ML22146A017: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Appendix C               Job Performance Measure Worksheet                     Form ES-C-1 Facility: Palisades                                 Task No: PL-342 026 03 03 Task
{{#Wiki_filter:Appendix C Job Performance Measure Worksheet Form ES-C-1
 
Facility: Palisades Task No: PL -342 026 03 03
 
Task


==Title:==
==Title:==
Review a PCS Leakrate Calculation       Job Performance Measure No: 2017 Remediation Admin 1A K/A  
Review a PCS Leakrate Calculation Job Performance Measure No: 2017 Remediation Admin 1A
 
K/A  


==Reference:==
==Reference:==
2.1.20, Ability to interpret and execute procedure steps.
: 2. 1.20, Ability to interpret and execute procedure steps.
Examinee:                                           NRC Examiner:
 
Facility Evaluator:                                 Date:
Examinee: NRC Examiner:
 
Facility Evaluator: Date:
 
Method of testing:
Method of testing:
Simulated Performance _______________                Actual Performance _______X_________
Classroom ______X________            Simulator ______________          Plant __________


Appendix C                     Job Performance Measure Worksheet                     Form ES-C-1 Read to the examinee:
Simulated Performance _______________ Actual Performance _______X _________
 
Classroom ______X_ _______ Simulator ______________ Plant __________
 
Appendix C Job Performance Measure Worksheet Form ES-C-1
 
Read to the examinee:
 
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
: 1. The reactor is at full power
: 1. The reactor is at full power
Line 41: Line 56:
: 7. CRDM Seal leakage is 10 ml/min
: 7. CRDM Seal leakage is 10 ml/min
: 8. No known leakage sources outside the PCPB
: 8. No known leakage sources outside the PCPB
: 9. No known leakage sources inside the PCPB Task Standard:             Review and Approve a Primary System Leakage Calculation (DWO-1, Attachment 8, PCS Inventory Form)
: 9. No known leakage sources inside the PCPB
Required Materials:       DWO-1, Attachment 8, PCS Inventory Form completed by NCO-R General  
 
Task Standard: Review and Approve a Primary System Leakage Calculation (DWO-1, Attachment 8, PCS Inventory Form)
 
Required Materials: DWO-1, Attachment 8, PCS Inventory Form completed by NCO-R
 
General  


==References:==
==References:==
DWO-1, OPERATORS DAILY/WEEKLY ITEMS MODES 1, 2, 3, AND 4 Initiating Cue:           The NCO-R has just completed a PCS Leak Rate, DWO-1, Attachment 8, PCS Inventory Form, and requests that you review and approve it per DWO-1, Section 5.1.5 Time Critical Task:       No Validation Time:           30 minutes
DWO-1, OPERATORS DAILY/WEEKLY ITEMS MODES 1, 2, 3, AND 4
 
Initiating Cue: The NCO-R has just completed a PCS Leak Rate, DWO-1, Attachment 8, PCS Inventory Form, and requests that you review and approve it per DWO-1, Section 5.1.5
 
Time Critical Task: No
 
Validation Time: 30 minutes
 
Appendix C 3 Form ES-C-1
 
Performance Information
 
Denote critical steps with a check mark
 
_____ Performance step: 1,
 
Obtain completed DWO-1, Attachment 8, PCS Inventory Form
 
Standard: SRO obtains completed Working Copy of DWO-1, Attachment 8 and determines time of leakrate was 180 minutes for blank 1a.


Appendix C                                  3                              Form ES-C-1 Performance Information Denote critical steps with a check mark
_____        Performance step: 1, Obtain completed DWO-1, Attachment 8, PCS Inventory Form Standard:    SRO obtains completed Working Copy of DWO-1, Attachment 8 and determines time of leakrate was 180 minutes for blank 1a.
Note: Blanks 1b through 1e are given parameters on the data sheet handout and no verification is required.
Note: Blanks 1b through 1e are given parameters on the data sheet handout and no verification is required.
Comment:      Evaluator provides candidate with the completed PCS Inventory Form (Attachment 8) Working Copy.
______        Performance step: 2, IF MODE 1, 2 or 3 AND Pressure is between 2055 and 2065 psia (inclusive),
THEN RECORD 0.18021 ft3 for Pressurizer Vapor Space specific volume on Att. 8, Step 1.f.
Standard:    SRO ensures 0.18021 entered in Att. 8, Step 1.f Comment:
______        Performance step: 3, IF MODE 1, 2 or 3 AND Pressure is between 2055 and 2065 psia (inclusive),
THEN RECORD 0.02595 ft3/lbm for Pressurizer Liquid Space specific volume on Att. 8, Step 1.g Standard:    SRO ensures 0.02595 entered in Att. 8, Step1.g Comment:


Appendix C                                   4                               Form ES-C-1 Performance Information Denote critical steps with a check mark
Comment: Evaluator provides candidate with the completed PCS Inventory Form (Attachment 8) Working Copy.
______       Performance step: 4 RECORD 0.01616 ft3/lbm for Volume Control Tank specific volume on Att. 8, Step 1.h Standard:     SRO ensures 0.01616 entered in Att. 8, Step 1.h Comment:
 
______       Performance step: 5 DETERMINE Primary Coolant System specific volume from Steam Tables or DWO-1 Basis Document AND RECORD on Att. 8, Step 1.i Standard:     SRO ensures .021733 entered in Att. 8, Step 1.i Comment:     Provide candidate with DWO-1 Basis when asked.
______ Performance step: 2,
______       Performance step: 6 CALCULATE Pressurizer Vapor Space Volume (VGPZR) to the nearest 0.1 ft3 AND RECORD on Att.8, Step 1.j VGPZR = (94.3% - LPZR) (14.370 ft3/%) + 182.20 ft3 Standard:     SRO ensures 703.7 entered in Att. 8, Step 1.j Comment:     Using given Pressurizer Level of 58.01 for LPZR from 1b on datasheet
 
IF MODE 1, 2 or 3 AND Pressure is between 2055 and 2065 psia (inclusive),
THEN RECORD 0.1802 1 ft3 for Pressurizer Vapor Space specific volume on Att. 8, Step 1.f.
 
Standard: SRO ensures 0.1802 1 entered in Att. 8, Step 1.f
 
Comment:
 
______ Performance step: 3, IF MODE 1, 2 or 3 AND Pressure is between 2055 and 2065 psia (inclusive),
THEN RECORD 0.02595 ft3/lbm for Pressurizer Liquid Space specific volume on Att. 8, Step 1.g
 
Standard: SRO ensures 0.02595 entered in Att. 8, Step1.g
 
Comment:
 
Appendix C 4 Form ES-C-1
 
Performance Information
 
Denote critical steps with a check mark
 
______ Performance step: 4
 
RECORD 0.01616 ft3/lbm for Volume Control Tank specific volume on Att. 8, Step 1.h
 
Standard: SRO ensures 0.01616 entered in Att. 8, Step 1.h
 
Comment:
 
______ Performance step: 5
 
DETERMINE Primary Coolant System specific volume from Steam Tables or DWO-1 Basis Document AND RECORD on Att. 8, Step 1.i
 
Standard: SRO ensures.021733 entered in Att. 8, Step 1.i
 
Comment: Provide candidate with DWO-1 Basis when asked.
 
______ Performance step: 6
 
CALCULATE Pressurizer Vapor Space Volume (VGPZR) to the nearest 0.1 ft3 AND RECORD on Att.8, Step 1.j
 
VGPZR = (94.3% - LPZR) (14.370 ft3/%) + 182.20 ft3
 
Standard: SRO ensures 703.7 entered in Att. 8, Step 1.j
 
Comment: Using given Pressurizer Level of 58.01 for LPZR from 1b on datasheet
 
Appendix C 5 Form ES-C-1
 
Performance Information
 
Denote critical steps with a check mark
 
______ Performance step: 7
 
CALCULATE Pressurizer Liquid Space Volume (VFPZR) to the nearest 0.1 ft3 AND RECORD on Att.8, Step 1.k
 
VFPZR = 1547 - VGPZR
 
Standard: SRO ensures 843.3 ft3 entered in Att. 8, Step 1.k
 
Comment:
 
___ __ Performance step: 8
 
IF Primary Makeup Water was added during performance of the test THEN:
: 1. DETERMINE the total AND RECORD.on Att. 8, Step 1.m.1
: 2. CALCULATE mass added AND RECORD. on Att. 8, Step 1.m.3
 
Standard: SRO ensures:
25.1 entered in Att. 8, Step 1.m.1 209.1 entered in Att. 8, Step 1.m.3


Appendix C                                    5                            Form ES-C-1 Performance Information Denote critical steps with a check mark
Comment: 25.1 is given as the volume of makeup water added.
______        Performance step: 7 CALCULATE Pressurizer Liquid Space Volume (VFPZR) to the nearest 0.1 ft3 AND RECORD on Att.8, Step 1.k VFPZR = 1547 - VGPZR Standard:    SRO ensures 843.3 ft3 entered in Att. 8, Step 1.k Comment:
_____        Performance step: 8 IF Primary Makeup Water was added during performance of the test THEN:
: 1. DETERMINE the total  AND RECORD .on Att. 8, Step 1.m.1
: 2. CALCULATE mass added AND RECORD . on Att. 8, Step 1.m.3 Standard:    SRO ensures:
25.1 entered in Att. 8, Step 1.m.1 209.1 entered in Att. 8, Step 1.m.3 Comment:     25.1 is given as the volume of makeup water added.
209.1 is the mass conversion calculated in this step
209.1 is the mass conversion calculated in this step
______        Performance step: 9 IF Boric Acid was added during performance of the test THEN: .
Standard:    SRO ensures:
0 entered in Att. 8, Step 1.n.1 0 entered in Att. 8, Step 1.n.3 Comment:      Note: No Boric Acid Added


Appendix C                                     6                               Form ES-C-1 Performance Information Denote critical steps with a check mark
______ Performance step: 9
_____        Performance step: 10 Calculate Zinc injection Rate Standard:     SRO ensures:
 
2.36 entered in Att. 8, Step 1.o.1 (Zinc Injection Rate) 0 entered in Att. 8, Step 1.o.1 due to rounding to nearest .001 gpm 180 entered in Att. 8, Step 1.o.2 0 entered in Att. 8, Step 1.o.4 Comment:     Note: 2.36 liters/day given in Initial Conditions from Shift Managers Log Per procedural step 0 is entered due to rounding to the nearest 0.001 gpm 180 is the time in minutes for the leakrate The calculation is multiplied by 9 due to 1.o.1 entry
IF Boric Acid was added during performance of the test THEN:.
____        Performance step: 11 CALCULATE Total Mass added AND RECORD on Att. 8, Step 1.p Total Mass added = 1.m.3 + 1.n.3 + 1.o.4 Standard:     SRO ensures 209.1 entered in Att. 8, Step 1.p Comment:
 
_____        Performance step: 12 CALCULATE Total Uncorrected Leakage AND RECORD to the nearest 0.001 gpm per Att. 8, Step 1.q Standard:     SRO identifies ERROR as decimal error/miscalculation and enters .083 entered in Att. 8, Step 1.q instead of 0.83 Comment:     EVALUATOR: If candidate directs NCO to reperform calculation, instruct the candidate that the NCO is busy and that they should perform the corrections.
Standard: SRO ensures:
0 entered in Att. 8, Step 1.n.1 0 entered in Att. 8, Step 1.n.3
 
Comment: Note: No Boric Acid Added
 
Appendix C 6 Form ES-C-1
 
Performance Information
 
Denote critical steps with a check mark
 
__ ___ Performance step: 10
 
Calculate Zinc injection Rate
 
Standard: SRO ensures:
2.36 entered in Att. 8, Step 1.o.1 (Zinc Injection Rate) 0 entered in Att. 8, Step 1.o.1 due to rounding to nearest.001 gpm 180 entered in Att. 8, Step 1.o.2 0 entered in Att. 8, Step 1.o.4
 
Comment: Note: 2.36 liters/day given in Initial Conditions from Shift Managers Log Per procedural step 0 is entered due to rounding to the nearest 0.001 gpm 180 is the time in minutes for the leakrate The calculation is multiplied by 9 due to 1.o.1 entry
 
__ __ Performance step: 11
 
CALCULATE Total Mass added AND RECORD on Att. 8, Step 1.p Total Mass added = 1.m.3 + 1.n.3 + 1.o.4
 
Standard: SRO ensures 209.1 entered in Att. 8, Step 1.p
 
Comment:
 
___ __ Performance step: 12
 
CALCULATE Total Uncorrected Leakage AND RECORD to the nearest 0.001 gpm per Att. 8, Step 1.q
 
Standard: SRO identifies ERROR as decimal error/miscalculation and en ters.083 entered in Att. 8, Step 1.q instead of 0.83
 
Comment: EVALUATOR: If candidate directs NCO to reperform calculation, instruct the candidate that the NCO is busy and that they should perform the corrections.
 
Appendix C 7 Form ES-C-1
 
Performance Information
 
Denote critical steps with a check mark
 
__ ___ Performance step: 13
 
RECORD Charging Pump seal leakage in ml/min on Att. 8, Step 2.a
 
Standard: SRO identifies and corrects to 105 entered in Att. 8, Step 2.a
 
Comment: Note: Candidate discovers that 10 ml/min has been entered for Charging Pump Seal Leakage in Att. 8, Step 2.a.


Appendix C                                    7                                Form ES-C-1 Performance Information Denote critical steps with a check mark
_____        Performance step: 13 RECORD Charging Pump seal leakage in ml/min on Att. 8, Step 2.a Standard:    SRO identifies and corrects to 105 entered in Att. 8, Step 2.a Comment:      Note: Candidate discovers that 10 ml/min has been entered for Charging Pump Seal Leakage in Att. 8, Step 2.a.
EVALUATOR: If candidate directs NCO to reperform calculation, instruct the candidate that the NCO is busy and that they should perform the corrections.
EVALUATOR: If candidate directs NCO to reperform calculation, instruct the candidate that the NCO is busy and that they should perform the corrections.
_____        Performance step: 14 CONVERT Charging Pump seal leakage to gpm AND RECORD to the nearest 0.001 gpm per Att. 8, Step 2.a Standard:    SRO identifies error and corrects to .028 gpm entered in Att. 8, Step 2.a Comment:
_____        Performance step: 15 IF any primary coolant leakage sources outside of Primary Coolant Pressure Boundary .
Standard:    SRO verifies 0 entered in Att. 8, Step 2.b for rate Comment:      Note: No other leakage sources outside the PCPB given in Initial Conditions.


Appendix C                                         8                           Form ES-C-1 Performance Information Denote critical steps with a check mark
___ __ Performance step: 14
______       Performance step: 16 CONVERT primary coolant leakage sources outside of the Primary Coolant Pressure Boundary Standard:     SRO ensures 0 entered in Att. 8, Step 2.b Comment:
 
_____        Performance step: 17 CALCULATE leakage which affects PCS leakrate calculations and is outside of the Primary Coolant Pressure Boundary AND RECORD to the nearest 0.001 gpm per Att. 8, Step 2.c Standard:     SRO identifies ERROR and corrects value to .028 in Att. 8, Step 2.c Comment:     NOTE: Charging seal leakage and CRDM seal leakage have been incorrectly switched causing this calculation error.
CONVERT Charging Pump seal leakage to gpm AND RECORD to the nearest 0.001 gpm per Att. 8, Step 2.a
_____        Performance step: 18 CALCULATE Corrected PCS Leakage AND RECORD to the nearest 0.001 gpm per Att.8, Step 2.d (Att. 8, Step 1.q - Att. 8, Step 2.c)
 
Standard:     SRO identifies error and corrects .055 entered in Att. 8, Step 2.d Comment:
Standard: SRO identifies error and corrects to.028 gpm entered in Att. 8, Step 2.a
 
Comment:
 
___ __ Performance step: 15
 
IF any primary coolant leakage sources outside of Primary Coolant Pressure Boundary.
 
Standard: SRO verifies 0 entered in Att. 8, Step 2. b for rate
 
Comment: Note: No other leakage sources outside the PCPB given in Initial Conditions.
 
Appendix C 8 Form ES-C-1
 
Performance Information
 
Denote critical steps with a check mark
 
______ Performance step: 16
 
CONVERT primary coolant leakage sources outside of the Primary Coolant Pressure Boundary  
 
Standard: SRO ensures 0 entered in Att. 8, Step 2.b
 
Comment:
 
__ ___ Performance step: 17
 
CALCULATE leakage which affects PCS leakrate calculations and is outside of the Primary Coolant Pressure Boundary AND RECORD to the nearest 0.001 gpm per Att. 8, Step 2.c
 
Standard: SRO identifies ERROR and corrects value to.028 in Att. 8, Step 2.c
 
Comment: NOTE: Charging seal leakage and CRDM seal leakage have been incorrectly switched causing this calculation error.
 
___ __ Performance step: 18
 
CALCULATE Corrected PCS Leakage AND RECORD to the nearest 0.001 gpm per Att.8, Step 2.d (Att. 8, Step 1.q - Att. 8, Step 2.c)
 
Standard: SRO identifies error and corrects.055 entered in Att. 8, Step 2.d
 
Comment:
 
Appendix C 9 Form ES-C-1
 
Performance Information
 
Denote critical steps with a check mark
 
___ ____ Performance step: 19
 
RECORD the most recent CRDM seal leakage measurement in ml/min on Att. 8, Step 3.a.
 
Standard: SRO ensures 10 entered in Att. 8, Step 3.a calculation
 
Comment: Note: Candidate discovers that 105 ml/min has been entered for CRDM seal leakage. Candidate corrects this by entering 10 on Att. 8, step 3.a.


Appendix C                                      9                                  Form ES-C-1 Performance Information Denote critical steps with a check mark
_______      Performance step: 19 RECORD the most recent CRDM seal leakage measurement in ml/min on Att. 8, Step 3.a.
Standard:    SRO ensures 10 entered in Att. 8, Step 3.a calculation Comment:      Note: Candidate discovers that 105 ml/min has been entered for CRDM seal leakage. Candidate corrects this by entering 10 on Att. 8, step 3.a.
EVALUATOR: If candidate directs NCO to reperform calculation, instruct the candidate that the NCO is busy and that they should perform the corrections.
EVALUATOR: If candidate directs NCO to reperform calculation, instruct the candidate that the NCO is busy and that they should perform the corrections.
_______      Performance step: 20 COVERT CRDM seal leakage to gpm AND RECORD to the nearest 0.001 gpm per Att. 8, Step 3.a Standard:     SRO ensures .003 entered in Att. 8, Step 3.a Comment:     Note: Candidate discovers that .028 gpm has been entered for CRDM seal leakage. Candidate corrects this by entering .003 gpm on Att. 8, step 3.a.
 
___ ____ Performance step: 20
 
COVERT CRDM seal leakage to gpm AND RECORD to the nearest 0.001 gpm per Att. 8, Step 3.a
 
Standard: SRO ensures.003 entered in Att. 8, Step 3.a
 
Comment: Note: Candidate discovers that.028 gpm has been entered for CRDM seal leakage. Candidate corrects this by entering.003 gpm on Att. 8, step 3.a.
Charging seal leakage and CRDM seal leakage have been incorrectly switched causing this calculation error.
Charging seal leakage and CRDM seal leakage have been incorrectly switched causing this calculation error.
______        Performance step: 21 IF any primary coolant leakage sources inside the Primary Coolant Pressure Boundary ..
Standard:    SRO ensures 0 entered in Att. 8, Step 3.b Comment:      Note: No known leakage sources inside the PCPB given in Initial Conditions.


Appendix C                                         10                           Form ES-C-1 Performance Information Denote critical steps with a check mark
______ Performance step: 21
________      Performance step: 22 CONVERT primary coolant leakage sources inside of the Primary Coolant Pressure Boundary AND record to the nearest 0.001 gpm per Att. 8, Step 3b Standard:     SRO ensures 0 entered in Att. 8, Step 3.b Comment:
 
_______      Performance step:23 CALCULATE Identified PCS Leakage AND RECORD to the nearest 0.001 gpm per Att. 8, Step 3.c (Att. 8, Step 3.a + Att. 8, Step 3.b)
IF any primary coolant leakage sources inside the Primary Coolant Pressure Boundary..
Standard:     SRO ensures .003 entered in Att. 8, Step 3.c Comment:     Note: Candidate discovers ERROR that .028 gpm has been entered for Identified leakage. Candidate corrects this by entering .003 gpm on Att. 8, step 3.c.
 
_______      Performance step:24 CALCULATE Unidentified PCS Leakage AND RECORD to the nearest 0.001 gpm per Att. 8, Step 4.a (Att. 8, Step 2.d - Att. 8, Step 3.c)
Standard: SRO ensures 0 entered in Att. 8, Step 3.b
Standard:     SRO ensures .052 entered in Att. 8, Step 4.a Comment:     Note: Candidate discovers that .7994 gpm has been entered for Identified leakage. Candidate corrects this by entering .052 gpm on Att. 8, step 4.a.
 
Comment: Note: No known leakage sources inside the PCPB given in Initial Conditions.
 
Appendix C 10 Form ES-C-1
 
Performance Information
 
Denote critical steps with a check mark
 
____ ____ Performance step: 22
 
CONVERT primary coolant leakage sources inside of the Primary Coolant Pressure Boundary AND record to the nearest 0.001 gpm per Att. 8, Step 3b
 
Standard: SRO ensures 0 entered in Att. 8, Step 3.b
 
Comment:
 
___ ____ Performance step:23
 
CALCULATE Identified PCS Leakage AND RECORD to the nearest 0.001 gpm per Att. 8, Step 3.c (Att. 8, Step 3.a + Att. 8, Step 3.b)
 
Standard: SRO ensures.003 entered in Att. 8, Step 3.c
 
Comment: Note: Candidate discovers ERROR that.028 gpm has been entered for Identified leakage. Candidate corrects this by entering.003 gpm on Att. 8, step 3.c.
 
___ ____ Performance step:24
 
CALCULATE Unidentified PCS Leakage AND RECORD to the nearest 0.001 gpm per Att. 8, Step 4.a (Att. 8, Step 2.d - Att. 8, Step 3.c)
 
Standard: SRO ensures.052 entered in Att. 8, Step 4.a
 
Comment: Note: Candidate discovers that.7994 gpm has been entered for Identified leakage. Candidate corrects this by entering.052 gpm on Att. 8, step 4.a.
 
Terminating cue:
Terminating cue:
EVALUATOR QUE: When candidate completes PCS leakrate calculation, end the JPM.
EVALUATOR QUE: When candidate completes PCS leakrate calculation, end the JPM.


Appendix C                                   11                 Form ES-C-1 Verification of Completion Job Performance Measure No.         ADMIN JPM 1 Examinees Name:
Appendix C 11 Form ES-C-1
 
Verification of Completion
 
Job Performance Measure No. ADMIN JPM 1
 
Examinees Name:
 
Examiners Name:
Examiners Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question: __________________________________________________________________
Question: __________________________________________________________________
Response: _________________________________________________________________
Response: _________________________________________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________    ________


Appendix C                                       12                   Form ES-C-1 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
Result: Satisfactory/Unsatisfactory
 
Examiners signature and date: _______________________________ ________
 
Appendix C 12 Form ES-C-1
 
CANDIDATE CUE SHEET
 
(TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
 
INITIAL CONDITIONS:
INITIAL CONDITIONS:
DWO-1, Attachment 8, PCS Inventory Form, has been completed A 25.1 gallon PMW addition was made to the PCS No Boric Acid Additions were made Zinc addition is 2.36 liters/day (from the Shift Managers log)
DWO-1, Attachment 8, PCS Inventory Form, has been completed A 25.1 gallon PMW addition was made to the PCS No Boric Acid Additions were made Zinc addition is 2.36 liters/day (from the Shift Managers log)
Charging Pump Seal leakage (total) is 105 ml/min CRDM Seal leakage is 10 ml/min No known leakage sources outside the PCPB No known leakage sources inside the PCPB INITIATING CUES:
Charging Pump Seal leakage (total) is 105 ml/min CRDM Seal leakage is 10 ml/min No known leakage sources outside the PCPB No known leakage sources inside the PCPB
 
INITIATING CUES:
The NCO-R has just completed a PCS Leak Rate, DWO-1, Attachment 8, PCS Inventory Form, and requests that you review and approve it.
The NCO-R has just completed a PCS Leak Rate, DWO-1, Attachment 8, PCS Inventory Form, and requests that you review and approve it.
STUDENT HANDOUT Proc No DWO-1 Attachment 8 Revision 108 PCS INVENTORY FORM Page 1 of 4 Date: Today


STUDENT HANDOUT                                                                          Proc No DWO-1 Attachment 8 Revision 108 PCS INVENTORY FORM                        Page 1 of 4 Date: Today TECHNICAL SPECIFICATION REQUIRED                                               INFORMATION ONLY
TECHNICAL SPECIFICATION REQUIRED INFORMATION ONLY
: 1. TOTAL UNCORRECTED LEAKAGE CALCULATION (Section 5.1.5)
: 1. TOTAL UNCORRECTED LEAKAGE CALCULATION (Section 5.1.5)
PARAMETER                           TIME 1             TIME 2         DELTA TIME
 
: a. Leakrate Duration                                 0000             + 0300               =     180 min Pressurizer Level (LPRZ)
PARAMETER TIME 1 TIME 2 DELTA TIME
: b. PPC PT LPRZC_AVG or LPRZC or                               58.01%               58.01%
: a. Leakrate Duration 0000 + 0300 = 180 min Pressurizer Level (LPRZ)
LT_0101A_D; LIC-0101A or LIC-0101B Pressurizer Pressure (PPRZ)
: b. PPC PT LPRZC_AVG or LPRZC or 58.01% 58.01%
: c.                                                          2061 psia           2061 psia PPC PT PRZBE; LPIR-0101A/B Volume Control Tank Level (LVCT)
LT_0101A_D; LIC-0101A or LIC-0101B
: d. PPC Point LTC0205_AVG or LTC0205;                         71.09 %             71.39 %
: c. Pressurizer Pressure (PPRZ) 2061 psia 2061 psia PPC PT PRZBE; LPIR-0101A/B Volume Control Tank Level (LVCT)
: d. PPC Point LTC0205_AVG or LTC0205; 71.09 % 71.39 %
LIC-0205 PCS Avg Coolant Temperature (TAVE)
LIC-0205 PCS Avg Coolant Temperature (TAVE)
: e. PPC PT TAVG_AVG or TAVG or TYT_0100 or                   560.62 °F           560.62°F TYT_0200A; TI-0110 Reactor Reg #___
: e. PPC PT TAVG_AVG or TAVG or TYT_0100 or 560.62 °F 560.62°F TYT_0200A; TI-0110 Reactor Reg #___
Pressurizer Vapor Space Specific Volume
: f. Pressurizer Vapor Space Specific Volume 0.18021 ft 3 /lb m 0.18021 ft 3 /lb m Vg PZR @ P PRZ
: f.                                                      0.18021 ft3/lbm    0.18021 ft3/lbm Vg PZR @ PPRZ Pressurizer Liquid Space Specific Volume
: g. Pressurizer Liquid Space Specific Volume 0.02595 ft 3 /lb m 0.02595 ft 3 /lb m V f PZR @ P PRZ
: g.                                                      0.02595 ft3/lbm    0.02595 ft3/lbm Vf PZR @ PPRZ Volume Control Tank Specific Volume
: h. Volume Control Tank Specific Volume 0.01616 ft 3 /lb m 0.01616 ft 3 /lb m V f VCT
: h.                                                      0.01616 ft3/lbm    0.01616 ft3/lbm Vf VCT Primary Coolant System Specific Volume
: i. Primary Coolant System Specific Volume 0.021733 ft3 /lb m 0.021733 ft3 /lb m V f PCS @ P PRZ & T AVE
: i.                                                    0.021733 ft3/lbm    0.021733 ft3/lbm Vf PCS @ PPRZ & TAVE Pressurizer Vapor Space Volume (VGPZR)
: j. Pressurizer Vapor Space Volume (V GPZR ) 703.7 ft 3 703.7 ft 3 V GPZR = (94.3% - L PRZ ) (14.370 ft3 /%) + 182.20 ft3
: j.                                                          703.7 ft3            703.7 ft3 VGPZR = (94.3% - LPRZ) (14.370 ft3/%) + 182.20 ft3 Pressurizer Liquid Space Volume (VFPZR)
: k. Pressurizer Liquid Space Volume (V FPZR ) 843.3 ft 3 843.3 ft 3 V FPZR = 1547 ft3 - V GPZR
: k.                                                          843.3 ft3            843.3 ft3 VFPZR = 1547 ft3 - VGPZR
: l. Repeat data at the end of the time period
: l. Repeat data at the end of the time period


STUDENT HANDOUT                                                                                                           Proc No DWO-1 Attachment 8 Revision 108 PCS INVENTORY FORM                                                     Page 2 of 4
STUDENT HANDOUT Proc No DWO-1 Attachment 8 Revision 108 PCS INVENTORY FORM Page 2 of 4
: m. Primary Makeup Water Addition
: m. Primary Makeup Water Addition
: 1. Volume (FIC-0210A)                                                                                       25.1 gal
: 1. Volume (FIC-0210A) 25.1 gal
: 2. Specific Volume of water at room temperature                                                     0.01605 ft3/lbm Mass added = volume (gal) x 0.13368 ft3/gal ÷
: 2. Specific Volume of water at room temperature 0.01605 ft3/lbm
: 3.                                                                                                            209.1 lbm 0.01605 ft3/lbm
: 3. Mass added = volume (gal) x 0.13368 ft3/gal ÷= 1=lb m =
: n. Boric Acid Solution Addition
01605=f3/m =
: 1. Volume (FIC-0210B)                                                                                             0 gal
=
: 2. Specific Volume of water at 160°F                                                                 0.01639 ft3/lbm Mass added = volume (gal) x 0.13368 ft3/gal ÷
= Borc=Siddii= = = =
: 3.                                                                                                                  0 lbm 0.01639 ft3/lbm
= =
: o. Zinc Addition Zinc Injection Rate:
= Ve=(FIC -0210B)= =0=gal=
: 1.  ( 2.36        liters/day x 0.000183)                                                                         0 gpm
= Specifice=ofa=a °F== 3/m =
[conversion units are gal day/liter min]
= Ms=added=egal).13368 3/gal=÷= 0=lb 3/ = m =
: 2. Leak rate duration from 1.a                                                                               180 min
m
: 3. Specific Volume of water at room temperature                                                      0.01605 ft3/lbm Mass added = injection rate (gpm) x leakrate
=
: 4.                                                                                                                0 lbm.
= ddiion==
duration (min) x 0.13368 ft3/gal ÷ 0.01605 ft3/lbm
=
: p. Total Mass added = 1.m.3 + 1.n.3 + 1.o.4                                                                   209.1 lbm
njia =
: q. Total Uncorrected Leakage Calculation                                                                      0.83      gpm 1      1            V        V            V        V                L        L 9136.8 GPZR 2    FPZR 2          GPZR1    FPZR1                VCT 2    VCT 1
= (= =liers/÷=x=0.000183)=== 0=gpm=
                                                                +                  +          4.588 VfPCS 2 VfPCS 1    VgPZR 2 VfPZR 2  VgPZR1 VfPZR1                        VfVCT VfVCT Total _ PCS 0.1201  
[convsis=are=da÷/lii=
              =
= arir=a = 180=min=
Leak _ Rate     Time  
= Specifice=ofa=am=rae = 01605=f3/m =
                                                                      + Total Mass     Added                                                
= Ms=added=====iecion=rem)eakre= =0=lb =
durimi=x=133683/gal=÷=016053/m = m.
=
= Toass=1.m.3=+=1.n.+.4 = = = = 9. m==
=
= Tor=Leakaci= = = ===8 gpm =
=
11 +VGPZR2VFPZR2 +VGPZR1VFPZR1 LVCT2LVCT1 9136.8 4.
VfPCS2 588VfPCS1VgPZR2VfPZR2VgPZR1VfPZR1VfVCTVfVCT Total_ PCS 0.1201  
=
Leak _ Rate Time  
+ Total Mass Added  
 
STUDENT HANDOUT Proc No DWO -1 Attachment 8 Revision 107 PCS INVENTORY FORM Page 3 of 4


STUDENT HANDOUT                                                                                                        Proc No DWO-1 Attachment 8 Revision 107 PCS INVENTORY FORM                                                Page 3 of 4 Total _ PCS  0.1201                  1 1    j2 k2  j1 k1                        d2        d1 Leak _ Rate = a   9136.8 i2 i1     f2 + g2   f1 + g1   4.588 0.01616 0.01616 + p 9136.8    1      1    703.7 843.3  703.7                  843.3          71.39          71.09
pTotal_PCS0 1.1201 11 +j2k2 +j1k1 d2d
                                                                    +                  +        4.588                     
= 9136.8 4.588 +
                                    .021733 .021733    .18021 .02595  .18021 .02595                    0.01616 0.01616 Total_ PCS  0.1201 Leak _ Rate  = 180                                                                                                                     
Leak _ Rate a i2 i1 f2 g2 f1 g1 0.01616 0.01616  
                                                                              + 209.1                                                   
                  = 0.083


STUDENT HANDOUT                                                                           Proc No DWO-1 Attachment 8 Revision 108 PCS INVENTORY FORM                             Page 4 of 4
11 +703.7843.3 +703.7843.3 71.3971.09 9136.8 4.588 Total_ PCS.021733.021733.18021.02595.18021.02595 0.01616 0.01616
= 0.1201 Leak _ Rate 180
+ 209.1
 
= 0. 0 83
 
STUDENT HANDOUT Proc No DWO-1 Attachment 8 Revision 108 PCS INVENTORY FORM Page 4 of 4
: 2. LEAKAGE CORRECTION CALCULATION (Section 5.1.7)
: 2. LEAKAGE CORRECTION CALCULATION (Section 5.1.7)
Charging Pump Seal Leakage:
: a. Charging Pump Seal Leakage:.003 gpm
: a.                                                                              .003 gpm
( 10 ml/min x 0.0002642 gal/ml)
( 10 ml/min x 0.0002642 gal/ml)
Other known leakage sources outside the PCPB; list source and rate:
Other known leakage sources outside the PCPB;
: b.                                                                                0 gpm Source:
: b. list source and rate: 0 gpm Source:
Rate: ( 0 ml/min x 0.0002642 gal/ml)
Rate: ( 0 ml/min x 0.0002642 gal/ml)
Leakage outside the PCPB which affects the PCS
: c. Leakage outside the PCPB which affects the PCS.003 gpm leakrate calculation: (2.a + 2.b)
: c.                                                                              .003 gpm leakrate calculation: (2.a + 2.b)
: d. Corrected PCS Leakage: (1.q - 2.c).827 gpm
: d. Corrected PCS Leakage: (1.q - 2.c)                                         .827 gpm
: 3. IDENTIFIED PCS LEAKAGE CALCULATION (Section 5.1.8)
: 3. IDENTIFIED PCS LEAKAGE CALCULATION (Section 5.1.8)
CRDM Seal Leakage:
: a. CRDM Seal Leakage:.028 gpm
: a.                                                                              .028 gpm
( 105 ml/min x 0.0002642 gal/ml)
( 105 ml/min x 0.0002642 gal/ml)
Other known leakage sources inside the PCPB; list source and rate:
Other known leakage sources inside the PCPB;
: b.                                                                                0 gpm Source:
: b. list source and rate: 0 gpm Source:
Rate: ( 0 ml/min x 0.0002642 gal/ml)
Rate: ( 0 ml/min x 0.0002642 gal/ml)
                                                                                        .028 gpm
.028 gpm
: c. Identified PCS Leakage: (3.a + 3.b)                         (If >10.0 gpm - refer to Step 5.1.10d)
: c. Identified PCS Leakage: (3.a + 3.b) (If >10.0 gpm - refer to Step 5.1.10d)
: 4. UNIDENTIFIED PCS LEAKAGE CALCULATION (Section 5.1.9)
: 4. UNIDENTIFIED PCS LEAKAGE CALCULATION (Section 5.1.9)
                                                                                        .799 gpm Unidentified PCS Leakage:
 
: a.                                                 (If 0.15 gpm, refer to Step5.1.10b)
.799 gpm
(2.d - 3.c)
: a. Unidentified PCS Leakage: (2.d - 3.c) (If 0.15 gpm, refer to Step5.1.10b)
(If >1.0 gpm - refer to Step 5.1.10d)
(If >1.0 gpm - refer to Step 5.1.10d)
: 5. PCS LEAKAGE CALCULATION COMPLETION (Section 5.1.10) a.1     Record positive values ( 0 gpm) as calculated on Attachment 1, Step 5.1.
: 5. PCS LEAKAGE CALCULATION COMPLETION (Section 5.1.10) a.1 Record positive values ( 0 gpm) as calculated on Attachment 1, Step 5.1.
a.2    Record negative values (< 0 gpm) as 0 gpm on Attachment 1, Step 5.1.
Nate C Operator/ Today                                                /
Calculated By                        Date          Reviewed By                              Date


KEY                                                                                       Proc No DWO-1 Attachment 8 Revision 108 PCS INVENTORY FORM                         Page 1 of 4 Date: Today TECHNICAL SPECIFICATION REQUIRED                                               INFORMATION ONLY
a.2 Record negative values (< 0 gpm) as 0 gpm on Attachment 1, Step 5.1.
 
Nate C Operator/ Today /
Calculated By Date Reviewed By Date
 
KEY Proc No DWO-1 Attachment 8 Revision 108 PCS INVENTORY FORM Page 1 of 4
 
Date: Today
 
TECHNICAL SPECIFICATION REQUIRED INFORMATION ONLY
: 1. TOTAL UNCORRECTED LEAKAGE CALCULATION (Section 5.1.5)
: 1. TOTAL UNCORRECTED LEAKAGE CALCULATION (Section 5.1.5)
PARAMETER                           TIME 1             TIME 2         DELTA TIME
 
: a. Leakrate Duration                                 0000             + 0300             =     180 min Pressurizer Level (LPRZ)
PARAMETER TIME 1 TIME 2 DELTA TIME
: b. PPC PT LPRZC_AVG or LPRZC or                               58.01%               58.01%
: a. Leakrate Duration 0000 + 0300 = 180 min Pressurizer Level (LPRZ)
LT_0101A_D; LIC-0101A or LIC-0101B Pressurizer Pressure (PPRZ)
: b. PPC PT LPRZC_AVG or LPRZC or 58.01% 58.01%
: c.                                                          2061 psia           2061 psia PPC PT PRZBE; LPIR-0101A/B Volume Control Tank Level (LVCT)
LT_0101A_D; LIC-0101A or LIC-0101B
: d. PPC Point LTC0205_AVG or LTC0205;                         71.09 %             71.39 %
: c. Pressurizer Pressure (PPRZ) 2061 psia 2061 psia PPC PT PRZBE; LPIR-0101A/B Volume Control Tank Level (LVCT)
: d. PPC Point LTC0205_AVG or LTC0205; 71.09 % 71.39 %
LIC-0205 PCS Avg Coolant Temperature (TAVE)
LIC-0205 PCS Avg Coolant Temperature (TAVE)
: e. PPC PT TAVG_AVG or TAVG or TYT_0100 or                   560.62 &deg;F           560.62&deg;F TYT_0200A; TI-0110 Reactor Reg #___
: e. PPC PT TAVG_AVG or TAVG or TYT_0100 or 560.62 &deg;F 560.62&deg;F TYT_0200A; TI-0110 Reactor Reg #___
Pressurizer Vapor Space Specific Volume
: f. Pressurizer Vapor Space Specific Volume 0.18021 ft 3 /lb m 0.18021 ft 3 /lb m Vg PZR @ P PRZ
: f.                                                      0.18021 ft3/lbm    0.18021 ft3/lbm Vg PZR @ PPRZ Pressurizer Liquid Space Specific Volume
: g. Pressurizer Liquid Space Specific Volume 0.02595 ft 3 /lb m 0.02595 ft 3 /lb m V f PZR @ P PRZ
: g.                                                      0.02595 ft3/lbm    0.02595 ft3/lbm Vf PZR @ PPRZ Volume Control Tank Specific Volume
: h. Volume Control Tank Specific Volume 0.01616 ft 3 /lb m 0.01616 ft 3 /lb m V f VCT
: h.                                                      0.01616 ft3/lbm    0.01616 ft3/lbm Vf VCT Primary Coolant System Specific Volume
: i. Primary Coolant System Specific Volume 0.021733 ft 3 /lb m 0.021733 ft 3 /lb m V f PCS @ P PRZ & T AVE
: i.                                                    0.021733 ft3/lbm    0.021733 ft3/lbm Vf PCS @ PPRZ & TAVE Pressurizer Vapor Space Volume (VGPZR)
: j. Pressurizer Vapor Space Volume (V GPZR ) 703.7 ft 3 703.7 ft 3 V GPZR = (94.3% - L PRZ ) (14.370 ft3 /%) + 182.20 ft3
: j.                                                          703.7 ft3            703.7 ft3 VGPZR = (94.3% - LPRZ) (14.370 ft3/%) + 182.20 ft3 Pressurizer Liquid Space Volume (VFPZR)
: k. Pressurizer Liquid Space Volume (V FPZR ) 843.3 ft 3 843.3 ft 3 V FPZR = 1547 ft3 - V GPZR
: k.                                                          843.3 ft3            843.3 ft3 VFPZR = 1547 ft3 - VGPZR
: l. Repeat data at the end of the time period
: l. Repeat data at the end of the time period


KEY                                                                                                           Proc No DWO-1 Attachment 8 Revision 108 PCS INVENTORY FORM                                       Page 2 of 4
KEY Proc No DWO-1 Attachment 8 Revision 108 PCS INVENTORY FORM Page 2 of 4
: m. Primary Makeup Water Addition
: m. Primary Makeup Water Addition
: 1. Volume (FIC-0210A)                                                                           25.1 gal
: 1. Volume (FIC-0210A) 25.1 gal
: 2. Specific Volume of water at room temperature                                         0.01605 ft3/lbm Mass added = volume (gal) x 0.13368 ft3/gal &#xf7;
: 2. Specific Volume of water at room temperature 0.01605 ft3/lbm
: 3.                                                                                              209.1 lbm 0.01605 ft3/lbm
: 3. Mass added = volume (gal) x 0.13368 ft3/gal &#xf7;= 1=lb m =
: n. Boric Acid Solution Addition
01605=f3/m =
: 1. Volume (FIC-0210B)                                                                               0 gal
=
: 2. Specific Volume of water at 160&deg;F                                                     0.01639 ft3/lbm Mass added = volume (gal) x 0.13368 ft3/gal &#xf7;
= Borc=Siddii= = = =
: 3.                                                                                                    0 lbm 0.01639 ft3/lbm
= =
: o. Zinc Addition Zinc Injection Rate:
= Ve=(FIC -0210B)= =0=gal=
: 1.  ( 2.36        liters/day x 0.000183)                                                           0 gpm
= Specifice=ofa=a &deg;F== 3/m =
[conversion units are gal day/liter min]
= Ms=added=egal).13368 3/gal=&#xf7;= 0=lb 3/ = m =
: 2. Leak rate duration from 1.a                                                                 180 min
m
: 3. Specific Volume of water at room temperature                                          0.01605 ft3/lbm Mass added = injection rate (gpm) x leakrate
=
: 4.                                                                                                    0 lbm duration (min) x 0.13368 ft3/gal &#xf7; 0.01605 ft3/lbm
= ddiion==
: p. Total Mass added = 1.m.3 + 1.n.3 + 1.o.4                                                       209.1 lbm
=
: q. Total Uncorrected Leakage Calculation                                                          0.083    gpm 9136.8 1  1    VGPZR 2 + VFPZR 2    VGPZR1 + VFPZR1  4.588 LVCT 2  LVCT 1 VfPCS 2 VfPCS 1    VgPZR 2 VfPZR 2  VgPZR1 VfPZR1            VfVCT VfVCT Total _ PCS  0.1201  
njia =
              =
= (= =liers/&#xf7;=x=0.000183)=== 0=gpm=
Leak _ Rate     Time
[convsis=are=da&#xf7;/lii=
                                                                + Total Mass  Added                                         
= arir=a = 180=min=
= Specifice=ofa=am=rae = 01605=f3/m =
= Ms=added=====iecion=rem)eakre= =0=lb durimi=x=133683/gal=&#xf7;=016053/ = m =
m
=
= Toass=1.m.3=+=1.n.+.4 = = = = 9. m==
=
= Tor=Leakaci= = = ===08 =g =
=
11 +VGPZR2VFPZR2 +VGPZR1VFPZR1 LVCT2LVCT1 9136.8 4.
VfPCS2 588VfPCS1VgPZR2VfPZR2VgPZR1VfPZR1VfVCTVfVCT Total_ PCS 0.1201
=
Leak _ Rate Time
+ Total Mass Added
 
KEY Proc No DWO-1 Attachment 8 Revision 107
 
PCS INVENTORY FORM Page 3 of 4
 
pTotal_PCS0 1.1201 11 +j2k2 +j1k1 d2d
= 9136.8 4.588 +
Leak _ Rate a i2 i1 f2 g2 f1 g1 0.01616 0.01616
 
11 +703.7843.3 +703.7843.3 71.3971.09 9136.8 4.588 Total_ PCS.021733.021733.18021.02595.18021.02595 0.01616 0.01616
  = 0.1201 Leak _ Rate 180
+ 209.1
 
= 0.083


KEY                                                                             Proc No DWO-1 Attachment 8 Revision 107 PCS INVENTORY FORM                              Page 3 of 4 Total _ PCS  0.1201              1 1    j2 k2  j1 k1                            d2      d1 Leak _ Rate  = a  9136.8 i2  i1    f2 + g2    f1 + g1  4.588 0.01616  0.01616  + p 9136.8    1              1        703.7            843.3  703.7    843.3            71.39    71.09
KEY Proc No DWO-1 Attachment 8 Revision 107
                                                                            +                +            4.588               
                                    .021733 .021733    .18021 .02595  .18021 .02595                              0.01616 0.01616 Total_ PCS  0.1201 Leak _ Rate  = 180
                                                                                      + 209.1
                                                    = 0.083


KEY                                                                                Proc No DWO-1 Attachment 8 Revision 107 PCS INVENTORY FORM                         Page 4 of 4
PCS INVENTORY FORM Page 4 of 4
: 2. LEAKAGE CORRECTION CALCULATION (Section 5.1.7)
: 2. LEAKAGE CORRECTION CALCULATION (Section 5.1.7)
Charging Pump Seal Leakage:
: a. Charging Pump Seal Leakage:.028 gpm
: a.                                                                              .028 gpm
( 105 ml/min x 0.0002642 gal/ml)
( 105 ml/min x 0.0002642 gal/ml)
Other known leakage sources outside the PCPB; list source and rate:
Other known leakage sources outside the PCPB;
: b.                                                                                  0 gpm Source:
: b. list source and rate: 0 gpm Source:
Rate: ( 0 ml/min x 0.0002642 gal/ml)
Rate: ( 0 ml/min x 0.0002642 gal/ml)
Leakage outside the PCPB which affects the PCS
: c. Leakage outside the PCPB which affects the PCS.028 gpm leakrate calculation: (2.a + 2.b)
: c.                                                                              .028 gpm leakrate calculation: (2.a + 2.b)
: d. Corrected PCS Leakage: (1.q - 2.c).055 gpm
: d. Corrected PCS Leakage: (1.q - 2.c)                                         .055 gpm
: 3. IDENTIFIED PCS LEAKAGE CALCULATION (Section 5.1.8)
: 3. IDENTIFIED PCS LEAKAGE CALCULATION (Section 5.1.8)
CRDM Seal Leakage:
: a. CRDM Seal Leakage:.003 gpm (10 ml/min x 0.0002642 gal/ml)
: a.                                                                              .003 gpm (10 ml/min x 0.0002642 gal/ml)
Other known leakage sources inside the PCPB;
Other known leakage sources inside the PCPB; list source and rate:
: b. list source and rate: 0 gpm Source:
: b.                                                                                  0 gpm Source:
Rate: ( 0 ml/min x 0.0002642 gal/ml)
Rate: ( 0 ml/min x 0.0002642 gal/ml)
                                                                                        .003 gpm
.003 gpm
: c. Identified PCS Leakage: (3.a + 3.b)                         (If >10.0 gpm - refer to Step 5.1.10d)
: c. Identified PCS Leakage: (3.a + 3.b) (If >10.0 gpm - refer to Step 5.1.10d)
: 4. UNIDENTIFIED PCS LEAKAGE CALCULATION (Section 5.1.9)
: 4. UNIDENTIFIED PCS LEAKAGE CALCULATION (Section 5.1.9)
                                                                                        .052 gpm Unidentified PCS Leakage:
 
: a.                                                 (If 0.15 gpm, refer to Step5.1.10b)
.052 gpm
(2.d - 3.c)
: a. Unidentified PCS Leakage: (2.d - 3.c) (If 0.15 gpm, refer to Step5.1.10b)
(If >1.0 gpm - refer to Step 5.1.10d)
(If >1.0 gpm - refer to Step 5.1.10d)
: 5. PCS LEAKAGE CALCULATION COMPLETION (Section 5.1.10) a.1     Record positive values ( 0 gpm) as calculated on Attachment 1, Step 5.1.
: 5. PCS LEAKAGE CALCULATION COMPLETION (Section 5.1.10)
a.2     Record negative values (< 0 gpm) as 0 gpm on Attachment 1, Step 5.1.
 
Nate C Operator/ Today                                                 /
a.1 Record positive values ( 0 gpm) as calculated on Attachment 1, Step 5.1.
Calculated By                         Date           Reviewed By                               Date}}
 
a.2 Record negative values (< 0 gpm) as 0 gpm on Attachment 1, Step 5.1.
 
Nate C Operator/ Today /
Calculated By Date Reviewed By Date}}

Latest revision as of 00:13, 18 November 2024

JPM 1a
ML22146A017
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/08/2017
From: Randy Baker
NRC/RGN-III/DRS/OLB
To:
Entergy Nuclear Operations
Baker R
Shared Package
ML17142A234 List:
References
Download: ML22146A017 (20)


Text

Appendix C Job Performance Measure Worksheet Form ES-C-1

Facility: Palisades Task No: PL -342 026 03 03

Task

Title:

Review a PCS Leakrate Calculation Job Performance Measure No: 2017 Remediation Admin 1A

K/A

Reference:

2. 1.20, Ability to interpret and execute procedure steps.

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance _______________ Actual Performance _______X _________

Classroom ______X_ _______ Simulator ______________ Plant __________

Appendix C Job Performance Measure Worksheet Form ES-C-1

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. The reactor is at full power
2. DWO-1, Attachment 8, PCS Inventory Form, has been completed
3. A 25.1 gallon PMW addition was made to the PCS
4. No Boric Acid Additions were made
5. Zinc addition is 2.36 liters/day (from the Shift Managers log)
6. Charging Pump Seal leakage (total) is 105 ml/min
7. CRDM Seal leakage is 10 ml/min
8. No known leakage sources outside the PCPB
9. No known leakage sources inside the PCPB

Task Standard: Review and Approve a Primary System Leakage Calculation (DWO-1, Attachment 8, PCS Inventory Form)

Required Materials: DWO-1, Attachment 8, PCS Inventory Form completed by NCO-R

General

References:

DWO-1, OPERATORS DAILY/WEEKLY ITEMS MODES 1, 2, 3, AND 4

Initiating Cue: The NCO-R has just completed a PCS Leak Rate, DWO-1, Attachment 8, PCS Inventory Form, and requests that you review and approve it per DWO-1, Section 5.1.5

Time Critical Task: No

Validation Time: 30 minutes

Appendix C 3 Form ES-C-1

Performance Information

Denote critical steps with a check mark

_____ Performance step: 1,

Obtain completed DWO-1, Attachment 8, PCS Inventory Form

Standard: SRO obtains completed Working Copy of DWO-1, Attachment 8 and determines time of leakrate was 180 minutes for blank 1a.

Note: Blanks 1b through 1e are given parameters on the data sheet handout and no verification is required.

Comment: Evaluator provides candidate with the completed PCS Inventory Form (Attachment 8) Working Copy.

______ Performance step: 2,

IF MODE 1, 2 or 3 AND Pressure is between 2055 and 2065 psia (inclusive),

THEN RECORD 0.1802 1 ft3 for Pressurizer Vapor Space specific volume on Att. 8, Step 1.f.

Standard: SRO ensures 0.1802 1 entered in Att. 8, Step 1.f

Comment:

______ Performance step: 3, IF MODE 1, 2 or 3 AND Pressure is between 2055 and 2065 psia (inclusive),

THEN RECORD 0.02595 ft3/lbm for Pressurizer Liquid Space specific volume on Att. 8, Step 1.g

Standard: SRO ensures 0.02595 entered in Att. 8, Step1.g

Comment:

Appendix C 4 Form ES-C-1

Performance Information

Denote critical steps with a check mark

______ Performance step: 4

RECORD 0.01616 ft3/lbm for Volume Control Tank specific volume on Att. 8, Step 1.h

Standard: SRO ensures 0.01616 entered in Att. 8, Step 1.h

Comment:

______ Performance step: 5

DETERMINE Primary Coolant System specific volume from Steam Tables or DWO-1 Basis Document AND RECORD on Att. 8, Step 1.i

Standard: SRO ensures.021733 entered in Att. 8, Step 1.i

Comment: Provide candidate with DWO-1 Basis when asked.

______ Performance step: 6

CALCULATE Pressurizer Vapor Space Volume (VGPZR) to the nearest 0.1 ft3 AND RECORD on Att.8, Step 1.j

VGPZR = (94.3% - LPZR) (14.370 ft3/%) + 182.20 ft3

Standard: SRO ensures 703.7 entered in Att. 8, Step 1.j

Comment: Using given Pressurizer Level of 58.01 for LPZR from 1b on datasheet

Appendix C 5 Form ES-C-1

Performance Information

Denote critical steps with a check mark

______ Performance step: 7

CALCULATE Pressurizer Liquid Space Volume (VFPZR) to the nearest 0.1 ft3 AND RECORD on Att.8, Step 1.k

VFPZR = 1547 - VGPZR

Standard: SRO ensures 843.3 ft3 entered in Att. 8, Step 1.k

Comment:

___ __ Performance step: 8

IF Primary Makeup Water was added during performance of the test THEN:

1. DETERMINE the total AND RECORD.on Att. 8, Step 1.m.1
2. CALCULATE mass added AND RECORD. on Att. 8, Step 1.m.3

Standard: SRO ensures:

25.1 entered in Att. 8, Step 1.m.1 209.1 entered in Att. 8, Step 1.m.3

Comment: 25.1 is given as the volume of makeup water added.

209.1 is the mass conversion calculated in this step

______ Performance step: 9

IF Boric Acid was added during performance of the test THEN:.

Standard: SRO ensures:

0 entered in Att. 8, Step 1.n.1 0 entered in Att. 8, Step 1.n.3

Comment: Note: No Boric Acid Added

Appendix C 6 Form ES-C-1

Performance Information

Denote critical steps with a check mark

__ ___ Performance step: 10

Calculate Zinc injection Rate

Standard: SRO ensures:

2.36 entered in Att. 8, Step 1.o.1 (Zinc Injection Rate) 0 entered in Att. 8, Step 1.o.1 due to rounding to nearest.001 gpm 180 entered in Att. 8, Step 1.o.2 0 entered in Att. 8, Step 1.o.4

Comment: Note: 2.36 liters/day given in Initial Conditions from Shift Managers Log Per procedural step 0 is entered due to rounding to the nearest 0.001 gpm 180 is the time in minutes for the leakrate The calculation is multiplied by 9 due to 1.o.1 entry

__ __ Performance step: 11

CALCULATE Total Mass added AND RECORD on Att. 8, Step 1.p Total Mass added = 1.m.3 + 1.n.3 + 1.o.4

Standard: SRO ensures 209.1 entered in Att. 8, Step 1.p

Comment:

___ __ Performance step: 12

CALCULATE Total Uncorrected Leakage AND RECORD to the nearest 0.001 gpm per Att. 8, Step 1.q

Standard: SRO identifies ERROR as decimal error/miscalculation and en ters.083 entered in Att. 8, Step 1.q instead of 0.83

Comment: EVALUATOR: If candidate directs NCO to reperform calculation, instruct the candidate that the NCO is busy and that they should perform the corrections.

Appendix C 7 Form ES-C-1

Performance Information

Denote critical steps with a check mark

__ ___ Performance step: 13

RECORD Charging Pump seal leakage in ml/min on Att. 8, Step 2.a

Standard: SRO identifies and corrects to 105 entered in Att. 8, Step 2.a

Comment: Note: Candidate discovers that 10 ml/min has been entered for Charging Pump Seal Leakage in Att. 8, Step 2.a.

EVALUATOR: If candidate directs NCO to reperform calculation, instruct the candidate that the NCO is busy and that they should perform the corrections.

___ __ Performance step: 14

CONVERT Charging Pump seal leakage to gpm AND RECORD to the nearest 0.001 gpm per Att. 8, Step 2.a

Standard: SRO identifies error and corrects to.028 gpm entered in Att. 8, Step 2.a

Comment:

___ __ Performance step: 15

IF any primary coolant leakage sources outside of Primary Coolant Pressure Boundary.

Standard: SRO verifies 0 entered in Att. 8, Step 2. b for rate

Comment: Note: No other leakage sources outside the PCPB given in Initial Conditions.

Appendix C 8 Form ES-C-1

Performance Information

Denote critical steps with a check mark

______ Performance step: 16

CONVERT primary coolant leakage sources outside of the Primary Coolant Pressure Boundary

Standard: SRO ensures 0 entered in Att. 8, Step 2.b

Comment:

__ ___ Performance step: 17

CALCULATE leakage which affects PCS leakrate calculations and is outside of the Primary Coolant Pressure Boundary AND RECORD to the nearest 0.001 gpm per Att. 8, Step 2.c

Standard: SRO identifies ERROR and corrects value to.028 in Att. 8, Step 2.c

Comment: NOTE: Charging seal leakage and CRDM seal leakage have been incorrectly switched causing this calculation error.

___ __ Performance step: 18

CALCULATE Corrected PCS Leakage AND RECORD to the nearest 0.001 gpm per Att.8, Step 2.d (Att. 8, Step 1.q - Att. 8, Step 2.c)

Standard: SRO identifies error and corrects.055 entered in Att. 8, Step 2.d

Comment:

Appendix C 9 Form ES-C-1

Performance Information

Denote critical steps with a check mark

___ ____ Performance step: 19

RECORD the most recent CRDM seal leakage measurement in ml/min on Att. 8, Step 3.a.

Standard: SRO ensures 10 entered in Att. 8, Step 3.a calculation

Comment: Note: Candidate discovers that 105 ml/min has been entered for CRDM seal leakage. Candidate corrects this by entering 10 on Att. 8, step 3.a.

EVALUATOR: If candidate directs NCO to reperform calculation, instruct the candidate that the NCO is busy and that they should perform the corrections.

___ ____ Performance step: 20

COVERT CRDM seal leakage to gpm AND RECORD to the nearest 0.001 gpm per Att. 8, Step 3.a

Standard: SRO ensures.003 entered in Att. 8, Step 3.a

Comment: Note: Candidate discovers that.028 gpm has been entered for CRDM seal leakage. Candidate corrects this by entering.003 gpm on Att. 8, step 3.a.

Charging seal leakage and CRDM seal leakage have been incorrectly switched causing this calculation error.

______ Performance step: 21

IF any primary coolant leakage sources inside the Primary Coolant Pressure Boundary..

Standard: SRO ensures 0 entered in Att. 8, Step 3.b

Comment: Note: No known leakage sources inside the PCPB given in Initial Conditions.

Appendix C 10 Form ES-C-1

Performance Information

Denote critical steps with a check mark

____ ____ Performance step: 22

CONVERT primary coolant leakage sources inside of the Primary Coolant Pressure Boundary AND record to the nearest 0.001 gpm per Att. 8, Step 3b

Standard: SRO ensures 0 entered in Att. 8, Step 3.b

Comment:

___ ____ Performance step:23

CALCULATE Identified PCS Leakage AND RECORD to the nearest 0.001 gpm per Att. 8, Step 3.c (Att. 8, Step 3.a + Att. 8, Step 3.b)

Standard: SRO ensures.003 entered in Att. 8, Step 3.c

Comment: Note: Candidate discovers ERROR that.028 gpm has been entered for Identified leakage. Candidate corrects this by entering.003 gpm on Att. 8, step 3.c.

___ ____ Performance step:24

CALCULATE Unidentified PCS Leakage AND RECORD to the nearest 0.001 gpm per Att. 8, Step 4.a (Att. 8, Step 2.d - Att. 8, Step 3.c)

Standard: SRO ensures.052 entered in Att. 8, Step 4.a

Comment: Note: Candidate discovers that.7994 gpm has been entered for Identified leakage. Candidate corrects this by entering.052 gpm on Att. 8, step 4.a.

Terminating cue:

EVALUATOR QUE: When candidate completes PCS leakrate calculation, end the JPM.

Appendix C 11 Form ES-C-1

Verification of Completion

Job Performance Measure No. ADMIN JPM 1

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question: __________________________________________________________________

Response: _________________________________________________________________

Result: Satisfactory/Unsatisfactory

Examiners signature and date: _______________________________ ________

Appendix C 12 Form ES-C-1

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

DWO-1, Attachment 8, PCS Inventory Form, has been completed A 25.1 gallon PMW addition was made to the PCS No Boric Acid Additions were made Zinc addition is 2.36 liters/day (from the Shift Managers log)

Charging Pump Seal leakage (total) is 105 ml/min CRDM Seal leakage is 10 ml/min No known leakage sources outside the PCPB No known leakage sources inside the PCPB

INITIATING CUES:

The NCO-R has just completed a PCS Leak Rate, DWO-1, Attachment 8, PCS Inventory Form, and requests that you review and approve it.

STUDENT HANDOUT Proc No DWO-1 Attachment 8 Revision 108 PCS INVENTORY FORM Page 1 of 4 Date: Today

TECHNICAL SPECIFICATION REQUIRED INFORMATION ONLY

1. TOTAL UNCORRECTED LEAKAGE CALCULATION (Section 5.1.5)

PARAMETER TIME 1 TIME 2 DELTA TIME

a. Leakrate Duration 0000 + 0300 = 180 min Pressurizer Level (LPRZ)
b. PPC PT LPRZC_AVG or LPRZC or 58.01% 58.01%

LT_0101A_D; LIC-0101A or LIC-0101B

c. Pressurizer Pressure (PPRZ) 2061 psia 2061 psia PPC PT PRZBE; LPIR-0101A/B Volume Control Tank Level (LVCT)
d. PPC Point LTC0205_AVG or LTC0205; 71.09 % 71.39 %

LIC-0205 PCS Avg Coolant Temperature (TAVE)

e. PPC PT TAVG_AVG or TAVG or TYT_0100 or 560.62 °F 560.62°F TYT_0200A; TI-0110 Reactor Reg #___
f. Pressurizer Vapor Space Specific Volume 0.18021 ft 3 /lb m 0.18021 ft 3 /lb m Vg PZR @ P PRZ
g. Pressurizer Liquid Space Specific Volume 0.02595 ft 3 /lb m 0.02595 ft 3 /lb m V f PZR @ P PRZ
h. Volume Control Tank Specific Volume 0.01616 ft 3 /lb m 0.01616 ft 3 /lb m V f VCT
i. Primary Coolant System Specific Volume 0.021733 ft3 /lb m 0.021733 ft3 /lb m V f PCS @ P PRZ & T AVE
j. Pressurizer Vapor Space Volume (V GPZR ) 703.7 ft 3 703.7 ft 3 V GPZR = (94.3% - L PRZ ) (14.370 ft3 /%) + 182.20 ft3
k. Pressurizer Liquid Space Volume (V FPZR ) 843.3 ft 3 843.3 ft 3 V FPZR = 1547 ft3 - V GPZR
l. Repeat data at the end of the time period

STUDENT HANDOUT Proc No DWO-1 Attachment 8 Revision 108 PCS INVENTORY FORM Page 2 of 4

m. Primary Makeup Water Addition
1. Volume (FIC-0210A) 25.1 gal
2. Specific Volume of water at room temperature 0.01605 ft3/lbm
3. Mass added = volume (gal) x 0.13368 ft3/gal ÷= 1=lb m =

01605=f3/m =

=

Borc=Siddii= = =

Ve=(FIC -0210B)= =0=gal

Specifice=ofa=a °F== 3/m

Ms=added=egal).13368 3/gal=÷= 0=lb 3/ = m

m

=

ddiion=

=

njia =

(= =liers/÷=x=0.000183)=== 0=gpm

[convsis=are=da÷/lii=

arir=a = 180=min

Specifice=ofa=am=rae = 01605=f3/m

Ms=added=====iecion=rem)eakre= =0=lb

durimi=x=133683/gal=÷=016053/m = m.

=

Toass=1.m.3=+=1.n.+.4 = = = = 9. m=

=

Tor=Leakaci= = = ===8 gpm

=

11 +VGPZR2VFPZR2 +VGPZR1VFPZR1 LVCT2LVCT1 9136.8 4.

VfPCS2 588VfPCS1VgPZR2VfPZR2VgPZR1VfPZR1VfVCTVfVCT Total_ PCS 0.1201

=

Leak _ Rate Time

+ Total Mass Added

STUDENT HANDOUT Proc No DWO -1 Attachment 8 Revision 107 PCS INVENTORY FORM Page 3 of 4

pTotal_PCS0 1.1201 11 +j2k2 +j1k1 d2d

= 9136.8 4.588 +

Leak _ Rate a i2 i1 f2 g2 f1 g1 0.01616 0.01616

11 +703.7843.3 +703.7843.3 71.3971.09 9136.8 4.588 Total_ PCS.021733.021733.18021.02595.18021.02595 0.01616 0.01616

= 0.1201 Leak _ Rate 180

+ 209.1

= 0. 0 83

STUDENT HANDOUT Proc No DWO-1 Attachment 8 Revision 108 PCS INVENTORY FORM Page 4 of 4

2. LEAKAGE CORRECTION CALCULATION (Section 5.1.7)
a. Charging Pump Seal Leakage:.003 gpm

( 10 ml/min x 0.0002642 gal/ml)

Other known leakage sources outside the PCPB;

b. list source and rate: 0 gpm Source:

Rate: ( 0 ml/min x 0.0002642 gal/ml)

c. Leakage outside the PCPB which affects the PCS.003 gpm leakrate calculation: (2.a + 2.b)
d. Corrected PCS Leakage: (1.q - 2.c).827 gpm
3. IDENTIFIED PCS LEAKAGE CALCULATION (Section 5.1.8)
a. CRDM Seal Leakage:.028 gpm

( 105 ml/min x 0.0002642 gal/ml)

Other known leakage sources inside the PCPB;

b. list source and rate: 0 gpm Source:

Rate: ( 0 ml/min x 0.0002642 gal/ml)

.028 gpm

c. Identified PCS Leakage: (3.a + 3.b) (If >10.0 gpm - refer to Step 5.1.10d)
4. UNIDENTIFIED PCS LEAKAGE CALCULATION (Section 5.1.9)

.799 gpm

a. Unidentified PCS Leakage: (2.d - 3.c) (If 0.15 gpm, refer to Step5.1.10b)

(If >1.0 gpm - refer to Step 5.1.10d)

5. PCS LEAKAGE CALCULATION COMPLETION (Section 5.1.10) a.1 Record positive values ( 0 gpm) as calculated on Attachment 1, Step 5.1.

a.2 Record negative values (< 0 gpm) as 0 gpm on Attachment 1, Step 5.1.

Nate C Operator/ Today /

Calculated By Date Reviewed By Date

KEY Proc No DWO-1 Attachment 8 Revision 108 PCS INVENTORY FORM Page 1 of 4

Date: Today

TECHNICAL SPECIFICATION REQUIRED INFORMATION ONLY

1. TOTAL UNCORRECTED LEAKAGE CALCULATION (Section 5.1.5)

PARAMETER TIME 1 TIME 2 DELTA TIME

a. Leakrate Duration 0000 + 0300 = 180 min Pressurizer Level (LPRZ)
b. PPC PT LPRZC_AVG or LPRZC or 58.01% 58.01%

LT_0101A_D; LIC-0101A or LIC-0101B

c. Pressurizer Pressure (PPRZ) 2061 psia 2061 psia PPC PT PRZBE; LPIR-0101A/B Volume Control Tank Level (LVCT)
d. PPC Point LTC0205_AVG or LTC0205; 71.09 % 71.39 %

LIC-0205 PCS Avg Coolant Temperature (TAVE)

e. PPC PT TAVG_AVG or TAVG or TYT_0100 or 560.62 °F 560.62°F TYT_0200A; TI-0110 Reactor Reg #___
f. Pressurizer Vapor Space Specific Volume 0.18021 ft 3 /lb m 0.18021 ft 3 /lb m Vg PZR @ P PRZ
g. Pressurizer Liquid Space Specific Volume 0.02595 ft 3 /lb m 0.02595 ft 3 /lb m V f PZR @ P PRZ
h. Volume Control Tank Specific Volume 0.01616 ft 3 /lb m 0.01616 ft 3 /lb m V f VCT
i. Primary Coolant System Specific Volume 0.021733 ft 3 /lb m 0.021733 ft 3 /lb m V f PCS @ P PRZ & T AVE
j. Pressurizer Vapor Space Volume (V GPZR ) 703.7 ft 3 703.7 ft 3 V GPZR = (94.3% - L PRZ ) (14.370 ft3 /%) + 182.20 ft3
k. Pressurizer Liquid Space Volume (V FPZR ) 843.3 ft 3 843.3 ft 3 V FPZR = 1547 ft3 - V GPZR
l. Repeat data at the end of the time period

KEY Proc No DWO-1 Attachment 8 Revision 108 PCS INVENTORY FORM Page 2 of 4

m. Primary Makeup Water Addition
1. Volume (FIC-0210A) 25.1 gal
2. Specific Volume of water at room temperature 0.01605 ft3/lbm
3. Mass added = volume (gal) x 0.13368 ft3/gal ÷= 1=lb m =

01605=f3/m =

=

Borc=Siddii= = =

Ve=(FIC -0210B)= =0=gal

Specifice=ofa=a °F== 3/m

Ms=added=egal).13368 3/gal=÷= 0=lb 3/ = m

m

=

ddiion=

=

njia =

(= =liers/÷=x=0.000183)=== 0=gpm

[convsis=are=da÷/lii=

arir=a = 180=min

Specifice=ofa=am=rae = 01605=f3/m

Ms=added=====iecion=rem)eakre= =0=lb durimi=x=133683/gal=÷=016053/ = m

m

=

Toass=1.m.3=+=1.n.+.4 = = = = 9. m=

=

Tor=Leakaci= = = ===08 =g

=

11 +VGPZR2VFPZR2 +VGPZR1VFPZR1 LVCT2LVCT1 9136.8 4.

VfPCS2 588VfPCS1VgPZR2VfPZR2VgPZR1VfPZR1VfVCTVfVCT Total_ PCS 0.1201

=

Leak _ Rate Time

+ Total Mass Added

KEY Proc No DWO-1 Attachment 8 Revision 107

PCS INVENTORY FORM Page 3 of 4

pTotal_PCS0 1.1201 11 +j2k2 +j1k1 d2d

= 9136.8 4.588 +

Leak _ Rate a i2 i1 f2 g2 f1 g1 0.01616 0.01616

11 +703.7843.3 +703.7843.3 71.3971.09 9136.8 4.588 Total_ PCS.021733.021733.18021.02595.18021.02595 0.01616 0.01616

= 0.1201 Leak _ Rate 180

+ 209.1

= 0.083

KEY Proc No DWO-1 Attachment 8 Revision 107

PCS INVENTORY FORM Page 4 of 4

2. LEAKAGE CORRECTION CALCULATION (Section 5.1.7)
a. Charging Pump Seal Leakage:.028 gpm

( 105 ml/min x 0.0002642 gal/ml)

Other known leakage sources outside the PCPB;

b. list source and rate: 0 gpm Source:

Rate: ( 0 ml/min x 0.0002642 gal/ml)

c. Leakage outside the PCPB which affects the PCS.028 gpm leakrate calculation: (2.a + 2.b)
d. Corrected PCS Leakage: (1.q - 2.c).055 gpm
3. IDENTIFIED PCS LEAKAGE CALCULATION (Section 5.1.8)
a. CRDM Seal Leakage:.003 gpm (10 ml/min x 0.0002642 gal/ml)

Other known leakage sources inside the PCPB;

b. list source and rate: 0 gpm Source:

Rate: ( 0 ml/min x 0.0002642 gal/ml)

.003 gpm

c. Identified PCS Leakage: (3.a + 3.b) (If >10.0 gpm - refer to Step 5.1.10d)
4. UNIDENTIFIED PCS LEAKAGE CALCULATION (Section 5.1.9)

.052 gpm

a. Unidentified PCS Leakage: (2.d - 3.c) (If 0.15 gpm, refer to Step5.1.10b)

(If >1.0 gpm - refer to Step 5.1.10d)

5. PCS LEAKAGE CALCULATION COMPLETION (Section 5.1.10)

a.1 Record positive values ( 0 gpm) as calculated on Attachment 1, Step 5.1.

a.2 Record negative values (< 0 gpm) as 0 gpm on Attachment 1, Step 5.1.

Nate C Operator/ Today /

Calculated By Date Reviewed By Date