MONTHYEARML15196A0292015-07-0606 July 2015 Termination of Quality Assurance Program Approval for Radioactive Material Packages No. 0348 ML15112A0832015-04-14014 April 2015 Amendment No. 12 to Indemnity Agreement No. E-24 University of Michigan Ford Nuclear Reactor ML14310A5882015-04-0202 April 2015 Ford License Termination Letter - Termination of Facility Operating License No. R-28 for the University of Michigan Ford Nuclear Reactor ML15030A3112015-01-22022 January 2015 Analytical Results for University of Michigan Soil ML15020A7252015-01-16016 January 2015 University of Michigan, Ford Nuclear Reactor, Storage Ports Soil Sample Results ML15029A5102015-01-14014 January 2015 University of Michigan, Ford Nuclear Reactor, Report on Reactor. Operations ML14099A1072014-03-28028 March 2014 Report on Reactor Operations University of Michigan Ford Nuclear Reactor ML14063A2072014-02-26026 February 2014 University of Michigan, Request for Termination of the Ford Nuclear Reactor ML13360A1802013-12-23023 December 2013 University of Michigan Ford Reactor Master Inspection Plan IR 05000002/20120022013-10-0404 October 2013 IR 05000002-12-002(DNMS), on 09/11/2013, University of Michigan Ford Reactor Inspection Report ML13235A0092013-08-19019 August 2013 University of Michigan, Ford Nuclear Reactor, Submittal of Final Status Survey - Background Count Rate Correction ML13205A1532013-07-11011 July 2013 University of Michigan - Ford Nuclear Reactor: Final Status Survey Report (Cover Letter) ML13051A0472013-02-14014 February 2013 University of Michigan - Ford Nuclear Reactor, Reportable Occurrence #24, Reactor Building Flood - Ruptured Fire Suppression Line, Technical Specification (Section 1.0 / Item 8) ML13029A5002013-01-24024 January 2013 University of Michigan, Submittal of 2012 Report on Reactor Operations ML12356A1352012-12-18018 December 2012 MIP- University of Michigan Ford Reactor Master Inspection Plan CY2013 ML13028A1012012-12-11011 December 2012 University of Michigan, Technical Specification Amendment Request Final Status Survey - Survey Design Package for Fnr Foundation Cavity ML12312A1302012-11-0202 November 2012 Ford Nuclear Reactor, Technical Specification Amendment Request Decommissioning Plan - Revised Section 4.5.10.6 (Final Status Survey) ML12293A3022012-10-25025 October 2012 T. Alexander Ltr. Approval of Partial Final Site Survey Plan for University of Michigan Ford Nuclear Reactor IR 05000000/20120012012-10-10010 October 2012 IR 0500000-12-001, 9/11/2012, University of Michigan - Ford Nuclear Reactor ML12264A0642012-09-18018 September 2012 University of Michigan - Ford Nuclear Reactor Final Disposition of Fnr Storage Ports ML12264A5622012-09-17017 September 2012 University of Michigan - Ford Nuclear Reactor, Quality Assurance Plan for Final Status Survey Plan ML12199A0182012-07-13013 July 2012 University of Michigan, Request an Amendment to the Ford Nuclear Reactor Technical Specification Decommissioning Plan - Revised Section 4.0 (Final Status Survey ML12157A2662012-06-0101 June 2012 Ford Nuclear Reactor - Technical Specification Amendment Request Decommissioning Plan - Revised Section 4.0 (Final Status Survey) ML12124A3102012-04-20020 April 2012 University of Michigan, Report on Reactor Operations for January 1 to December 31, 2011 ML12117A1182012-04-20020 April 2012 Occupational Safety & Environmental Health ML12095A3782012-02-14014 February 2012 University of Michigan Ltr Ford Nuclear Reactor- Decommissioning Plan- Additional Information for Section 4.0 (Final Status Survey Plan) Docket 50-2/ License R-28 ML12025A1252012-01-20020 January 2012 Ford Nuclear Reactor - Technical Specification Amendment Request Decommissioning Plan - Revised Section 4.0 (Final Status Survey) ML1132606162011-11-21021 November 2011 IR 05000002-11-001; 08/09/2011, University of Michigan, Reply to a NRC Inspection Report Notice of Violation IR 05000002/20110012011-10-24024 October 2011 IR 05000002-11-001 and Notice of Violation, on 08/09-11/2011 - 10/12/2011, Univ of Mi Ford Nuclear Reactor ML11273A0262011-09-29029 September 2011 Fy 2012 University of Michigan Ford Nuclear Reactor Master Inspection Plan ML1124208522011-08-23023 August 2011 Orise Contract No. DE-AC05-06OR23100 Letter Report for Analytical Results for Three Soil Samples from the University of Michigan Ford Reactor, Ann Arbor, Michigan ML11199A0092011-07-12012 July 2011 Ford Nuclear Reactor - Technical Specification Amendment Request Decommissioning Plan - Revised Section 4.0 (Final Status Survey Plan) (Response to NRC Comments Dtd June 1, 2011 on Initial Fnr - Technical Specification Amendment Submitted A IR 05000002/19500112011-04-29029 April 2011 Notification of Licensed Operator Initial Examination 05000250-11-3002,05000251-11-302 ML11119A0042011-04-0808 April 2011 Ford Nuclear Reactor - Technical Specification Amendment Request Decommissioning Plan - Revised Section 4.0 (Final Status Survey Plan) IR 05000002/20090032011-03-24024 March 2011 IR 05000002-09-003, on 09/14-16/2010, In-office Review Through 03/14/2011, University of Michigan - Ford Nuclear Reactor ML1104101322011-02-14014 February 2011 Change in NRC Staff Project Management for the University of Michigan Ford Nuclear Reactor ML1032300972010-11-17017 November 2010 Oak Ridge Institute for Science and Education (Orise) Letter Report for Four Soil Samples from the University of Michigan Ford Reactor (IR 05000002/2009003) ML1027803212010-10-0101 October 2010 MIP- University of Michigan Ford Nuclear Reactor Fiscal Year 2011 IR 05000002/19600102010-02-0909 February 2010 Notification of Licensed Operator Initial Examination - 05000259-10-301, 05000260-10-0301, 05000296-10-301 ML0935210582009-12-17017 December 2009 Mip - University of Michigan Ford Nuclear Reactor-FY 2010 IR 05000002/20200902009-12-0404 December 2009 IR 05000220-090-10 and 05000410-09-010; Nine Mile Point Nuclear Station, LLC; on 10/5-22/2009; Nine Mile Point Nuclear Station, Units 1 and 2; Biennial Baseline Inspection of Identification and Resolution of Problems Report ML0931305262009-11-20020 November 2009 October 23, 2009 Summary of Open Meeting with the University of Michigan to Discuss Decommissioning Status of Ford Nuclear Reactor IR 05000002/19640092009-07-0909 July 2009 IR 05000264-09 on 06/22/09 - 06/26/09 for Dow Chemical Co IR 05000002/20090022009-06-19019 June 2009 IR 05000002-09-002 on 03/24/09 and 06/01/09 - 06/02/09 for Univ of Michigan - Ford Nuclear Reactor ML0915505952009-06-0101 June 2009 Orise, Letter Report for Analytical Results for Two Soil Samples and One Concrete Sample from the Ford Reactor at the University of Michigan, Ann Arbor, Mi IR 05000002/19772782009-01-0606 January 2009 EA-08-298, Peach Bottom - Notice of Violation with Proposed Imposition of Civil Penalty - $65,000 (Peach Bottom Atomic Power Station - NRC Investigation Report No. 1-2008-001 and NRC Inspection Report Nos. 05000277-278/2007404; and 05000277 IR 05000002/20090012008-12-23023 December 2008 IR 05000002-09-01 on 12/10/08 - 12/11/2008 for Ford Nuclear Reactor; (DNMS) ML0829806362008-10-22022 October 2008 University of Michigan Ford Nuclear Reactor Master Inspection Plan - Fiscal Year 2009 IR 05000002/20080012008-09-25025 September 2008 IR 05000002-08-01 (DNMS) on 08/28/08 for Ford Nuclear Reactor, Univ. of Michigan IR 05000002/20070012007-12-0606 December 2007 IR 05000002-07-001, on 06/28/2007 & 11/13-14/2007, Univ. of Michigan - Ford Nuclear Reactor Inspection 2015-07-06
[Table view] Category:License-QA Program Approval for Radioactive Materials Packages
MONTHYEARML15196A0292015-07-0606 July 2015 Termination of Quality Assurance Program Approval for Radioactive Material Packages No. 0348 2015-07-06
[Table view] |
Text
Occupational Safety &Environmental Health
.~UniversityO SEH ___________________Campus Occupational Safety & -,1239 Safety Services Building of Michigan Kipke Drive, Ann Arbor, M1 48109-1010 Environmental Health Phone: 734 647-1143
- Fax: 734 763-1185 Terrance G. Alexander, Executive Director July 6, 2015 ATTN: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 RE: Termination of Quality Assurance Program Approval for Radioactive Material Packages No. 0348 (Docket No. 71-03481/ Expiration Date: October 31, 2015)
University of Michigan Document Control Desk:
Please note that the University of Michigan (U-M) is requesting termination of the Quality Assurance Program Approval for Radioactive Material Packages No. 0348, Revision 8 (Docket No. 71 -0348).
This QA program was established in support of the U-M Ford Nuclear Reactor (Facility Operating License No. R-28 / Docket No. 50-02).
Since the Ford Nuclear Reactor has been decommissioned and the Facility Operating License terminated (April 2, 2015), there is no longer a need for the U-M to maintain Quality Assurance Program Approval No. 0348.
Thank you for your time and consideration in this request. Please do not hesitate to contact me at Radiation Safety Service I OSEH [(734) 647-2251 or drisc(,umich.edu] should you have any questions or comments regarding this request.
Sincerely, Mark L. Driscoll Director/IRadiation Safety Officer Radiation Safety Service I OSEH MLD/mld NRCTerminatel 0CFR71 QAProg ram.docx cc: Terrance Alexander, Executive Director. OSEH Robert Blackburn, Facility Coordinator I Manager, NERS Ford Nuclear Reactor Files (R-28 / Docket No. 50-02)
Radiation Safety Service I OSEH Files
Mr. Christopher W. Becker Nuclear Reactor Laboratory Manager University of Michigan.
Ford Nuclear Reactor Phoenix Memorial Laboratory 2301 Bonisteel Boulevard Ann Arbor, MI 48109-2100
SUBJECT:
QUALITY ASSURANCE PROGRAM APPROVAL FOR RADIOACTIVE MATERIAL PACKAGES NO. 0348, REVISION 8
Dear Mr. Becker:
Enclosed is the Quality Assurance (QA) Program Approval for Radioactive Material Packages No. 0348, Revision No. 8. This Approval satisfies the requirements of 10 CFR 71.12(b) and 71.101(c) for a QA Program approved by the U. S. Nuclear Regulatory Commission.
This Approval will remain in effect until the expiration date, indicated in Block No. 3.
Termination of your materials license does not cause this Approval to be automatically terminated. If you wish to renew, amend, or terminate this Approval, please request it in writing.
Sincerely, IRA/
Juan D. Peralta, Acting Chief Transportation and Storage Safety and Inspection Section Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards Docket No.: 71-0348
Enclosure:
QA Program Approval No. 0348, Rev. 8 DISTRIBUTION: ML052760290 NRC File Center SFPO r/f NMSS r/f JCameron, R-lIll WRuland WBlaney, OCFO
-:\Filenet\ML052760290.wpd OFC: SFPO E SPSP NAME FGee MDeBose JPeralta DATE: 9/29 /05 9/29 /05 9/ 30) /05 OFFICIAL RECORD COPY
NRC FORM 311 U.S. NUCLEAR REGULATORY COMMISSION 1. APPROVAL NUMBER (5-FR0001 03A4 1CF71QUALITY ASSURANCE PROGRAM APPROVAL REVISION NUMBER FOR RADIOACTIVE MATERIAL PACKAGESJ Pursuant to the Atomic Energy Act of 1954, as amended, the Energy Reorganization Act of 1974, as amended, and Title 10, Code of Federal Regulations, Chapter 1, Part 71, and in reliance on statements and representations heretofore made in Item 5 by the organization named in Item 2, the Quality Assurance Program identified in Item 5 is hereby approved. This approval is issued to satisfy the requirements of Section 71.101 of 10 CFR Part 71. This approval is subject to all applicable rules, regulations, and orders of the Nuclear Regulatory Commission now or hereafter in effect and to any conditions specified below.
- 2. NAME 3. EXPIRATION DATE University of Michigan October 31, STREET ADDRESS **',
Php~iYM*mnin *13Inhrnnr Rni*t~pl n~p~nr 4 DCET*IE cnw " STATE ZIZPCODE7-38
- 5. QUALITY ASSURANCE PROGRAM APPLICATION DATE(S)
May 12, 2000: July 21, 2005: and September 8, 2005
- 6. CONDITIONS
- 1. Activities authorized by this approval: procurement, maintenance, repair, and use are to be executed with regard to transportation packagings. All other activities (i.e., design, fabrication, assembly, testing, and modification) shall be satisfied by obtaining certifications from packaging suppliers that these activities were conducted in accordance with an NRC-approved Quality Assurance Program. It shall remain the responsibility of the Quality Assurance Program holder that all transportation activities meet the requirements of 10 CFR 71 .101.
- 2. Records shall be maintained in accordance with the provisions of 10 CFR Part 71.
Specifically:
- a. Records of each shipment of licensed material shall be maintained for 3 years after that shipment [10 CFR 71 .91 (a)].
- b. Records providing evidence of packaging quality shall be maintained for 3 years after the life of the packaging [10 CFR 71.91(c)].
- c. Records describing activities affecting packaging quality shall be maintained for 3 years after this Quality Assurance ProgramApproval is terminated [10 CFR 71.135].
- 3. Planned and periodic audits of all aspects of the Quality Assurance Program shall be conducted in accordance with written procedures or checklists, by appropriately trained personnel not having direct resPonsibility in the areas being audited, in accordance with 10 CFR 71 .137.
FOR THE U.S. NUCLEAR REGULATORY COMMISSION SSIGNATURE IRAI 09/30/05 SJUAN 0. PERALTA, ACTING CHIEF TRANSPORTATION AND STORAGE SAFETY AND INSPECTION SECTION SSPENT FUEL PROJECT OFFICE OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS NRC FORM 311 (5-2000) PRINTED ON RECYCLED PAPER