Page 1 of 9 EMERGENCY PROCEDURE ATTACHMENT f 1 1-OO3O142, REV. (DRAFT)

AS FLORIDA POWER 6 LIGHT COMPANY STe LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1&030142 REVISION (DRAFT)

ALTERNATE SHUTDOWN AS TOTAL NOi OF PAGES 9 83105.70224 831007 PDR ADQCK 05000335 F PDR

Page 2 of 9 FLORIDA POWER 6 LIGHT COMPANY ST+ LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1-0030142, REVI$ ION (DRAFT)

ALTERNATE SHUTDOWN I 0 SCOPE:

This procedure provides instructions for placing the plant in a safe condition when operations cannot safely be conducted from the Control Room due to a fire in the Control Room and/or Cable Spreading Room 2 0 SYMPTOMS:

Conditions exist such that operations cannot be safely- conducted from the Contxol Room due to a fire, 3e0 AUTOMATIC ACZIONS:

None 4o0 IMMEDIATE OPERATOR ACTION:

ACTION NOTE S 4~1 Manually trip the Reactor, 4~1 Push buttons and control Turbine, and Reactor Coolant Pumps switches on RTGB-101, prior to leaving the Control Room, 103 and 104 if possiblei

'i2 Announce evacuation of the Control Room over the P A~ system~

4i3 Implement the Emergency Plan, as necessary, in accordance with EPIP 3100021E, "Duties and Responsibilities of the Emergency Coordinator" ~

4i4 Evacuate all personnel from the Control Roomi

Page 3 of 9 AS ST ~ LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION (DRAFT)

ALTERNATE SHUTDOWN 5>>0 SUBSE UENT ACTIONS:

CHECK 5 ~1 Man and take control of stations as follows:

1~ Reactor Control 0 erator "A" Hot Shutdown Panel>>

A>> Establish communications on the Sound Power Phone System>>

BE Monitor available plant parameters on the Hot Shutdown Panel>> "

NOTE If the fire is in the Cable Spreading Room, control of the reactor and other plant components must be done "B" train components utilizing only C>> Start motor or steam-driven AFW Pumps and feed the S/Gs as required>>

CAUTION Slowly open AFW valves to S/Gs to prevent decreasing Pressurizer level due to excessive cooldown D>> Control Pressurizer pressure and level by manual control of Pressurizer heaters, auxiliary spray valves, and letdown valves>>

Page 4 of 9 AS STo LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION (DRAFg)

ALTERNATE SHUTDOWN 5<<0 SUBSE GENT ACTIONS: (continued) 5~1 (continued) 2 ~ Assistant Nuclear Plant Su rvisor - Electrical Equipment Room, Reactor Auxiliary Building - 43" Elevation Ai Open or check open Reactor Trip Breakers 8, if possible~

TCB-1'hrough BE Place isolation switches in the ISOLATE position on the following switchgear in the order listed:

NOTE Isolation switch lists are posted on respective switchgear cabinets throughout plant 480V Bus 1A3 Pressurizer heaters 8 480V Bus 1B3 Pressurizer heaters 8 480V LoCo 1A2 4160V Bus 1A3 480V MCC 1A5 480V MCC 1A6 480V LeC ~ 1B2 4160V Bus 1B3 480V MCC 1B6 480V MCC 1B5 480V MCC lAB Isolation Panel 1AB Isolation Panel IA Isolation Panel 1B Evacuation Alarm Isolate Panel Ce Assist Reactor Control Operator "A" in monitoring unit parameters from the Hot Shutdown Panels 8 Only if accessible (due to location of fire) ~

yA e e Page 5 AS of 9 ST>> LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION (DRAPT)

ALTERNATE SHUTDOWN 5,0 SUBSE UENT ACTIONS: (continued) 5>>l (continued) CNECK 3 ~ Reactor Control 0 rator "B" - Turbine Operating Level>>

A>> Locally trip or verify the Turbine has tripped B>> Verify Turbine Stop Valves and Control Valves are shut If not, initiate Turbine Trip from Turbine front standard>>

C~ Proceed to Turbine Building Switchgear Room and establish communications on the Sound Powered Phone circuit>>

D>> Place isolation switches in the ISOLATE position for bus feeder breakers as follows:

NOTE Isolation switch lists are posted on respective switchgear cabinets>>

4160V Swgr, lA2 4160V Swgr>> 1B2 6900V Swgr>> 1A1 6900V Swgr>> 1Bl E>> Stop 1A and 1B Main Peedwater Pumps, 1A and 1B Heater Drain Pumps and one Condensate Pump by opening their respective breakers>>

CAUTION Ensure that Condensate remains in service ifoneoff-site Pump power available>>

Page 6 of 9 AS ST>> LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION (DRAFT)

ALTERNATE SHUTDOWN 5,0 SUBSE UENT ACTIONS: (continued) 5 1 (continued) 4, Nuclear 0 rator - Reactor Auxiliary Building>>

A>> Place isolate switches in ISOLATE/LOCAL position on the following switchgear:

NOTE Isolation switch lists are posted on respective switchgear cabinets>>

4160V Swgr, 1AB 480V .Load Center lAB BE Proceed to the Diesel Generator Building and place isolation switches on 1A and 1B Diesel Control Panels in ISOLATE position OTE Isolation switch lists are posted on respective switchgear cabinets C>> Proceed to the Charging Pump area and establish communications on the Sound Powered Phone circuit, A>> Muster the Fire Team comprised of at least five (5) individuals from the following classifications:

Watch Engineer Nuclear Turbine Operator (Unit .1)

Nuclear Turbine Operator (Unit 2)

Associate Nuclear Plant Operator (ANPO)

Radiation Protection Man (RPM)

BE Proceed to fight the fire in accordance with plant procedures and fire fighting strategies>>

5,2 Maintain Pressurizer level at approximately 33K indicated levels

Page 7 of 9 AS STe LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION (DRAFT)

ALTERNATE SHUTDOWN 5,0 SUBSE UENT ACTIONS: (continued) 5i3 Maintain Pressurizer pressure at approximately 2100 psia by use of auxiliary spraysi NOTE If Pressurizer auxiliary spray actuates with Pressurizer/spray line temperature 5T >200oF, record as per AP 0010134' 4 Verify natural circulation cooling of RCS by maintaining RCS temperature at or below 532 F (lA cold leg temperature) by use of Atmospheric Steam Dumps, Sf operable, 5,5 When conditions have stabilized after the plant trip, maintain or ~slowl increase N/G levels by operation of the AFW Pumps and discharge valves to the S/Gs+

CAUTION If decreasing RCS temperature and/or Pressurizer level occurs, consider decreasing AFW flow to the S/Gs, Si6 Isolate S/G blowdown by manually closing isolation valves at the Closed Blowdown Heat Exchangersi 5+7 When Turbine speed decreases to "0" RPM, verify that the Turning Gear Oil Pump and the turning gear are in operation 5,8 When conditions permit, reoccupy the Control Roomi Return isolation switches to NORMAL .for switches and controls that are operational and maintain the Unit at Hot Standby until a complete evaluation has been madee 5m9 If control cannot be restored to the Control Room, make preparations to place the Unit in a Cold Shutdown condition by utilizing OP 1-0030127, "Reactor Plant Cooldown - Hot Standby to Cold Shutdown," as a guide and substituting local manual operations where requirede ~

NOTE Prior to depressurization below 1600 psia, a manual blocking of all equipment associated with SIAS must be accomplished to prevent SIAS actuationi

Page 8 of 9 AS ST, LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION (DRAFT)

ALTERNATE SHUTDOWN 6oO PURPOSE AND DISCUSSION:

This procedure provides instructions for placing the plant in a safe condition when operations cannot safely be conducted from the Control Room due to a fire in the Control Room and/or Cable Spreading Room The Reactor, Turbine, and Reactor Coolant Pumps are manually tripped prior to leaving the Control Room, if possible, or locally from the Reactor Trip Switchgear, Turbine front standard, and 6i9KV Switchgeari A heat sink is provided by automatic steam dump to the Condenser and/or to atmosphere Level is maintained in the'S/Gs by manual control of auxiliary feedwater valves with flow furnished by the AFW Pumps~ Pressurizer level and pressure are maintained by manual control of Pressurizer heaters, auxiliary spray valves, and letdown valves, and are monitored at the Hot Shutdown Panel+

Isolation switches located in the Reactor Auxiliary Building Electrical Equipment Room, Turbine Building Switchgear Room, Diesel Generator Rooms, and Reactor Auxiliary Building are manually selected to the ISOLATE position to prevent inadvertant operation of vital equipment due to possible electrical malfunction in the unattended Control Room A copy of this procedure will be posted at each manned operating station required for plant shutdown from outside the Control Room~ A listing of isolation switches will be posted on each of the following panels, MCCs, and distribution buses Load Centers lA2, 1B2, 1A5, 1B9, lAB, 1A6, 1B6 2~ Isolation Panels lA, 1B, IAB 3~ MCC lA5, 1A6, 1B5, 1B&

4~ 4160V Buses 1A3, 1B3, lAB 5~ 4160V Buses 1A2, IB2 6~ 6900V Buses lA1, 1Bl 7 ~ Diesel Generator lA and 1B Control Panels The Nuclear Plant Supervisor will utilize additional personnel as available to assist in required subsequent actionso

Page 9 of 9 AS ST+ LUCIE UNIT 1 EMERGENCY OPERATING PROCEDURE 1-0030142, REVISION (DRAFT)

ALTERNATE SHUTDOWN 7,0

REFERENCES:

7 el EOP 1 0030141, "Control Room Inaccessibility" >>

7 2 St~ Lucie Unit 1 Technical Specificationsi 7.3 10 CFR 50, Appendix R.

8 0 RECORDS:

8~1 A completed, initialed copy of this procedure shall be retained in the plant filesi 9 ' REVIEW AND APPROVAL:

Reviewed by Facility Review Group Approved by lant Manager 19 Revision Reviewed by PRG 19 Approved by Plant Manager 19 EP 1-0030142 Revision (draft)

Total No of Pages 9

PAGE 1 OF 4 TABLE 1 ISOLATION SWITCHES AVAILABLE FOR ALTERNATE SHUTDOWN-ST LUCIF. UNIT NO 1 PANEL OR PLANT FIRE SWITCH POWER CENTER LOCATION 70NE DES IGNATION COMPONENT Isolation Panel 1A A-Swgr Room 60 SS/189-1 Auxil fary Spray Valve SS/158 Letdown & Spray Va1ves Control SS-3/603 SG lA Press & Level Indfcatfon Ss-l/603 SG 1A Atm Steam Dump Control Ss-l /380 SG 1A Level (Wfde Range>

SS/130 SS-1/157 Pressurfzer level & Press Ind T.etdown Isolatfon Valve V-1402, PORV e

I-SF.-02-01, Charging Lfne Iso Isolation Panel lB B-Swgr Room SS/189-2 Auxflfary Spray Valve SS-2/157 Letdown Stop Valve SS-4/604 SG 18 Press & T.evel Indfcatfon SS-2/603 SG 18 Atm Steam Pump Control SS-2/380 SG 18 Level (Wide Range>

Pressurfzer Level & Press Ind V-1404, PORV Isolation Panel lAB Cable Spread Room 57 SS/631 AFW Pump lC Turbfne Ind SS /632 AFW Pump 1C Stop Valve Isolation Panel Communications Room 73 Ffre Alarm/Sf te Fvac Control Control Room PA Code Call DG lA Control Panel DG Buf1ding lA Voltage Control Frequency Control Start Cfrcuft DG lB Control Panel DG Buf 1 d ing 1B Vol tage Control Frequency Control Start Cfrcuft MCC lA5 A-Swgr Boom 60 V-2514, BAMP to Cbrgr Pumps MV-14-6, Fan Coo>er CCW Inlet MV-4-8, Fan Cooler CCW Outlet MV-09-9, AFW Pump lA Dfscharge in> nn w o A mr.v r

~ ~

0 PAGE 2 OF 4 TABLE 1 ISOLATION SWITCHES AVAILABLE FOR ALTERNATE SHUTDOWN (Cont'd)

ST LUCIE UNIT NO 1 PANEL OR PLANT FIRE SWITCH POWER CENTER LOCATION 70NE DES IGNATION COMPONFNT MCC 1B5 B-Swgr Room 56 V-2508, 8AMT 18 Gravity Feed V-250~, BAMT lA Gravity Feed MV-14-5, Fan Cooler CCW Inlet MV-14-7, Fan Cooler CCW Outlet MV-OO-10, AFW Pump 18 Discharge MV-09-14, AFW Cross Tie V-2504, RWT to Charging Pumps V-1405, PORV Block MCCC 1A6 A-Swgr Room 60 BAMP 1A BAMP 1B HVA-3A, Control Room AC HVA-6A, Shield Building Exh HVE-'13A, Cont Room Booster MCC lB6 B-Swgr Room HVA-38, Cont Room AC HVF.-68, Shield 8uilding Fxh HVE-138, Cont Room Booster MCC-1AB Cable Spread Room 57 HVA-3C, Cont Room AC MV-0'l-ll, AFW pump lC Discharge MV-QO-17, AFW Pump 1C Discharge MV-08-1'1, AFW Pump >urb Supply MV-08-14, AIW Pump Turb Supply MV-14-1, C(W Discharge MV-14-2, CCW Discharge MV-14-3, CCW Di scbarge MV-14-4, COP Discharge 480V Swgr 1A2 A-Swgr Room 60 SS Transformer 1A2 Bus Tie to 480 V 1A8 Air Recirc Fan HVS 1A Air Recirc Fan HVS 18 Charging Pump 1A

PAGE 3 OF 4

~ ~

TABLE 1 ISOLATION SWITCHES AVAILABLE FOR ALTERNATE SHUTDOWN (Cont'd)

ST LUCIF. UNIT NO 1 PANEL OR PLANT FIRE SWITCH POWER CENTER LOCATION ZONE DES IGNATION COMPONENT 480 V Swgr 1B2 B-Swgr Room SS Transformer 1H2 Hus Tfe to 480 V lAB Afr Recfrc Fan 1C Afr Recfrc Fan 19 Cbargfng Pump 1H 480 V Swgr lAB AB-Swgr Room 47 Hus Tfe to 480 V Swgr 1A2 Hus <fe to 480 V Swgr 182 Cbargfng Pump lC 480 U Bus 1A3 Cable Spread Room 57 Heater. Hank P-1 Heater Bank B-1 Heater Ban'k H-2 Heater Hank H-3 480 V Bus 1B3 Cable Spread Room 57 Heater Bank P-2 Heater Hank H-4 Heater Hank H-5 Heater Bank B-6 4.16 kV Bus lA3 A-Swgr Room 60 A HPSI Pump A LPSI Pump A Cont Spray Pump Feed to Press Htr Trans 1A A Comp Coolfng Wtr Pump A Intake Cool.fng Wtr Pump Feed to 4.16 kV Swgr lAB Feed From 4.16 kU Hus 1A2 Feed to 4.16 kV Sta Ser Trans 1A2 Feed from Fmerg Dfese1 A A Auxflfary Feedwater Pump

PAGF. 4 OF 4

~ ~

t ~

TABLE 1 ISOLATION SWITCHES AVAILABLE FOR ALTERNATF. SHUTDOWN (Cont'd'l ST LUCIE UNIT NO 1 PANEL OR PLANT FIRE SWITCH POWER CENTER LOCATION 7.0NE DES IGNATTON 4.16 kV Bus 183 8-Swgr Room 56 8 HPSI Pump 8 LPSI Pump 8 Cont Spray Pump Feed to Press Htr Trans 18 8 Comp Cooling Wtr Pump 8 Intake Cool fng -Wtr Pump Feed to 4.16 kV Swgr 1AB Feed from 4.16 kV Bus 182 Feed to 4.16 kV Sta Ser Trans 182 Feed from Emerg Dfesel 8 8 Auxflfary Feedwater Pump 4.16 kV Bus lAB AB-Swgr Room 47 C HPSI Pump C Comp Coolfng Wtr Pump C Intake Cooling Wtr from 4.16 kV Bus lA3 Pump'eed Feed from 4.16 kV Bus 183 4.16 kV Bus 1A2 Turbine Bufldfng 21 Feed to 4.16 kV Sta Ser Trans 1Al Feed from SU Trans lA Feed to 4.16 kV Swgr lA3 4.16 kV Bus 182 Turbine Building 22 Feed to 4.16 kV Sta Ser Trans 181 Feed from SU Trans 18 Feed to 4.16 kV Swgr 183 6.9 kV Bus 1Al Turbine Buflding 21 Feed from SU Trans 1A 6.'9 kV Bus 181 Turbine Building 22 Feed from SU Trans 18

0502s e

FLORIDA POWER 6 LIGHT COMPANY ST LUCIE PLANT - UNIT NO ~ 1 ALTERNATIVE SHUTDOWN e) Attachment l outlines the basic steps required to bring the plant to cold shutdown from outside the Control Room. This procedure has been developed to instruct plant operators in the specifi'c tasks required to effect safe shutdown.

f) 'he manpower available to perform safe shutdown functions as well as fight fires is described in Attachment l. C h

( y

. ~

-c-5 r.

g) Tests will be performed periodically (gg

~ (+F~

on )y PP)I and that the equipment-cannot be-operated-from-th

,that-the-equipmen~ t o crate fr from the Hot Shutdown-.Panel-when. transfer-swah position.

h) Technical Specifications will be prepared to cover all new isolation/

transfer switches added for alternative shutdown. ~

i) Only existing components and systems will be employed for alternative shutdown. As such, verification of system capabilities is not required.

Circuitry modifications will be consistent with existing design criteria.

j) No credit is taken for repair of damaged cold shutdown equipment.

~ ~ \

0 0 l l

/

/