{{#Wiki_filter:OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION "Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this transmittal document is decontrolled."
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION August 30, 2013
Mr. Einar T. Ronningen, Superintendent
Rancho Seco Assets Sacramento Municipal Utility District 14440 Twin Cities Road, MS N493 Herald, CA  95638
==SUBJECT:==
RANCHO SECO INDEPENDENT SPENT FUEL STORAGE INSTALLATION,  PHYSICAL SECURITY REQUIREMENTS FOR INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS INSPECTION REPORT 072-11/2013401
==Dear Mr. Ronningen:==
On August 1, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an Independent Spent Fuel Storage Installation Security Inspection at your Rancho Seco facility. The enclosed inspection report documents the inspection results, which were discussed on August 1, 2013, with Mr. S. Flake, Manager, Power Generation, and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. 
Based on the results of this inspection, the NRC identified two Severity Level IV violations of the NRC requirements. These violations were determ ined to be of low security significance and circumstances surrounding the violations are discussed in the enclosed report. Furthermore, because of the low security significance and because they were entered into your site corrective action program, the NRC is treating these violations as non-cited violations (NCV), consistent with Section VI. A. 1 of the Enforcement Policy. If you contest these violations or the severity level of the NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN:  Document Control Desk, Washington, DC 20555-0001, with a copy to the Regional Administrator, Region IV and the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511 OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
.
Sincerely, 
  /RA/
Mark S. Haire, Chief Plant Support Branch-1 Division of Reactor Safety
Docket Nos.:  050-312; 72-00011 License Nos.: DPR-54; SNM-2510 
cc w/o enclosure:  Electronic Distribution for Rancho Seco      Independent Spent Fuel Storage Installation
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION T. Ronningen 3 OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION Electronic Distribution by RIV w/o enclosure
: Acting Regional Administrator (Steven.Reynolds@nrc.gov)
Acting Deputy Regional Administrator (Thomas.Bergman@nrc.gov)
Chief, Response Coordination Branch (Linda.Howell@nrc.gov
)  DNMS Director (Anton.Vegel@nrc.gov
) DNMS Deputy Director (Vivian Campbell@nrc.gov)
Branch Chief (Blair Spitzberg@nrc.gov)
RSFS Inspector (Lee.Brookhart@nrc.gov)
SFST RIV Project Manager (William.Allen@nrc.gov)
Hard Copy: RIV DNMS File - 5th Floor 
ML13242A252 Cover Letter Only  Non Sensitive    Publicly Available:  JRL  SUNSI Review Complete: JRL  Sensitive            Non-Publicly Available SPSI:PSB1 C:PSB-1 C:FCDB C:PSB-1 JLarsen DHolman BSpitzberg MHaire /RA/ /RA/
/RA/ /RA/ 8/23/13 8/23/13 8/28/13 8/30/13 OFFICIAL RECORD COPY            T=Telephone          E=E-mail        F=Fax}}

Revision as of 10:19, 4 July 2018

Rancho Seco 072-11-2013401 Non-SGI Cover ltr-JRL
ML13242A252
Person / Time
Site: Rancho Seco, 07200011
Issue date: 08/30/2013
From: Haire M S
Plant Support Branch-1
To: Ronningen E T
Sacramento Municipal Utility District (SMUD)
References
IR-13-401
Download: ML13242A252 (3)


Text

OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION "Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this transmittal document is decontrolled."

OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION August 30, 2013

Mr. Einar T. Ronningen, Superintendent

Rancho Seco Assets Sacramento Municipal Utility District 14440 Twin Cities Road, MS N493 Herald, CA 95638

SUBJECT:

RANCHO SECO INDEPENDENT SPENT FUEL STORAGE INSTALLATION, PHYSICAL SECURITY REQUIREMENTS FOR INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS INSPECTION REPORT 072-11/2013401

Dear Mr. Ronningen:

On August 1, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an Independent Spent Fuel Storage Installation Security Inspection at your Rancho Seco facility. The enclosed inspection report documents the inspection results, which were discussed on August 1, 2013, with Mr. S. Flake, Manager, Power Generation, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, the NRC identified two Severity Level IV violations of the NRC requirements. These violations were determ ined to be of low security significance and circumstances surrounding the violations are discussed in the enclosed report. Furthermore, because of the low security significance and because they were entered into your site corrective action program, the NRC is treating these violations as non-cited violations (NCV), consistent with Section VI. A. 1 of the Enforcement Policy. If you contest these violations or the severity level of the NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with a copy to the Regional Administrator, Region IV and the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511 OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

.

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch-1 Division of Reactor Safety

Docket Nos.: 050-312; 72-00011 License Nos.: DPR-54; SNM-2510

cc w/o enclosure: Electronic Distribution for Rancho Seco Independent Spent Fuel Storage Installation

OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION T. Ronningen 3 OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION Electronic Distribution by RIV w/o enclosure

Acting Regional Administrator (Steven.Reynolds@nrc.gov)

Acting Deputy Regional Administrator (Thomas.Bergman@nrc.gov)

Chief, Response Coordination Branch (Linda.Howell@nrc.gov

) DNMS Director (Anton.Vegel@nrc.gov

) DNMS Deputy Director (Vivian Campbell@nrc.gov)

Branch Chief (Blair Spitzberg@nrc.gov)

RSFS Inspector (Lee.Brookhart@nrc.gov)

SFST RIV Project Manager (William.Allen@nrc.gov)

Hard Copy: RIV DNMS File - 5th Floor

ML13242A252 Cover Letter Only Non Sensitive Publicly Available: JRL SUNSI Review Complete: JRL Sensitive Non-Publicly Available SPSI:PSB1 C:PSB-1 C:FCDB C:PSB-1 JLarsen DHolman BSpitzberg MHaire /RA/ /RA/

/RA/ /RA/ 8/23/13 8/23/13 8/28/13 8/30/13 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax