Line 21: Line 21:
[[Issue date::October 4, 2013]]
[[Issue date::October 4, 2013]]


Mr. Terrence Alexander, Executive Director Department of Occupational Safety & Environmental Health Campus Safety Services Building 1239 Kipke Drive University of Michigan Ann Arbor, MI 48109-1010
Mr. Terrence Alexander, Executive Director Department of Occupational Safety & Environmental Health Campus Safety Services Building 1239 Kipke Drive University of Michigan  
 
Ann Arbor, MI 48109-1010


SUBJECT: NRC INSPECTION REPORT 05000002/2012002(DNMS) FORD NUCLEAR REACTOR
SUBJECT: NRC INSPECTION REPORT 05000002/2012002(DNMS) FORD NUCLEAR REACTOR


==Dear Mr. Alexander:==
==Dear Mr. Alexander:==
On September 11, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed inspection activities at the Ford Nuclear Reactor. The purpose of the inspection was to determine whether the decommissioning activities were conducted safely and in accordance with NRC requirements. Specifically, during an onsite inspection on December 3 - 6, 2012, and subsequent in-office review through September 11, 2013, the inspector evaluated decommissioning performance and performed independent radiation surveys and sampling activities assisted by personnel from Oak Ridge Associated Universities (ORAU). At the conclusion of the on-site inspection, the inspector discussed the interim inspection results with you and members of your staff. A final report from ORAU with the results of the surveys and sampling was provided to the NRC on August 1, 2013. At the conclusion of the in-office review, a final telephone exit meeting was conducted on September 18, 2013, to discuss the final results with members of your staff.
On September 11, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed inspection activities at the Ford Nuclear Reactor. The purpose of the inspection was to determine whether  
 
the decommissioning activities were conducted safely and in accordance with NRC requirements. Specifically, during an onsite inspection on December 3 - 6, 2012, and subsequent in-office review through September 11, 2013, the inspector evaluated decommissioning performance and performed independent radiation surveys and sampling activities assisted by personnel from Oak Ridge Associated Universities (ORAU). At the conclusion of the on-site inspection, the inspector discussed the interim inspection results with you and members of your staff. A final  
 
report from ORAU with the results of the surveys and sampling was provided to the NRC on August 1, 2013. At the conclusion of the in-office review, a final telephone exit meeting was conducted on September 18, 2013, to discuss the final results with members of your staff.


This inspection consisted of an examination of decommissioning activities at the Ford Nuclear Reactor as they relate to safety and compliance with the Commission's rules and regulations.
This inspection consisted of an examination of decommissioning activities at the Ford Nuclear Reactor as they relate to safety and compliance with the Commission's rules and regulations.
Line 34: Line 40:
Based on the results of this inspection, the NRC did not identify any violations.
Based on the results of this inspection, the NRC did not identify any violations.


In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you may have regarding this inspection.
In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html
. We will gladly discuss any questions you may have regarding this inspection.
 
Sincerely,/RA by Wayne J. Slawinski Acting For/
Robert J. Orlikowski, Chief Materials Control, ISFSI,


Sincerely,/RA by Wayne J. Slawinski Acting For/ Robert J. Orlikowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00002 License No. R-28  
and Decommissioning Branch  
 
Division of Nuclear Materials Safety Docket No. 050-00002 License No. R-28  


===Enclosure:===
===Enclosure:===
Inspection Report 05000002/2012002(DNMS) cc w/encl: V. Sick, University of Michigan M. Driscoll, University of Michigan K. Yale, State of Michigan
Inspection Report 05000002/2012002(DNMS)
cc w/encl: V. Sick, University of Michigan M. Driscoll, University of Michigan  
 
K. Yale, State of Michigan
}}
}}

Revision as of 23:51, 3 July 2018

IR 05000002-12-002(DNMS), on 09/11/2013, University of Michigan Ford Reactor Inspection Report
ML13280A303
Person / Time
Site: University of Michigan
Issue date: 10/04/2013
From: Orlikowski R J
NRC/RGN-III/DNMS/MCID
To: Alexander T
University of Michigan
Tapp J E
References
IR-12-002
Download: ML13280A303 (11)


Text

October 4, 2013

Mr. Terrence Alexander, Executive Director Department of Occupational Safety & Environmental Health Campus Safety Services Building 1239 Kipke Drive University of Michigan

Ann Arbor, MI 48109-1010

SUBJECT: NRC INSPECTION REPORT 05000002/2012002(DNMS) FORD NUCLEAR REACTOR

Dear Mr. Alexander:

On September 11, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed inspection activities at the Ford Nuclear Reactor. The purpose of the inspection was to determine whether

the decommissioning activities were conducted safely and in accordance with NRC requirements. Specifically, during an onsite inspection on December 3 - 6, 2012, and subsequent in-office review through September 11, 2013, the inspector evaluated decommissioning performance and performed independent radiation surveys and sampling activities assisted by personnel from Oak Ridge Associated Universities (ORAU). At the conclusion of the on-site inspection, the inspector discussed the interim inspection results with you and members of your staff. A final

report from ORAU with the results of the surveys and sampling was provided to the NRC on August 1, 2013. At the conclusion of the in-office review, a final telephone exit meeting was conducted on September 18, 2013, to discuss the final results with members of your staff.

This inspection consisted of an examination of decommissioning activities at the Ford Nuclear Reactor as they relate to safety and compliance with the Commission's rules and regulations.

Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, and interviews with personnel.

Based on the results of this inspection, the NRC did not identify any violations.

In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html

. We will gladly discuss any questions you may have regarding this inspection.

Sincerely,/RA by Wayne J. Slawinski Acting For/

Robert J. Orlikowski, Chief Materials Control, ISFSI,

and Decommissioning Branch

Division of Nuclear Materials Safety Docket No. 050-00002 License No. R-28

Enclosure:

Inspection Report 05000002/2012002(DNMS)

cc w/encl: V. Sick, University of Michigan M. Driscoll, University of Michigan