I OPERATING DATA REPORT DOCKET NO. 50-293 DATE 09/13/82 COMPLETED BY G.G.wnitney TELEPHONE 617-746-7900 OPERATING STATUS Pilgrim 1            Notes
: 1. Unit Name:
August, 1982
: 2. Reporting Period:
                                                            # 0*
: 3. Licensed Thermal Power (MWt):
: 4. Nameplate Rating (Gross MWe):
678.
: 5. Design Electrical Rating (Net MWe):
655.
: 6. Maximum Dependable Capacity (Gross MWe):
690.
: 7. Maximum Dependable Capacity (Net MWe):            670.
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
: 9. Power Luel To Which Restricted,if Any (Net MWe):          None
: 10. Reasons For Restrictions. If Any:
N/A This Month          Yr.-to-Date        Cumulative
: 11. Hours in Reporting Period                            744.0                  5831.0              85271.0
: 12. Number Of Hours Reactor Was Critical                  639.2                  3453.6              59486.9
: 13. Reactar Reserve Shutdown Hours                          0.0                      0.0                0.0
: 14. Hours Generator On-Line                                615.9                  3208.8              57486.7
: 15. Unit Reserve Shutdown Hours                              0.0                      0.0                0.0
: 16. Gross Thermal Energy Generated (MWH) 1133616.0                5704584.0          98522472.0        .
j l    17. Gross Electrical Energy Generated (MWH)          392160.0        _
1969030.0          32880264.0 l    18. Net Electrical Energy Generated (MWH)            377254.0              1895207.0          31589691.0 I
: 19. Unit Service Factor                                    82.8                      55.0              67.4
: 20. Unit Availability Factor                                82.8                      55.0              67.4
: 21. Unit Capacity Factor (Using MDC Net)                    75.7                    48,3                55.3
: 22. Unit Capacity Factor (Using DER Net)                    77 A                    A4 A                56 6
: 23. Unit Forced Outage Rate                                17.2                      8.3                9.9 l                                            .
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
NONE l
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: Unit Operating l    26. Units In Test Status t Prior to Commercial Operation):                    Forecast            Achieved
(
INITIAL CRITICALITY l                            INITIAL ELECTRICITY l
COMMERCIAL OPERATION 8211020276 82091S t              PDR ADOCK 05000293 l              R                          PDR l                                                                                                                  (0/77) l
 
          .                                  AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-293 UNIT Pilgrim DATE 09/13/82 COMPLEED BY          G.G. Whitney
                              -                                                              TELEPHONE 617-746-7900 mm,              82 MONTH
                                                                                                                              ~
DAY      AVERAGE DAILY POWER LEVEL                          DAY        AVERAGE DAILY POWER LEVEL (MWe Net)                                                  (MWe Net) 1 626                                g7                      4.
662.                                gg                    382.
3 3                        616.                                19                    301.
: 22.                                    ""
4                                                            20 g                        581.                                                    543.
3 6
618.                                , . ,                644.
7                        655.                                33                  663.
3                        663.                                34                  66'3.
9                        662.                                25                  664.
70                        662.                                26                  665.
l        ;g                        657.                                37                  665.
13                        m                                  33                  664.
13 384.                                39 661.
g                            0.                              30 665.              _
l        15                          0.                              33                  614.
l l'      16                          0.
INSTRUCTIONS                  -
On this format. !ist the average dany unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
                        '                                                                                            to/77 )
W-
 
DOCKET NO.        50-293 UNIT SilU1 DOWNS AND POWER REDUCllONS                                          Pilgrim 1 UNIT NAME DATE      W/ U/ 02 AUGUST, 1982                    COMPLETED BY        G.G. Whitney REPOR T MONif f                                                      617-746-7900 TELErilONE c          es  % en 2
                                                                                                .      EE          E    , .5 M            i icensee    Et        5"L c                    Cause A Correceive No.                                                      Ikie                              g.      p gj        g  jgy                    Event      ;; ,.2      E3u Action to
                                                                                                                                                                                                                          ~
F                                                          dig
                                                                                                        $E          E  jdg                  Repint it                                      Present Recunence 6
25                          82/08/03                                                    F        23.2        H          3                N/A      CD            N/A    Main Steam Line Hi Rsd Scram due to air intrusion.
26                          82/08/13                                                    F      104.9          H          3          82-023/01T      CD      ZZZZZZ      Scram when stagin), struck main steam
                                                                                                                                                                                                          ~
line instrunient" rack.
                                                                                                                                                        ~
I                                                                                        2                                                          3                                  4 F: Forced                                                                                Reason:                                                    Method:                            Exhibit G - Instructions S: Scheduled                                                                            A Equipment Failure (Explain)                              1. Manual                          for Preparation of Data D-Maintenance of Test                                      2-Manual Scram.                    Entry Sheets for IJcensee C. Refueling                                                3. Auf omatic Scram.                Event Report (LER) File INUREG.
                                                ,                                            D Regulatory Restriction                                    4-Other (Explain)                  0161)
E-Operator Training A License Examination F- Administ rative                                                                          5 G-Operational Ee ror (Explain)                                                                  Exhibit I - Same Soince (9/77)                                                                                      Il-Other (E xplain)
 
r    .
          ..                                              BOSTON EDISON COMPANY g                                            PILGRIM NUCLEAR POWER STATION Summary of Operations for AUGUST, 1982          ,          l The unit was operating at 100% power until August 3, when the reactor scrammed                        '
due to main steam line radiation believed.to be caused by air intrusion.
The reactor started up on August 4, generator put on grid, main condenser back-washed and power increased to 86%.
1 OnAugust5,powerwas_reducedto60%tochangecontrolrodpatternandsubsequently incre~ased to _ 100% . '          hPCI was declared inoperable on August 6 to repair leak on gland seal condenser and was returned to service. Reactor power was re-turned to 99% power on August 6.
On August 7, power was reduced to 65% to minimize main steam line high radiation levels while shifting condensate demineralizers. Reactor power returned to 99% on August 8.
On August 9          "B" Diesel Generator was declared inoperable for repairs. Repairs.
were completed on August 10 and the unit was returned to service.
On August 12 power was reduced to 70% While putting "E" Condensate demineralizer on line. RWCU'was removed and isolated in an attempt to identify dyrwell leakage.
The reactor scrammed at_._1400_on August 13 due to main steam line hi flow when
              'sta'ging struck inain steam 1ine instrument yack.
On August 14 "B" Diesel made inoperable due to ground at 1330.                      "B" Diesel declared operable at 2014.
Reactor power was increased to 70% on August 19 per direction of Reactor Engineering. ___                        ___
Holding.80% power on August 20 while investigating core flows mismatch (speed versus pump flow problem.) Continued increasing power under Reactor Engineering guidance. Trimmed power 2h hours due to high condenser Delta T. Reactor power returned to 99% on August 22, 1982.
On August 26 power was returned to 100% until August 30.                      On August 31 main condenser was backwashed, and divers cleaned intake bays.
t i
1 i
t t                  --      - . . .- ,          . _.-.m._.                      ..    .  ._.            _
 
r REFUELING INFORMATION
          .        The following, refueling information is included in the Monthly Report as requested in a letter to Mr. G. C. Andognini dated January 18, 1978:
For your convenience, the information supplied has been enumerated so that each number corresponds to equivalent notation utilized in the request.
: 1. The name of this facility is Pilgrim Nuclear Power Station, Dbcket Numb'er 50-293.
: 2. Scheduled date for next Refueling Shutdown:        September,1983    !
        .          3. Scheduled date for restart following refueling: November , 1983-
: 4.                                                            *
: 5. Due to their similarity, requests 4, 5, & 6 ard responded to collectively:
: 6. The fuel,' which had been loaded during the 1981 scheduled refueling outage, is .of the same P8x8R design, as loaded the previous outage con-sisting of 112 P8DRB282 assemblies and 60 P8DRB265 assemblies.
: 7.    (a) There are 580 fuel assemblies in the core.                                '
(b) There are' 936 fuel assemblies'in the speSt fu,el pool.
: 8.    (a)    The station is presently licensed to store 2320 spent fuel assemblies.              -
                -              The actual spent fuel storage capacity is 1770 fuel assemblies at present.                                                ,
(b)  The planned spent fuel storage capacity is 2320 fuel assemblies.
: 9. With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 834 fuel assemblies.
i l
l
                  ~                                                                              .
l            .
i i
I i
l t -~                -          -  -            - ----m-w-  .
                                                                                                      -        :~
 
                                                              ...........in    ...so.    ...u.. . . . . . . . . .
IMJOR SAFETY RELATED FMINTENANCE                                      MONTil  AUCUSTo 1982
                                                                                                                                                                    ?
e CORRECTIVE ACTION SYSTEM              COMPONENT MALFUNCTION                  CAUSE              . MAINTENANCE                        TO PREVENT RECURRENCE              ASSOCIATED LER i                                                      .
              "A"  Recire. Speed mismatch    Broken timing                Replaced belt                      See LER                              82-022/03L-0 fECIRC          Pump                            bolt on scoop                      ,          _
tube positioner llPCI        Control circuit ry HPCI tripped    Gland seal con-              Replaced gasket.                  Engineering support requested.      82-024/01T-0 de'nser gasket                                                                                  '
failure MAIN        MOV 220-2        Erroneous indi-  Worn limit switc1 Replaced actuator                            Isolated Event                      82-028/03L-0 STEAM                      cation            components                  compone,nt s .-
3 Stem nut restaked picsel      "B" D/G          Would not stop    Faulty solenoid Replaced Solenoid                  See LER                              82-029/03L-0 eneratar                  when manual stop in Woodward was activated    Governor S
Il e
a B
e e
g
: b.        ,
a SAFETY / RELIEF VALVE CHALLENGES MONTH OF: AUCUST, 1982 REQUIREMENT:      TMI T.A.P. II.K.33                                                                ,
DATE:              August 3, 1982 VALVE NUMBERS:    RV 203-3C REACTOR PRESSURE:  1040 REASON:            Manual reduction of Reactor pressure subsequent to scram.
DATE:              August 13, 1982 VALVE NUMBERS:      (RV203-3)
B    C          D        B          C  D    B    C  D    B  C-REACTOR PRESSURE:              1050            1050              1059      1059      1050      890 1050                  1072          1068      1040      975 REASON:            Manual reduction of Reactor pressure subsequent to scram.
* O N                  M      m-  e.        . ..A          gg g>m- _eg@
* W      =h*                        -          '}}

Latest revision as of 03:42, 6 January 2021

Monthly Operating Rept for Aug 1982
ML20065T229
Person / Time
Site: Pilgrim
Issue date: 09/13/1982
From: Whitney G
BOSTON EDISON CO.
To:
Shared Package
ML20065T203 List:
References
NUDOCS 8211020276
Download: ML20065T229 (7)


Text

_.

i 1

I OPERATING DATA REPORT DOCKET NO. 50-293 DATE 09/13/82 COMPLETED BY G.G.wnitney TELEPHONE 617-746-7900 OPERATING STATUS Pilgrim 1 Notes

1. Unit Name:

August, 1982

2. Reporting Period:
  1. 0*
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):

678.

5. Design Electrical Rating (Net MWe):

655.

6. Maximum Dependable Capacity (Gross MWe):

690.

7. Maximum Dependable Capacity (Net MWe): 670.
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Luel To Which Restricted,if Any (Net MWe): None
10. Reasons For Restrictions. If Any:

N/A This Month Yr.-to-Date Cumulative

11. Hours in Reporting Period 744.0 5831.0 85271.0
12. Number Of Hours Reactor Was Critical 639.2 3453.6 59486.9
13. Reactar Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 615.9 3208.8 57486.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1133616.0 5704584.0 98522472.0 .

j l 17. Gross Electrical Energy Generated (MWH) 392160.0 _

1969030.0 32880264.0 l 18. Net Electrical Energy Generated (MWH) 377254.0 1895207.0 31589691.0 I

19. Unit Service Factor 82.8 55.0 67.4
20. Unit Availability Factor 82.8 55.0 67.4
21. Unit Capacity Factor (Using MDC Net) 75.7 48,3 55.3
22. Unit Capacity Factor (Using DER Net) 77 A A4 A 56 6
23. Unit Forced Outage Rate 17.2 8.3 9.9 l .
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

NONE l

25. If Shut Down At End Of Report Period. Estimated Date of Startup: Unit Operating l 26. Units In Test Status t Prior to Commercial Operation): Forecast Achieved

(

INITIAL CRITICALITY l INITIAL ELECTRICITY l

COMMERCIAL OPERATION 8211020276 82091S t PDR ADOCK 05000293 l R PDR l (0/77) l

. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-293 UNIT Pilgrim DATE 09/13/82 COMPLEED BY G.G. Whitney

- TELEPHONE 617-746-7900 mm, 82 MONTH

~

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 1 626 g7 4.

662. gg 382.

3 3 616. 19 301.

22. ""

4 20 g 581. 543.

3 6

618. , . , 644.

7 655. 33 663.

3 663. 34 66'3.

9 662. 25 664.

70 662. 26 665.

l ;g 657. 37 665.

13 m 33 664.

13 384. 39 661.

g 0. 30 665. _

l 15 0. 33 614.

l l' 16 0.

INSTRUCTIONS -

On this format. !ist the average dany unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

' to/77 )

W-

DOCKET NO. 50-293 UNIT SilU1 DOWNS AND POWER REDUCllONS Pilgrim 1 UNIT NAME DATE W/ U/ 02 AUGUST, 1982 COMPLETED BY G.G. Whitney REPOR T MONif f 617-746-7900 TELErilONE c es  % en 2

. EE E , .5 M i icensee Et 5"L c Cause A Correceive No. Ikie g. p gj g jgy Event  ;; ,.2 E3u Action to

~

F dig

$E E jdg Repint it Present Recunence 6

25 82/08/03 F 23.2 H 3 N/A CD N/A Main Steam Line Hi Rsd Scram due to air intrusion.

26 82/08/13 F 104.9 H 3 82-023/01T CD ZZZZZZ Scram when stagin), struck main steam

~

line instrunient" rack.

~

I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1. Manual for Preparation of Data D-Maintenance of Test 2-Manual Scram. Entry Sheets for IJcensee C. Refueling 3. Auf omatic Scram. Event Report (LER) File INUREG.

, D Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training A License Examination F- Administ rative 5 G-Operational Ee ror (Explain) Exhibit I - Same Soince (9/77) Il-Other (E xplain)

r .

.. BOSTON EDISON COMPANY g PILGRIM NUCLEAR POWER STATION Summary of Operations for AUGUST, 1982 , l The unit was operating at 100% power until August 3, when the reactor scrammed '

due to main steam line radiation believed.to be caused by air intrusion.

The reactor started up on August 4, generator put on grid, main condenser back-washed and power increased to 86%.

1 OnAugust5,powerwas_reducedto60%tochangecontrolrodpatternandsubsequently incre~ased to _ 100% . ' hPCI was declared inoperable on August 6 to repair leak on gland seal condenser and was returned to service. Reactor power was re-turned to 99% power on August 6.

On August 7, power was reduced to 65% to minimize main steam line high radiation levels while shifting condensate demineralizers. Reactor power returned to 99% on August 8.

On August 9 "B" Diesel Generator was declared inoperable for repairs. Repairs.

were completed on August 10 and the unit was returned to service.

On August 12 power was reduced to 70% While putting "E" Condensate demineralizer on line. RWCU'was removed and isolated in an attempt to identify dyrwell leakage.

The reactor scrammed at_._1400_on August 13 due to main steam line hi flow when

'sta'ging struck inain steam 1ine instrument yack.

On August 14 "B" Diesel made inoperable due to ground at 1330. "B" Diesel declared operable at 2014.

Reactor power was increased to 70% on August 19 per direction of Reactor Engineering. ___ ___

Holding.80% power on August 20 while investigating core flows mismatch (speed versus pump flow problem.) Continued increasing power under Reactor Engineering guidance. Trimmed power 2h hours due to high condenser Delta T. Reactor power returned to 99% on August 22, 1982.

On August 26 power was returned to 100% until August 30. On August 31 main condenser was backwashed, and divers cleaned intake bays.

t i

1 i

t t -- - . . .- , . _.-.m._. .. . ._. _

r REFUELING INFORMATION

. The following, refueling information is included in the Monthly Report as requested in a letter to Mr. G. C. Andognini dated January 18, 1978:

For your convenience, the information supplied has been enumerated so that each number corresponds to equivalent notation utilized in the request.

1. The name of this facility is Pilgrim Nuclear Power Station, Dbcket Numb'er 50-293.
2. Scheduled date for next Refueling Shutdown: September,1983  !

. 3. Scheduled date for restart following refueling: November , 1983-

4. *
5. Due to their similarity, requests 4, 5, & 6 ard responded to collectively:
6. The fuel,' which had been loaded during the 1981 scheduled refueling outage, is .of the same P8x8R design, as loaded the previous outage con-sisting of 112 P8DRB282 assemblies and 60 P8DRB265 assemblies.
7. (a) There are 580 fuel assemblies in the core. '

(b) There are' 936 fuel assemblies'in the speSt fu,el pool.

8. (a) The station is presently licensed to store 2320 spent fuel assemblies. -

- The actual spent fuel storage capacity is 1770 fuel assemblies at present. ,

(b) The planned spent fuel storage capacity is 2320 fuel assemblies.

9. With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 834 fuel assemblies.

i l

l

~ .

l .

i i

I i

l t -~ - - - - ----m-w- .

-  :~

...........in ...so. ...u.. . . . . . . . . .

IMJOR SAFETY RELATED FMINTENANCE MONTil AUCUSTo 1982

?

e CORRECTIVE ACTION SYSTEM COMPONENT MALFUNCTION CAUSE . MAINTENANCE TO PREVENT RECURRENCE ASSOCIATED LER i .

"A" Recire. Speed mismatch Broken timing Replaced belt See LER 82-022/03L-0 fECIRC Pump bolt on scoop , _

tube positioner llPCI Control circuit ry HPCI tripped Gland seal con- Replaced gasket. Engineering support requested. 82-024/01T-0 de'nser gasket '

failure MAIN MOV 220-2 Erroneous indi- Worn limit switc1 Replaced actuator Isolated Event 82-028/03L-0 STEAM cation components compone,nt s .-

3 Stem nut restaked picsel "B" D/G Would not stop Faulty solenoid Replaced Solenoid See LER 82-029/03L-0 eneratar when manual stop in Woodward was activated Governor S

Il e

a B

e e

g

b. ,

a SAFETY / RELIEF VALVE CHALLENGES MONTH OF: AUCUST, 1982 REQUIREMENT: TMI T.A.P. II.K.33 ,

DATE: August 3, 1982 VALVE NUMBERS: RV 203-3C REACTOR PRESSURE: 1040 REASON: Manual reduction of Reactor pressure subsequent to scram.

DATE: August 13, 1982 VALVE NUMBERS: (RV203-3)

B C D B C D B C D B C-REACTOR PRESSURE: 1050 1050 1059 1059 1050 890 1050 1072 1068 1040 975 REASON: Manual reduction of Reactor pressure subsequent to scram.