IR 05000528/2006401

From kanterella
Jump to navigation Jump to search
IR 05000528-06-401, 05000529-06-401, and 05000530-06-401 for Palo Verde, Units 1, 2 and 3
ML062650460
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/20/2006
From: Troy Pruett
NRC/RGN-IV/DRP/RPB-D
To: James M. Levine
Arizona Public Service Co
References
IR-06-401
Download: ML062650460 (2)


Text

UNITED STATES NUCLEAR REGULATORY C 0 M M I S S ION ber 20, 2006

SUBJECT:

PAL0 VERDE NUCLEAR GENERATING STATION, UNITS 1,2, AND 3 - NRC INSPECTION REPORT 05000528/2006401, 05000529/2006401, AND 05000530/200640 1

Dear Mr. Levine:

On August 18, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Report of Closeout Inspection of Nuclear Reactor Safeguards Interim Compensatory Measure. The enclosed inspection report documents the inspection results, which were discussed on August 22, 2006, with Mr. Eubanks and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 and the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.aov/readina-rm/adams.html (The Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. J. In accordance with 10 CFR 2.39O(b)(l)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.

Sincerely,

/ /

Troi W. Pru&t, Chief Reactor Projects Branch D Division of Reactor Projects Docket No. 50-528, 50-529, 50-530 License No. NPF-41 NPF-51, NPF-74 Enclosure:

NRC Inspection Report 05000528/2006401, 05000529/2006401, and 05000530/2006401 ( )

cc without Safeguards Information enclosure:

Craig K. Seaman, General Manager Regulatory Affairs and Performance Improvement Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ 85072-2034