{{#Wiki_filter:1NRR-PMDAPEm Resource From:Miller, Ed Sent:Monday, April 14, 2014 7:22 AM To:'phil.barrett@duke-energy.com'
==Subject:==
Catawba 2.3 Walkdown Call Phil, The seismic folks sent me a more detailed write-up of the clarification they are seeking WRT the walkdown report:
From the limited discussion in Section 3 and Attachment 3A of the seismic walkdown report, the staff was unable to understand the screening process followed that excluded several rapid drain down items (identified in the "Rapid Drain Down List") from the final SWEL 2. Please describe the process that was followed to develop the SWEL 2 as it pertains to rapid drain down items and justify meeting the intent of Screening 4 "Rapid Drain Down"  of the walkdown guidance.
Hopefully this will help you better prepare for the call this afternoon. 
Ed Miller 415-2481 Hearing Identifier:  NRR_PMDA Email Number:  1230  Mail Envelope Properties  (9C2386A0C0BC584684916F7A0482B6CAF9972A4020) 
==Subject:==
Catawba 2.3 Walkdown Call  Sent Date:  4/14/2014 7:21:49 AM  Received Date:  4/14/2014 7:21:00 AM From:    Miller, Ed Created By:  Ed.Miller@nrc.gov Recipients:    "'phil.barrett@duke-energy.com'" <phil.barrett@duke-energy.com>
Tracking Status: None
Post Office:  HQCLSTR02.nrc.gov Files    Size      Date & Time MESSAGE    716      4/14/2014 7:21:00 AM 
Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:}}

Revision as of 21:02, 1 July 2018

2014/04/14 NRR E-mail Capture - Catawba 2.3 Walkdown Call
ML14106A669
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/14/2014
From: Miller G E
Plant Licensing Branch II
To: Barrett P
Duke Energy Corp
References
Download: ML14106A669 (2)


Text

1NRR-PMDAPEm Resource From:Miller, Ed Sent:Monday, April 14, 2014 7:22 AM To:'phil.barrett@duke-energy.com'

Subject:

Catawba 2.3 Walkdown Call Phil, The seismic folks sent me a more detailed write-up of the clarification they are seeking WRT the walkdown report:

From the limited discussion in Section 3 and Attachment 3A of the seismic walkdown report, the staff was unable to understand the screening process followed that excluded several rapid drain down items (identified in the "Rapid Drain Down List") from the final SWEL 2. Please describe the process that was followed to develop the SWEL 2 as it pertains to rapid drain down items and justify meeting the intent of Screening 4 "Rapid Drain Down" of the walkdown guidance.

Hopefully this will help you better prepare for the call this afternoon.

Ed Miller 415-2481 Hearing Identifier: NRR_PMDA Email Number: 1230 Mail Envelope Properties (9C2386A0C0BC584684916F7A0482B6CAF9972A4020)

Subject:

Catawba 2.3 Walkdown Call Sent Date: 4/14/2014 7:21:49 AM Received Date: 4/14/2014 7:21:00 AM From: Miller, Ed Created By: Ed.Miller@nrc.gov Recipients: "'phil.barrett@duke-energy.com'" <phil.barrett@duke-energy.com>

Tracking Status: None

Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 716 4/14/2014 7:21:00 AM

Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: