| | number = ML18142A703 | | | number = ML18142A703 |
| | issue date = 04/18/1978 | | | issue date = 04/18/1978 |
| | title = R.E. Ginna - Response to NRC Request Consisting of Information Concerning Data Taken During the Startup of Cycle 7 at Subject Facility with Attachment Table Presenting Predicted Rod Worth and the Measured Rod Worths with and Without Control | | | title = Response to NRC Request Consisting of Information Concerning Data Taken During the Startup of Cycle 7 at Subject Facility with Attachment Table Presenting Predicted Rod Worth and the Measured Rod Worths with and Without Control Rod |
| | author name = White L | | | author name = White L |
| | author affiliation = Rochester Gas & Electric Corp | | | author affiliation = Rochester Gas & Electric Corp |
Similar Documents at Ginna |
---|
Category:Graphics incl Charts and Tables
MONTHYEARNMP1L3339, R. E. Ginna Station - Constellation Energy Group, LLC: Notification of Change in Indirect Ownership2020-04-24024 April 2020 R. E. Ginna Station - Constellation Energy Group, LLC: Notification of Change in Indirect Ownership ML18143B0222018-05-23023 May 2018 R. E. Ginna - Plate G-I, Seismic Refraction Profile I ML18143B0262018-05-23023 May 2018 R. E. Ginna - Plate G-3, Seismic Refraction Surveys, Seismic Refraction Line III and Iv. ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML15334A4532015-12-0404 December 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request-Flood Causing Mechanism Reevaluation ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0315504242003-06-0303 June 2003 in Surge Example, Ginna Maximum System At'S During Heatups, & Ginna Maximum System At'S During Cooldowns ML18143A4451978-08-0303 August 1978 Spent Fuel Pool Cooling ML18143A4421978-08-0202 August 1978 R. E. Ginna - Response to Request, Attached Are Additional Detail on Flux Map Taken During Startup of Cycle 8 ML18142B0721978-07-28028 July 1978 Forwards Semiannual Effluent Release Report for the Period of Jan. - Jun. 1978 ML18143A4501978-07-27027 July 1978 R. E. Ginna - 1978 Steam Generator Inspection Final Report and NRC Questionnaire Update ML18142A7031978-04-18018 April 1978 Response to NRC Request Consisting of Information Concerning Data Taken During the Startup of Cycle 7 at Subject Facility with Attachment Table Presenting Predicted Rod Worth and the Measured Rod Worths with and Without Control Rod ML18142B0711978-03-14014 March 1978 Forwards Semiannual Effluent Release Report for the Period of Jul. - Dec. 1977 ML18192A0781977-05-11011 May 1977 R. E. Ginna - Steam Generator Inspection Final Report, May 11, 1977 ML18142B0701977-02-0303 February 1977 Forwards Semiannual Effluent Release Report for the Period of Jul. - Dec. 1976 ML18142B0691976-07-26026 July 1976 Forwards Semiannual Effluent Release Report for the Period of Jan. - Jun. 1976 ML18142C0691975-10-30030 October 1975 R. E. Ginna - 10/30/1975 Letter Transmittal of Request for Exemption from Certain Provisions of Appendix J to 10 C.F.R. Part 50 2020-04-24
[Table view] Category:Letter
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 and Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 ML24067A2532024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report 2024-09-25
[Table view] |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM <RIDS)
DISTRIBUTION FOR INCOMING MATERIAL 50-244 I
REC: ZIEMANN D L ORG: WHITE L D DOCDATE: 04/i8/78 NRC RQCHESTER GAS 8( ELEC DATE RCVD: 09/26/78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED
SUBJECT:
LTR i ENCL 1 FORWARDING RESPONSE TO NRC REQUEST CONSISTING QF INFO CONCERNING DATA TAKEN DURING THE STARTUP OF CYCLE 7 AT SUBJECT FACILITY... W/ATT TABLE PRESENTING PREDICTED ROD WORTH AND THE MEASURED ROD WORTHS WITH AND WITHOUT CONTROL RODS L8 8. K7 SWAPPED.
PLANT NAME: RE GINNA UNIT i REVIEWER DISTRIBUTQR INITIAL: X JM INITIAL'~
DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ANNUAL ENVIRONMENTAL RPTS (OL STAGE>.
<DISTRIBUTION CODE A007)
FOR ACTION:
INTERNAL: REG FILE+4W/ENCL NRC PDR++W/ENCL EEB++W/ENCL BALLARD~~~W/ENCL J. COLLINS+4 W/ENCL KREGER++W/ENCL KASTNER4 4 W/ENCL EXTERNAL: LPDR~S ROCHESTER> NY++W/ENCL TIC>~W/ENCL NS I C4 4~W/ENCL ACRS CAT B>+W/ENCL DISTRIBUTION: LTR 20 ENCL 20 CONTROL NBR: 78i i60i78 SIZE: iP+3P w
THE END
1 I' ~
'1 II W
IH
'I
0
~ >jg y
r<rizzz zringjj~i(
muzzy izzard' uzzsiltl jiiiiiiiiiiiiii ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE, JR. TELEPHONE VICE PRESIDENT AREA CODE Tle 546 2700 April 18, 1978 CU I "I En cnt.','I
- i) U IXI Kl ~w Pi'I tPL-I
>Ca MLJ
>>B,Xg rTI~
Cl>~
XEO Director of Nuclear Reactor Regulation Attention: Mr. Dennis Ziemann, Chief C7 ITI ED Operating Reactors Branch o. 2 CA II.R. Nuclear Regulatory Commission .g]jiIIIIfgI Ma fbi Washington, DC 20555 Mg g
Dear Mr. Ziemann:
-
During conversations with members of the NRC staff, a revue'st" was made for data taken during the startup of Cycle 7 at the R. E. Ginna Plant. This data reflects measurements taken with control rod LS operating as a D bank rod and rgd K7 operating as an A bank rod. Figure 1 illustrates the F obtained from the Incore reduction of Flux Map VII-3 which Rs take with the rods as described above. Figure 2 illustrates the F>HIs with the rod swap corrected.
Also attached is a table which presents the predicted rod worth and the measured rod worths with and without control rods LS and K7 swapped.
Very truly yours, L. D. White, Jr .
,7Sl160i78 t Aoo
Cycle 7 Flux Map VII-3 D bank = 136 steps, 28% power, Control Rod L8 and K7 interchanged ROCHESTER GAS ANO ELECTRIC CORPORATION CORE MAP N
Measured F~H 2700 2 3 4 5 6 7 9 10 11 12 13 I I I I I I I I I I I I 0.546 0.552 0.56
-1.0 0.6 1.5
- 0. 636 - 009 l. 131 0. 824 1. 144 . 022 0. 647
-1. 1 -1. 0 -1. 0 -0.4 0.2 p.3 0.6
.471 1. 008 . 284 1. 117 0. 907 1.11 . 301 1. 025 0-479
-1.1 -1.1 -1. 1 -0. 2 -0. 5 -0. 0.3 0.6 0. 6 p.62g 0.998 0. 979 -130 1.244 0.980 1.24 .134 1- 006 1- 025 0. 646
-., 2.2 -2.2 2 2 ~ -0.3 0.3 0.5 0. 0.0 0.5 0.4 0.4 0'.gg7 1.270 l. 111 1- 255 1. 178 0. 978 l. 17 .266 1.141 1.305 1.024
-2. 2 -2. 2 2~2 -1.2 -0.3 -0.1 -0. -0.3 0.4 0.4 0.4
.556 1.152 1.095 l. 215 1-162 1.034 1-230 1.159 1.222 1.107 1.148 ~ 568 1.1 0 -2 ' 2~2 9 -1.4 2 -1.7 -1.1 0.7 3.3
.551 0.831 o.914 0. 969 0. 961 1. 224 1. 049 1.20 0.944 0.949 0.888 0.82 .563 0' 1.0 p 9 0 4 -0. 6 0 -1.8 6 -2. -3.8 -2.7 -2.4
~ 0.7 3.3 G
.556 l. 152 l. 131 1.254 1.182 1 043 1.236 1.02 1-150 1.217 1.096 1.13 0.568 1.1 1.0 1.0 0.9 03 -06 07 -2. -2.9 -2.1 -2.1 -0. 3.3
- 1. 03 1. 315 l. 147 27g 1 185 0 980 1.19 1-268 1.118 1.269 0.99 Oi2 1.2 1.2 0.9 p 7 p,p 0. -0.2 -1.6 -2.3 -2.
- 0. 692 1. 098 l. 050 1.173 1.242 p.g8p 1.25 1.139 0.993 1.004 0.62
- 3. 5 0.1 7.6 7.6 4.9 0.5 1. 0.5 -0.8 -1.6 -2.
- 0. 517 1. 101 1.408 1-204 0.918 1.10 1.269 76 p 992 0 474~
8.4 8.0 85 08 -1. -2.2 -0.6
- 0. 703 1.110 1.140 0.827 1.10 0.963 0.605 9.4 8.9 -0.2 -0.0 -F 1 -5.5 -5.8 0.550 0.548 0. 54
-0.2 -0.2 -2. ~
~F~
%
N Difference between measured and predicted I I I I I I I I I 1 2 3 4 5 6 7 9 10 11 12 13 90~
Meas-Pred Pred il l7 FIGURE 3,
ycle 7 Flux Map VIZ-4 D bank = 119 steps, 25% power, Control Rod Swap Corrected ROCHESTER GAS ANO ELECTRIC CORPORATION CORE MAP N
Measured F~
2704 1 2 3 4 8 7 8 9 10 11 12 13 I I I I I I i I I I I I I
- 0. 0. 589 0. 578 5.6 3.8 2.6
- 0. 690 l. 051 1.171 0.852 .137 1.031 0 ~
5.6 5.6 5.7 3.2 2.6 3.6 6.
s.s4
- 1. 081 1.334 1. 109 0. 875 1. 104 l. 329 1.087 .535 5.6 1.1 -0.7 . 0.7 5.2 6. 6.2 0.646 1.011 1.002 1.148 1. 207 0. 949 1. 229 1.162 1 03 ~ . 016 0.648
-1.3 -1.3 -1.3 1.2 -2.1 -4.1 -0.3 2.4 .. 1. -0. 9 -0.9 0.983 1.248 1.123 1. 270 1. 201 0.99 1.145 1.244 1.12 .253 0. 986
-1.3 -1.3 -1.3 -0.1 0.2 -2. -4.5 -0. -0.9 -0. 9 0.552 1.086 1.083 1.219 1.184 1. 068
-1.8 -1.8 1. 24 1. 038 1.152 1.20 . 087 1.087 0-547
-1.3 -1.3 -1.4 -1.5 -2. -4. 2 4.1 -2. -0. 9 -1.8 180
- 0. 554 0.808 p.864 0 974 0. 988 1.226 1.06 1.211 0 965 0.96 0. 871 p.8p8 0.549
-1.8 -1.8 -1.9 -1.6 -2.8 -3.9 -4.
~
-5.1 -5. 1 -2. -1. 1 2 7 G
0.551 1.086 1.077 1.222 1.181
-1.8 -1.8 -1.8 -1.0 -1.6 l.-'4.039 1.19 1.008 1.171 1.23 1.108 1.105 p.547
-6. -7.1 -2.S 1.0 -0.2 -2.7 2 0-
- 0. 977 1. 241 1. 130 1.271 1.149 0.95 1.186 1.306 1.16 G299 1. 026
-1.8 -1.8 -0.6 0.1 -4.2 -6. -1.1 2.8 2.7 3.0 0'.517 0.674 1.055 1.034 1.149 1. 183 0.97 1.280 1.177 1 p3 1. 052 0. 674 30 30 18 1.3 -4 -1. 3.8 3 ' 2. 2.6 3.1 1.053 1. 300 1.13 0. 92 1. 164 1 330 1 06 0. 515 2.7 2.9 2 8 ~ 3. 5. 6.2 5.3 2.2
- 0. 670 1. 023 1. 08 l. 068 p,7p 2.6 2.8 2~
- 1. 3.7 149 7~3 7.
- 0. 55 0 55 p 573 2~
+ F N
1.7
%Difference between measured and predicted i I I I I I I I 2 3 4 5 7 9 10 11 12 90' FIGURE 2 47 ~ I T
Startup Cycle 7 May 21, 1977 Core Condition Boron Worth Boron End oint Isotherm Temp. Coefficient**
Predicted Measured* Predicted Measured*
(ppm) (ppm) (pcm 'F) pcm 'F ARO -115 1382 1400 -3.4 3 ~ 23 D bank in -114 1296, 1321 -5. 0 -5.2 DSC bank in -114 1177 1207 -7.8 -8.25 Control Rod Bank Worth Bank Predicted Worth (%kg) Measured* (%Q) Measured (%hP)
Bank Cumulative Bank Cumulative Bank Cumulative
/ D 0. 754 0. 7'54 0.666 0.666 0. 711 0.711 DSC 1.047 1.801 0. 991 1.657 0.979 1.690
- indicates measurements done with control rod L8 operating as a D bank rod and rod K7 operating as an A bank rod.
- Doppler Coefficient is +1.9 pcm/'F