| number = ML19255H303
| number = ML19255H303
| issue date = 09/12/2019
| issue date = 09/12/2019
| title = Acceptance Review - Relief Request I4R-07 to Utilize Code Case N-513-4
| title = NRR E-mail Capture - Acceptance Review - Relief Request I4R-07 to Utilize Code Case N-513-4
| author name = Singal B
| author name = Singal B
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV

Revision as of 08:42, 1 December 2019

NRR E-mail Capture - Acceptance Review - Relief Request I4R-07 to Utilize Code Case N-513-4
ML19255H303
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/12/2019
From: Balwant Singal
Plant Licensing Branch IV
To: Good N
Wolf Creek
References
L-2019-LLR-0075
Download: ML19255H303 (2)


Text

NRR-DRMAPEm Resource From: Singal, Balwant Sent: Thursday, September 12, 2019 8:19 AM To: Nicole Good

Subject:

Acceptance Review - Relief Request I4R-07 to Utilize Code Case N-513-4 (EPID L-2019-LLR-0075)

By letter dated August 15, 2019 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML19232A139), Wolf Creek Nuclear Operating Corporation submitted relief request I4R-07 to utilize Code Case N-513-4 for evaluation criteria for temporary acceptance of flaws in moderate energy ASME Section XI class 2 or 3 piping at Wolf Creek Generating Station.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 180 hours0.00208 days <br />0.05 hours <br />2.97619e-4 weeks <br />6.849e-5 months <br /> to complete. The NRC staff expects to complete its review and formal authorization by August 31, 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

Balwant K. Singal Senior Project Manager (Diablo Canyon and Wolf Creek)

Nuclear Regulatory Commission Division of Operating Reactor Licensing Balwant.Singal@nrc.gov Tel: (301) 415-3016 Fax: (301) 415-1222 1

Hearing Identifier: NRR_DRMA Email Number: 197 Mail Envelope Properties (BN6PR09MB11560BF1B79AAE1323D35CB586B00)

Subject:

Acceptance Review - Relief Request I4R-07 to Utilize Code Case N-513-4 (EPID L-2019-LLR-0075)

Sent Date: 9/12/2019 8:18:31 AM Received Date: 9/12/2019 8:18:00 AM From: Singal, Balwant Created By: Balwant.Singal@nrc.gov Recipients:

"Nicole Good" <Nicole.Good@WCNOC.com>

Tracking Status: None Post Office: BN6PR09MB1156.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1938 9/12/2019 8:18:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: