Category:Drawing
MONTHYEARML20339A0472020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 11, Figures ML20339A0412020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis, Figures ML20339A0432020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Figures ML20339A0352020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Figures ML20339A0372020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, Probable Maximum Flood and Low Water Conditions, Figures ML20339A0152020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 3, Appendix B, Figures ML20339A0522020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Drift and Dispersion Characteristics of Lake Ontario Near Shore Waters, Figures ML20339A0162020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Figures ML20339A0342020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Figures ML20339A0632020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Figures ML19150A4392019-05-10010 May 2019 8 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Figures ML19150A4762019-05-10010 May 2019 8 to Updated Final Safety Analysis Report, Chapter 08, Figures ML19150A4662019-05-10010 May 2019 8 to Updated Final Safety Analysis Report, Chapter 5, Figures ML19150A4542019-05-10010 May 2019 8 to Updated Final Safety Analysis Report, Chapter 3, Appendix B, Figures - Design of Large Opening Reinforcements for Containment Vessel ML19150A4422019-05-10010 May 2019 8 to Updated Final Safety Analysis Report, Chapter 2, Figures ML19150A4412019-05-10010 May 2019 8 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2C, Figures ML19150A4372019-05-10010 May 2019 8 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, Figures ML19150A4932019-05-10010 May 2019 8 to Updated Final Safety Analysis Report, Chapter 13, Figures ML19150A4992019-05-10010 May 2019 8 to Updated Final Safety Analysis Report, Chapter 15, Figures ML18186A2052018-07-0505 July 2018 R. E. Ginna - Drawing 0521-066, Reactor Containment Vessel Steam Gen. Coolant Pump & Pressurizer Bracket & Support-Locations & Orientation ML18143B0222018-05-23023 May 2018 R. E. Ginna - Plate G-I, Seismic Refraction Profile I ML18143B1932018-05-23023 May 2018 R. E. Ginna - Plate 5.2-7, Surficial Geologic Map Showing Areas of Active Erosion ML18143B1912018-05-23023 May 2018 R. E. Ginna - Chart 2, Brookwood Site Environs, Numbers in Squares Refer to Water Well Locations ML18143B1902018-05-23023 May 2018 R. E. Ginna - Chart 4, Layout and Topography ML18143B1872018-05-23023 May 2018 R. E. Ginna - Chart 11, Genesee River Turbidity ML18143B1832018-05-23023 May 2018 R. E. Ginna - Sketch of the East Side of the Pit Excavation, Showing Stratigraphy of Surficial Deposits, Till Stacking, Bedrock Faults, and Glacial Shears ML18143B0372018-05-23023 May 2018 R. E. Ginna - Plate D-1A, Cross Section Showing Contact Surface Between Grey Clay and Red Till in Postulated Vicinity of Intersection of Faulting with Shoreline ML18143B1242018-03-14014 March 2018 R. E. Ginna - Drawing E, Correlation and Geologic Interpretation from West to East in Central Portion of the Site ML18143B1222018-03-14014 March 2018 R. E. Ginna - Plate A-78, Correlation and Geologic Interpretation from North to South in the Central Portion of the Site ML18143B1302018-03-14014 March 2018 R. E. Ginna - Plate 85, North-South Profile Showing Fresh Bedrock Surface in the Fault Area Between Borings 113 and 210 ML18025A9852018-01-23023 January 2018 Attachment 3 - Ginna Flooding Focused Evaluation Audit Documentation ML18025A9872018-01-23023 January 2018 Attachment 1 - Ginna Flooding Focused Evaluation Audit Documentation ML16180A1362016-05-0505 May 2016 6 to the Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Appendix 2A, Probable Maximum Flood and Low Water Conditions ML16180A1312016-05-0505 May 2016 6 to the Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant, Figure 1.2-1 ML16180A1482016-05-0505 May 2016 6 to the Updated Final Safety Analysis Report, Chapter 03, Design of Structures, Components, Equipment, and Systems, Figures 3.7-1 Through 3.11-1 ML16180A1392016-05-0505 May 2016 6 to the Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Figures 2.1-1 Through 2.5-3 ML0515304512004-06-0202 June 2004 Drawing 1 of 4, Ginna Site Boundary Survey, Rev. 1 ML0515304532004-06-0202 June 2004 Drawing 2 of 4, Building Details, Rev 1 ML0515304542004-06-0202 June 2004 Drawing 3 of 4, Site Detail, Rev. 1 ML0515304572004-06-0202 June 2004 Drawing 4 of 4, Station 13A Site Survey Map, Rev. 2 ML0412110062004-02-16016 February 2004 Drawing 33013-3102, Rev. 0, Control Room East Wall Penetrations for Creats Ducts. Sheet 1 ML0412110042004-02-11011 February 2004 Drawing 33013-3100, Rev. 0, Relay Room Annex Roof Penetrations and Creats Ducts ML0405502742004-02-11011 February 2004 Drawing No. 33013-3000, Revision 2, Control Room HVAC Control Room Emergency Air Treatment System (Creats) and Emergency Cooling System, Modification P & Id ML0222105382002-03-15015 March 2002 Drawing 33013-1275, Rev 4, Waste Disposal -- Gas Hydrogen Recombiner (Wd) P & Id Sheet 2 of 2-LR ML0222101972002-03-11011 March 2002 Drawing 33013-1248-LR, Rev 27, Auixilary Cooling Spent Fuel Pool Cooling (AC) P & Id ML0222105282002-03-0101 March 2002 Drawing 33013-1272, Rev 11, Waste Disposal -- Liquid Rc Drain Tank (Wd) P & Id Sheet 2 of 2 ML0222105332002-03-0101 March 2002 Drawing 33013-1274-LR, Rev 17, Waste Disposal -- Gas Hydrogen & Nitrogen (Wd) P & Id ML0222102962002-02-27027 February 2002 Drawing 33013-1258-LR, Rev. 23, Reactor Coolant Pressurizer (Rc) P & Id ML0222402702002-02-23023 February 2002 Drawing 33013-1885, Rev 30, Circulating Water P & Id Sheet 2 of 2-LR ML0222103092002-02-22022 February 2002 Drawing 33013-1260-LR, Rev 21, Reactor Coolant (Rc) P & Id 2020-11-20
[Table view] Category:Graphics incl Charts and Tables
MONTHYEARNMP1L3339, R. E. Ginna Station - Constellation Energy Group, LLC: Notification of Change in Indirect Ownership2020-04-24024 April 2020 R. E. Ginna Station - Constellation Energy Group, LLC: Notification of Change in Indirect Ownership ML18143B0222018-05-23023 May 2018 R. E. Ginna - Plate G-I, Seismic Refraction Profile I ML18143B0262018-05-23023 May 2018 R. E. Ginna - Plate G-3, Seismic Refraction Surveys, Seismic Refraction Line III and IV ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees Decommissioning Funding Status Reports ML15334A4532015-12-0404 December 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request-Flood Causing Mechanism Reevaluation ML12170A5342012-06-13013 June 2012 Eal.Jpg ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0315504242003-06-0303 June 2003 In Surge Example, Ginna Maximum System ats During Heatups, & Ginna Maximum System ats During Cooldowns ML18143A4451978-08-0303 August 1978 Spent Fuel Pool Cooling ML18143A4421978-08-0202 August 1978 R. E. Ginna - Response to Request, Attached Are Additional Detail on Flux Map Taken During Startup of Cycle 8 ML18142B0721978-07-28028 July 1978 Forwards Semiannual Effluent Release Report for the Period of Jan. - Jun. 1978 ML18143A4501978-07-27027 July 1978 R. E. Ginna - 1978 Steam Generator Inspection Final Report and NRC Questionnaire Update ML18142A7031978-04-18018 April 1978 Response to NRC Request Consisting of Information Concerning Data Taken During the Startup of Cycle 7 at Subject Facility with Attachment Table Presenting Predicted Rod Worth and the Measured Rod Worths with and Without Control Rod ML18142B0711978-03-14014 March 1978 Forwards Semiannual Effluent Release Report for the Period of Jul. - Dec. 1977 ML18192A0781977-05-11011 May 1977 R. E. Ginna - Steam Generator Inspection Final Report, May 11, 1977 ML18142B0701977-02-0303 February 1977 Forwards Semiannual Effluent Release Report for the Period of Jul. - Dec. 1976 ML18142B0691976-07-26026 July 1976 Forwards Semiannual Effluent Release Report for the Period of Jan. - Jun. 1976 ML18142C0691975-10-30030 October 1975 R. E. Ginna - 10/30/1975 Letter Transmittal of Request for Exemption from Certain Provisions of Appendix J to 10 C.F.R. Part 50 2020-04-24
[Table view] |