ML24114A182: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:FORM APF-05D-001-02, REV. 12 Page | {{#Wiki_filter:FORM APF-05D-001-02, REV. 12 Page 1 CALCULATION CHANGE NOTICE CCN NO. XX-E-013- 004-CN009 | ||
Base Calc No. | Base Calc No. Rev No. Sequence No. | ||
CALCULATION TITLE - | CALCULATION TITLE - From CALCULATION TITLE field in EIS: | ||
POST-FIRE SAFE SHUTDOWN (PFSSD) ANALYSIS | POST-FIRE SAFE SHUTDOWN (PFSSD) ANALYSIS | ||
COMPUTER CODE: | COMPUTER CODE: N/A VERSION: | ||
Administrative? | Administrative? YES NO ASSOCIATED ENGINEERING CHANGE #: CP020292 R0 | ||
REGULATORY | REGULATORY Attached Evaluation # | ||
REVIEWS: | REVIEWS: Attached to: | ||
CP020292 R0 Not Applicable | CP020292 R0 Not Applicable N/A Only if Administrative USAR STATEMENT: Requires a change to the USAR: | ||
Does NOT | Does NOT require a change to the USAR | ||
ANY DOCUMENTS | ANY DOCUMENTS YES If yes, enter: SWO #, or Condition Report #, if applicable. | ||
IMPACTED? | IMPACTED? NO | ||
Status: | Status: COMMITTED FINAL VOID SUPERSEDED | ||
DigsigOrg 2.8, 0.7 ORIG | DigsigOrg 2.8, 0.7 ORIG Greg Yerino (qualified) / Alex 5/25/2022 ORIG Wurtz (non-qualified) Date Printed Name Date Printed Name | ||
Signature | Signature | ||
/ ES9280479 QUALIFICATION REQUIRED: ES9280479 Signature QUALIFICATION REQUIRED: | |||
DigsigVer 2.8, 0.7 VERF | DigsigVer 2.8, 0.7 VERF Brian Fox (qualified) 6/13/2022 VERF Printed Name Date Printed Name Date | ||
Signature ES9280479 | Signature ES9280479 QUALIFICATION REQUIRED: ES9280479 | ||
Signature QUALIFICATION REQUIRED: | Signature QUALIFICATION REQUIRED: | ||
DigsigApp 2.8, 0.7 APP | DigsigApp 2.8, 0.7 APP Jeff Suter 07/12/2022 APP Printed Name Date Printed Name Date | ||
Signature Signature DigsigCert 3.5 1.75 Joseph D. | Signature Signature DigsigCert 3.5 1.75 Joseph D. | ||
Helget 2022.07.26 14:04:23 | Helget 2022.07.26 14:04:23 | ||
-05'00' RPE Certification (For ASME Section III Stress Reports/Design Reports, refer to AP 05D-001 for qualification requirements) | |||
FORM APF-05D-001-02, REV. 12 Page 2 CALCULATION CHANGE NOTICE | FORM APF-05D-001-02, REV. 12 Page 2 CALCULATION CHANGE NOTICE CCN NO. XX-E-013 - 004 - CN009 | ||
Base Calc No. | Base Calc No. Rev No. Sequence No. | ||
CALCULATION SUBJECT (Statement Of Problem) - | CALCULATION SUBJECT (Statement Of Problem) - Enter this in SUBJECT field in EIS: | ||
This change incorporates changes per CP 020292 (Substation Transformers NO. 8, 9, 10 & 11 and Breakers Replacement R25) removes breakers switchyard breakers 13-8 and 13-48 and re | This change incorporates changes per CP 020292 (Substation Transformers NO. 8, 9, 10 & 11 and Breakers Replacement R25) removes breakers switchyard breakers 13-8 and 13-48 and re places them with new switchyard breakers 13-49 and 13-50, respectively. This change in breakers is detailed on WIP-KD-7496-073-B-1, R0. XX-E-013 Appendix 3 references the 13-8 and 13-48 breaker numbers. This CCN changes the breaker num bers referenced in Appendix 3 to 13-49 and 13-50. | ||
FORM APF-05D-001-02, REV. 12 Page 3 CALCULATION DATABASE INPUT | FORM APF-05D-001-02, REV. 12 Page 3 CALCULATION DATABASE INPUT CCN NO. XX-E-013 - 004 - CN009 | ||
Base Calc No. Rev No. Sequence No. | Base Calc No. Rev No. Sequence No. | ||
Link new systems to the calculation/CCN in EIS. | Link new systems to the calculation/CCN in EIS. | ||
Systems Affected: | Systems Affected: XX Develop relationships between interdependent calculations in EIS. | ||
Additional | Additional NONE Calculations Providing Input to this calculation: | ||
Additional | Additional NONE Calculations Impacted by this calculation: | ||
Develop relationships between the calculation/CCN and controlled reference documents in EIS. | Develop relationships between the calculation/CCN and controlled reference documents in EIS. | ||
Additional | Additional KD-7496, Rev. 74 Controlled Documents Inputs to this calculation: | ||
Additional | Additional NONE Controlled Documents Impacted by this calculation: | ||
The reference documents listed below are those that cannot be linked to the calculation/CCN and shall be entered in the INDUSTRY REFERENCE field in EIS, e.g., ASME Codes, ANSI Standards, letters, etc. | The reference documents listed below are those that cannot be linked to the calculation/CCN and shall be entered in the INDUSTRY REFERENCE field in EIS, e.g., ASME Codes, ANSI Standards, letters, etc. | ||
Additional | Additional NONE Other Reference Documents: | ||
Link new components to the calculation/CCN in EIS. | Link new components to the calculation/CCN in EIS. | ||
Additional | Additional NONE Components: | ||
REFER TO DESKTOP GUIDE FOR PROCESSING CALCULATIONS IN EIS | REFER TO DESKTOP GUIDE FOR PROCESSING CALCULATIONS IN EIS | ||
FORM APF-05D-001-02, REV. 12 Page 4 LIST OF EFFECTIVE PAGES | FORM APF-05D-001-02, REV. 12 Page 4 LIST OF EFFECTIVE PAGES CCN NO. XX-E-013 - 004 - CN009 | ||
Base Calc No. Rev No. Sequence No. | Base Calc No. Rev No. Sequence No. | ||
Page CCN Calc. CCN Calc. CCN Calc. | Page CCN Calc. CCN Calc. CCN Calc. CCN Calc. | ||
No. Page | No. Page Page Page Page Page Page Page Affected No. Affected No. Affected No. Affected DVR/SCRN/ /DVR/SCRN /DVR/SCRN /DVR/SCRN Other /Other /Other /Other | ||
1-5 None | 1-5 None | ||
Line 93: | Line 93: | ||
CVR None | CVR None | ||
CVR | CVR = Calculation Verification Report (if applicable) | ||
SCRN | SCRN = Regulatory Screening (if applicable) | ||
AD | AD = Applicability Determination | ||
FORM APF-05D-001-02, REV. 12 Page 5 CALCULATION SHEET | FORM APF-05D-001-02, REV. 12 Page 5 CALCULATION SHEET CCN NO. XX-E-013 - 004 - CN009 | ||
Base Calc. No. | Base Calc. No. Rev. No. Sequence No | ||
XX-E-013-004-CN009 change summary: | XX-E-013-004-CN009 change summary: | ||
Line 122: | Line 122: | ||
Attachment 1 is not affected by this change. | Attachment 1 is not affected by this change. | ||
FORM | FORM APF-05D-001-02, REV. 12 Page 6 CALCULATION SHEET CCN NO. XX-E-013- 004-CN009 | ||
Base Calc. No. | Base Calc. No. Rev. No. Sequence No FORM APF-05D-001-02, REV. 12 Page 7 CALCULATION SHEET CCN NO. XX-E-013- 004-CN009 | ||
Base Calc. No. | Base Calc. No. Rev. No. Sequence No | ||
13-49 FORM | 13-49 FORM APF-05D-001-02, REV. 12 Page 8 CALCULATION SHEET CCN NO. XX-E-013- 004-CN009 | ||
Base Calc. No. | Base Calc. No. Rev. No. Sequence No bus NB01 or NB02. | ||
E-1000-SY13 | E-1000-SY13 |
Latest revision as of 17:00, 4 October 2024
ML24114A182 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 04/15/2024 |
From: | Wolf Creek |
To: | Office of Nuclear Reactor Regulation |
References | |
000347 | |
Download: ML24114A182 (1) | |
Text
FORM APF-05D-001-02, REV. 12 Page 1 CALCULATION CHANGE NOTICE CCN NO. XX-E-013- 004-CN009
Base Calc No. Rev No. Sequence No.
CALCULATION TITLE - From CALCULATION TITLE field in EIS:
POST-FIRE SAFE SHUTDOWN (PFSSD) ANALYSIS
COMPUTER CODE: N/A VERSION:
Administrative? YES NO ASSOCIATED ENGINEERING CHANGE #: CP020292 R0
REGULATORY Attached Evaluation #
REVIEWS: Attached to:
CP020292 R0 Not Applicable N/A Only if Administrative USAR STATEMENT: Requires a change to the USAR:
Does NOT require a change to the USAR
ANY DOCUMENTS YES If yes, enter: SWO #, or Condition Report #, if applicable.
IMPACTED? NO
Status: COMMITTED FINAL VOID SUPERSEDED
DigsigOrg 2.8, 0.7 ORIG Greg Yerino (qualified) / Alex 5/25/2022 ORIG Wurtz (non-qualified) Date Printed Name Date Printed Name
Signature
/ ES9280479 QUALIFICATION REQUIRED: ES9280479 Signature QUALIFICATION REQUIRED:
DigsigVer 2.8, 0.7 VERF Brian Fox (qualified) 6/13/2022 VERF Printed Name Date Printed Name Date
Signature ES9280479 QUALIFICATION REQUIRED: ES9280479
Signature QUALIFICATION REQUIRED:
DigsigApp 2.8, 0.7 APP Jeff Suter 07/12/2022 APP Printed Name Date Printed Name Date
Signature Signature DigsigCert 3.5 1.75 Joseph D.
Helget 2022.07.26 14:04:23
-05'00' RPE Certification (For ASME Section III Stress Reports/Design Reports, refer to AP 05D-001 for qualification requirements)
FORM APF-05D-001-02, REV. 12 Page 2 CALCULATION CHANGE NOTICE CCN NO. XX-E-013 - 004 - CN009
Base Calc No. Rev No. Sequence No.
CALCULATION SUBJECT (Statement Of Problem) - Enter this in SUBJECT field in EIS:
This change incorporates changes per CP 020292 (Substation Transformers NO. 8, 9, 10 & 11 and Breakers Replacement R25) removes breakers switchyard breakers 13-8 and 13-48 and re places them with new switchyard breakers 13-49 and 13-50, respectively. This change in breakers is detailed on WIP-KD-7496-073-B-1, R0. XX-E-013 Appendix 3 references the 13-8 and 13-48 breaker numbers. This CCN changes the breaker num bers referenced in Appendix 3 to 13-49 and 13-50.
FORM APF-05D-001-02, REV. 12 Page 3 CALCULATION DATABASE INPUT CCN NO. XX-E-013 - 004 - CN009
Base Calc No. Rev No. Sequence No.
Link new systems to the calculation/CCN in EIS.
Systems Affected: XX Develop relationships between interdependent calculations in EIS.
Additional NONE Calculations Providing Input to this calculation:
Additional NONE Calculations Impacted by this calculation:
Develop relationships between the calculation/CCN and controlled reference documents in EIS.
Additional KD-7496, Rev. 74 Controlled Documents Inputs to this calculation:
Additional NONE Controlled Documents Impacted by this calculation:
The reference documents listed below are those that cannot be linked to the calculation/CCN and shall be entered in the INDUSTRY REFERENCE field in EIS, e.g., ASME Codes, ANSI Standards, letters, etc.
Additional NONE Other Reference Documents:
Link new components to the calculation/CCN in EIS.
Additional NONE Components:
REFER TO DESKTOP GUIDE FOR PROCESSING CALCULATIONS IN EIS
FORM APF-05D-001-02, REV. 12 Page 4 LIST OF EFFECTIVE PAGES CCN NO. XX-E-013 - 004 - CN009
Base Calc No. Rev No. Sequence No.
Page CCN Calc. CCN Calc. CCN Calc. CCN Calc.
No. Page Page Page Page Page Page Page Affected No. Affected No. Affected No. Affected DVR/SCRN/ /DVR/SCRN /DVR/SCRN /DVR/SCRN Other /Other /Other /Other
1-5 None
6 App. 3 Page 116
7 App. 3 Page 118
8 App. 3 Page 125
CVR None
CVR = Calculation Verification Report (if applicable)
SCRN = Regulatory Screening (if applicable)
AD = Applicability Determination
FORM APF-05D-001-02, REV. 12 Page 5 CALCULATION SHEET CCN NO. XX-E-013 - 004 - CN009
Base Calc. No. Rev. No. Sequence No
XX-E-013-004-CN009 change summary:
This change incorporates changes per CP 020292 (Substation Transformers NO. 8, 9, 10 & 11 and Breakers Replacement R25) that removes breakers switchyard breakers 13-8 and 13-48 and replaces them with new switchyard breakers 13-49 and 13-50, respectively. The breakers are detailed on KD-7496. XX-E-013 Appendix 3 references the 13-8 and 13-48 breaker numbers. This CCN changes the breaker numbers referenced in Appendix 3 to 13-49 and 13-50.
XX-E-013 impact:
The calculation main body is not affected by this change (there are no changes to Results, Conclusions, Assumptions, Design Inputs, Methodology, Nomenclature, or Computations).
Appendix 1 is not affected by this change.
Appendix 2 is not affected by this change.
Appendix 3 is affected by this change as shown on the following pages.
Appendix 4 is not affected by this change.
Appendix 5 is not affected by this change.
Appendix 6 is not affected by this change.
Attachment 1 is not affected by this change.
FORM APF-05D-001-02, REV. 12 Page 6 CALCULATION SHEET CCN NO. XX-E-013- 004-CN009
Base Calc. No. Rev. No. Sequence No FORM APF-05D-001-02, REV. 12 Page 7 CALCULATION SHEET CCN NO. XX-E-013- 004-CN009
Base Calc. No. Rev. No. Sequence No
13-49 FORM APF-05D-001-02, REV. 12 Page 8 CALCULATION SHEET CCN NO. XX-E-013- 004-CN009
Base Calc. No. Rev. No. Sequence No bus NB01 or NB02.
E-1000-SY13
13-49
13-50