ML17223A162: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML17223A162
| number = ML17223A162
| issue date = 06/05/1989
| issue date = 06/05/1989
| title = Special Rept:On 890406,Emergency Diesel Generator 2A Failed. Caused by Thrust Bearing Failure Due to Excessive Clearance Between Bearing Collar & Fan Shaft.Cooling Fan Blades & Shroud Repaired
| title = Special Rept:On 890406,emergency Diesel Generator 2A Failed. Caused by Thrust Bearing Failure Due to Excessive Clearance Between Bearing Collar & Fan Shaft.Cooling Fan Blades & Shroud Repaired
| author name = WOODY C O
| author name = WOODY C O
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.

Revision as of 02:27, 27 February 2018

Special Rept:On 890406,emergency Diesel Generator 2A Failed. Caused by Thrust Bearing Failure Due to Excessive Clearance Between Bearing Collar & Fan Shaft.Cooling Fan Blades & Shroud Repaired
ML17223A162
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/05/1989
From: WOODY C O
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-185, NUDOCS 8906090135
Download: ML17223A162 (3)