Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 Annual Radioactive Effluent Release Report 58, January 1, 2015 through December 31, 2015 On 4/29/16, Peach Bottom Atomic Power Station (PBAPS) submitted the subject Annual Radioactive Effluent Release Report (ARERR). This report included a revision to the site Process Control Program (PCP) for Radioactive Wastes (RW-AA-100) which was marked 'Exelon Confidential/Proprietary'. Although the PCP was submitted as company confidential, Exelon has re-evaluated this marking and does not consider this procedure to be company confidential. The PCP should not have included the 'Exelon Confidential/Proprietary' label and therefore, there is no need for the NRC to process this as a proprietary document. This oversight has been entered into the Exelon Corrective Action Program. Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station CCN: 16-51 cc: NRC Regional Administrator -Region I NRC Senior Resident Inspector -Peach Bottom Atomic Power Station NRC Regional Inspector (C. Graves) | |||
Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 Annual Radioactive Effluent Release Report 58, January 1, 2015 through December 31, 2015 On 4/29/16, Peach Bottom Atomic Power Station (PBAPS) submitted the subject Annual Radioactive Effluent Release Report (ARERR). | |||
This report included a revision to the site Process Control Program (PCP) for Radioactive Wastes (RW-AA-100) which was marked 'Exelon Confidential/Proprietary'. | |||
Although the PCP was submitted as company confidential, Exelon has re-evaluated this marking and does not consider this procedure to be company confidential. | |||
The PCP should not have included the 'Exelon Confidential/Proprietary' label and therefore, there is no need for the NRC to process this as a proprietary document. | |||
This oversight has been entered into the Exelon Corrective Action Program. | |||
Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station CCN: 16-51 cc: NRC Regional Administrator | |||
-Region I NRC Senior Resident Inspector | |||
-Peach Bottom Atomic Power Station NRC Regional Inspector (C. Graves) | |||
Exelon Generation May 24, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Independent Spent Fuel Storage Installation (ISFSI) Facility Operating License No. DPR-12 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-171. 50-277. 50-278. and ISFSI Docket 72-29 10CFR 50.4 | Exelon Generation May 24, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Independent Spent Fuel Storage Installation (ISFSI) Facility Operating License No. DPR-12 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-171. 50-277. 50-278. and ISFSI Docket 72-29 10CFR 50.4 | ||
==Subject:== | ==Subject:== | ||
Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 Annual Radioactive Effluent Release Report 58, January 1, 2015 through December 31, 2015 On 4/29/16, Peach Bottom Atomic Power Station (PBAPS) submitted the subject Annual Radioactive Effluent Release Report (ARERR). This report included a revision to the site Process Control Program (PCP) for Radioactive Wastes (RW-AA-100) which was marked 'Exelon Confidential/Proprietary'. Although the PCP was submitted as company confidential, Exelon has re-evaluated this marking and does not consider this procedure to be company confidential. The PCP should not have included the 'Exelon Confidential/Proprietary' label and therefore, there is no need for the NRC to process this as a proprietary document. This oversight has been entered into the Exelon Corrective Action Program. Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station CCN: 16-51 cc: NRC Regional Administrator -Region I NRC Senior Resident Inspector -Peach Bottom Atomic Power Station NRC Regional Inspector (C. Graves)}} | |||
Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 Annual Radioactive Effluent Release Report 58, January 1, 2015 through December 31, 2015 On 4/29/16, Peach Bottom Atomic Power Station (PBAPS) submitted the subject Annual Radioactive Effluent Release Report (ARERR). | |||
This report included a revision to the site Process Control Program (PCP) for Radioactive Wastes (RW-AA-100) which was marked 'Exelon Confidential/Proprietary'. | |||
Although the PCP was submitted as company confidential, Exelon has re-evaluated this marking and does not consider this procedure to be company confidential. | |||
The PCP should not have included the 'Exelon Confidential/Proprietary' label and therefore, there is no need for the NRC to process this as a proprietary document. | |||
This oversight has been entered into the Exelon Corrective Action Program. | |||
Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station CCN: 16-51 cc: NRC Regional Administrator | |||
-Region I NRC Senior Resident Inspector | |||
-Peach Bottom Atomic Power Station NRC Regional Inspector (C. Graves)}} |
Revision as of 07:24, 30 June 2018
ML16145A326 | |
Person / Time | |
---|---|
Site: | Peach Bottom |
Issue date: | 05/24/2016 |
From: | Navin P D Exelon Generation Co |
To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of New Reactors |
References | |
CCN: 16-51 | |
Download: ML16145A326 (1) | |
Text
Exelon Generation May 24, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Independent Spent Fuel Storage Installation (ISFSI) Facility Operating License No. DPR-12 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-171. 50-277. 50-278. and ISFSI Docket 72-29 10CFR 50.4
Subject:
Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 Annual Radioactive Effluent Release Report 58, January 1, 2015 through December 31, 2015 On 4/29/16, Peach Bottom Atomic Power Station (PBAPS) submitted the subject Annual Radioactive Effluent Release Report (ARERR).
This report included a revision to the site Process Control Program (PCP) for Radioactive Wastes (RW-AA-100) which was marked 'Exelon Confidential/Proprietary'.
Although the PCP was submitted as company confidential, Exelon has re-evaluated this marking and does not consider this procedure to be company confidential.
The PCP should not have included the 'Exelon Confidential/Proprietary' label and therefore, there is no need for the NRC to process this as a proprietary document.
This oversight has been entered into the Exelon Corrective Action Program.
Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station CCN: 16-51 cc: NRC Regional Administrator
-Region I NRC Senior Resident Inspector
-Peach Bottom Atomic Power Station NRC Regional Inspector (C. Graves)
Exelon Generation May 24, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Independent Spent Fuel Storage Installation (ISFSI) Facility Operating License No. DPR-12 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-171. 50-277. 50-278. and ISFSI Docket 72-29 10CFR 50.4
Subject:
Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 Annual Radioactive Effluent Release Report 58, January 1, 2015 through December 31, 2015 On 4/29/16, Peach Bottom Atomic Power Station (PBAPS) submitted the subject Annual Radioactive Effluent Release Report (ARERR).
This report included a revision to the site Process Control Program (PCP) for Radioactive Wastes (RW-AA-100) which was marked 'Exelon Confidential/Proprietary'.
Although the PCP was submitted as company confidential, Exelon has re-evaluated this marking and does not consider this procedure to be company confidential.
The PCP should not have included the 'Exelon Confidential/Proprietary' label and therefore, there is no need for the NRC to process this as a proprietary document.
This oversight has been entered into the Exelon Corrective Action Program.
Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station CCN: 16-51 cc: NRC Regional Administrator
-Region I NRC Senior Resident Inspector