ML17266A210: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 15: Line 15:
| document type = LICENSEE EVENT REPORT (SEE ALSO AO,RO), TEXT-SAFETY REPORT
| document type = LICENSEE EVENT REPORT (SEE ALSO AO,RO), TEXT-SAFETY REPORT
| page count = 2
| page count = 2
| revision = 0
}}
}}

Revision as of 04:57, 26 February 2018

LER 80-027/09T-0:on 800514,During Shutdown for Maint,Nsss Notified Util That Partial Draining of RCS While in Mode 5 is Condition That Has Not Been Analyzed for Boron Dilution Event.Procedures Revised to Increase Min Shutdown Margin
ML17266A210
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/21/1980
From: SCHOPPMAN M A
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17208A673 List:
References
REF-PT21-80-220-001 LER-80-027-09T, LER-80-27-9T, NUDOCS 8006030449
Download: ML17266A210 (2)