{{#Wiki_filter:-41~+0CATEGORY1~IfF,FhF"REGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9809220046 DOC.DATE:
{{#Wiki_filter:-41~+0 CATEGORY 1~If F, Fh F" REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9809220046 DOC.DATE: 98/09/16 NOTARIZED:
98/09/16NOTARIZED:
NO'OCKET N FACIL-50-315 Donald C.Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50-316 Donald C.Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH.NAME AUTHOR AFFILIATION POWERS,R.P.
NO'OCKETNFACIL-50-315 DonaldC.CookNuclearPowerPlant,Unit1,IndianaM0500031550-316DonaldC.CookNuclearPowerPlant,Unit2,IndianaM05000316AUTH.NAMEAUTHORAFFILIATION POWERS,R.P.
Indiana Michigan Power Co.(formerly Indiana t Mich gan Ele RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document'Control Desk
IndianaMichiganPowerCo.(formerly IndianatMichganEleRECIP.NAME RECIPIENT AFFILIATION RecordsManagement Branch(Document
'ControlDesk


==SUBJECT:==
==SUBJECT:==
AdvisesNRCofchangestoDCPrestartplan5:schedule.Rev 3to"CookNuclearPlantRestartPlan,"enclforNRCuseinfolloa-up inspactivities.
Advises NRC of changes to DCP restart plan 5: schedule.Rev 3 to"Cook Nuclear Plant Restart Plan," encl for NRC use in folloa-up insp activities.
DISTRIBUTION CODE:IE26DCOPIESRECEIVED:LTR JENCLLSIZE:(0TITLE:StartupReport/Refueling Report(perTechSpecs)NOTES:RECIPIENT IDCODE/NAME PD3-3PDINTERN:FICENT3FILE01EXTERNAL:
DISTRIBUTION CODE: IE26D COPIES RECEIVED:LTR J ENCL L SIZE: (0 TITLE: Startup Report/Refueling Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD3-3 PD INTERN: FI CENT 3 FILE 01 EXTERNAL: NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 NRC PDR 1 1 RECIPIENT ,COPIES ID CODE/NAME'TTR ENCL STANG,J 1-1 NRR/DSSA/SRXB/B 1 1-'-'-R'-l F Y;hf'"'G" C NOTE TO ALL"RIDSE RECIPIENTS'LEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 I TOTAL NUMBER OF COPIES REQUIRED: LTTR 7 ENCL 7
NOACCOPIESLTTRENCL11111111NRCPDR11RECIPIENT
,COPIESIDCODE/NAME
'TTRENCLSTANG,J1-1NRR/DSSA/SRXB/B 11-'-'-R'-l FY;hf'"'G"CNOTETOALL"RIDSERECIPIENTS'LEASE HELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083ITOTALNUMBEROFCOPIESREQUIRED:
LTTR7ENCL7


4indianaMichiganPowerCompany500CircleDriveBuchanan, Ml491071395 INDIANANICHIGllNPOWERSeptember 16,1998ABP:NRC:1260GFDocketNos:50-31550-316U.S.NuclearRegulatory Commission ATTN:DocumentControlDeskMailStop0-Pl-17Washington, D.C.20555-0001 Gentlemen:
4 indiana Michigan Power Company 500 Circle Drive Buchanan, Ml 491071395 INDIANA NICHIGll N POWER September 16, 1998 ABP: NRC: 1260GF Docket Nos: 50-315 50-316 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop 0-Pl-17 Washington, D.C.20555-0001 Gentlemen:
DonaldC.CookNuclearPlantUnits1and2'RBSTARTSCHBDULBBXTBNSION ThepurposeofthisletteristoadviseyouofchangestotheCookNuclearPlantrestartplanandschedule.
Donald C.Cook Nuclear Plant Units 1 and 2'RBSTART SCHBDULB BXTBNSION The purpose of this letter is to advise you of changes to the Cook Nuclear Plant restart plan and schedule.You were previously advised of our plans for restart during the course of the 0350 meetings.Based on our current progress in the Restart Plan and the best available information, our restart has been delayed until first quarter 1999.This schedule change is necessary to support an improved sequence to support ice basket repair quality requirements, additional scope due to ice basket inspections, and to integrate engineering work items associated with validating the ice condenser design basis.Attachment 1'.provides the top level schedule with additional detail.We have recently approved a revision to the final restart plan.This revision updates the plan to include: actions associated with the 0350 restart checklist; control of the management review board condition report review process;expansion of roles and responsibilities; directions for completion of action plans;restructuring the plan to reflect restart process elements;and improved schedule change control.Attachment 2 provides a copy of revision 3 to the Restart Plan for your use in follow-up inspection activities.
Youwerepreviously advisedofourplansforrestartduringthecourseofthe0350meetings.
It is recognized that there are potential challenges to the schedule, which we will continue to pursue until appropriately resolved.As one example, we are implementing a thorough vertical slice inspection of our auxiliary feedwater system.Any findings during this inspection will be evaluated for possible impact on previously completed system reviews and re-inspections of systems which may impact the current schedule for completion of restart activities.
BasedonourcurrentprogressintheRestartPlanandthebestavailable information, ourrestarthasbeendelayeduntilfirstquarter1999.Thisschedulechangeisnecessary tosupportanimprovedsequencetosupporticebasketrepairqualityrequirements, additional scopeduetoicebasketinspections, andtointegrate engineering workitemsassociated withvalidating theicecondenser designbasis.Attachment 1'.providesthetoplevelschedulewithadditional detail.Wehaverecentlyapprovedarevisiontothefinalrestartplan.Thisrevisionupdatestheplantoinclude:actionsassociated withthe0350restartchecklist; controlofthemanagement reviewboardcondition reportreviewprocess;expansion ofrolesandresponsibilities; directions forcompletion ofactionplans;restructuring theplantoreflectrestartprocesselements; andimprovedschedulechangecontrol.Attachment 2providesacopyofrevision3totheRestartPlanforyouruseinfollow-up inspection activities.
Further,'detailed validation of the updated final safety analysis report is in progress for 21 selected risk significant systems.Appropriate disposition of any discrepancies discovered during the validation may also represent a schedule 980922004b 9809lb PDR ADOCK 050003i5 P PDR J U.S.Nuclear Regulatory Commission Page 2 AEP:NRC:1260GF challenge.
Itisrecognized thattherearepotential challenges totheschedule, whichwewillcontinuetopursueuntilappropriately resolved.
Finally, to provide reasonable assurance that our restart plan is thorough and adequate to address significant concerns, we are in the process of reviewing and validating our strategies for addressing the fundamental root causes of the extended shutdown and major hardware programmatic problems.Following this review, additional actions may be'onsidered that have the potential for schedule impact.We will continue to advise you of our progress to address restart issues or schedule adjustments through the 0350 process.Please advise if you have any questions.
Asoneexample,weareimplementing athoroughverticalsliceinspection ofourauxiliary feedwater system.Anyfindingsduringthisinspection willbeevaluated forpossibleimpactonpreviously completed systemreviewsandre-inspections ofsystemswhichmayimpactthecurrentscheduleforcompletion ofrestartactivities.
Sincerely, R.P.Powers Vice President/jmc Attachment c J.A.Abramson J.L..Caldwell, w/attachments MDBQ-DW&RPD NRC Resident Inspector, w/attachments J.R.Sampson, w/attachments U.S.Nuclear Regulatory Commission Page 3 AEP:NRC:1260GF bc: T.P.Beilman, w/attachments E.R.Eckstein/D.
Further,'
R.Hafer/K.R.Baker J.J.Euto FOLIO, w/attachments J.B.Kingseed/G.
detailedvalidation oftheupdatedfinalsafetyanalysisreportisinprogressfor21selectedrisksignificant systems.Appropriate disposition ofanydiscrepancies discovered duringthevalidation mayalsorepresent aschedule980922004b 9809lbPDRADOCK050003i5PPDRJ U.S.NuclearRegulatory Commission Page2AEP:NRC:1260GF challenge.
P.Arent/M.J.Gumns J.F.Stang, Jr.,-NRC Washington, D.C., w/attachments  
Finally,toprovidereasonable assurance thatourrestartplanisthoroughandadequatetoaddresssignificant
~4 E y.a,)0'}}
: concerns, weareintheprocessofreviewing andvalidating ourstrategies foraddressing thefundamental rootcausesoftheextendedshutdownandmajorhardwareprogrammatic problems.
Following thisreview,additional actionsmaybe'onsidered thathavethepotential forscheduleimpact.Wewillcontinuetoadviseyouofourprogresstoaddressrestartissuesorscheduleadjustments throughthe0350process.Pleaseadviseifyouhaveanyquestions.
Sincerely, R.P.PowersVicePresident
/jmcAttachment cJ.A.AbramsonJ.L..Caldwell, w/attachments MDBQ-DW&RPDNRCResidentInspector, w/attachments J.R.Sampson,w/attachments U.S.NuclearRegulatory Commission Page3AEP:NRC:1260GF bc:T.P.Beilman,w/attachments E.R.Eckstein/D.
R.Hafer/K.R.BakerJ.J.EutoFOLIO,w/attachments J.B.Kingseed/G.
P.Arent/M.J.GumnsJ.F.Stang,Jr.,-NRCWashington, D.C.,w/attachments  
~4Ey.a,)0'}}

Revision as of 07:07, 6 July 2018

Advises NRC of Changes to DCP Restart Plan & Schedule.Rev 3 to Cook Nuclear Plant Restart Plan, Encl for NRC Use in follow-up Insp Activities
ML17335A227
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/16/1998
From: POWERS R P
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17335A229 List:
References
AEP:NRC:1260GF, NUDOCS 9809220046
Download: ML17335A227 (6)


Text

-41~+0 CATEGORY 1~If F, Fh F" REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9809220046 DOC.DATE: 98/09/16 NOTARIZED:

NO'OCKET N FACIL-50-315 Donald C.Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50-316 Donald C.Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH.NAME AUTHOR AFFILIATION POWERS,R.P.

Indiana Michigan Power Co.(formerly Indiana t Mich gan Ele RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document'Control Desk

SUBJECT:

Advises NRC of changes to DCP restart plan 5: schedule.Rev 3 to"Cook Nuclear Plant Restart Plan," encl for NRC use in folloa-up insp activities.

DISTRIBUTION CODE: IE26D COPIES RECEIVED:LTR J ENCL L SIZE: (0 TITLE: Startup Report/Refueling Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD3-3 PD INTERN: FI CENT 3 FILE 01 EXTERNAL: NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 NRC PDR 1 1 RECIPIENT ,COPIES ID CODE/NAME'TTR ENCL STANG,J 1-1 NRR/DSSA/SRXB/B 1 1-'-'-R'-l F Y;hf'"'G" C NOTE TO ALL"RIDSE RECIPIENTS'LEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 I TOTAL NUMBER OF COPIES REQUIRED: LTTR 7 ENCL 7

4 indiana Michigan Power Company 500 Circle Drive Buchanan, Ml 491071395 INDIANA NICHIGll N POWER September 16, 1998 ABP: NRC: 1260GF Docket Nos: 50-315 50-316 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop 0-Pl-17 Washington, D.C.20555-0001 Gentlemen:

Donald C.Cook Nuclear Plant Units 1 and 2'RBSTART SCHBDULB BXTBNSION The purpose of this letter is to advise you of changes to the Cook Nuclear Plant restart plan and schedule.You were previously advised of our plans for restart during the course of the 0350 meetings.Based on our current progress in the Restart Plan and the best available information, our restart has been delayed until first quarter 1999.This schedule change is necessary to support an improved sequence to support ice basket repair quality requirements, additional scope due to ice basket inspections, and to integrate engineering work items associated with validating the ice condenser design basis.Attachment 1'.provides the top level schedule with additional detail.We have recently approved a revision to the final restart plan.This revision updates the plan to include: actions associated with the 0350 restart checklist; control of the management review board condition report review process;expansion of roles and responsibilities; directions for completion of action plans;restructuring the plan to reflect restart process elements;and improved schedule change control.Attachment 2 provides a copy of revision 3 to the Restart Plan for your use in follow-up inspection activities.

It is recognized that there are potential challenges to the schedule, which we will continue to pursue until appropriately resolved.As one example, we are implementing a thorough vertical slice inspection of our auxiliary feedwater system.Any findings during this inspection will be evaluated for possible impact on previously completed system reviews and re-inspections of systems which may impact the current schedule for completion of restart activities.

Further,'detailed validation of the updated final safety analysis report is in progress for 21 selected risk significant systems.Appropriate disposition of any discrepancies discovered during the validation may also represent a schedule 980922004b 9809lb PDR ADOCK 050003i5 P PDR J U.S.Nuclear Regulatory Commission Page 2 AEP:NRC:1260GF challenge.

Finally, to provide reasonable assurance that our restart plan is thorough and adequate to address significant concerns, we are in the process of reviewing and validating our strategies for addressing the fundamental root causes of the extended shutdown and major hardware programmatic problems.Following this review, additional actions may be'onsidered that have the potential for schedule impact.We will continue to advise you of our progress to address restart issues or schedule adjustments through the 0350 process.Please advise if you have any questions.

Sincerely, R.P.Powers Vice President/jmc Attachment c J.A.Abramson J.L..Caldwell, w/attachments MDBQ-DW&RPD NRC Resident Inspector, w/attachments J.R.Sampson, w/attachments U.S.Nuclear Regulatory Commission Page 3 AEP:NRC:1260GF bc: T.P.Beilman, w/attachments E.R.Eckstein/D.

R.Hafer/K.R.Baker J.J.Euto FOLIO, w/attachments J.B.Kingseed/G.

P.Arent/M.J.Gumns J.F.Stang, Jr.,-NRC Washington, D.C., w/attachments

~4 E y.a,)0'