MONTHYEARNMP1L3339, R. E. Ginna Station - Constellation Energy Group, LLC: Notification of Change in Indirect Ownership2020-04-24024 April 2020 R. E. Ginna Station - Constellation Energy Group, LLC: Notification of Change in Indirect Ownership ML18143B0222018-05-23023 May 2018 R. E. Ginna - Plate G-I, Seismic Refraction Profile I ML18143B0262018-05-23023 May 2018 R. E. Ginna - Plate G-3, Seismic Refraction Surveys, Seismic Refraction Line III and Iv. ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML15334A4532015-12-0404 December 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request-Flood Causing Mechanism Reevaluation ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0315504242003-06-0303 June 2003 in Surge Example, Ginna Maximum System At'S During Heatups, & Ginna Maximum System At'S During Cooldowns ML18143A4451978-08-0303 August 1978 Spent Fuel Pool Cooling ML18143A4421978-08-0202 August 1978 R. E. Ginna - Response to Request, Attached Are Additional Detail on Flux Map Taken During Startup of Cycle 8 ML18142B0721978-07-28028 July 1978 Forwards Semiannual Effluent Release Report for the Period of Jan. - Jun. 1978 ML18143A4501978-07-27027 July 1978 R. E. Ginna - 1978 Steam Generator Inspection Final Report and NRC Questionnaire Update ML18142A7031978-04-18018 April 1978 Response to NRC Request Consisting of Information Concerning Data Taken During the Startup of Cycle 7 at Subject Facility with Attachment Table Presenting Predicted Rod Worth and the Measured Rod Worths with and Without Control Rod ML18142B0711978-03-14014 March 1978 Forwards Semiannual Effluent Release Report for the Period of Jul. - Dec. 1977 ML18192A0781977-05-11011 May 1977 R. E. Ginna - Steam Generator Inspection Final Report, May 11, 1977 ML18142B0701977-02-0303 February 1977 Forwards Semiannual Effluent Release Report for the Period of Jul. - Dec. 1976 ML18142B0691976-07-26026 July 1976 Forwards Semiannual Effluent Release Report for the Period of Jan. - Jun. 1976 ML18142C0691975-10-30030 October 1975 R. E. Ginna - 10/30/1975 Letter Transmittal of Request for Exemption from Certain Provisions of Appendix J to 10 C.F.R. Part 50 2020-04-24
[Table view] Category:Letter
MONTHYEARIR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of B Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23135A0412023-05-15015 May 2023 2022 Annual Radioactive Effluent Release Report and 2022 Annual Radiological Environmental Operating Report ML23121A0482023-05-0101 May 2023 R. E. Ginna Nuclear Power Plant Core Operating Limits Report Cycle 44, Revision 0 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000244/20230012023-04-26026 April 2023 LLC - Integrated Inspection Report 05000244/2023001 ML23100A0302023-04-10010 April 2023 2023 10 CFR 50.46 Annual Report ML23114A1152023-03-29029 March 2023 Electronic Reporting of Exposure Data for 2022 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23075A0872023-03-15015 March 2023 R. E. Ginna Nuclear Power Plant - Project Manager Assignment ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML23060A1622023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23005A1762023-02-23023 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 153 Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML23005A1222023-02-22022 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No 152 Adopt TSTF-315-Revise Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2 RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators ML22287A0692023-02-0808 February 2023 R. E. Ginna Station - Forward Fit Analysis (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23031A2992023-02-0707 February 2023 R. E. Ginna Nuclear Power Plant - Withdrawal of an Amendment Request ML23010A0112023-02-0101 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Inservice Testing of Refueling Water Storage Tank Outlet Value RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000244/20223012023-01-20020 January 2023 Initial Operator Licensing Examination Report 05000244/2022301 IR 05000244/20220122023-01-12012 January 2023 LLC - Design Basis Assurance Inspection (Teams) Inspection Report 05000244/2022012 ML22362A0382022-12-28028 December 2022 R. E. Ginna Nuclear Power Plant - Letter to Withdraw Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML22348A2062022-12-14014 December 2022 Re. Ginna Nuclear Power Plant - Annual Commitment Change Notification RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator 2024-02-05
[Table view] |
Text
U.S, NUCLEAR REGULATORY C~4ISSION DOCKET NUMBER NRC FORM 195 I2 76I Wo- >VAN FILE NUMBER
~ NRC DISTRIBUTION FQR PART 50 DOCKET MATERIAL nu i ~an me,n fe TO: Mr J P O'Reilly. FROM:Rochester Gas 6,.flee Co DATE OF DOCUMENT Rochester, NY 2"3"77 L D.White Jr DATE RECEIVED 2 B 77 HLETTER C3 NO TO R I Z E D PROP INPUT FORM NUMBER OF COPIES RECEIVED
~ORIeINAL QS NC LASS IF I E D gfCOP Y 1CC DESCRIPTION ENCLOSU RE Ltr trans the following: Semiannual Rpt o f Radioactive Ef fluents . from,,
j Ginna for the P'eriod July through December 76
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
5 lp 3p
/
r Pgg@TP~~,~IAQT( J)
,qagOT BZMOi"
'LANT NAME: G irma SAFETY FOR ACTION/INFORMATION 2<<8-77 eh f ASSIGNED AD:
C Wart e. 5 QMJBE C'ASST PROJECT MANAGER LIC ASST ~
L INTERNAL D ISTRI BUTION G FX SYSTEMS SAFETY PLANT SYSTEMS S TE SAFE C PDR t HEINE IAN TEDESCO 1 SCHROEDER OELD GOSSXCK 6 STAFF ENGXNEERING IPPOL 0 MXPC ERNST CASE KNIGHT BALLARD HANAUER SIHWEIL OPERATXNG REACTORS SPANGLER HARLESS PAWL CK STELLO SITE TECH PROJECT IQ,NAG&IENT REACTOR SAFE OPERATING TECH GAMIILL BOYD ROSS EXSENHUT STEPP PE COLLINS NOVAK HULMAN HOUSTON ROSZTOCZY PETERSON CHECK SITE ANALYSIS MELTZ VOLLMER HELTEMES AT&X BUNCH SKOVHOLT SALTZMAN J, COLLINS RUTBERG KREGER EXTERNAL DISTRIBUTION CONTROL NUMBER LPDRi cs NAT LAB~ N L. 3NMIEhYE TIC:" t ~5 Al REG V IE ULRIKSON OR NSXC: LA PDR ASLB: CONSULTANTS:
ACRS CYS HOLDING/
NRC FORM 196 (2.76)
C
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ >c
.,j<'Ni><j]$
1h"."ZZ!/$
I*Id ~
ROCHESTER GAS AND ELECTRIC CORPORATION LEON O. WQITE, JR.
VICC PRCSIOCNT
~ S9 EAST 0
AVENUE, ROCHESTER, N.Y. 14649 Pebruary 3, 1977 TCLCPMOMC ARCA COOt 7ld 546.2700 fdAK
.... Mr. James P. O'Reilly, Director U.S. Nuclear Regulatory Commission II'/(Pg" Office of Inspection and Enforcement Region I 631 Park Avenue ,CCM~)~+~~
>$8~
IQng of Prussia;. Pennsylvania 19406-' ~
5 Subf ect: =
Semiannual Effluent Release. Report R. E. Ginna Nuclear Power Plant, Unit No. 1 Docket No. 50-244
Dear Mr. O'Reilly:
In accordance with the requirements of our Technical Specifications 6.9.3.b, attached is the semiannual'eport of radioactive effluents from our Ginna Plant for the period July through December 1976.
These include the liquid and airborne effluent tables and a tabula-tion of the shipments off site of 1,671 cubic feet of solid radioactive waste containing 12.01 curies of activity.
One additional copy of this letter and the attachment are enclosed.
Very truly yours, L. D. White, Jr.
Attachment (i>e cc: Dr. Ernst Volgenau (25), egiuja~o Mr. William G. McDonald (2) 3'+ g
$ 197I" ~I~-'0 I~
~
h ~
P'~i / pg
'I 0
$ hi&Ne ei
~g~~~)y E ~
ft1 K
ROQlESIER GAS & EUZmIC KBPORATICN l
1976 FACILITY I'IQV)0 RELEASES
- 1. GROSS RADIOACIIVI~TV 6+V MITS ~ LY SEP OCT.
A) TOTAL RELKASE CURIES .OO 91M O AVERAGE CONCENTRATION RELEASEO UCI HL ..OOE-5 1~6E- 0 i.33E-EE LOiE~0 .29E-11~ .262 - 0 C) HAXINtxl CONCENTRATION RELEASED UCI/IR. .82E-9 57E-9 3,75EE .7I2E- AZ-9 OEQ TRIT IUll A) TOTAL RELKASE CURIE 5 32 0 Ol ,92 AVERAGE CONCENTRATION RELEASED UCI/NL E-HORLK GAS'ES
'ISSOLVED A) TOTAL RELEASE CURIES O) AVE RAGF. CONCENTRATION RELKASED UCI/HL 4~ GROSS ALPIIA RAG IOAC'TIV I TV JO EL 5E RIES 49M 3E-0~3~% L93E-S 19E=
- 5. ~ VOttPIK OF I.IOUIO WASTE TO "DISCHARGE CANAL LI TER $6 76E5 5.70E5 3.51E6 2.42E 6 8.19E5
- 6. VOLtAIE OF DILUTION 'RATER LITERS 6. OE 3. 2E10 EO /I.S 549EL
- 7. ISOTOPES RKLEASED CUR IKS OA LA )40 SR-89 ZOOOZ I13 XE- l35
<<s-137 0011 00102 .0020 6 2 CS-)34 33 JM 030 OQ03 23 .00346 CO. 60 .00415 0013 0~0' 1
CD.SS CR SI 12 JM .00016 tIN-54 ZN-65 00 - JNN
.00003 8 ~ PKRCIHT OI'ECHNICAL SPECIF ICATIOH LIHIT FOR TOTAL ACT IVI TV R'ELKASKD <.001
.00008 .00017 ~
.00005 . 7 .000002 .0001 AgllM ~ ND .00001 ~ .00002 .00004 .000010 .00002 RLI103. ..00002 .00002 .QQQ004 .00002 .000016 ND
'eI41
. ND - ND .000007 ND .000116 ND
f 4 H ~ ~ ~ ~,, S>> ~oP.
'1 Nochestcr Oas and Electric Corporation
. 1976 II AIRBORNE RELEASES VIII TS JULY AUG SEPT OCT IIOV OEC DN.OLE ALL CUR IES J1L85 129~5
- 2. 'IOIAL UALOGENS CVRIES 1.3 J}00D.
- 3. TOTAL I'ARTICULATE GROSS RADIOACTIVITY ID,YI CUR I ES 1.5E-6 .88E-6 2.32E-6 .57E-6 1.33E-6 S. TO'IAL TRITIUM CORI'ES .Ois". 1.582 5 ~ TOTAL PARTICULATE GROSS ALAPIIA RADIOACTIVITY
,llE-7 9.0E-9 3210
- 6. MAXIMUM NODLE GAS RELASE RATE UCI/SEC 08.
- 7. PERCENT OF AI'PLICADLE LIMIT FOR:
AD NOPLE GASSES R. NALOGENS 6z 634 L083 C. I'AR'IICULATES C < 001
- 8. ISOIOI'E RELEASEDI CUR IES PARTICULATES CS-137 84E-7 8 LII 140 .ND .95'h SIT=8 02Eel CS-13S SR-89 U9K2 NALOGENS I-133 9}110 eau 00070 J}00K IO I}02 KQ1 0005 .00011 ~
I 135 GASES KR.85 XE-133 KR-88 KR-87 KR Q T35i .2 62 .723 .609 29 XE 135M XE-135 AR-41 DIVERS AS APPROPRI ALE lSPECIFYl XO131H ,Ql,0 ,08$
XO133H J}088
.D.lE= N) NO
- 2. E-7 4.57E-S I.ZOE-7 3..53EdL Nb 95 1 3.44E-S 9 5~-9 Te 132.
Ce141 2. 14E-S ND 854 2. SE-9 HD
~
ND - None Detected
\ 1 f
8,
'I
\
SOLID HASTE JULY 1 1976 throu h DEC&GER 31 1976 During the six month period, 1671 cubic feet of solid waste containing 12.01 Curies of radioactive material was shipped offsite for burial. All the solid waste was sent to the Barnwell, South Carolina burial ground operated by Chem-Nuclear Systems, Inc.
DATE SHIPPED CURIES CUBIC FEET 30 August 3.36 348
- 20. 4.72 419 October'3 November 1.71 '04 13 December 2.22 500 July <<Dec. Total 12.01 1671 Jan -. June Total 85. 82 8223 1976 Total 97. 83 9894 23 Shipments