{{#Wiki_filter:CATEGORYREGULATORY INFORMATION DISTRIBUTION SYSTEM"(RIDS)"
{{#Wiki_filter:CATEGORY REGULATORY INFORMATION DISTRIBUTION SYSTEM"(RIDS)" 4 ACCESSION NBR:9804200484 DOC.DATE: 98/04/14 NOTARIZED:
4ACCESSION NBR:9804200484 DOC.DATE:
YES FACIL:50-315 Donald C.Cook Nuclear Power Plant, Unit 1, Indiana M50-316 Donald.C.Cook Nuclear Power Plant, Unit 2, Indiana M AUTH;NAME AUTHOR AFFILIATION FITZPATRICK,E.
98/04/14NOTARIZED:
Indiana Michigan Power Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)DOCKET¹05000315 05000316
YESFACIL:50-315 DonaldC.CookNuclearPowerPlant,Unit1,IndianaM50-316Donald.C.CookNuclearPowerPlant,Unit2,IndianaMAUTH;NAME AUTHORAFFILIATION FITZPATRICK,E.
IndianaMichiganPowerCo.RECIP.NAME RECIPIENT AFFILIATION DocumentControlBranch(Document ControlDesk)DOCKET¹0500031505000316


==SUBJECT:==
==SUBJECT:==
ForwardsresponsetoGL97-06,"Degradation ofSGIntervals.
Forwards response to GL 97-06,"Degradation of SG Intervals.
DISTRIBUTION CODE:ZOOIDCOPIESRECEIVED:,LTR iENCLiSIZE:TITLE:ORSubmittal:
DISTRIBUTION CODE: ZOOID COPIES RECEIVED:,LTR i ENCL i SIZE: TITLE: OR Submittal:
GeneralDistribution NOTES:RECIPIENT IDCODE/NAME PD3-3LASTANG,JCOPIESLTTRENCL,1111RECIPIENT IDCODE/NAME PD3-3PDCOPIESLTTRENCL11EINTERNAL.-ENT---1NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL:
General Distribution NOTES: RECIPIENT ID CODE/NAME PD3-3 LA STANG,J COPIES LTTR ENCL, 1 1 1 1 RECIPIENT ID CODE/NAME PD3-3 PD COPIES LTTR ENCL 1 1 E INTERNAL.-ENT---1 NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL: NOAC 1 1 1 1 1 1 1 1 NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 NRC PDR 1 1 1 1 1 1 1 0 1 1 D NOTE TO ALL"RIDS" RECIPIENTS:
NOAC11111111NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS2NRCPDR1111111011DNOTETOALL"RIDS"RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL 12 Indiana Michigan~Power Company 500 Circle Drive Buchanan, Ml 491071395 Il fNENANA MICHIGAN PQWM April 14, 1998 AEP:NRC:1166AM Docket Nos.: 50-315 50-316 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop 0-Pl-17 Washington, D.C.20555-0001 Gentlemen:
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:
Donald C.Cook Nuclear Plant Units 1 and 2 RESPONSE TO NRC GENERIC LETTER (GL)97-06 DEGRADATION OF STEAM GENERATOR INTERNALS This letter and its attachment provide information requested in GL 97-06, concerning steam generator internals degradation.
LTTR13ENCL12 IndianaMichigan~PowerCompany500CircleDriveBuchanan, Ml491071395 IlfNENANAMICHIGANPQWMApril14,1998AEP:NRC:1166AM DocketNos.:50-31550-316U.S.NuclearRegulatory Commission ATTN:DocumentControlDeskMailStop0-Pl-17Washington, D.C.20555-0001 Gentlemen:
Sincerely, pug E.E.Fitzpatrick Vice President J'SWORN TO AND SUBSCRIBED BEFORE ME gA THIS~DAY OF~/Z., 1998 Notary Public/.Sd//vlb Attachment Z.A.Abramson A.B.Beach MDEQ-DW&RPD NRC Resident Inspector 8.R.Sampson UNDA L BOEI.CKE Notary Public, Berrien County, Ml M Commission Expires January 21, 200 I 2001 y Qo I 9804200484 9804l4 PDR ADOCK 050003iS p PDR ATTACHMENT TO AEP:NRC: 1166AM RESPONSE TO NRC GENERIC LETTER 97-06 DEGRADATION OF STEAM GENERATOR INTERNALS 5.~'Attachment to AEP:NRC:1166AM Page 1 INTRODUCTION Generic letter (GL)97-06 was issued to'alert addressees to foreign and domestic findings of damage to steam generator (SG)internals, emphasize the importance of performing comprehensive examinations of SG internals, and request information that will enable the NRC staff to verify the internals of Cook Nuclear Plant's SGs conform-to the current licensing basis.BACKGROUND AND DESCRIPTION OF CIRCUMSTANCES French authorities have reported various SG tube support plate (TSP)damage mechanisms.
DonaldC.CookNuclearPlantUnits1and2RESPONSETONRCGENERICLETTER(GL)97-06DEGRADATION OFSTEAMGENERATOR INTERNALS Thisletteranditsattachment provideinformation requested inGL97-06,concerning steamgenerator internals degradation.
Damage has.-included wastage in the uppermost TSP due to misapplication of.a chemical cleaning process, broken TSP ligaments resulting from inadequate clearance for, differential thermal expansion, and TSP wastage at various elevations apparently involving a corrosion or erosion-corrosion mechanism of undetermined origin.Other ins'tances of internals degradation include wrapper drop/cracking at a foreign utility that is suspected to have been caused by severe cooling transients, and instances of erosion-corrosion of eggcrate supports in untubed areas initiated"by unknown causes that occurred at a domestic facility.These instances.
Sincerely, pugE.E.Fitzpatrick VicePresident J'SWORNTOANDSUBSCRIBED BEFOREMEgATHIS~DAYOF~/Z.,1998NotaryPublic/.Sd//vlbAttachment Z.A.AbramsonA.B.BeachMDEQ-DW&RPDNRCResidentInspector 8.R.SampsonUNDALBOEI.CKENotaryPublic,BerrienCounty,MlMCommission ExpiresJanuary21,200I2001yQoI9804200484 9804l4PDRADOCK050003iSpPDR ATTACHMENT TOAEP:NRC:1166AMRESPONSETONRCGENERICLETTER97-06DEGRADATION OFSTEAMGENERATOR INTERNALS 5.~'Attachment toAEP:NRC:1166AM Page1INTRODUCTION Genericletter(GL)97-06wasissuedto'alertaddressees toforeignanddomesticfindingsofdamagetosteamgenerator (SG)internals, emphasize theimportance ofperforming comprehensive examinations ofSGinternals, andrequestinformation thatwillenabletheNRCstafftoverifytheinternals ofCookNuclearPlant'sSGsconform-tothecurrentlicensing basis.BACKGROUND ANDDESCRIPTION OFCIRCUMSTANCES Frenchauthorities havereportedvariousSGtubesupportplate(TSP)damagemechanisms.
highlight the potential for degradation mechanisms that may lead to TSP and tube wrapper damage..As a result of this concern, GL 97-06 requests: 1.Discussion of any programs in place to detect degradation of SG internals and a description of inspection plans (scope, frequency, methods, and equipment)
Damagehas.-includedwastageintheuppermost TSPduetomisapplication of.achemicalcleaningprocess,brokenTSPligaments resulting frominadequate clearance for,differential thermalexpansion, andTSPwastageatvariouselevations apparently involving acorrosion orerosion-corrosion mechanism ofundetermined origin.Otherins'tances ofinternals degradation includewrapperdrop/cracking ataforeignutilitythatissuspected tohavebeencausedbyseverecoolingtransients, andinstances oferosion-corrosion ofeggcratesupportsinuntubedareasinitiated "byunknowncausesthatoccurredatadomesticfacility.
.This discussion should.address.the following information for each facility.a~b.C.Whether inspection records have been reviewed for indications of TSP signal anomalies from eddy current testing of SG tubes'hat may be indicative of support plate or ligament damage.Whether visual or video camera inspections have been performed on the secondary side to gain information on the condition of SG internals (e.g., support plates, tube bundle wrappers, etc.).Whether degradation, of SG internals has been detected, and how it was assessed and dispositioned.
Theseinstances.
2.In the event no program is in place to detect internals degradation, provide a discussion or justification for development of a program or why such a program is not:needed..
highlight thepotential fordegradation mechanisms thatmayleadtoTSPandtubewrapperdamage..Asaresultofthisconcern,GL97-06requests:
Prior to issuance of this GL, Westinghouse Owners Group (WOG), Electric Power Research Institute (EPRI), and Nuclear Energy Institute (NEI)developed an action plan to assess the susceptibility of SG secondary"side degradation.
1.Discussion ofanyprogramsinplacetodetectdegradation ofSGinternals andadescription ofinspection plans(scope,frequency, methods,andequipment)
We intend to follow the industry action plan as modified by our site-specific experience.
.Thisdiscussion should.address.thefollowing information foreachfacility.
Included in the action plan is a requirement to understand the causal factors involved in the degradation experienced in the French units.This information is captured in EPRI report GC-109558,"Steam Generator Internals Degradation:
a~b.C.Whetherinspection recordshavebeenreviewedforindications ofTSPsignalanomalies fromeddycurrenttestingofSGtubes'hat maybeindicative ofsupportplateorligamentdamage.Whethervisualorvideocamerainspections havebeenperformed onthesecondary sidetogaininformation onthecondition ofSGinternals (e.g.,supportplates,tubebundlewrappers, etc.).Whetherdegradation, ofSGinternals hasbeendetected, andhowitwasassessedanddispositioned.
Attachment to AEP:NRC:1166AM Page 2 Modes of Degradation Detected in EdF Units".This report was submitted'o the NRC via an NEZ letter, dated December 19, 1997.-WOG has reviewed EPRZ GC-109558 relative to the, design of series 51 SGs and determined limited potential susceptibility.
2.Intheeventnoprogramisinplacetodetectinternals degradation, provideadiscussion orjustification fordevelopment ofaprogramorwhysuchaprogramisnot:needed..
For plants with series 51 SGs, this conclusion is documented in WCAP-15002, revision 1,."Evaluation of EdF Steam Generator Internals Degradation
PriortoissuanceofthisGL,Westinghouse OwnersGroup(WOG),ElectricPowerResearchInstitute (EPRI),andNuclearEnergyInstitute (NEI)developed anactionplantoassessthesusceptibility ofSGsecondary "sidedegradation.
-Impact of Causal Factors on Westinghouse
Weintendtofollowtheindustryactionplanasmodifiedbyoursite-specific experience.
.51 Series Steam Generators", December 1997.The series 51 SGs are the most similar model SG to that of the Electricith de France (EdF).units and are installed in unit 1.WCAP-.15002, revision 1, documents visual inspections performed at the series 51 SG plants.Zt was concluded.that the number.of plants that have been inspected and the inspection results demonstrate that the causal factors identified by EdF do not jeopardize the continued operability of Westinghouse series 51 SGs.This conclusion is supported by the-capability of eddy current inspections to,detect.
Includedintheactionplanisarequirement tounderstand thecausalfactorsinvolvedinthedegradation experienced intheFrenchunits.Thisinformation iscapturedinEPRIreportGC-109558, "SteamGenerator Internals Degradation:
detrimental effects on tubing due to wear caused by TSP ligament degradation, loose'parts, and secondary side'low distribution changes.Foreign object search and retrieval~efforts are typically conducted as standard practice to discover or~retrieve loose parts, thus limiting the potential for damage.A response to GL 97-06 has been completed for unit 1 addressing the susceptibility of the unit 1 SGs to internals degradation, specific unit 1 inspection practices and recent inspection results, along ,with a discussion of subsequent plant operation with potential SG internals degradation of the type experienced;in the French units (and other types of degradation experienced domestically)
Attachment toAEP:NRC:1166AM Page2ModesofDegradation DetectedinEdFUnits".Thisreportwassubmitted'o theNRCviaanNEZletter,datedDecember19,1997.-WOGhasreviewedEPRZGC-109558 relativetothe,designofseries51SGsanddetermined limitedpotential susceptibility.
~This discussion begins in the"UNIT 1 SG PROGRAM (INTERNALS 1NSPECTION)
Forplantswithseries51SGs,thisconclusion isdocumented inWCAP-15002, revision1,."Evaluation ofEdFSteamGenerator Internals Degradation
" section of this attachment.
-ImpactofCausalFactorsonWestinghouse
Because a detailed Westinghouse evaluation has not been performed , for our unit 2 SGs, inspection recommendations have.been identified on an interim basis.Industry representatives have indicated that'valuations should be completed by May 1998, and the results will be factored into the unit 2 SG program.As such.the response to'tem 1 for unit, 2, which is detailed in the"UNIT 2 SG PROGRAM (INTERNALS INSPECTION)" section of this attachment, may be modified in the future as dictated by the results of the pending evaluation.
.51SeriesSteamGenerators",
UNIT 1 SG PROGRAM INTERNALS INSPECTION SG Descri tion Unit 1 contains four Westinghouse series 51 SGs that were placed in service in 1975.Key design features include alloy 600 mill annealed tubing, a partial depth hardroll expansion at the tube-to-tubesheet joint, and drilled carbon steel support plates.The nominal tube outside diameter (OD)is 0.875 inches with a nominal wall thickness of 0.050 inches.The four unit 1 SGs are presently scheduled for replacement in the year 2000.
December1997.Theseries51SGsarethemostsimilarmodelSGtothatoftheElectricith deFrance(EdF).unitsandareinstalled inunit1.WCAP-.15002, revision1,documents visualinspections performed attheseries51SGplants.Ztwasconcluded
Attachment to=AEP: NRC: 1166AM Page 3 Related Indust Findin s As discussed in WCAP-15002, revision 1, eighteen plants with series 51 SGs supplied information to the WOG concerning results of SG secondary side inspections and relevant tube inspections for TSP conditions.
.thatthenumber.ofplantsthathavebeeninspected andtheinspection resultsdemonstrate thatthecausalfactorsidentified byEdFdonotjeopardize thecontinued operability ofWestinghouse series51SGs.Thisconclusion issupported bythe-capability ofeddycurrentinspections to,detect.
These results did not report detection of several modes of degradation experienced in the EdF units.There is-no evidence of post-chemical cleaning inspections indicating any.significant material loss, nor is there evidence of wrapper having dropped.While TSP ligament cracking has occurred in units with carbon steel support, plates with drilled'ound holes and.flow'oles, there is no evidence indicating TSP ligament cracking or thinning that is progressive and continuing.
detrimental effectsontubingduetowearcausedbyTSPligamentdegradation, loose'parts, andsecondary side'lowdistribution changes.Foreignobjectsearchandretrieval
The f ollowing table summarizes the applicable WOG conclusions concerning the susceptibility of SGs like oui unit 1 series 51 SGs to secondary side internals degradation.
~effortsaretypically conducted asstandardpracticetodiscoveror~retrievelooseparts,thuslimitingthepotential fordamage.AresponsetoGL97-06hasbeencompleted forunit1addressing thesusceptibility oftheunit1SGstointernals degradation, specificunit1inspection practices andrecentinspection results,along,withadiscussion ofsubsequent plantoperation withpotential SGinternals degradation ofthetypeexperienced;in theFrenchunits(andothertypesofdegradation experienced domestically)
TABLE 1 DEGRADATION TYPE Erosion Corrosion:
~Thisdiscussion beginsinthe"UNIT1SGPROGRAM(INTERNALS 1NSPECTION)
Moisture Separator TSP Flow Hole/Ligaments Feed Ring/8-Tubes Cracking: TSP Ligaments Near Wedges**TSP Ligaments Near Patch Plates Carbon Steel TSP Ligaments (random areas)LEVEL OF SUSCEPTIBILITY N N X*" Other: Wrapper Near Supports**N Wrapper Drop**N X~o serve xn some SGs N=not susceptible to EdF casual factors L~low susceptibility to EdF casual factors*~various indication of degradation may be artifacts of manufacturing related to patch plate plug welds and/or drilling alignment**various Westinghouse design features're beneficial relative to some of the SG design features of foreign manufacturers Site-S ecific Findin s The unit 1 SGs were last inspected in the spring of 1997.In~addition to the standard eddy current tube inspection, additional measures were performed to assure the integrity of the SG internals.
"sectionofthisattachment.
These inspections, coupled with related findings from previous inspections, demonstrate that the'reas noted in table 1 have been periodically examined with no abnormal conditions.noted.
BecauseadetailedWestinghouse evaluation hasnotbeenperformed
e t~~Attachment to AEP:NRC:1166AM Page 4 The following discussion presents the internals inspection scope and findings for the unit 1 1997 refueling outage (U1R97).A 100%computer data screening (CDS)sort was performed on the low frequency bobbin coil data from each SG to address the potential for TSP damage or ligament cracking.Indications of possible ligament damage were examined using a motorized rotating pancake coil (MRPC)probe.The indications were subsequently dispositioned as having no degradation found (NDF)or determined to be aligned with the patch plate, thus yielding a"false" indication.
,forourunit2SGs,inspection recommendations have.beenidentified onaninterimbasis.Industryrepresentatives haveindicated that'valuations shouldbecompleted byMay1998,andtheresultswillbefactoredintotheunit2SGprogram.Assuch.theresponseto'tem1forunit,2,whichisdetailedinthe"UNIT2SGPROGRAM(INTERNALS INSPECTION)"
One tube, R39/C22 in SG 11 was noted to have a 0.78'olt MRPC indication at the seventh hot leg support plate, near the wedge location.Research of the previous outage data confirmed this condition has been present for at least three years.This indication will continue to be monitored during future eddy current inspections.
sectionofthisattachment, maybemodifiedinthefutureasdictatedbytheresultsofthependingevaluation.
Regarding the performance of secondary side visual inspections, the following activities were performed in each SG (unless otherwise noted)during the U1R97 foreign object search and retrieval operations:
UNIT1SGPROGRAMINTERNALS INSPECTION SGDescritionUnit1containsfourWestinghouse series51SGsthatwereplacedinservicein1975.Keydesignfeaturesincludealloy600millannealedtubing,apartialdepthhardrollexpansion atthetube-to-tubesheet joint,anddrilledcarbonsteelsupportplates.Thenominaltubeoutsidediameter(OD)is0.875incheswithanominalwallthickness of0.050inches.Thefourunit1SGsarepresently scheduled forreplacement intheyear2000.
~Pre-Sludge Lance Inspection
Attachment to=AEP:NRC:1166AMPage3RelatedIndustFindinsAsdiscussed inWCAP-15002, revision1,eighteenplantswithseries51SGssuppliedinformation totheWOGconcerning resultsofSGsecondary sideinspections andrelevanttubeinspections forTSPconditions.
-A visual inspection was performed to identify the tubing/sludge conditions at the tubesheet prior,to lancing.This inspection included the annulus and divider lane.~Post-Lance Inspection
Theseresultsdidnotreportdetection ofseveralmodesofdegradation experienced intheEdFunits.Thereis-noevidenceofpost-chemical cleaninginspections indicating any.significant materialloss,noristhereevidenceofwrapperhavingdropped.WhileTSPligamentcrackinghasoccurredinunitswithcarbonsteelsupport,plateswithdrilled'ound holesand.flow'oles,thereisnoevidenceindicating TSPligamentcrackingorthinningthatisprogressive andcontinuing.
-A visual inspection was performed to verify the effectiveness of the sludge removal process and general tubesheet/tubing conditions at the top of the tubesheet.
Thefollowingtablesummarizes theapplicable WOGconclusions concerning thesusceptibility ofSGslikeouiunit1series51SGstosecondary sideinternals degradation.
The inspection consisted of the annulus, divider lane and an inner bundle pass in both the hot and cold leg sides..Wrapper Barrel Inspection
TABLE1DEGRADATION TYPEErosionCorrosion:
-This visual inspection was performed to.verify the integrity of the wrapper barrel support structure.
MoistureSeparator TSPFlowHole/Ligaments FeedRing/8-Tubes Cracking:
First Tube Support Ligament (2, SGs)-This inspection involved a visual review of the first TSP between the wrapper barrel and the tube bundle directly above the handhold: The pre/post-lance inspections confirmed" the effectiveness of the sludge removal operations and the general condition of the tubing at the tubesheet.
TSPLigaments NearWedges**TSPLigaments NearPatchPlatesCarbonSteelTSPLigaments (randomareas)LEVELOFSUSCEPTIBILITY NNX*"Other:WrapperNearSupports**NWrapperDrop**NX~oservexnsomeSGsN=notsusceptible toEdFcasualfactorsL~lowsusceptibility toEdFcasualfactors*~variousindication ofdegradation maybeartifacts ofmanufacturing relatedtopatchplateplugweldsand/ordrillingalignment
No anomalies or loose parts were noted by the inspection.
**variousWestinghouse designfeatures'rebeneficial relativetosomeoftheSGdesignfeaturesofforeignmanufacturers Site-SecificFindinsTheunit1SGswerelastinspected inthespringof1997.In~additiontothestandardeddycurrenttubeinspection, additional measureswereperformed toassuretheintegrity oftheSGinternals.
The wrapper barrel inspection produced no evidence of slippage or movement.Additional verification of the integrity of the support structure was provided by the successful installation of the sludge lance equipment.
Theseinspections, coupledwithrelatedfindingsfrompreviousinspections, demonstrate thatthe'reasnotedintable1havebeenperiodically examinedwithnoabnormalconditions
The lack of any interferences'uring this installation provided assurance that no deformation had~occurred.Inspections of the first support plate identified no signs of anomalies in either of the two SGs inspected.
.noted.
While no inspections were performed during U1R97 on the upper internals, previous inspections have identified only minimal wear.'uring the 1995 inspection, fifteen J-nozzles and the feedring tee section of one SG.were inspected.
et~~Attachment toAEP:NRC:1166AM Page4Thefollowing discussion presentstheinternals inspection scopeandfindingsfortheunit11997refueling outage(U1R97).A100%computerdatascreening (CDS)sortwasperformed onthelowfrequency bobbincoildatafromeachSGtoaddressthepotential forTSPdamageorligamentcracking.
The J-nozzles were termed to be in very good condition, with no thinning observed on the thermal liner and tee.Prior to the 1995 inspection, extensive inspections were conducted in 1989 in which visual inspections were conducted.on the J-nozzles of three SGs.The visual examination of one of l~
Indications ofpossibleligamentdamagewereexaminedusingamotorized rotatingpancakecoil(MRPC)probe.Theindications weresubsequently dispositioned ashavingnodegradation found(NDF)ordetermined tobealignedwiththepatchplate,thusyieldinga"false"indication.
Attachment to AEP:NRC:1166AM Page 5 these SGs was supplemented by an added ultrasonic test (UT)examination.
Onetube,R39/C22inSG11wasnotedtohavea0.78'oltMRPCindication attheseventhhotlegsupportplate,nearthewedgelocation.
Neither the visual or UT examinations noted any apparent degradation.
Researchofthepreviousoutagedataconfirmed thiscondition hasbeenpresentforatleastthreeyears.Thisindication willcontinuetobemonitored duringfutureeddycurrentinspections.
These inspections have indicated that degradation in the upper internals is a slow progressing phenomena.
Regarding theperformance ofsecondary sidevisualinspections, thefollowing activities wereperformed ineachSG(unlessotherwise noted)duringtheU1R97foreignobjectsearchandretrieval operations:
Based on minimal degradation to date and the near end of life for these SGs, no examinations were performed during U1R97.Safet Assessment The following safety concerns have been postulated by WOG relative to the French SG internals degradation experience.
~Pre-Sludge LanceInspection
~Loss of support in the tube.bundle leading to wear, and possible primary-to-secondary leakage or inadequate burst margins.Increased TSP deformation during a postulated loss-of-coolant accident (LOCA)plus safe shutdown earthquake (SSE)'event, resulting in unacceptable SG tube collapse or secondary-to-primary inleakage.
-Avisualinspection wasperformed toidentifythetubing/sludge conditions atthetubesheet prior,tolancing.Thisinspection includedtheannulusanddividerlane.~Post-Lance Inspection
i~Generation of a loose object in the secondary side of a SG that may result in tube wear or impacting, and possibly primary-to-secondary leakage.As discussed below, industry experience and various standard practices are typically employed to provide assurance of SG integrity and negate the potential for these'oncerns.As evidenced from the previously discussed U1R97 inspection results, our unit 1 experiences and practices mirror that of the industry.Based on'review of the table 1 information, the only degradation types that may occur domestically that could result, in the loss of TSP integrity are TSP flow hole/ligament erosion-corrosion, TSP ligament cracking near the patch plates, and TSP ligament cracking in random areas.There is no industry evidence of post-chemical cleaning inspections indicating.
-Avisualinspection wasperformed toverifytheeffectiveness ofthesludgeremovalprocessandgeneraltubesheet/tubing conditions atthetopofthetubesheet.
significant material loss, nor is'there evidence of any wrapper having dropped.While TSP'ligament cracking has occurred in units with carbon steel.support plates with drilled round holes and flow holes, there is no evidence indicating TSP ligament cracking or thinning that is progressive and continuing.
Theinspection consisted oftheannulus,dividerlaneandaninnerbundlepassinboththehotandcoldlegsides..WrapperBarrelInspection
Utilities with series 51 SGs with carbon'steel support plates inspect a significant percentage of SG tubes every outage with a bobbin coil probe (unit 1 inspects 100%).If sections of the tube support were missing, it would be readily detectable because of a lack of eddy current.response at the TSP elevation.
-Thisvisualinspection wasperformed to.verifytheintegrity ofthewrapperbarrelsupportstructure.
There is no increased susceptibility to ligament cracking near the wedge supports in the series 51 SG design.Either there are no flow holes extending to the periphery'at the wedge locations, or=.the wedges are not welded to the TSPs, as is the case with the EdF 51M SG.Existing calculations evaluating the effects of LOCA plus SSE loadings on the tube bundle continue to apply in determining whether certain tubes should be excluded from application of the voltage based plugging criteria, or whether certain tubes should be removed from service in plants that do not currently have the criteria, but may have SG tubes experiencing
FirstTubeSupportLigament(2,SGs)-Thisinspection involvedavisualreviewofthefirstTSPbetweenthewrapperbarrelandthetubebundledirectlyabovethehandhold:
~cracking at TSP intersections.
Thepre/post-lance inspections confirmed" theeffectiveness ofthesludgeremovaloperations andthegeneralcondition ofthetubingatthetubesheet.
Attachment to AEP:NRC:1166AM Page 6 Another occurrence resulting from SG internal degradation that may.affect a SG in performing its intended safety function is the potential for tube wear and primary-to secondary leakage due to the generation of a loose object on the secondary side of the SG.This may occur due to erosion-corrosion of the moisture separators, feed ring/J-nozzle, or TSP flow holes, or the occurrence of TSP ligament cracking.If primary-to-secondary leakage should occur because of tube wear from a loose object, the expected consequences would be bounded by a single tube rupture event and, therefore, would remain within the current licensing basis of the plant.It is our position that loose objects should be removed whenever possible.Tubes observed to have visible damage are eddy current inspected and plugged as necessary.
Noanomalies orloosepartswerenotedbytheinspection.
Elements of the SG program, includi'ng eddy current inspection, foreign object search and retrieval during each refueling outage, and loose parts monitoring are in place to help ensure the maintenance of tube integrity during plant operation.
Thewrapperbarrelinspection producednoevidenceofslippageormovement.
Because no internals degradation of consequence has be'en observed on the unit 1 SGs, it is expected that, near term degradation would be limited in extent, such that'the tubes will remain capable of sustaining the conditions of normal operations, including operational transient, design basis accidents, external events, and natural phenomena, permitting the affected SG to perform its safety function.Inservice Ins ection Plan Because of.the pending SG replacement, it is projected that the unit 1 SGs will undergo only one more inspection prior to the replacement outage.Based on the previous discussions, the upcoming inspection plan will closely mirror activities performed in 1997.The planned workscope is summarized as follows.A 100%CDS scan will be performed on the bobbin coil data for.evidence of support plate/ligament damage.Indication disposition will be by MRPC probe.Note that the bobbin coil examination will be performed on 100%of the in-service tubing.Foreign object search and retrieval operations will be performed in each SG to access the tubing and support structure conditions as well as verify the sludge conditions within the SGs.Accessible tubesheet surfaces and tubes at the top of the tubesheet will be targeted during the inspection.
Additional verification oftheintegrity ofthesupportstructure wasprovidedbythesuccessful installation ofthesludgelanceequipment.
During sludge lance operations to be performed in each SG, it will be verified that the lancing equipment can be inserted without interference.
Thelackofanyinterferences'uring thisinstallation providedassurance thatnodeformation had~occurred.
Successful installation will provide verification of wrapper integri.ty.
Inspections ofthefirstsupportplateidentified nosignsofanomalies ineitherofthetwoSGsinspected.
If interference is detected, the lower wrapper support blocks will be visually inspected.
Whilenoinspections wereperformed duringU1R97ontheupperinternals, previousinspections haveidentified onlyminimalwear.'uring the1995inspection, fifteenJ-nozzles andthefeedringteesectionofoneSG.wereinspected.
The wrapper block'inspection will also be conducted if any evidence of tube damage in the periphery of the first TSP is detected.Inspections will be performed on the first and uppermost TSP of one SG to assess fouling conditions and identify any evidence of corrosion or damage.  
TheJ-nozzles weretermedtobeinverygoodcondition, withnothinningobservedonthethermallinerandtee.Priortothe1995inspection, extensive inspections wereconducted in1989inwhichvisualinspections wereconducted
~~Attachment to AEP:NRC:1166AM Page 7 Based on site inspection experience, no upper-bundle inspections are planned during the upcoming inspection.
.ontheJ-nozzles ofthreeSGs.Thevisualexamination ofoneof l~
Should the unit.1 SGs be replaced during the next outage, our inspection plan will be revised appropriately.
Attachment toAEP:NRC:1166AM Page5theseSGswassupplemented byanaddedultrasonic test(UT)examination.
-UNIT 2 SG PROGRAM INTERNALS INSPECTION SG Descri tion In 1989, the four original unit 2 Westinghouse series 53.SGs were replaced with Westinghouse series 54F SGs.Key design features of the replacement SGs.include thermally treated alloy 690 tubing, a full depth hydraulic expansion at the tube-to-tubesheet
NeitherthevisualorUTexaminations notedanyapparentdegradation.
'joint, quatrefoil stainless steel support plates,.increased row 1 U-bend radius, and heat treated low row U-bends.The nominal tube OD is 0.875 inches, with a nominal wall thickness of 0.050 inches.Related Industr Findin s As discussed in WCAP-15002, revision 1, twelve plants with series D, E, 44F, and F SGs supplied information to the WOG concerning results of SG secondary side inspections and relevant tube inspections for TSP conditions.
Theseinspections haveindicated thatdegradation intheupperinternals isaslowprogressing phenomena.
For the most, part, the findings did not report detection of several modes of degradation experienced in the EdF units.There is no evidence of post-chemical cleaning inspections indicating significant material loss,.nor is there evidence of any wrapper, having dropped.While TSP ligament cracking has occurred in units with carbon steel support plates with drilled round holes and flow holes, there is no evidence indicating TSP ligament cracking or thinning that is progressive and continuing.
Basedonminimaldegradation todateandthenearendoflifefortheseSGs,noexaminations wereperformed duringU1R97.SafetAssessment Thefollowing safetyconcernshavebeenpostulated byWOGrelativetotheFrenchSGinternals degradation experience.
The f ollowing table summarizes the applicable WOG conclusions concerning the susceptibility of SGs like the unit 2 series 54F SGs.to secondary side internals degradation.
~Lossofsupportinthetube.bundleleadingtowear,andpossibleprimary-to-secondary leakageorinadequate burstmargins.Increased TSPdeformation duringapostulated loss-of-coolant accident(LOCA)plussafeshutdownearthquake (SSE)'event,resulting inunacceptable SGtubecollapseorsecondary-to-primaryinleakage.
TABLE 2 DEGRADATION TYPE LEVEL OF SUSCEPTIBILITY Erosion Corrosion:
i~Generation ofalooseobjectinthesecondary sideofaSGthatmayresultintubewearorimpacting, andpossiblyprimary-to-secondary leakage.Asdiscussed below,industryexperience andvariousstandardpractices aretypically employedtoprovideassurance ofSGintegrity andnegatethepotential forthese'oncerns.
Moisture Separator TSP Flow Hole/Ligaments Feed Ring/8-Nozzles Cracking: TSP Ligaments***Wrapper Near Supports*+Other: NA Wrapper Drop**
Asevidenced fromthepreviously discussed U1R97inspection results,ourunit1experiences andpractices mirrorthatoftheindustry.
Attachment to AEP:NRC:1166AM Page 8 X L NA~*a observed in some SGs low susceptibility not applicable various indication of degradation may be artifacts of manufacturing related to patch plate plug welds and/or drilling alignment various Westinghouse
Basedon'reviewofthetable1information, theonlydegradation typesthatmayoccurdomestically thatcouldresult,inthelossofTSPintegrity areTSPflowhole/ligament erosion-corrosion, TSPligamentcrackingnearthepatchplates,andTSPligamentcrackinginrandomareas.Thereisnoindustryevidenceofpost-chemical cleaninginspections indicating.
.design features'are beneficial relative to some of the SG design features of foreign manufacturers Site-S ecific Findin s The unit 2 SGs were last inspected in the fall of 1997.In addition to the standard eddy"current tube i.nspection, other measures were performed to assure the integrity of the SG internals.
significant materialloss,noris'thereevidenceofanywrapperhavingdropped.WhileTSP'ligament crackinghasoccurredinunitswithcarbonsteel.supportplateswithdrilledroundholesandflowholes,thereisnoevidenceindicating TSPligamentcrackingorthinningthatisprogressive andcontinuing.
These inspections, coupled with related findings from'revious inspections and design attributes of the unit 2 series 54F SGs, demonstrate
Utilities withseries51SGswithcarbon'steelsupportplatesinspectasignificant percentage ofSGtubeseveryoutagewithabobbincoilprobe(unit1inspects100%).Ifsectionsofthetubesupportweremissing,itwouldbereadilydetectable becauseofalackofeddycurrent.responseattheTSPelevation.
.,that the areas of interest as, noted"in table 2 have been addressed with no abnormal conditions noted.The following discussion presents the internals inspection scope and findings for the unit 2 1997 refueling outage (U2R97).The following activities were performed in each SG (unless otherwise noted)during the U2R97 foreign object search and retrieval operations.
Thereisnoincreased susceptibility toligamentcrackingnearthewedgesupportsintheseries51SGdesign.Eithertherearenoflowholesextending totheperiphery
~Pre-sludge Lance Inspection
'atthewedgelocations, or=.thewedgesarenotweldedtotheTSPs,asisthecasewiththeEdF51MSG.Existingcalculations evaluating theeffectsofLOCAplusSSEloadingsonthetubebundlecontinuetoapplyindetermining whethercertaintubesshouldbeexcludedfromapplication ofthevoltagebasedpluggingcriteria, orwhethercertaintubesshouldberemovedfromserviceinplantsthatdonotcurrently havethecriteria, butmayhaveSGtubesexperiencing
-A visual inspection was performed to identify the tubing/sludge, conditions at the tubesheet prior to lancing.This inspection included the annulus and divider lane.Post-Lance Inspection
~crackingatTSPintersections.
-A visual inspection was performed to verify the effectiveness of the sludge removal process and the general tubesheet/tubing conditions on the top of the tubesheet.
Attachment toAEP:NRC:1166AM Page6Anotheroccurrence resulting fromSGinternaldegradation thatmay.affectaSGinperforming itsintendedsafetyfunctionisthepotential fortubewearandprimary-to secondary leakageduetothegeneration ofalooseobjectonthesecondary sideoftheSG.Thismayoccurduetoerosion-corrosion ofthemoistureseparators, feedring/J-nozzle, orTSPflowholes,ortheoccurrence ofTSPligamentcracking.
Areas reviewed consisted of the annulus, divider lane and an inner bundle pass.on both the hot.and cold leg sides.~Sixth and'Seventh TSP.(One SG)-A visual inspection reviewed the sixth and seventh TSPs to access sludge conditions and fouling conditions in the upper region of the one SG.The pre/post-lance inspection confirmed the effectiveness of the sludge removal operations and the general condition of the tubing at'he tubesheet.
Ifprimary-to-secondary leakageshouldoccurbecauseoftubewearfromalooseobject,theexpectedconsequences wouldbeboundedbyasingletuberuptureeventand,therefore, wouldremainwithinthecurrentlicensing basisoftheplant.Itisourpositionthatlooseobjectsshouldberemovedwheneverpossible.
No,,degradation or signs of abnormalities were noted during the inspection.
Tubesobservedtohavevisibledamageareeddycurrentinspected andpluggedasnecessary.
The upper support plate inspection noted no signs of damaged components or degradation.
ElementsoftheSGprogram,includi'ng eddycurrentinspection, foreignobjectsearchandretrieval duringeachrefueling outage,andloosepartsmonitoring areinplacetohelpensurethemaintenance oftubeintegrity duringplantoperation.
Regarding TSP damage.or ligament cracking, eddy current assessments were not performed because the quatrefoil broached hole support plate design makes this technique not applicable for detecting damage.No abnormalities were detected in this area during the foreign object search and retrieval operations that would suggest damage of this nature.In general, erosion-corrosion induced degradation is viewed as a low susceptibility event because the plates are constructed of stainless steel.Specific inspection of the wrapper barrel area was not performed.
Becausenointernals degradation ofconsequence hasbe'enobservedontheunit1SGs,itisexpectedthat,neartermdegradation wouldbelimitedinextent,suchthat'thetubeswillremaincapableofsustaining theconditions ofnormaloperations, including operational transient, designbasisaccidents, externalevents,andnaturalphenomena, permitting theaffectedSGtoperformitssafetyfunction.
However, wrapper conditions did not affect the installation of the Attachment to AEP:NRC:1166AM Page 9 sludge lancing equipment that was performed in each SG.Therefore, it was concluded that the wrapper had not slipped or moved.While no inspections were performed duiing U2R97,on, the upper internals, previous inspections have been performed.
Inservice InsectionPlanBecauseof.thependingSGreplacement, itisprojected thattheunit1SGswillundergoonlyonemoreinspection priortothereplacement outage.Basedonthepreviousdiscussions, theupcominginspection planwillcloselymirroractivities performed in1997.Theplannedworkscope issummarized asfollows.A100%CDSscanwillbeperformed onthebobbincoildatafor.evidenceofsupportplate/ligament damage.Indication disposition willbebyMRPCprobe.Notethatthebobbincoilexamination willbeperformed on100%ofthein-service tubing.Foreignobjectsearchandretrieval operations willbeperformed ineachSGtoaccessthetubingandsupportstructure conditions aswellasverifythesludgeconditions withintheSGs.Accessible tubesheet surfacesandtubesatthetopofthetubesheet willbetargetedduringtheinspection.
During the 1994 inspection, ten J-nozzles and the feedring tee section of one SG were inspected.
Duringsludgelanceoperations tobeperformed ineachSG,itwillbeverifiedthatthelancingequipment canbeinsertedwithoutinterference.
No erosion was noted during the inspection.
Successful installation willprovideverification ofwrapperintegri.ty.
The original, feedrings/J-nozzles were replaced when the unit 2 SGs were replaced in 1989.The replacement feedrings are constructed of extra strong carbon steel and the J-nozzles are made.from, alloy 600, which is less susceptible to erosion damage than.the typical carbon steel J-nozzles.
Ifinterference isdetected, thelowerwrappersupportblockswillbevisuallyinspected.
These inspections indicate that degradation in the upper internals is a slow progressing phenomena., Based on minimal degradation to-date, no examinations were scheduled'for U2R97.Safet Assessment As noted in the unit 1 safety assessment, the following safety concerns have been postulated by the WOG relative to the French SG internals degradation experience.
Thewrapperblock'inspection willalsobeconducted ifanyevidenceoftubedamageintheperiphery ofthefirstTSPisdetected.
~>>Loss of support leading to wear and possible primary-to-secondary leakage or inadequate burst margins..More significant TSP deformation during a postulated LOCA plus SSE event, resulting in unacceptable SG tube collapse or secondary-to-primary inleakage.
Inspections willbeperformed onthefirstanduppermost TSPofoneSGtoassessfoulingconditions andidentifyanyevidenceofcorrosion ordamage.  
Generation of a loose object in the secondary side of a SG which may result in tube wear or impacting and possibly primary-to-secondary leakage.As discussed below, design.features, industry experience, and various standard practices are typically employed to-provide assurance of SG integrity and negate the potential for these concerns.Previously discussed U2R97 inspection results indicate our unit 2 experiences and practices are similar to that of the industry.Based on a review of the table 2 information, the only degradation types that may occur domestically that would likely result in the loss of TSP integrity are TSP flow hole/ligament erosion-corrosion, TSP ligament cracking near the patch plates, and TSP ligament cracking in random areas.There is no industry evidence of post-chemical cleaning inspections resulting in the discovery of any significant material loss, nor is there.evidence of any wrapper having dropped.No TSP ligament indications have been found in steam generators with stainless steel TSPs.This population includes the unit 2 SGs.No increased susceptibility to ligament cracking near the wedge supports has been identified in the series D, E, 44F, and F (unit.2)SGs designs.Existing calculations evaluating the effects of LOCA plus SSE loadings on the tube bundle continue to apply in determining whether certain tubes should be excluded from application of the voltage based plugging criteria, or whether certain.tubes should be removed from service in plants that do not currently have a criteria but may have SG tubes experiencing cracking at TSP intersections.  
~~Attachment toAEP:NRC:1166AM Page7Basedonsiteinspection experience, noupper-bundleinspections areplannedduringtheupcominginspection.
Shouldtheunit.1SGsbereplacedduringthenextoutage,ourinspection planwillberevisedappropriately.
-UNIT2SGPROGRAMINTERNALS INSPECTION SGDescritionIn1989,thefouroriginalunit2Westinghouse series53.SGswerereplacedwithWestinghouse series54FSGs.Keydesignfeaturesofthereplacement SGs.includethermally treatedalloy690tubing,afulldepthhydraulic expansion atthetube-to-tubesheet
'joint,quatrefoil stainless steelsupportplates,.increased row1U-bendradius,andheattreatedlowrowU-bends.ThenominaltubeODis0.875inches,withanominalwallthickness of0.050inches.RelatedIndustrFindinsAsdiscussed inWCAP-15002, revision1,twelveplantswithseriesD,E,44F,andFSGssuppliedinformation totheWOGconcerning resultsofSGsecondary sideinspections andrelevanttubeinspections forTSPconditions.
Forthemost,part,thefindingsdidnotreportdetection ofseveralmodesofdegradation experienced intheEdFunits.Thereisnoevidenceofpost-chemicalcleaninginspections indicating significant materialloss,.noristhereevidenceofanywrapper,havingdropped.WhileTSPligamentcrackinghasoccurredinunitswithcarbonsteelsupportplateswithdrilledroundholesandflowholes,thereisnoevidenceindicating TSPligamentcrackingorthinningthatisprogressive andcontinuing.
Thefollowingtablesummarizes theapplicable WOGconclusions concerning thesusceptibility ofSGsliketheunit2series54FSGs.tosecondary sideinternals degradation.
TABLE2DEGRADATION TYPELEVELOFSUSCEPTIBILITY ErosionCorrosion:
MoistureSeparator TSPFlowHole/Ligaments FeedRing/8-Nozzles Cracking:
TSPLigaments
***WrapperNearSupports*+Other:NAWrapperDrop**
Attachment toAEP:NRC:1166AM Page8XLNA~*aobservedinsomeSGslowsusceptibility notapplicable variousindication ofdegradation maybeartifacts ofmanufacturing relatedtopatchplateplugweldsand/ordrillingalignment variousWestinghouse
.designfeatures'arebeneficial relativetosomeoftheSGdesignfeaturesofforeignmanufacturers Site-SecificFindinsTheunit2SGswerelastinspected inthefallof1997.Inadditiontothestandardeddy"currenttubei.nspection, othermeasureswereperformed toassuretheintegrity oftheSGinternals.
Theseinspections, coupledwithrelatedfindingsfrom'revious inspections anddesignattributes oftheunit2series54FSGs,demonstrate
.,thattheareasofinterestas,noted"intable2havebeenaddressed withnoabnormalconditions noted.Thefollowing discussion presentstheinternals inspection scopeandfindingsfortheunit21997refueling outage(U2R97).Thefollowing activities wereperformed ineachSG(unlessotherwise noted)duringtheU2R97foreignobjectsearchandretrieval operations.
~Pre-sludge LanceInspection
-Avisualinspection wasperformed toidentifythetubing/sludge, conditions atthetubesheet priortolancing.Thisinspection includedtheannulusanddividerlane.Post-Lance Inspection
-Avisualinspection wasperformed toverifytheeffectiveness ofthesludgeremovalprocessandthegeneraltubesheet/tubing conditions onthetopofthetubesheet.
Areasreviewedconsisted oftheannulus,dividerlaneandaninnerbundlepass.onboththehot.andcoldlegsides.~Sixthand'Seventh TSP.(OneSG)-Avisualinspection reviewedthesixthandseventhTSPstoaccesssludgeconditions andfoulingconditions intheupperregionoftheoneSG.Thepre/post-lance inspection confirmed theeffectiveness ofthesludgeremovaloperations andthegeneralcondition ofthetubingat'hetubesheet.
No,,degradation orsignsofabnormalities werenotedduringtheinspection.
Theuppersupportplateinspection notednosignsofdamagedcomponents ordegradation.
Regarding TSPdamage.orligamentcracking, eddycurrentassessments werenotperformed becausethequatrefoil broachedholesupportplatedesignmakesthistechnique notapplicable fordetecting damage.Noabnormalities weredetectedinthisareaduringtheforeignobjectsearchandretrieval operations thatwouldsuggestdamageofthisnature.Ingeneral,erosion-corrosion induceddegradation isviewedasalowsusceptibility eventbecausetheplatesareconstructed ofstainless steel.Specificinspection ofthewrapperbarrelareawasnotperformed.
However,wrapperconditions didnotaffecttheinstallation ofthe Attachment toAEP:NRC:1166AM Page9sludgelancingequipment thatwasperformed ineachSG.Therefore, itwasconcluded thatthewrapperhadnotslippedormoved.Whilenoinspections wereperformed duiingU2R97,on, theupperinternals, previousinspections havebeenperformed.
Duringthe1994inspection, tenJ-nozzles andthefeedringteesectionofoneSGwereinspected.
Noerosionwasnotedduringtheinspection.
Theoriginal, feedrings/J-nozzles werereplacedwhentheunit2SGswerereplacedin1989.Thereplacement feedrings areconstructed ofextrastrongcarbonsteelandtheJ-nozzles aremade.from,alloy600,whichislesssusceptible toerosiondamagethan.thetypicalcarbonsteelJ-nozzles.
Theseinspections indicatethatdegradation intheupperinternals isaslowprogressing phenomena.,
Basedonminimaldegradation to-date,noexaminations werescheduled'for U2R97.SafetAssessment Asnotedintheunit1safetyassessment, thefollowing safetyconcernshavebeenpostulated bytheWOGrelativetotheFrenchSGinternals degradation experience.
~>>Lossofsupportleadingtowearandpossibleprimary-to-secondary leakageorinadequate burstmargins..Moresignificant TSPdeformation duringapostulated LOCAplusSSEevent,resulting inunacceptable SGtubecollapseorsecondary-to-primary inleakage.
Generation ofalooseobjectinthesecondary sideofaSGwhichmayresultintubewearorimpacting andpossiblyprimary-to-secondary leakage.Asdiscussed below,design.features, industryexperience, andvariousstandardpractices aretypically employedto-provideassurance ofSGintegrity andnegatethepotential fortheseconcerns.
Previously discussed U2R97inspection resultsindicateourunit2experiences andpractices aresimilartothatoftheindustry.
Basedonareviewofthetable2information, theonlydegradation typesthatmayoccurdomestically thatwouldlikelyresultinthelossofTSPintegrity areTSPflowhole/ligament erosion-corrosion, TSPligamentcrackingnearthepatchplates,andTSPligamentcrackinginrandomareas.Thereisnoindustryevidenceofpost-chemicalcleaninginspections resulting inthediscovery ofanysignificant materialloss,noristhere.evidence ofanywrapperhavingdropped.NoTSPligamentindications havebeenfoundinsteamgenerators withstainless steelTSPs.Thispopulation includestheunit2SGs.Noincreased susceptibility toligamentcrackingnearthewedgesupportshasbeenidentified intheseriesD,E,44F,andF(unit.2)SGsdesigns.Existingcalculations evaluating theeffectsofLOCAplusSSEloadingsonthetubebundlecontinuetoapplyindetermining whethercertaintubesshouldbeexcludedfromapplication ofthevoltagebasedpluggingcriteria, orwhethercertain.tubesshouldberemovedfromserviceinplantsthatdonotcurrently haveacriteriabutmayhaveSGtubesexperiencing crackingatTSPintersections.  


Attachment toAEP:NRC:1166AM Page10Anotheroccurrence resulting fromSGinternaldegradation thatmayaffectaSGinperforming itsintendedsafetyfunctionisthe"potential fortubewearandprimary-to-secondary leakageduetothegeneration ofalooseobjectonthesecondary sideoftheSG.Thismayoccurbecauseoferosion-corrosion ofthemoistureseparators ortheoccurrence ofTSPligamentcracking.
Attachment to AEP:NRC:1166AM Page 10 Another occurrence resulting from SG internal degradation that may affect a SG in performing its intended safety function is the" potential for tube wear and primary-to-secondary leakage due to the generation of a loose object on the secondary side of the SG.This may occur because of erosion-corrosion of the moisture separators or the occurrence of TSP ligament cracking.If primary-to-secondary leakage should occur due to tube wear from a loose object, the expected consequences would be bounded by a single tube rupture event and would remain within the current licensing basis of the plant.It is our position that loose objects should be removed whenever possible., Tubes observed to have visible damage are eddy current inspected and plugged as necessary.
Ifprimary-to-secondary leakageshouldoccurduetotubewearfromalooseobject,theexpectedconsequences wouldbeboundedbyasingletuberuptureeventandwouldremainwithinthecurrentlicensing basisoftheplant.Itisourpositionthatlooseobjectsshouldberemovedwheneverpossible.,
Elements of the SG program, including eddy current inspection, foreign object search and retrieval during each refueling outage, and loose parts monitoring are in place to help ensure the maintenance of tube integrity during plant operation.
Tubesobservedtohavevisibledamageareeddycurrentinspected andpluggedasnecessary.
Because no internals degradation of consequence has been observed on the unit 2 SGs, it is expected that future degradation would be limited in extent such that the tubes will remain capable of sustaining the conditions of normal operations, including operational transient, design basis accidents, external events, and natural phenomena, permitting the affected SG to perform its safety function.Based on the above, implementation of the following inspection plan is planned on the unit 2 SGs to address the various types of SG secondary side internals degradation that may occur in Westinghouse-designed SGs.This plan may be amended, pending the results of a detailed industry evaluation that is expected to be completed by mid-1998.Inservice Ins ection Plan Given the primary side eddy current, inspection resulting in a C-1 classification and the absence of secondary side findings during the last inspection, no inspection activities are planned at the end of the current cycle (cycle 12).Inspection scope for the subsequent outage has not been finalized.
ElementsoftheSGprogram,including eddycurrentinspection, foreignobjectsearchandretrieval duringeachrefueling outage,andloosepartsmonitoring areinplacetohelpensurethemaintenance oftubeintegrity duringplantoperation.
However, at a minimum, planned secondary side inspections will be similar to those performed in 1997.The planned workscope is summarized as follows.Foreign object search and retrieval operations will be performed in each SG to access the tubing and support structure conditions as well as verify the sludge conditions within the SGs.Accessible tubesheet surfaces and tubes at the top of the tubesheet will be targeted during the inspection.
Becausenointernals degradation ofconsequence hasbeenobservedontheunit2SGs,itisexpectedthatfuturedegradation wouldbelimitedinextentsuchthatthetubeswillremaincapableofsustaining theconditions ofnormaloperations, including operational transient, designbasisaccidents, externalevents,andnaturalphenomena, permitting theaffectedSGtoperformitssafetyfunction.
During sludge lance operations to be performed in each SG, it will be verified that the lancing equipment can be inserted without interference.
Basedontheabove,implementation ofthefollowing inspection planisplannedontheunit2SGstoaddressthevarioustypesofSGsecondary sideinternals degradation thatmayoccurinWestinghouse-designed SGs.Thisplanmaybeamended,pendingtheresultsofadetailedindustryevaluation thatisexpectedtobecompleted bymid-1998.
Successful installation will provide verification of wrapper integrity.
Inservice InsectionPlanGiventheprimarysideeddycurrent,inspection resulting inaC-1classification andtheabsenceofsecondary sidefindingsduringthelastinspection, noinspection activities areplannedattheendofthecurrentcycle(cycle12).Inspection scopeforthesubsequent outagehasnotbeenfinalized.
If interference is detected, the lower wrapper support blocks will be visually inspected.
However,ataminimum,plannedsecondary sideinspections willbesimilartothoseperformed in1997.Theplannedworkscope issummarized asfollows.Foreignobjectsearchandretrieval operations willbeperformed ineachSGtoaccessthetubingandsupportstructure conditions aswellasverifythesludgeconditions withintheSGs.Accessible tubesheet surfacesandtubesatthetopofthetubesheet willbetargetedduringtheinspection.
The wrapper block inspection will also be conducted if evidence of tube damage in the periphery of the first TSP is detected.Inspections will be performed on the first and uppermost TSP of one SG to assess fouling conditions and identify evidence of corrosion or damage.
Duringsludgelanceoperations tobeperformed ineachSG,itwillbeverifiedthatthelancingequipment canbeinsertedwithoutinterference.
I 1 1 a Attachment to.AEP:NRC:1166AM Page 11 To verify conditions in the upper bundle area remain consistent with past inspections, an.inspection will be performed on the moisture separator units and a population of J-nozzles and the feedring tee area of one SG.CONCLUSIONS The aforementioned inspection programs are, based on industry experience and our site-specific inspection findings.We believe these programs are of a nature to adequately address concerns of internals degradation as noted in GL 97-06.}}
Successful installation willprovideverification ofwrapperintegrity.
Ifinterference isdetected, thelowerwrappersupportblockswillbevisuallyinspected.
Thewrapperblockinspection willalsobeconducted ifevidenceoftubedamageintheperiphery ofthefirstTSPisdetected.
Inspections willbeperformed onthefirstanduppermost TSPofoneSGtoassessfoulingconditions andidentifyevidenceofcorrosion ordamage.
I11a Attachment to.AEP:NRC:1166AM Page11Toverifyconditions intheupperbundlearearemainconsistent withpastinspections, an.inspection willbeperformed onthemoistureseparator unitsandapopulation ofJ-nozzles andthefeedringteeareaofoneSG.CONCLUSIONS Theaforementioned inspection programsare,basedonindustryexperience andoursite-specific inspection findings.
Webelievetheseprogramsareofanaturetoadequately addressconcernsofinternals degradation asnotedinGL97-06.}}

Revision as of 07:12, 6 July 2018

Forwards Response to GL 97-06, Degradation of SG Internals. GL Was Issued to Alert Addressees to Foreign & Domestic Findings of Damage to SG Internals,Emphasize Importance of Performing Comprehensive Exams of Internals
ML17334B729
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/14/1998
From: FITZPATRICK E
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AEP:NRC:1166AM, GL-97-06, GL-97-6, NUDOCS 9804200484
Download: ML17334B729 (17)


Text

CATEGORY REGULATORY INFORMATION DISTRIBUTION SYSTEM"(RIDS)" 4 ACCESSION NBR:9804200484 DOC.DATE: 98/04/14 NOTARIZED:

YES FACIL:50-315 Donald C.Cook Nuclear Power Plant, Unit 1, Indiana M50-316 Donald.C.Cook Nuclear Power Plant, Unit 2, Indiana M AUTH;NAME AUTHOR AFFILIATION FITZPATRICK,E.

Indiana Michigan Power Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)DOCKET¹05000315 05000316

SUBJECT:

Forwards response to GL 97-06,"Degradation of SG Intervals.

DISTRIBUTION CODE: ZOOID COPIES RECEIVED:,LTR i ENCL i SIZE: TITLE: OR Submittal:

General Distribution NOTES: RECIPIENT ID CODE/NAME PD3-3 LA STANG,J COPIES LTTR ENCL, 1 1 1 1 RECIPIENT ID CODE/NAME PD3-3 PD COPIES LTTR ENCL 1 1 E INTERNAL.-ENT---1 NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL: NOAC 1 1 1 1 1 1 1 1 NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 NRC PDR 1 1 1 1 1 1 1 0 1 1 D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL 12 Indiana Michigan~Power Company 500 Circle Drive Buchanan, Ml 491071395 Il fNENANA MICHIGAN PQWM April 14, 1998 AEP:NRC:1166AM Docket Nos.: 50-315 50-316 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop 0-Pl-17 Washington, D.C.20555-0001 Gentlemen:

Donald C.Cook Nuclear Plant Units 1 and 2 RESPONSE TO NRC GENERIC LETTER (GL)97-06 DEGRADATION OF STEAM GENERATOR INTERNALS This letter and its attachment provide information requested in GL 97-06, concerning steam generator internals degradation.

Sincerely, pug E.E.Fitzpatrick Vice President J'SWORN TO AND SUBSCRIBED BEFORE ME gA THIS~DAY OF~/Z., 1998 Notary Public/.Sd//vlb Attachment Z.A.Abramson A.B.Beach MDEQ-DW&RPD NRC Resident Inspector 8.R.Sampson UNDA L BOEI.CKE Notary Public, Berrien County, Ml M Commission Expires January 21, 200 I 2001 y Qo I 9804200484 9804l4 PDR ADOCK 050003iS p PDR ATTACHMENT TO AEP:NRC: 1166AM RESPONSE TO NRC GENERIC LETTER 97-06 DEGRADATION OF STEAM GENERATOR INTERNALS 5.~'Attachment to AEP:NRC:1166AM Page 1 INTRODUCTION Generic letter (GL)97-06 was issued to'alert addressees to foreign and domestic findings of damage to steam generator (SG)internals, emphasize the importance of performing comprehensive examinations of SG internals, and request information that will enable the NRC staff to verify the internals of Cook Nuclear Plant's SGs conform-to the current licensing basis.BACKGROUND AND DESCRIPTION OF CIRCUMSTANCES French authorities have reported various SG tube support plate (TSP)damage mechanisms.

Damage has.-included wastage in the uppermost TSP due to misapplication of.a chemical cleaning process, broken TSP ligaments resulting from inadequate clearance for, differential thermal expansion, and TSP wastage at various elevations apparently involving a corrosion or erosion-corrosion mechanism of undetermined origin.Other ins'tances of internals degradation include wrapper drop/cracking at a foreign utility that is suspected to have been caused by severe cooling transients, and instances of erosion-corrosion of eggcrate supports in untubed areas initiated"by unknown causes that occurred at a domestic facility.These instances.

highlight the potential for degradation mechanisms that may lead to TSP and tube wrapper damage..As a result of this concern, GL 97-06 requests: 1.Discussion of any programs in place to detect degradation of SG internals and a description of inspection plans (scope, frequency, methods, and equipment)

.This discussion should.address.the following information for each facility.a~b.C.Whether inspection records have been reviewed for indications of TSP signal anomalies from eddy current testing of SG tubes'hat may be indicative of support plate or ligament damage.Whether visual or video camera inspections have been performed on the secondary side to gain information on the condition of SG internals (e.g., support plates, tube bundle wrappers, etc.).Whether degradation, of SG internals has been detected, and how it was assessed and dispositioned.

2.In the event no program is in place to detect internals degradation, provide a discussion or justification for development of a program or why such a program is not:needed..

Prior to issuance of this GL, Westinghouse Owners Group (WOG), Electric Power Research Institute (EPRI), and Nuclear Energy Institute (NEI)developed an action plan to assess the susceptibility of SG secondary"side degradation.

We intend to follow the industry action plan as modified by our site-specific experience.

Included in the action plan is a requirement to understand the causal factors involved in the degradation experienced in the French units.This information is captured in EPRI report GC-109558,"Steam Generator Internals Degradation:

Attachment to AEP:NRC:1166AM Page 2 Modes of Degradation Detected in EdF Units".This report was submitted'o the NRC via an NEZ letter, dated December 19, 1997.-WOG has reviewed EPRZ GC-109558 relative to the, design of series 51 SGs and determined limited potential susceptibility.

For plants with series 51 SGs, this conclusion is documented in WCAP-15002, revision 1,."Evaluation of EdF Steam Generator Internals Degradation

-Impact of Causal Factors on Westinghouse

.51 Series Steam Generators", December 1997.The series 51 SGs are the most similar model SG to that of the Electricith de France (EdF).units and are installed in unit 1.WCAP-.15002, revision 1, documents visual inspections performed at the series 51 SG plants.Zt was concluded.that the number.of plants that have been inspected and the inspection results demonstrate that the causal factors identified by EdF do not jeopardize the continued operability of Westinghouse series 51 SGs.This conclusion is supported by the-capability of eddy current inspections to,detect.

detrimental effects on tubing due to wear caused by TSP ligament degradation, loose'parts, and secondary side'low distribution changes.Foreign object search and retrieval~efforts are typically conducted as standard practice to discover or~retrieve loose parts, thus limiting the potential for damage.A response to GL 97-06 has been completed for unit 1 addressing the susceptibility of the unit 1 SGs to internals degradation, specific unit 1 inspection practices and recent inspection results, along ,with a discussion of subsequent plant operation with potential SG internals degradation of the type experienced;in the French units (and other types of degradation experienced domestically)

~This discussion begins in the"UNIT 1 SG PROGRAM (INTERNALS 1NSPECTION)

" section of this attachment.

Because a detailed Westinghouse evaluation has not been performed , for our unit 2 SGs, inspection recommendations have.been identified on an interim basis.Industry representatives have indicated that'valuations should be completed by May 1998, and the results will be factored into the unit 2 SG program.As such.the response to'tem 1 for unit, 2, which is detailed in the"UNIT 2 SG PROGRAM (INTERNALS INSPECTION)" section of this attachment, may be modified in the future as dictated by the results of the pending evaluation.

UNIT 1 SG PROGRAM INTERNALS INSPECTION SG Descri tion Unit 1 contains four Westinghouse series 51 SGs that were placed in service in 1975.Key design features include alloy 600 mill annealed tubing, a partial depth hardroll expansion at the tube-to-tubesheet joint, and drilled carbon steel support plates.The nominal tube outside diameter (OD)is 0.875 inches with a nominal wall thickness of 0.050 inches.The four unit 1 SGs are presently scheduled for replacement in the year 2000.

Attachment to=AEP: NRC: 1166AM Page 3 Related Indust Findin s As discussed in WCAP-15002, revision 1, eighteen plants with series 51 SGs supplied information to the WOG concerning results of SG secondary side inspections and relevant tube inspections for TSP conditions.

These results did not report detection of several modes of degradation experienced in the EdF units.There is-no evidence of post-chemical cleaning inspections indicating any.significant material loss, nor is there evidence of wrapper having dropped.While TSP ligament cracking has occurred in units with carbon steel support, plates with drilled'ound holes and.flow'oles, there is no evidence indicating TSP ligament cracking or thinning that is progressive and continuing.

The f ollowing table summarizes the applicable WOG conclusions concerning the susceptibility of SGs like oui unit 1 series 51 SGs to secondary side internals degradation.

TABLE 1 DEGRADATION TYPE Erosion Corrosion:

Moisture Separator TSP Flow Hole/Ligaments Feed Ring/8-Tubes Cracking: TSP Ligaments Near Wedges**TSP Ligaments Near Patch Plates Carbon Steel TSP Ligaments (random areas)LEVEL OF SUSCEPTIBILITY N N X*" Other: Wrapper Near Supports**N Wrapper Drop**N X~o serve xn some SGs N=not susceptible to EdF casual factors L~low susceptibility to EdF casual factors*~various indication of degradation may be artifacts of manufacturing related to patch plate plug welds and/or drilling alignment**various Westinghouse design features're beneficial relative to some of the SG design features of foreign manufacturers Site-S ecific Findin s The unit 1 SGs were last inspected in the spring of 1997.In~addition to the standard eddy current tube inspection, additional measures were performed to assure the integrity of the SG internals.

These inspections, coupled with related findings from previous inspections, demonstrate that the'reas noted in table 1 have been periodically examined with no abnormal conditions.noted.

e t~~Attachment to AEP:NRC:1166AM Page 4 The following discussion presents the internals inspection scope and findings for the unit 1 1997 refueling outage (U1R97).A 100%computer data screening (CDS)sort was performed on the low frequency bobbin coil data from each SG to address the potential for TSP damage or ligament cracking.Indications of possible ligament damage were examined using a motorized rotating pancake coil (MRPC)probe.The indications were subsequently dispositioned as having no degradation found (NDF)or determined to be aligned with the patch plate, thus yielding a"false" indication.

One tube, R39/C22 in SG 11 was noted to have a 0.78'olt MRPC indication at the seventh hot leg support plate, near the wedge location.Research of the previous outage data confirmed this condition has been present for at least three years.This indication will continue to be monitored during future eddy current inspections.

Regarding the performance of secondary side visual inspections, the following activities were performed in each SG (unless otherwise noted)during the U1R97 foreign object search and retrieval operations:

~Pre-Sludge Lance Inspection

-A visual inspection was performed to identify the tubing/sludge conditions at the tubesheet prior,to lancing.This inspection included the annulus and divider lane.~Post-Lance Inspection

-A visual inspection was performed to verify the effectiveness of the sludge removal process and general tubesheet/tubing conditions at the top of the tubesheet.

The inspection consisted of the annulus, divider lane and an inner bundle pass in both the hot and cold leg sides..Wrapper Barrel Inspection

-This visual inspection was performed to.verify the integrity of the wrapper barrel support structure.

First Tube Support Ligament (2, SGs)-This inspection involved a visual review of the first TSP between the wrapper barrel and the tube bundle directly above the handhold: The pre/post-lance inspections confirmed" the effectiveness of the sludge removal operations and the general condition of the tubing at the tubesheet.

No anomalies or loose parts were noted by the inspection.

The wrapper barrel inspection produced no evidence of slippage or movement.Additional verification of the integrity of the support structure was provided by the successful installation of the sludge lance equipment.

The lack of any interferences'uring this installation provided assurance that no deformation had~occurred.Inspections of the first support plate identified no signs of anomalies in either of the two SGs inspected.

While no inspections were performed during U1R97 on the upper internals, previous inspections have identified only minimal wear.'uring the 1995 inspection, fifteen J-nozzles and the feedring tee section of one SG.were inspected.

The J-nozzles were termed to be in very good condition, with no thinning observed on the thermal liner and tee.Prior to the 1995 inspection, extensive inspections were conducted in 1989 in which visual inspections were conducted.on the J-nozzles of three SGs.The visual examination of one of l~

Attachment to AEP:NRC:1166AM Page 5 these SGs was supplemented by an added ultrasonic test (UT)examination.

Neither the visual or UT examinations noted any apparent degradation.

These inspections have indicated that degradation in the upper internals is a slow progressing phenomena.

Based on minimal degradation to date and the near end of life for these SGs, no examinations were performed during U1R97.Safet Assessment The following safety concerns have been postulated by WOG relative to the French SG internals degradation experience.

~Loss of support in the tube.bundle leading to wear, and possible primary-to-secondary leakage or inadequate burst margins.Increased TSP deformation during a postulated loss-of-coolant accident (LOCA)plus safe shutdown earthquake (SSE)'event, resulting in unacceptable SG tube collapse or secondary-to-primary inleakage.

i~Generation of a loose object in the secondary side of a SG that may result in tube wear or impacting, and possibly primary-to-secondary leakage.As discussed below, industry experience and various standard practices are typically employed to provide assurance of SG integrity and negate the potential for these'oncerns.As evidenced from the previously discussed U1R97 inspection results, our unit 1 experiences and practices mirror that of the industry.Based on'review of the table 1 information, the only degradation types that may occur domestically that could result, in the loss of TSP integrity are TSP flow hole/ligament erosion-corrosion, TSP ligament cracking near the patch plates, and TSP ligament cracking in random areas.There is no industry evidence of post-chemical cleaning inspections indicating.

significant material loss, nor is'there evidence of any wrapper having dropped.While TSP'ligament cracking has occurred in units with carbon steel.support plates with drilled round holes and flow holes, there is no evidence indicating TSP ligament cracking or thinning that is progressive and continuing.

Utilities with series 51 SGs with carbon'steel support plates inspect a significant percentage of SG tubes every outage with a bobbin coil probe (unit 1 inspects 100%).If sections of the tube support were missing, it would be readily detectable because of a lack of eddy current.response at the TSP elevation.

There is no increased susceptibility to ligament cracking near the wedge supports in the series 51 SG design.Either there are no flow holes extending to the periphery'at the wedge locations, or=.the wedges are not welded to the TSPs, as is the case with the EdF 51M SG.Existing calculations evaluating the effects of LOCA plus SSE loadings on the tube bundle continue to apply in determining whether certain tubes should be excluded from application of the voltage based plugging criteria, or whether certain tubes should be removed from service in plants that do not currently have the criteria, but may have SG tubes experiencing

~cracking at TSP intersections.

Attachment to AEP:NRC:1166AM Page 6 Another occurrence resulting from SG internal degradation that may.affect a SG in performing its intended safety function is the potential for tube wear and primary-to secondary leakage due to the generation of a loose object on the secondary side of the SG.This may occur due to erosion-corrosion of the moisture separators, feed ring/J-nozzle, or TSP flow holes, or the occurrence of TSP ligament cracking.If primary-to-secondary leakage should occur because of tube wear from a loose object, the expected consequences would be bounded by a single tube rupture event and, therefore, would remain within the current licensing basis of the plant.It is our position that loose objects should be removed whenever possible.Tubes observed to have visible damage are eddy current inspected and plugged as necessary.

Elements of the SG program, includi'ng eddy current inspection, foreign object search and retrieval during each refueling outage, and loose parts monitoring are in place to help ensure the maintenance of tube integrity during plant operation.

Because no internals degradation of consequence has be'en observed on the unit 1 SGs, it is expected that, near term degradation would be limited in extent, such that'the tubes will remain capable of sustaining the conditions of normal operations, including operational transient, design basis accidents, external events, and natural phenomena, permitting the affected SG to perform its safety function.Inservice Ins ection Plan Because of.the pending SG replacement, it is projected that the unit 1 SGs will undergo only one more inspection prior to the replacement outage.Based on the previous discussions, the upcoming inspection plan will closely mirror activities performed in 1997.The planned workscope is summarized as follows.A 100%CDS scan will be performed on the bobbin coil data for.evidence of support plate/ligament damage.Indication disposition will be by MRPC probe.Note that the bobbin coil examination will be performed on 100%of the in-service tubing.Foreign object search and retrieval operations will be performed in each SG to access the tubing and support structure conditions as well as verify the sludge conditions within the SGs.Accessible tubesheet surfaces and tubes at the top of the tubesheet will be targeted during the inspection.

During sludge lance operations to be performed in each SG, it will be verified that the lancing equipment can be inserted without interference.

Successful installation will provide verification of wrapper integri.ty.

If interference is detected, the lower wrapper support blocks will be visually inspected.

The wrapper block'inspection will also be conducted if any evidence of tube damage in the periphery of the first TSP is detected.Inspections will be performed on the first and uppermost TSP of one SG to assess fouling conditions and identify any evidence of corrosion or damage.

~~Attachment to AEP:NRC:1166AM Page 7 Based on site inspection experience, no upper-bundle inspections are planned during the upcoming inspection.

Should the unit.1 SGs be replaced during the next outage, our inspection plan will be revised appropriately.

-UNIT 2 SG PROGRAM INTERNALS INSPECTION SG Descri tion In 1989, the four original unit 2 Westinghouse series 53.SGs were replaced with Westinghouse series 54F SGs.Key design features of the replacement SGs.include thermally treated alloy 690 tubing, a full depth hydraulic expansion at the tube-to-tubesheet

'joint, quatrefoil stainless steel support plates,.increased row 1 U-bend radius, and heat treated low row U-bends.The nominal tube OD is 0.875 inches, with a nominal wall thickness of 0.050 inches.Related Industr Findin s As discussed in WCAP-15002, revision 1, twelve plants with series D, E, 44F, and F SGs supplied information to the WOG concerning results of SG secondary side inspections and relevant tube inspections for TSP conditions.

For the most, part, the findings did not report detection of several modes of degradation experienced in the EdF units.There is no evidence of post-chemical cleaning inspections indicating significant material loss,.nor is there evidence of any wrapper, having dropped.While TSP ligament cracking has occurred in units with carbon steel support plates with drilled round holes and flow holes, there is no evidence indicating TSP ligament cracking or thinning that is progressive and continuing.

The f ollowing table summarizes the applicable WOG conclusions concerning the susceptibility of SGs like the unit 2 series 54F SGs.to secondary side internals degradation.

TABLE 2 DEGRADATION TYPE LEVEL OF SUSCEPTIBILITY Erosion Corrosion:

Moisture Separator TSP Flow Hole/Ligaments Feed Ring/8-Nozzles Cracking: TSP Ligaments***Wrapper Near Supports*+Other: NA Wrapper Drop**

Attachment to AEP:NRC:1166AM Page 8 X L NA~*a observed in some SGs low susceptibility not applicable various indication of degradation may be artifacts of manufacturing related to patch plate plug welds and/or drilling alignment various Westinghouse

.design features'are beneficial relative to some of the SG design features of foreign manufacturers Site-S ecific Findin s The unit 2 SGs were last inspected in the fall of 1997.In addition to the standard eddy"current tube i.nspection, other measures were performed to assure the integrity of the SG internals.

These inspections, coupled with related findings from'revious inspections and design attributes of the unit 2 series 54F SGs, demonstrate

.,that the areas of interest as, noted"in table 2 have been addressed with no abnormal conditions noted.The following discussion presents the internals inspection scope and findings for the unit 2 1997 refueling outage (U2R97).The following activities were performed in each SG (unless otherwise noted)during the U2R97 foreign object search and retrieval operations.

~Pre-sludge Lance Inspection

-A visual inspection was performed to identify the tubing/sludge, conditions at the tubesheet prior to lancing.This inspection included the annulus and divider lane.Post-Lance Inspection

-A visual inspection was performed to verify the effectiveness of the sludge removal process and the general tubesheet/tubing conditions on the top of the tubesheet.

Areas reviewed consisted of the annulus, divider lane and an inner bundle pass.on both the hot.and cold leg sides.~Sixth and'Seventh TSP.(One SG)-A visual inspection reviewed the sixth and seventh TSPs to access sludge conditions and fouling conditions in the upper region of the one SG.The pre/post-lance inspection confirmed the effectiveness of the sludge removal operations and the general condition of the tubing at'he tubesheet.

No,,degradation or signs of abnormalities were noted during the inspection.

The upper support plate inspection noted no signs of damaged components or degradation.

Regarding TSP damage.or ligament cracking, eddy current assessments were not performed because the quatrefoil broached hole support plate design makes this technique not applicable for detecting damage.No abnormalities were detected in this area during the foreign object search and retrieval operations that would suggest damage of this nature.In general, erosion-corrosion induced degradation is viewed as a low susceptibility event because the plates are constructed of stainless steel.Specific inspection of the wrapper barrel area was not performed.

However, wrapper conditions did not affect the installation of the Attachment to AEP:NRC:1166AM Page 9 sludge lancing equipment that was performed in each SG.Therefore, it was concluded that the wrapper had not slipped or moved.While no inspections were performed duiing U2R97,on, the upper internals, previous inspections have been performed.

During the 1994 inspection, ten J-nozzles and the feedring tee section of one SG were inspected.

No erosion was noted during the inspection.

The original, feedrings/J-nozzles were replaced when the unit 2 SGs were replaced in 1989.The replacement feedrings are constructed of extra strong carbon steel and the J-nozzles are made.from, alloy 600, which is less susceptible to erosion damage than.the typical carbon steel J-nozzles.

These inspections indicate that degradation in the upper internals is a slow progressing phenomena., Based on minimal degradation to-date, no examinations were scheduled'for U2R97.Safet Assessment As noted in the unit 1 safety assessment, the following safety concerns have been postulated by the WOG relative to the French SG internals degradation experience.

~>>Loss of support leading to wear and possible primary-to-secondary leakage or inadequate burst margins..More significant TSP deformation during a postulated LOCA plus SSE event, resulting in unacceptable SG tube collapse or secondary-to-primary inleakage.

Generation of a loose object in the secondary side of a SG which may result in tube wear or impacting and possibly primary-to-secondary leakage.As discussed below, design.features, industry experience, and various standard practices are typically employed to-provide assurance of SG integrity and negate the potential for these concerns.Previously discussed U2R97 inspection results indicate our unit 2 experiences and practices are similar to that of the industry.Based on a review of the table 2 information, the only degradation types that may occur domestically that would likely result in the loss of TSP integrity are TSP flow hole/ligament erosion-corrosion, TSP ligament cracking near the patch plates, and TSP ligament cracking in random areas.There is no industry evidence of post-chemical cleaning inspections resulting in the discovery of any significant material loss, nor is there.evidence of any wrapper having dropped.No TSP ligament indications have been found in steam generators with stainless steel TSPs.This population includes the unit 2 SGs.No increased susceptibility to ligament cracking near the wedge supports has been identified in the series D, E, 44F, and F (unit.2)SGs designs.Existing calculations evaluating the effects of LOCA plus SSE loadings on the tube bundle continue to apply in determining whether certain tubes should be excluded from application of the voltage based plugging criteria, or whether certain.tubes should be removed from service in plants that do not currently have a criteria but may have SG tubes experiencing cracking at TSP intersections.

Attachment to AEP:NRC:1166AM Page 10 Another occurrence resulting from SG internal degradation that may affect a SG in performing its intended safety function is the" potential for tube wear and primary-to-secondary leakage due to the generation of a loose object on the secondary side of the SG.This may occur because of erosion-corrosion of the moisture separators or the occurrence of TSP ligament cracking.If primary-to-secondary leakage should occur due to tube wear from a loose object, the expected consequences would be bounded by a single tube rupture event and would remain within the current licensing basis of the plant.It is our position that loose objects should be removed whenever possible., Tubes observed to have visible damage are eddy current inspected and plugged as necessary.

Elements of the SG program, including eddy current inspection, foreign object search and retrieval during each refueling outage, and loose parts monitoring are in place to help ensure the maintenance of tube integrity during plant operation.

Because no internals degradation of consequence has been observed on the unit 2 SGs, it is expected that future degradation would be limited in extent such that the tubes will remain capable of sustaining the conditions of normal operations, including operational transient, design basis accidents, external events, and natural phenomena, permitting the affected SG to perform its safety function.Based on the above, implementation of the following inspection plan is planned on the unit 2 SGs to address the various types of SG secondary side internals degradation that may occur in Westinghouse-designed SGs.This plan may be amended, pending the results of a detailed industry evaluation that is expected to be completed by mid-1998.Inservice Ins ection Plan Given the primary side eddy current, inspection resulting in a C-1 classification and the absence of secondary side findings during the last inspection, no inspection activities are planned at the end of the current cycle (cycle 12).Inspection scope for the subsequent outage has not been finalized.

However, at a minimum, planned secondary side inspections will be similar to those performed in 1997.The planned workscope is summarized as follows.Foreign object search and retrieval operations will be performed in each SG to access the tubing and support structure conditions as well as verify the sludge conditions within the SGs.Accessible tubesheet surfaces and tubes at the top of the tubesheet will be targeted during the inspection.

During sludge lance operations to be performed in each SG, it will be verified that the lancing equipment can be inserted without interference.

Successful installation will provide verification of wrapper integrity.

If interference is detected, the lower wrapper support blocks will be visually inspected.

The wrapper block inspection will also be conducted if evidence of tube damage in the periphery of the first TSP is detected.Inspections will be performed on the first and uppermost TSP of one SG to assess fouling conditions and identify evidence of corrosion or damage.

I 1 1 a Attachment to.AEP:NRC:1166AM Page 11 To verify conditions in the upper bundle area remain consistent with past inspections, an.inspection will be performed on the moisture separator units and a population of J-nozzles and the feedring tee area of one SG.CONCLUSIONS The aforementioned inspection programs are, based on industry experience and our site-specific inspection findings.We believe these programs are of a nature to adequately address concerns of internals degradation as noted in GL 97-06.