ML13178A373: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 25: Line 25:
: f. OT-3701-D17_001          Startup DW Airborne. Rad Monitor                            N, C                7
: f. OT-3701-D17_001          Startup DW Airborne. Rad Monitor                            N, C                7
: g. OT-3701-P41_001          Shift Service Water Pumps (normal)                          N, S              8
: g. OT-3701-P41_001          Shift Service Water Pumps (normal)                          N, S              8
: h. OT-3701-M25_501 Shift CR Ventilation to ER                                        N, S, A, EN            9
: h. OT-3701-M25_501 Shift CR Ventilation to ER                                        N, S, A, EN            9 In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
                    @
In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: i. OT-3701-P54_502            Emergency run of motor fire pump                        D, A, E              8
: i. OT-3701-P54_502            Emergency run of motor fire pump                        D, A, E              8
: j. OT-3701-T23_004            Containment Closure                                      D, R, E              5
: j. OT-3701-T23_004            Containment Closure                                      D, R, E              5
Line 47: Line 45:
: f. OT-3701-D17_001          Startup DW Airborne. Rad Monitor                            N, C              7
: f. OT-3701-D17_001          Startup DW Airborne. Rad Monitor                            N, C              7
: g. OT-3701-P41_001          Shift Service Water Pumps (normal)                          N, S              8
: g. OT-3701-P41_001          Shift Service Water Pumps (normal)                          N, S              8
: h. OT-3701-M25_501 Shift CR Ventilation to ER                                      N, S, A, EN            9
: h. OT-3701-M25_501 Shift CR Ventilation to ER                                      N, S, A, EN            9 In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
                    @
In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: i. OT-3701-P54_502            Emergency run of motor fire pump                        D, A, E            8
: i. OT-3701-P54_502            Emergency run of motor fire pump                        D, A, E            8
: j. OT-3701-T23_004            Containment Closure                                    D, R, E              5
: j. OT-3701-T23_004            Containment Closure                                    D, R, E              5
Line 57: Line 53:
(D)irect from bank                                                    9 / 8 / 4 (E)mergency or abnormal in-plant                                      1 / 1 / 1 (EN)gineered safety feature                                              - / -        /  1(control room system)
(D)irect from bank                                                    9 / 8 / 4 (E)mergency or abnormal in-plant                                      1 / 1 / 1 (EN)gineered safety feature                                              - / -        /  1(control room system)
(L)ow-Power / Shutdown                                                1 / 1        / 1 (N)ew or (M)odified from bank including 1(A)                          2 / 2 / 1 (P)revious 2 exams                                                    3 /  3 /  2 (randomly selected)
(L)ow-Power / Shutdown                                                1 / 1        / 1 (N)ew or (M)odified from bank including 1(A)                          2 / 2 / 1 (P)revious 2 exams                                                    3 /  3 /  2 (randomly selected)
(R)CA 1 / 1 / 1 (S)imulator
(R)CA 1 / 1 / 1 (S)imulator FENOC Facsimile Rev 0
                                                                      ---------------
FENOC Facsimile Rev 0


ES-301, Rev. 9                      Control Room/In-Plant Systems Outline                          Form ES-301-2 Facility:          Perry                                              Date of Examination:        Feb 2013 Examination Level:        SRO-U                                      Operating Test Number:          01 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
ES-301, Rev. 9                      Control Room/In-Plant Systems Outline                          Form ES-301-2 Facility:          Perry                                              Date of Examination:        Feb 2013 Examination Level:        SRO-U                                      Operating Test Number:          01 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Line 68: Line 62:
f.
f.
g.
g.
: h. OT-3701-M25_501 Shift CR Ventilation to ER                                      N, S, A, EN          9
: h. OT-3701-M25_501 Shift CR Ventilation to ER                                      N, S, A, EN          9 In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i.
                    @
In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i.
: j. OT-3701-T23_004            Containment Closure                                    D, R, E            5
: j. OT-3701-T23_004            Containment Closure                                    D, R, E            5
: k. OT-3701-R10_303            Shed non-essential Divisional loads                      D, E              6
: k. OT-3701-R10_303            Shed non-essential Divisional loads                      D, E              6
Line 77: Line 69:
(D)irect from bank                                                    9 / 8 / 4 (E)mergency or abnormal in-plant                                      1 / 1 / 1 (EN)gineered safety feature                                              - / -        /  1(control room system)
(D)irect from bank                                                    9 / 8 / 4 (E)mergency or abnormal in-plant                                      1 / 1 / 1 (EN)gineered safety feature                                              - / -        /  1(control room system)
(L)ow-Power / Shutdown                                                1 / 1        / 1 (N)ew or (M)odified from bank including 1(A)                          2 / 2 / 1 (P)revious 2 exams                                                    3 /  3 /  2 (randomly selected)
(L)ow-Power / Shutdown                                                1 / 1        / 1 (N)ew or (M)odified from bank including 1(A)                          2 / 2 / 1 (P)revious 2 exams                                                    3 /  3 /  2 (randomly selected)
(R)CA                                                                1 / 1 / 1 (S)imulator
(R)CA                                                                1 / 1 / 1 (S)imulator FENOC Facsimile Rev 0}}
                                                                      ---------------
FENOC Facsimile Rev 0}}

Latest revision as of 03:35, 6 February 2020

2013 Perry Nuclear Power Plant Initial License Examination Outline RO and SRO ES-301-2
ML13178A373
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 02/25/2013
From:
NRC/RGN-III
To:
FirstEnergy Nuclear Operating Co
Shared Package
ML11354A273 List:
References
Download: ML13178A373 (3)


Text

ES-301, Rev. 9 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Perry Date of Examination: Feb. 2013 Examination Level: RO Operating Test Number: 01 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code* Safety Function

a. OT-3701-C11_513 Withdraw Control Rods D, S, A, L 1
b. OT-3701-E51_006 Lineup RCIC to control RPV level per EOP- N, S, L 2 SPI 6.6
c. OT-3701-B21_009 Open MSIVs N, S 3
d. OT-3701-E12_506 Re-establish Shutdown Cooling D, S, A, L 4
e. OT-3701-R43_501 Shutdown Div 2 Diesel Generator D, S, A 6
f. OT-3701-D17_001 Startup DW Airborne. Rad Monitor N, C 7
g. OT-3701-P41_001 Shift Service Water Pumps (normal) N, S 8
h. OT-3701-M25_501 Shift CR Ventilation to ER N, S, A, EN 9 In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. OT-3701-P54_502 Emergency run of motor fire pump D, A, E 8
j. OT-3701-T23_004 Containment Closure D, R, E 5
k. OT-3701-R10_303 Shed non-essential Divisional bus loads D, E 6

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room ---------------

(D)irect from bank 9 / 8 / 4 (E)mergency or abnormal in-plant 1 / 1 / 1 (EN)gineered safety feature - / - / 1(control room system)

(L)ow-Power / Shutdown 1 / 1 / 1 (N)ew or (M)odified from bank including 1(A) 2 / 2 / 1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1 / 1 / 1 (S)imulator ---------------

FENOC Facsimile Rev 0

ES-301, Rev. 9 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Perry Date of Examination: Feb 2013 Examination Level: SRO-I Operating Test Number: 01 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code* Safety Function

a. OT-3701-C11_513 Withdraw Control Rods D, S, A, L 1
b. OT-3701-E51_006 Lineup RCIC to control RPV level per EOP- N, S, L 2 SPI 6.6
c. OT-3701-B21_009 Open MSIVs N, S 3
d. 4
e. OT-3701-R43_501 Shutdown Div 2 Diesel Generator D, S, A 6
f. OT-3701-D17_001 Startup DW Airborne. Rad Monitor N, C 7
g. OT-3701-P41_001 Shift Service Water Pumps (normal) N, S 8
h. OT-3701-M25_501 Shift CR Ventilation to ER N, S, A, EN 9 In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. OT-3701-P54_502 Emergency run of motor fire pump D, A, E 8
j. OT-3701-T23_004 Containment Closure D, R, E 5
k. OT-3701-R10_303 Shed non-essential Divisional loads D, E 6

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room ---------------

(D)irect from bank 9 / 8 / 4 (E)mergency or abnormal in-plant 1 / 1 / 1 (EN)gineered safety feature - / - / 1(control room system)

(L)ow-Power / Shutdown 1 / 1 / 1 (N)ew or (M)odified from bank including 1(A) 2 / 2 / 1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1 / 1 / 1 (S)imulator FENOC Facsimile Rev 0

ES-301, Rev. 9 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Perry Date of Examination: Feb 2013 Examination Level: SRO-U Operating Test Number: 01 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code* Safety Function

a. OT-3701-C11_513 Withdraw Control Rods D, S, A, L 1 b.
c. OT-3701-B21_009 Open MSIVs N, S 3 d.

e.

f.

g.

h. OT-3701-M25_501 Shift CR Ventilation to ER N, S, A, EN 9 In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i.
j. OT-3701-T23_004 Containment Closure D, R, E 5
k. OT-3701-R10_303 Shed non-essential Divisional loads D, E 6

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room ---------------

(D)irect from bank 9 / 8 / 4 (E)mergency or abnormal in-plant 1 / 1 / 1 (EN)gineered safety feature - / - / 1(control room system)

(L)ow-Power / Shutdown 1 / 1 / 1 (N)ew or (M)odified from bank including 1(A) 2 / 2 / 1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1 / 1 / 1 (S)imulator FENOC Facsimile Rev 0