IR 05000528/2008401: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 1: | Line 1: | ||
{{Adams|number = ML080740471}} | {{Adams | ||
| number = ML080740471 | |||
| issue date = 03/14/2008 | |||
| title = IR 05000528-08-401, 05000529-08-401, 05000530-08-401, on 03/03/08 - 03/06/08, Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - NRC Security Inspection Report - Letter Only | |||
| author name = Shannon M P | |||
| author affiliation = NRC/RGN-IV/DRS/PSB | |||
| addressee name = Edington R K | |||
| addressee affiliation = Arizona Public Service Co | |||
| docket = 05000528, 05000529, 05000530 | |||
| license number = NPF-041, NPF-051, NPF-074 | |||
| contact person = | |||
| document report number = IR-08-401 | |||
| document type = Inspection Report Correspondence, Letter | |||
| page count = 2 | |||
}} | |||
{{IR-Nav| site = 05000528 | year = 2008 | report number = 401 }} | {{IR-Nav| site = 05000528 | year = 2008 | report number = 401 }} | ||
Line 12: | Line 26: | ||
==Dear Mr. Edington:== | ==Dear Mr. Edington:== | ||
On March 6, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on March 6, 2008, with Mr. B. Bement, Vice President of Nuclear Operations, and other members of your staff | On March 6, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on March 6, 2008, with Mr. B. Bement, Vice President of Nuclear Operations, and other members of your staff. | ||
This inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. | |||
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | |||
Sincerely,/RA/ Michael P. Shannon, Chief Plant Support Branch Division of Reactor Safety Docket Nos.: 50-528; 50-529; 50-530 Licensee Nos.: NPF-41; NPF-51; NPF-74 Nonpublic | No findings of significance were identified. | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. Arizona Public Service Company - 2 - In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1). | |||
Sincerely,/RA/ | |||
Michael P. Shannon, Chief Plant Support Branch Division of Reactor Safety Docket Nos.: 50-528; 50-529; 50-530 Licensee Nos.: NPF-41; NPF-51; NPF-74 | |||
Nonpublic | |||
===Enclosure:=== | ===Enclosure:=== |
Revision as of 14:12, 30 August 2018
ML080740471 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 03/14/2008 |
From: | Shannon M P Plant Support Branch Region IV |
To: | Edington R K Arizona Public Service Co |
References | |
IR-08-401 | |
Download: ML080740471 (2) | |
Text
March 14, 2008
Randall Senior Vice President, Nuclear Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2 AND 3 - NRC SECURITY INSPECTION REPORT 05000528/2008401; 05000529/2008401; AND 05000530/2008401
Dear Mr. Edington:
On March 6, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on March 6, 2008, with Mr. B. Bement, Vice President of Nuclear Operations, and other members of your staff.
This inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. Arizona Public Service Company - 2 - In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,/RA/
Michael P. Shannon, Chief Plant Support Branch Division of Reactor Safety Docket Nos.: 50-528; 50-529; 50-530 Licensee Nos.: NPF-41; NPF-51; NPF-74
Nonpublic
Enclosure:
Inspection Report 05000528/2008401; 05000529/2008401; and 05000530/2008401
w/Attachment:
Supplemental Information cc w/o enclosure:
Scott Bauer, Director Regulatory Affairs Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ 85072-2034 Dwight C. Mims Vice President, Regulatory Affairs and Performance Improvement Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ 85072-2034