tage Control Frequency Control Start Cfrcuft MCC lA5 A-Swgr Boom 60 V-2514, BAMP to Cbrgr Pumps MV-14-6, Fan Coo>er CCW Inlet MV-4-8, Fan Cooler CCW Outlet MV-09-9, AFW Pump lA Dfscharge in>nn w o A mr.v r PAGE 2 OF 4~~0 TABLE 1 ISOLATION SWITCHES AVAILABLE FOR ALTERNATE SHUTDOWN (Cont'd)ST LUCIE UNIT NO 1 PANEL OR POWER CENTER MCC 1B5 MCCC 1A6 MCC lB6 MCC-1AB PLANT LOCATION B-Swgr Room A-Swgr Room B-Swgr Room Cable Spread Room FIRE 70NE 56 60 57 SWITCH DES IGNAT ION COMPONFNT V-2508, 8AMT 18 Gravity Feed V-250~, BAMT lA Gravity Feed MV-14-5, Fan Cooler CCW Inlet MV-14-7, Fan Cooler CCW Outlet MV-OO-10, AFW Pump 18 Discharge MV-09-14, AFW Cross Tie V-2504, RWT to Charging Pumps V-1405, PORV Block BAMP 1A BAMP 1B HVA-3A, Control Room AC HVA-6A, Shield Building Exh HVE-'13A, Cont Room Booster HVA-38, Cont Room AC HVF.-68, Shield 8uilding Fxh HVE-138, Cont Room Booster HVA-3C, Cont Room AC MV-0'l-ll, AFW pump lC Discharge MV-QO-17, AFW Pump 1C Discharge MV-08-1'1, AFW Pump>urb Supply MV-08-14, AIW Pump Turb Supply MV-14-1, C(W Discharge MV-14-2, CCW Discharge MV-14-3, CCW Di scbarge MV-14-4, COP Discharge 480V Swgr 1A2 A-Swgr Room 60 SS Transformer 1A2 Bus Tie to 480 V 1A8 Air Recirc Fan HVS 1A Air Recirc Fan HVS 18 Charging Pump 1A TABLE 1 PAGE 3 OF 4~~ISOLATION SWITCHES AVAILABLE FOR ALTERNATE SHUTDOWN (Cont'd)ST LUCIF.UNIT NO 1 PANEL OR POWER CENTER 480 V Swgr 1B2 480 V Swgr lAB 480 U Bus 1A3 480 V Bus 1B3 4.16 kV Bus lA3 PLANT LOCATION B-Swgr Room AB-Swgr Room Cable Spread Room Cable Spread Room A-Swgr Room FIRE ZONE 47 57 57 60 SWITCH DES IGNAT ION COMPONENT SS Transformer 1H2 Hus Tfe to 480 V lAB Afr Recfrc Fan 1C Afr Recfrc Fan 19 Cbargfng Pump 1H Hus Tfe to 480 V Swgr 1A2 Hus<fe to 480 V Swgr 182 Cbargfng Pump lC Heater.Hank P-1 Heater Bank B-1 Heater Ban'k H-2 Heater Hank H-3 Heater Bank P-2 Heater Hank H-4 Heater Hank H-5 Heater Bank B-6 A HPSI Pump A LPSI Pump A Cont Spray Pump Feed to Press Htr Trans 1A A Comp Coolfng Wtr Pump A Intake Cool.fng Wtr Pump Feed to 4.16 kV Swgr lAB Feed From 4.16 kU Hus 1A2 Feed to 4.16 kV Sta Ser Trans 1A2 Feed from Fmerg Dfese1 A A Auxflfary Feedwater Pump TABLE 1 PAGF.4 OF 4~~t~ISOLATION SWITCHES AVAILABLE FOR ALTERNATF.

SHUTDOWN (Cont'd'l ST LUCIE UNIT NO 1 PANEL OR POWER CENTER 4.16 kV Bus 183 4.16 kV Bus lAB 4.16 kV Bus 1A2 4.16 kV Bus 182 6.9 kV Bus 1Al 6.'9 kV Bus 181 PLANT LOCATION 8-Swgr Room AB-Swgr Room Turbine Bufldfng Turbine Building Turbine Buflding Turbine Building FIRE 7.0NE 56 47 21 22 21 22 SWITCH DES IGNAT TON 8 HPSI Pump 8 LPSI Pump 8 Cont Spray Pump Feed to Press Htr Trans 18 8 Comp Cooling Wtr Pump 8 Intake Cool fng-Wtr Pump Feed to 4.16 kV Swgr 1AB Feed from 4.16 kV Bus 182 Feed to 4.16 kV Sta Ser Trans 182 Feed from Emerg Dfesel 8 8 Auxflfary Feedwater Pump C HPSI Pump C Comp Coolfng Wtr Pump C Intake Cooling Wtr Pump'eed from 4.16 kV Bus lA3 Feed from 4.16 kV Bus 183 Feed to 4.16 kV Sta Ser Trans 1Al Feed from SU Trans lA Feed to 4.16 kV Swgr lA3 Feed to 4.16 kV Sta Ser Trans 181 Feed from SU Trans 18 Feed to 4.16 kV Swgr 183 Feed from SU Trans 1A Feed from SU Trans 18 0502s e FLORIDA POWER 6 LIGHT COMPANY ST LUCIE PLANT-UNIT NO~1 ALTERNATIVE SHUTDOWN e)Attachment l outlines the basic steps required to bring the plant to cold shutdown from outside the Control Room.This procedure has been developed to instruct plant operators in the specifi'c tasks required to effect safe shutdown.f)'he manpower available to perform safe shutdown functions as well fires is described in Attachment l..~r.(y-c-5 g)Tests will be performed periodically and that the equipment-cannot

-be-operated-from-th ,that-the-equipmen~

t o crate fr from the Hot Shutdown-.Panel-when.

transfer-swah position.on (gg~(+F~)y PP)I as fight C h h)Technical Specifications will be prepared to cover all new isolation/

transfer switches added for alternative shutdown.~i)Only existing components and systems will be employed for alternative shutdown.As such, verification of system capabilities is not required.Circuitry modifications will be consistent with existing design criteria.j)No credit is taken for repair of damaged cold shutdown equipment.

0 0~~\l l/l/