ML24165A281: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:NorthStar Vallecitos, LLC 6705 Vallecitos Rd.
{{#Wiki_filter:NorthStar Vallecitos, LLC 6705 Vallecitos Rd.
Sunol , Ca 94586 ww w.northstar.com
Sunol, Ca 94586 ww w.northstar.com


Luke M. Self Manager, Vallecitos Nuclear Center
Luke M. Self Manager, Vallecitos Nuclear Center


10 CFR       140.11(a)(4)
10 CFR 140.11(a)(4)
NSV           24-002
NSV 24-002


June           13, 20                                           24
June 13, 20 24


ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001


==SUBJECT:==
==SUBJECT:==
Documentary Evidence         of Insurance Vallecitos Nuclear Center Docket Nos. 50-18, 50-                                                     70, 50-73, 50-                                                     183 and 70-                                                                           754 License No. DPR-1, TR-1, R-33, DR-10 and SNM-960
Documentary Evidence of Insurance Vallecitos Nuclear Center Docket Nos. 50-18, 50- 70, 50-73, 50- 183 and 70- 754 License No. DPR-1, TR-1, R-33, DR-10 and SNM-960


==REFERENCE:==
==REFERENCE:==
Letter, USNRC to GEHA Regulatory Affairs., Order Approving T                                           ransfer of the Vallecitos Nuclear Center Licenses                     and Conforming L                                           icense A                     mendment (EPID L-2023-                                                                                       LLO-0002), dated April                                                                   25, 2024                                                                 (ML24039A                                                                                                             019)
Letter, USNRC to GEHA Regulatory Affairs., Order Approving T ransfer of the Vallecitos Nuclear Center Licenses and Conforming L icense A mendment (EPID L-2023-LLO-0002), dated April 25, 2024 (ML24039A 019)


==Dear Sir or Madam:==
==Dear Sir or Madam:==
By {{letter dated|date=April 25, 20|text=letter dated April 25, 20}} 24 (Reference), the USNRC transmitted an Order that provided consent to the direct transfer of the Vallecitos Nuclear Center (VNC) license s from GE-Hitachi Nuclear Energy Americas, LLC (GEHA) to NorthStar Vallecitos, LLC (N SV). The first condition of the Order states the following:


By letter dated April                                                                  25, 20                                          24          (Reference), the USNRC transmitted an Order that provided consent to the direct transfer of the Vallecitos Nuclear Center                                          (VNC) license                                                       s from GE-Hitachi          Nuclear Energy Americas, LLC (GEHA) to NorthStar Vallecitos, LLC (N          SV). The                                                    first condition of the Order states the following:
Prior to the closing of the license transfer transaction, NorthStar Vallecitos, LLC shall provide the Director of the NRCs Office of Nuclear Material Safety and Safeguards (NMSS) satisfactory documentary evidence that it has obtained, or will have obtained upon the closing of the transaction, the appropriate amount of insurance under 10 CFR Part 140 and 10 CFR 50.54(w), as applicable.


Prior to the closing of the license transfer transaction, NorthStar Vallecitos, LLC                  shall provide the Director of the NRCs Office of Nuclear Material Safety and          Safeguards (NMSS) satisfactory documentary evidence that it has obtained, or          will have obtained upon the closing of the transaction, the appropriate amount of          insurance under 10 CFR Part 140 and 10 CFR 50.54(w), as applicable.
In accordance with the subject condition of the Order, NSV hereby submits documentary evidence that the appropriate amount of insurance, consistent with that previously carried by GEHA, has been obtained for the licenses identified above. Documentary evidence of proof of insurance per 10 CFR 140.11(a)(4) is contained the Attachment to this letter.
 
In accordance with the subject condition of the Order         , NSV           hereby submits         documentary evidence that the appropriate amount of insurance, consistent with that previously carried by GEHA,       has been obtained for the licenses identified           above.                               Documentary         evidence of proof of insurance per 10           CFR 140.11(a)(4) is contained the                                                                                         Attachment to this letter.


This letter contains no new regulatory commitments.
This letter contains no new regulatory commitments.


Should you have any questions concerning this letter, or require additional information, please contact Mr. Thomas B. Silko at (802) 451-                                                                         5354, Ext 2506.
Should you have any questions concerning this letter, or require additional information, please contact Mr. Thomas B. Silko at (802) 451-5354, Ext 2506.
NSV 24-002 / Page 2 of 2
NSV 24-002 / Page 2 of 2


Sincerely,
Sincerely,


Luke M. SelfLuke M. Self, ,
Luke M. SelfLuke M. Self,,
Manager, Vallecitos Nuclear Center
Manager, Vallecitos Nuclear Center


==Attachment:==
==Attachment:==
Documentary evidence of proof of insurance per 10           CFR 140.11(a)(4).
Documentary evidence of proof of insurance per 10 CFR 140.11(a)(4).


cc:       Director, Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555
cc: Director, Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555


Regional Administrator, Region 4 U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, Texas 76011-4511 NSV 24-002 Docket Nos. 50-                   18, 50-                                               70, 50-                                               73, 50-                                                 183 and 70-                                       754
Regional Administrator, Region 4 U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, Texas 76011-4511 NSV 24-002 Docket Nos. 50- 18, 50- 70, 50- 73, 50- 183 and 70- 754


Attachment
Attachment
Line 63: Line 62:
Vallecitos Nuclear Center
Vallecitos Nuclear Center


Documentary evidence of proof of insurance per 10                     CFR 140.11(a)(4)
Documentary evidence of proof of insurance per 10 CFR 140.11(a)(4)
(1 page excluding this cover sheet)
(1 page excluding this cover sheet)
NSV 24-002 / Attachment / Page 1 of 1
NSV 24-002 / Attachment / Page 1 of 1
Line 69: Line 68:
Jason Martinez, CPCUDirector, Underwriting, ARM, ARe
Jason Martinez, CPCUDirector, Underwriting, ARM, ARe


June           13, 2024
June 13, 2024


Attn: Document Control Director, Office of Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555 -0001
Attn: Document Control Director, Office of Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555 -0001


Re: NorthStar Vallecitos, LLCNRC                         Operating           License Transfer           for           Vallecitos Atomic Laboratory - Revised
Re: NorthStar Vallecitos, LLCNRC Operating License Transfer for Vallecitos Atomic Laboratory - Revised


To Whom It May Concern,
To Whom It May Concern,


This letter confirms that American Nuclear Insurers will write nuclear liability insurance for NorthStar Vallecitos, LLC           for the           Vallecitos Atomic Laboratory.
This letter confirms that American Nuclear Insurers will write nuclear liability insurance for NorthStar Vallecitos, LLC for the Vallecitos Atomic Laboratory.


As of the date of the license amendment, which is expected to be on or before June 21                   , 2024, we           will amend the policy and certificate for the Vallecitos Atomic Laboratory           as follows:
As of the date of the license amendment, which is expected to be on or before June 21, 2024, we will amend the policy and certificate for the Vallecitos Atomic Laboratory as follows:
: a.                                       Facility Form Policy No. NF -0001: ANI will amend the named insured to             NorthStar Vallecitos, LLC in lieu of                   GE-Hitachi Nuclear Energy Americas LLC         . The operator of the facility will also change to NorthStar Vallecitos,             LLC.
: a. Facility Form Policy No. NF -0001: ANI will amend the named insured to NorthStar Vallecitos, LLC in lieu of GE-Hitachi Nuclear Energy Americas LLC. The operator of the facility will also change to NorthStar Vallecitos, LLC.
: b.                                     Master Worker Certificate No. NW -0500: ANI will amend the named insureds to NorthStar Vallecitos, LLC in lieu of GE                     -Hitachi Nuclear Energy Americas LLC. The operator of the facility will also change to NorthStar Vallecitos, LLC.
: b. Master Worker Certificate No. NW -0500: ANI will amend the named insureds to NorthStar Vallecitos, LLC in lieu of GE -Hitachi Nuclear Energy Americas LLC. The operator of the facility will also change to NorthStar Vallecitos, LLC.


The commitment to write insurance for NorthStar                         Vallecitos, LLC remains valid through September 30, 2024. In the event the license transfer                                                                                   s occur           after this date, ANI will review the existing circumstances prior to reinstating our commitment to provide insurance.
The commitment to write insurance for NorthStar Vallecitos, LLC remains valid through September 30, 2024. In the event the license transfer s occur after this date, ANI will review the existing circumstances prior to reinstating our commitment to provide insurance.


Please feel free to contact me with any questions or concerns.
Please feel free to contact me with any questions or concerns.
Line 89: Line 88:
Yours sincerely,
Yours sincerely,


Jason Martinez, CPCU                     , ARM, ARe Director, Underwriting
Jason Martinez, CPCU, ARM, ARe Director, Underwriting


C:           NorthStar -             DiCarlo, GregMarsh                         -               Hansen, Everett;           Evans, Dan
C: NorthStar - DiCarlo, GregMarsh - Hansen, Everett; Evans, Dan


American Nuclear Insurers           95 Glastonbury Blvd.,     Suite 300                                                                                 Glastonbury, CT 06033-4453 jmartinez@nuclearinsurance.com           Voice: (860) 682-13                   41           Fax: (860) 659-0002}}
American Nuclear Insurers 95 Glastonbury Blvd., Suite 300 Glastonbury, CT 06033-4453 jmartinez@nuclearinsurance.com Voice: (860) 682-13 41 Fax: (860) 659-0002}}

Revision as of 13:22, 4 October 2024

Northstar Vallecitos, LLC, Documentary Evidence of Insurance Vallecitos Nuclear Center
ML24165A281
Person / Time
Site: Vallecitos, 07000754, Vallecitos Nuclear Center
Issue date: 06/13/2024
From: Self L
NorthStar Vallecitos
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk
References
NSV 24-002
Download: ML24165A281 (1)


Text

NorthStar Vallecitos, LLC 6705 Vallecitos Rd.

Sunol, Ca 94586 ww w.northstar.com

Luke M. Self Manager, Vallecitos Nuclear Center

10 CFR 140.11(a)(4)

NSV 24-002

June 13, 20 24

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Documentary Evidence of Insurance Vallecitos Nuclear Center Docket Nos. 50-18, 50- 70, 50-73, 50- 183 and 70- 754 License No. DPR-1, TR-1, R-33, DR-10 and SNM-960

REFERENCE:

Letter, USNRC to GEHA Regulatory Affairs., Order Approving T ransfer of the Vallecitos Nuclear Center Licenses and Conforming L icense A mendment (EPID L-2023-LLO-0002), dated April 25, 2024 (ML24039A 019)

Dear Sir or Madam:

By letter dated April 25, 20 24 (Reference), the USNRC transmitted an Order that provided consent to the direct transfer of the Vallecitos Nuclear Center (VNC) license s from GE-Hitachi Nuclear Energy Americas, LLC (GEHA) to NorthStar Vallecitos, LLC (N SV). The first condition of the Order states the following:

Prior to the closing of the license transfer transaction, NorthStar Vallecitos, LLC shall provide the Director of the NRCs Office of Nuclear Material Safety and Safeguards (NMSS) satisfactory documentary evidence that it has obtained, or will have obtained upon the closing of the transaction, the appropriate amount of insurance under 10 CFR Part 140 and 10 CFR 50.54(w), as applicable.

In accordance with the subject condition of the Order, NSV hereby submits documentary evidence that the appropriate amount of insurance, consistent with that previously carried by GEHA, has been obtained for the licenses identified above. Documentary evidence of proof of insurance per 10 CFR 140.11(a)(4) is contained the Attachment to this letter.

This letter contains no new regulatory commitments.

Should you have any questions concerning this letter, or require additional information, please contact Mr. Thomas B. Silko at (802) 451-5354, Ext 2506.

NSV 24-002 / Page 2 of 2

Sincerely,

Luke M. SelfLuke M. Self,,

Manager, Vallecitos Nuclear Center

Attachment:

Documentary evidence of proof of insurance per 10 CFR 140.11(a)(4).

cc: Director, Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555

Regional Administrator, Region 4 U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, Texas 76011-4511 NSV 24-002 Docket Nos. 50- 18, 50- 70, 50- 73, 50- 183 and 70- 754

Attachment

Vallecitos Nuclear Center

Documentary evidence of proof of insurance per 10 CFR 140.11(a)(4)

(1 page excluding this cover sheet)

NSV 24-002 / Attachment / Page 1 of 1

Jason Martinez, CPCUDirector, Underwriting, ARM, ARe

June 13, 2024

Attn: Document Control Director, Office of Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555 -0001

Re: NorthStar Vallecitos, LLCNRC Operating License Transfer for Vallecitos Atomic Laboratory - Revised

To Whom It May Concern,

This letter confirms that American Nuclear Insurers will write nuclear liability insurance for NorthStar Vallecitos, LLC for the Vallecitos Atomic Laboratory.

As of the date of the license amendment, which is expected to be on or before June 21, 2024, we will amend the policy and certificate for the Vallecitos Atomic Laboratory as follows:

a. Facility Form Policy No. NF -0001: ANI will amend the named insured to NorthStar Vallecitos, LLC in lieu of GE-Hitachi Nuclear Energy Americas LLC. The operator of the facility will also change to NorthStar Vallecitos, LLC.
b. Master Worker Certificate No. NW -0500: ANI will amend the named insureds to NorthStar Vallecitos, LLC in lieu of GE -Hitachi Nuclear Energy Americas LLC. The operator of the facility will also change to NorthStar Vallecitos, LLC.

The commitment to write insurance for NorthStar Vallecitos, LLC remains valid through September 30, 2024. In the event the license transfer s occur after this date, ANI will review the existing circumstances prior to reinstating our commitment to provide insurance.

Please feel free to contact me with any questions or concerns.

Yours sincerely,

Jason Martinez, CPCU, ARM, ARe Director, Underwriting

C: NorthStar - DiCarlo, GregMarsh - Hansen, Everett; Evans, Dan

American Nuclear Insurers 95 Glastonbury Blvd., Suite 300 Glastonbury, CT 06033-4453 jmartinez@nuclearinsurance.com Voice: (860) 682-13 41 Fax: (860) 659-0002