University of Michigan Ford Reactor Master Inspection Plan
ML13360A180
Person / Time
Site: University of Michigan
Issue date: 12/23/2013
From: Robert Orlikowski
NRC/RGN-III/DNMS/MCID
To: Alexander T
University of Michigan
Tapp J
References
Download: ML13360A180 (3)


Text

December 23, 2013 Mr. Terrence Alexander, Executive Director Department of Occupational Safety

& Environmental Health Campus Safety Services Building 1239 Kipke Drive University of Michigan Ann Arbor, MI 48109-1010

SUBJECT:

UNIVERSITY OF MICHIGAN FORD NUCLEAR REACTOR MASTER INSPECTION PLAN CALENDAR YEAR 2014

Dear Mr. Alexander:

In accordance with U.S. Nuclear Regulatory Commission (NRC) Inspection Manual, Chapter 2545, Research and Test Reactor Inspection Program, the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for the Ford Nuclear Reactor.

The plan is based on your current performance and schedule of activities planned for the site for the period of January - December 2014. The plan outlines how we intend to focus our Regional inspection resources to provide oversight for significant decommissioning activities.

Because this MIP is based, in part, on your proposed schedule of significant decommissioning activities for CY14; the plan and focus of the NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that this MIP remains current, we request that you keep the Materials Control, ISFSI and Decommissioning (MCID) Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the Ford Nuclear Reactor inspection schedule.

We currently project the region will not conduct an inspection at the Ford Nuclear Reactor through December 2014 to evaluate decommissioning activities since you do not have any planned. Following is a list of the inspection procedures we would expect to use if the current plan changes. The specific procedures to be used if an inspection is conducted will depend on the specific decommissioning activities being performed. Additional inspection procedures may be used or inspections conducted if decommissioning activities warrant.

Inspection Procedure Title IP 69013 Research and Test Reactor Decommissioning IP 83801 Inspection of Final Surveys of Permanently Shutdown Reactors

T. Alexander In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Jeremy Tapp of my staff at (630) 829-9862.

Sincerely,

/RA/

Robert J. Orlikowski, Chief Materials Control, ISFSI and Decommissioning Branch Docket No. 050-00002 License No. R-28 cc: V. Sick, University of Michigan M. Driscoll, University of Michigan K. Yale, State of Michigan

T. Alexander In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Jeremy Tapp of my staff at (630) 829-9862.

Sincerely,

/RA/

Robert J. Orlikowski, Chief Materials Control, ISFSI and Decommissioning Branch Docket No. 050-00002 License No. R-28 cc: V. Sick, University of Michigan M. Driscoll, University of Michigan K. Yale, State of Michigan DISTRIBUTION:

Bruce Watson Theodore Smith Patrick Louden AnnMarie Stone Jared Heck Allan Barker Harral Logaras Viktoria Mitlyng Prema Chandrathil MCID Distribution DOCUMENT NAME:

Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl N" = No copy OFFICE RIII DNMS RIII DNMS RIII RIII NAME JETapp RO for RJOrlikowski DATE 12/ 23 /13 12/ 23 /13 OFFICIAL RECORD COPY