| | {{#Wiki_filter:Mary G. Korsnick Chief Nuclear Officer SVP -Chief Operations Officer CENG.a joint venture of COnatmiatiog- |
| | ,'--h O ewskwi .6 Office 410-470-5133 Fax 443-213-6739 E-mail: Maria.Korsnick@cengllc.com May 29,2013 U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 ATTENTION: |
| | |
| | ==SUBJECT:== |
| | Document Control Desk Calvert Cliffs Nuclear Power Plant, Unit 2 Renewed Facility Operating License No. DPR-69 Docket No. 50-318 Response to 10 CFR 50.54(f) Request for Information: |
| | Near-Term Task Force Recommendation 2.3, Flooding |
| | |
| | ==REFERENCES:== |
| | (a) Letter from E. J. Leeds (NRC) and M. R. Johnson (NRC) to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status, dated March 12, 2012, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, (ML 12073A348)(b) Letter from S. L. Belcher (CENG) to Document Control Desk (NRC), dated June 8, 2012, Ninety-Day Response to Flooding Recommendations 2.1 and 2.3 of 10 CFR 50.54(f) Request for Information (ML12164A369)(c) Letter from D. L. Skeen (NRC) to A. P. Heymer (NEI), dated May 31, 2012, Endorsement of Nuclear Energy Institute (NEI) 12-07, "Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features" (ML12 144A 142)(d) Letter from M. G. Korsnick (CENG) to Document Control Desk (NRC)dated November 27, 2012, Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3, Flooding (ML 12335A029) |
| | On March 12, 2012, the NRC issued Reference (a) to request in Enclosure 4 that licensees perform flood protection walkdowns to identify and address through the corrective action program plant-specific degraded, nonconforming, or unanalyzed conditions and cliff-edge effects and verify the adequacy of monitoring and maintenance programs.Constellation Energy Nuclear Group, LLC 100 Constellation Way, Suite 200C, Baltimore, MD 21202 pc) \pf_ý- |
| | Document Control Desk May 29, 2013 Page 2 Reference (b) confirmed that Constellation Energy Nuclear Group (CENG) licensees will use the flooding walkdown procedure Nuclear Energy Institute (NEI) 12-07, Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features, and will respond within 180 days of NRC's endorsement of the flooding walkdown procedure. |
| | The NRC endorsed NEI 12-07 in Reference (c).Reference (d) provided Attachments 1 -4, the responses for R.E. Ginna Nuclear Power Plant, Nine Mile Point Nuclear Station, and Calvert Cliffs Nuclear Power Plant, to comply with the commitment in Reference (b). Attachment 4 of Reference (d) included a statement that the Calvert Cliffs Unit 2 27-foot West Piping Penetration Room was unable to be inspected due to inaccessibility and the schedule to complete the walkdowns in this room.For Calvert Cliffs Nuclear Power Plant, Unit 2, CENG completed the scheduled walkdown in the piping penetration room on March 5, 2013. The walkdown was conducted in accordance with NEI 12-07. Parts a through e of the Walkdown Record Form provided in Appendix B to NEI 12-07 were completed and peer reviewed. |
| | No deficiencies were encountered. |
| | The conclusions outlined in Attachment 4 of Reference (c)remain valid.There are no regulatory commitments in this letter.If there are any questions regarding this submittal, please contact Everett (Chip) Perkins everett.perkinsicengllc.com at 410-470-3928. |
| | I declare under penalty of perjury that the foregoing is true and correct. Executed on May 29, 2013.Sincerely, Mary .Korsnick MGK/CM cc: B. K. Vaidya, NRC Resident Inspector, Calvert Cliffs M. C. Thadani, NRC S. Gray, DNR N. S. Morgan, NRC W. M. Dean, NRC}} |
Revision as of 01:57, 17 July 2018
Letter Sequence Request |
---|
|
|
MONTHYEARML12335A0292012-11-27027 November 2012 R. E. Ginna - Response to 10CFR50.54(f) Request for Information, Recommendation 2.3 Flooding Project stage: Request ML13154A3742013-05-29029 May 2013 Response to 10 CFR 50.54(f) Request for Information: Near-Term Task Force Recommendation 2.3, Flooding Project stage: Request ML14038A1222014-01-31031 January 2014 Update to Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Flooding - Review of Available Physical Margin Assessments Project stage: Request ML14153A4102014-07-24024 July 2014 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation Project stage: Acceptance Review ML15306A5022015-11-0404 November 2015 Supplement to Staff Assessment of Response to CFR 50.54(f) Information Request- Flood Causing Mechanisms Reevaluations Project stage: Other RS-17-027, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal2017-03-10010 March 2017 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal Project stage: Request 2014-01-31
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 IR 05000318/20240072024-11-0606 November 2024 Assessment Follow-Up Letter for Calvert Cliffs Nuclear Power Plant, Unit 2 (Report 05000318/2024007) ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000317/20240032024-10-22022 October 2024 Integrated Inspection Report 05000317/2024003, 05000318/2024003, and Independent Spent Fuel Storage Installation Report 07200008/2024001 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24283A0012024-10-0909 October 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000317/20245012024-10-0707 October 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000317/2024501 and 05000318/2024501 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000317/20240052024-08-29029 August 2024 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2024005 and 05000318/2024005) ML24240A1112024-08-27027 August 2024 Registration of Use of Casks to Store Spent Fuel ML24240A2462024-08-27027 August 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240022024-08-0606 August 2024 Integrated Inspection Report 05000317/2024002 and 05000318/2024002 IR 05000317/20240102024-07-31031 July 2024 Age-Related Degradation Inspection Report 05000317/2024010 and 05000318/2024010 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24198A0442024-07-16016 July 2024 Inservice Inspection Report IR 05000317/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000317/2024401 and 05000318/2024401 ML24177A1832024-06-25025 June 2024 Inservice Inspection Report RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24161A0012024-06-0909 June 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML24150A0522024-05-29029 May 2024 Operator Licensing Examination Approval ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24136A1962024-05-15015 May 2024 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Operating Report IR 05000317/20240012024-05-0707 May 2024 Integrated Inspection Report 05000317/2024001 and 05000318/2024001 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests 05000317/LER-2024-002, Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus2024-04-29029 April 2024 Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus 05000318/LER-2024-001, Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip2024-04-24024 April 2024 Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip ML24101A1942024-04-22022 April 2024 Closeout Letter for GL 2004-02 ML24114A0182024-04-18018 April 2024 Electronic Reporting of Occupational Exposure Reporting 05000318/LER-2023-004-01, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-04-12012 April 2024 Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240402024-04-11011 April 2024 95001 Supplemental Inspection Report 05000317/2024040 and Follow-Up Assessment Letter RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24082A0082024-03-22022 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML24078A1152024-03-18018 March 2024 10 CFR 50.46 Annual Report ML24059A0632024-03-15015 March 2024 Authorization and Safety Evaluation for Alternative Request ISI-05-021 (EPID L-2023-LLR-0006) - Non-Proprietary IR 05000317/20230062024-02-28028 February 2024 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2, (Reports 05000317/2023006 and 05000318/2023006 ML24052A0072024-02-14014 February 2024 Core Operating Limits Report for Unit 1, Cycle 27, Revision 0 ML24040A0962024-02-0909 February 2024 Notification of Readiness for NRC 95001 Inspection ML24040A1492024-02-0909 February 2024 Response to NRC Request for Additional Information Regarding Final Response to Generic Letter 2004-02 IR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank 2024-09-06
[Table view] |
Text
Mary G. Korsnick Chief Nuclear Officer SVP -Chief Operations Officer CENG.a joint venture of COnatmiatiog-
,'--h O ewskwi .6 Office 410-470-5133 Fax 443-213-6739 E-mail: Maria.Korsnick@cengllc.com May 29,2013 U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 ATTENTION:
SUBJECT:
Document Control Desk Calvert Cliffs Nuclear Power Plant, Unit 2 Renewed Facility Operating License No. DPR-69 Docket No. 50-318 Response to 10 CFR 50.54(f) Request for Information:
Near-Term Task Force Recommendation 2.3, Flooding
REFERENCES:
(a) Letter from E. J. Leeds (NRC) and M. R. Johnson (NRC) to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status, dated March 12, 2012, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, (ML 12073A348)(b) Letter from S. L. Belcher (CENG) to Document Control Desk (NRC), dated June 8, 2012, Ninety-Day Response to Flooding Recommendations 2.1 and 2.3 of 10 CFR 50.54(f) Request for Information (ML12164A369)(c) Letter from D. L. Skeen (NRC) to A. P. Heymer (NEI), dated May 31, 2012, Endorsement of Nuclear Energy Institute (NEI) 12-07, "Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features" (ML12 144A 142)(d) Letter from M. G. Korsnick (CENG) to Document Control Desk (NRC)dated November 27, 2012, Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3, Flooding (ML 12335A029)
On March 12, 2012, the NRC issued Reference (a) to request in Enclosure 4 that licensees perform flood protection walkdowns to identify and address through the corrective action program plant-specific degraded, nonconforming, or unanalyzed conditions and cliff-edge effects and verify the adequacy of monitoring and maintenance programs.Constellation Energy Nuclear Group, LLC 100 Constellation Way, Suite 200C, Baltimore, MD 21202 pc) \pf_ý-
Document Control Desk May 29, 2013 Page 2 Reference (b) confirmed that Constellation Energy Nuclear Group (CENG) licensees will use the flooding walkdown procedure Nuclear Energy Institute (NEI) 12-07, Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features, and will respond within 180 days of NRC's endorsement of the flooding walkdown procedure.
The NRC endorsed NEI 12-07 in Reference (c).Reference (d) provided Attachments 1 -4, the responses for R.E. Ginna Nuclear Power Plant, Nine Mile Point Nuclear Station, and Calvert Cliffs Nuclear Power Plant, to comply with the commitment in Reference (b). Attachment 4 of Reference (d) included a statement that the Calvert Cliffs Unit 2 27-foot West Piping Penetration Room was unable to be inspected due to inaccessibility and the schedule to complete the walkdowns in this room.For Calvert Cliffs Nuclear Power Plant, Unit 2, CENG completed the scheduled walkdown in the piping penetration room on March 5, 2013. The walkdown was conducted in accordance with NEI 12-07. Parts a through e of the Walkdown Record Form provided in Appendix B to NEI 12-07 were completed and peer reviewed.
No deficiencies were encountered.
The conclusions outlined in Attachment 4 of Reference (c)remain valid.There are no regulatory commitments in this letter.If there are any questions regarding this submittal, please contact Everett (Chip) Perkins everett.perkinsicengllc.com at 410-470-3928.
I declare under penalty of perjury that the foregoing is true and correct. Executed on May 29, 2013.Sincerely, Mary .Korsnick MGK/CM cc: B. K. Vaidya, NRC Resident Inspector, Calvert Cliffs M. C. Thadani, NRC S. Gray, DNR N. S. Morgan, NRC W. M. Dean, NRC