Line 13: |
Line 13: |
| | page count = 5 | | | page count = 5 |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:1 WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov] |
| | Sent: Thursday, October 04, 2012 1:40 PM To: Epperson, Dan; Wilson, George; Poole, Justin Cc: Arent, Gordon; Hamill, Carol L; Boyd, Desiree L |
| | |
| | ==Subject:== |
| | TVA letter to NRC_10-04-12_Revision of Commi t for U2 Implementation of Maint Rule Attachments: |
| | 10-04-12_Revision of Commit for U2 Impl ementation of Maint Rule_Final.pdfPlease see attached TVA letter that was sent to the NRC today. |
| | |
| | Thank You, ~*~*~*~*~*~*~*~*~*~*~ |
| | Désireé L. Boyd WBN Unit 2 Licensing dlboyd@tva.gov 423-365-8764 |
| | |
| | Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 746 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF33D04CC6) |
| | |
| | ==Subject:== |
| | TVA letter to NRC_10-04-12_Revision of Commit for U2 Implementation of Maint Rule Sent Date: 10/4/2012 1:39:32 PM Received Date: 10/4/2012 1:39:36 PM From: Boyd, Desiree L Created By: dlboyd@tva.gov Recipients: "Arent, Gordon" <garent@tva.gov> Tracking Status: None "Hamill, Carol L" <clhamill@tva.gov> Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov> |
| | Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov> Tracking Status: None "Wilson, George" <George.Wilson@nrc.gov> Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov> |
| | Tracking Status: None Post Office: TVANUCXVS2.main.tva.gov |
| | |
| | Files Size Date & Time MESSAGE 274 10/4/2012 1:39:36 PM 10-04-12_Revision of Commit for U2 Implementation of Maint Rule_Final.pdf 72897 Options Priority: Standard Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date: Recipients Received: |
| | Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 |
| | |
| | October 4, 2012 |
| | |
| | U.S. Nuclear Regulatory Commission |
| | |
| | ATTN: Document Control Desk Washington, D.C. 20555-0001 |
| | |
| | Watts Bar Nuclear Plant, Unit 2 NRC Docket No. 50-391 |
| | |
| | ==Subject:== |
| | Watts Bar Nuclear Plant (WBN) Unit 2 - Revision of Commitment for Unit 2s Implementation of the Maintenance Rule |
| | |
| | ==References:== |
| | : 1. TVA to NRC letter dated October 17, 2011, Watts Bar Nuclear Plant (WBN) Unit 2 - Revision of Commitment for Unit 2s Implementation of the Maintenance Rule (ADAMS Accession No. ML11292A199) 2. TVA to NRC letter dated November 17, 2010, Watts Bar Nuclear Plant (WBN) Unit 2 - Revision of Commitment for Unit 2s Implementation of the |
| | |
| | Maintenance Rule (ADAMS Accession No. ML103210644) 3. TVA to NRC letter dated January 29, 2008, Watts Bar Nuclear Plant (WBN) - |
| | Unit 2 - Regulatory Framework for the Completion of Construction and Licensing Activities for Unit 2 (ADAMS Accession No. ML080320443) |
| | |
| | The purpose of this letter is to revise the due date for the Maintenance Rule implementation for Unit 2 systems from October 31, 2012 (Reference 1) to June 20, 2014. This change is the result of Unit 2 schedule changes. Reference 2 had also previously changed this date as a result of schedule changes. |
| | |
| | U.S. Nuclear Regulatory Commission Page 3 October 4, 2012 bcc: Jessie Quichocho U.S. Nuclear Regulatory Commission MS 8 B1A One White Flint North |
| | |
| | 11555 Rockville Pike |
| | |
| | Rockville, Maryland 20852-2738 Fred Brown, Deputy Regional Administrator for Construction |
| | |
| | U.S. Nuclear Regulatory Commission |
| | |
| | Region II Marquis One Tower 245 Peachtree Center Ave., N.E., Suite 1200 Atlanta, GA 30303-1257}} |
|
---|
Category:E-Mail
MONTHYEARML24274A2762024-09-24024 September 2024 Email from K.Green to S.Hughes, Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, Hydrologic LAR to Revise the UFSAR ML24260A0322024-09-10010 September 2024 NRR E-mail Capture - Request for Additional Information Regarding the Watts Bar Unit 2 Steam Generator Tube Inspection Report for U2R5 ML24215A3152024-07-24024 July 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-276-A, Revision 2 TS 3.8.1, AC Sources ML24177A1412024-06-11011 June 2024 NRR E-mail Capture - Audit Plan Related to Review of the Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, LAR to Revise Technical Specification Table 3.3.2-1 Function 5 ML24157A3152024-06-0303 June 2024 2024 Sequoyah Commercial Grade Dedication Inspection Information Request ML24155A1372024-05-29029 May 2024 Email from K. Green to S. Hughes Request for Additional Information Related to License Amendment Request to Revise Residual Heat Removal Flow Rate ML24156A0062024-05-22022 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Recapture Low-Power Testing Time ML24130A0132024-05-0707 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.7.11 for MCR Chiller Completion Time ML24123A0882024-05-0202 May 2024 NRR E-mail Capture - Correction Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24122B4872024-04-30030 April 2024 NRR E-mail Capture - Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24082A0662024-04-17017 April 2024 Email to Stuart Rymer on Exemption Decision for Watts Bar ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24082A0682024-04-10010 April 2024 Email to Stuart Rymer Re_ Availability of EA-FONSI for Watts Bar ML24100A8392024-04-0909 April 2024 Response from State of Tn Regarding Review of Environmental Assessment for Watts Bar Exemption Request ML24100A8402024-04-0808 April 2024 Email to State of Tn Requesting Review of Environmental Assessment for Watts Bar Exemption Request ML24071A0982024-03-0707 March 2024 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate ML24058A0962024-02-26026 February 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant License Amendment Request to Revise UFSAR for Hydrologic Analysis ML24047A2792024-02-15015 February 2024 RAI Related to the Exemption Request for 10 CFR 37.11 ML24045A0312024-02-14014 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML24033A0562024-02-0101 February 2024 NRR E-mail Capture - Correction Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-427-A, Revision 2 Regarding Degraded Barriers ML24036A0132024-01-23023 January 2024 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar Nuclear Plants, License Amendment Request to Revise TS Table 3.3.2-1, Function 5, Turbine Trip and Feedwater Isolation ML24022A2592024-01-22022 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator ML24016A0762024-01-16016 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications ML23347A0642023-12-13013 December 2023 12-13-23 Email from Kimberly Green to Wells, Russell, Subject: Results of NRC SUNSI Review of Watts Bar Nuclear Plant Dual-Unit UFSAR, Amendment 5 ML23334A0932023-11-28028 November 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate During Mode 6 ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23254A2872023-09-11011 September 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Table 1.1-1 Re Number of Required Rvh Closure Bolts ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23191A8672023-07-10010 July 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23150A2472023-05-25025 May 2023 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23116A1492023-04-21021 April 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23075A0032023-03-13013 March 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1, 2, and 3, License Amendment Request to Revise TS 3.7.11, Required Actions A.1 and E.1 Footnotes Re Date for the Modification ML23072A0722023-03-10010 March 2023 NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22356A2982022-12-22022 December 2022 Email Response to Letter, Dated November 22, 2022 Regarding Watts Bar Integrated Inspection Report ML22353A0812022-12-15015 December 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Alternative Request WBN-2-ISI-01 Regarding Examination of Upper Head Injection Nozzle Dissimilar Metal Piping Butt Welds ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22227A0712022-08-15015 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected ML22227A0262022-08-12012 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 ML22194A8762022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 ML22166A4292022-06-0606 June 2022 NRR E-mail Capture - LAR to Adopt TSTF-577 ML22146A3342022-05-25025 May 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Relief Requests (EPID L-2022-LLR-0045 - 0047) ML22136A0182022-05-16016 May 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, Alternative Request RP-11 and Watts Bar Nuclear Plant, Units 1 and 2, Alternative Request IST-RR-9 2024-09-24
[Table view] |
Text
1 WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]
Sent: Thursday, October 04, 2012 1:40 PM To: Epperson, Dan; Wilson, George; Poole, Justin Cc: Arent, Gordon; Hamill, Carol L; Boyd, Desiree L
Subject:
TVA letter to NRC_10-04-12_Revision of Commi t for U2 Implementation of Maint Rule Attachments:
10-04-12_Revision of Commit for U2 Impl ementation of Maint Rule_Final.pdfPlease see attached TVA letter that was sent to the NRC today.
Thank You, ~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN Unit 2 Licensing dlboyd@tva.gov 423-365-8764
Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 746 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF33D04CC6)
Subject:
TVA letter to NRC_10-04-12_Revision of Commit for U2 Implementation of Maint Rule Sent Date: 10/4/2012 1:39:32 PM Received Date: 10/4/2012 1:39:36 PM From: Boyd, Desiree L Created By: dlboyd@tva.gov Recipients: "Arent, Gordon" <garent@tva.gov> Tracking Status: None "Hamill, Carol L" <clhamill@tva.gov> Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov> Tracking Status: None "Wilson, George" <George.Wilson@nrc.gov> Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None Post Office: TVANUCXVS2.main.tva.gov
Files Size Date & Time MESSAGE 274 10/4/2012 1:39:36 PM 10-04-12_Revision of Commit for U2 Implementation of Maint Rule_Final.pdf 72897 Options Priority: Standard Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date: Recipients Received:
Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000
October 4, 2012
U.S. Nuclear Regulatory Commission
ATTN: Document Control Desk Washington, D.C. 20555-0001
Watts Bar Nuclear Plant, Unit 2 NRC Docket No. 50-391
Subject:
Watts Bar Nuclear Plant (WBN) Unit 2 - Revision of Commitment for Unit 2s Implementation of the Maintenance Rule
References:
- 1. TVA to NRC letter dated October 17, 2011, Watts Bar Nuclear Plant (WBN) Unit 2 - Revision of Commitment for Unit 2s Implementation of the Maintenance Rule (ADAMS Accession No. ML11292A199) 2. TVA to NRC letter dated November 17, 2010, Watts Bar Nuclear Plant (WBN) Unit 2 - Revision of Commitment for Unit 2s Implementation of the
Maintenance Rule (ADAMS Accession No. ML103210644) 3. TVA to NRC letter dated January 29, 2008, Watts Bar Nuclear Plant (WBN) -
Unit 2 - Regulatory Framework for the Completion of Construction and Licensing Activities for Unit 2 (ADAMS Accession No. ML080320443)
The purpose of this letter is to revise the due date for the Maintenance Rule implementation for Unit 2 systems from October 31, 2012 (Reference 1) to June 20, 2014. This change is the result of Unit 2 schedule changes. Reference 2 had also previously changed this date as a result of schedule changes.
U.S. Nuclear Regulatory Commission Page 3 October 4, 2012 bcc: Jessie Quichocho U.S. Nuclear Regulatory Commission MS 8 B1A One White Flint North
11555 Rockville Pike
Rockville, Maryland 20852-2738 Fred Brown, Deputy Regional Administrator for Construction
U.S. Nuclear Regulatory Commission
Region II Marquis One Tower 245 Peachtree Center Ave., N.E., Suite 1200 Atlanta, GA 30303-1257