ML19210C942: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:*L AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
{{#Wiki_filter:*
50-368 UNIT ANO-2 DATE 11/la/70 COMPLETED BY
L AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.           50-368 UNIT         ANO-2 DATE       11/la/70 COMPLETED BY       _R. A. Pendergraft TELEPHONE 501-968-2519 MONTH       mtnher 1979 DAY       AVERAGE DAILY POWER LEVEL                       DAY     AVERAGE DAILY POWER LEVEL IMWe Net)                                           g gwe.geg, 1                   307                               ,7 0
_R.A. Pendergraft 501-968-2519 TELEPHONE MONTH mtnher 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL IMWe Net)g gwe.geg, 1 307 0 ,7 389 0 2__jg 3 398 0 39 4}01 0 20 5 0 21 0 6 0 22 0 7 23 0 0 8 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 0 29 14 0 0 30 0 15 0 33 16 0 1361 338 INSTRUCTIONS On this tormat, hst the ascrage dail) unit pimer leselin MWe Net for each day in the reporting inonth. Compute to the nearest whole megawatt.
2      __
19/77)7911200 h[  
389                               jg                    0 3                   398                                                     0 39 4                   }01                               20                    0 5                         0                                                  0 21 6                         0 22                   0 7                                                                           0 23 8
'4 OPERATING DATA REPORT 50-368 DOCKET NO.
0 24                   0 9                         0                                                  0 25 10                        0                                                   0 26 11                        0                                                   0 27 12                        0                                                   0 28 13                         0                                                   0 29 14                         0                                                   0 30 0
DATE 11/'a /'o COMPLETED BY R. A. P' ndergraft e TELEPHONE 501-968-2519 OPERATING STATUS Notes 1. Unit Name: Jrkansas Niiclew nnn _ tin ; , , 2. Reporting Penod:
15 33                    0 16                         0 1361         338 INSTRUCTIONS On this tormat, hst the ascrage dail) unit pimer leselin MWe Net for each day in the reporting inonth. Compute to the nearest whole megawatt.
October 1-31. 1979
19/77) 7911200 h             [
: 3. Licensed Thermal Power (MWt):
 
2815 959 4. Nameplate Rating (Gross MWel 912 5. Design Electrical Rating (Net MWel:
  '
NA 6. Maximum Dependable C:pacity (Gross MWe):
4 OPERATING DATA REPORT DOCKET NO.      50-368 DATE 11/'a /'o COMPLETED BY R. A.eP' ndergraft TELEPHONE 501-968-2519 OPERATING STATUS Notes
_#7. Maximum Depnuable Capacity (Net MWe).
: 1. Unit Name: Jrkansas Niiclew nnn _ tin ; , ,
: 2. Reporting Penod:       October 1-31. 1979
: 3. Licensed Thermal Power (MWt):       2815
: 4. Nameplate Rating (Gross MWel         959
: 5. Design Electrical Rating (Net MWel: 912 NA
: 6. Maximum Dependable C:pacity (Gross MWe):                         _
                                                            #
: 7. Maximum Depnuable Capacity (Net MWe).
: 8. If Char.ges Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
: 8. If Char.ges Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
Non+9. Powet Lesel To which Restricted. lf Anv (Net MWel:
Non+
None NA 10. Reasons For Restricticas. If Any:
: 9. Powet Lesel To which Restricted. lf Anv (Net MWel:       None
This Month Yr..to-Date Cumulatise I1. Ilours in Reporting Period 745.0 7296 n an4o n 12. Number Of ' aurs Reactor was Critical 78.0 2787.6 3999 s 0.0 2142.9 2285.1 13. Reactor Rewne Shutdown Hours
: 10. Reasons For Restricticas. If Any:       NA This Month           Yr..to-Date         Cumulatise I1. Ilours in Reporting Period                               745.0               7296 n                 an4o n
: 14. Ilours Generator On.Line 78.0 2447.0 2493.8 15. Unit Resene Shutdown Hours 0.0 21.7 71 _7 105867.0 2638959.0 2683537.0 16. Gross Thermal Energy Generated (MWill
: 12. Number Of ' aurs Reactor was Critical                     78.0               2787.6                 3999 s
: 17. Gross Eleevical Energy Generated iMWH) 31215.0 796971 n- 7non_n 18. Net Electrical Energy Generated (MWHi 28698.0__fMfLo41 o sq,o9q n__19. Unit Service Factor
: 13. Reactor Rewne Shutdown Hours 0.0               2142.9                 2285.1
]20. Unit Availability Factor I 21. Unit Capacity Factor (Using MDC Net) 7 NA UNTIL C0FNERCIAL OPERATION
: 14. Ilours Generator On.Line                                 78.0               2447.0                 2493.8
#22. Unit Capacity Factor (Using DER Net)
: 15. Unit Resene Shutdown Hours                                 0.0                 21.7                   71 _7
: 16. Gross Thermal Energy Generated (MWill              105867.0           2638959.0               2683537.0
: 17. Gross Eleevical Energy Generated iMWH)               31215.0           796971 n                 - 7non_n
: 18. Net Electrical Energy Generated (MWHi                 28698.0          __fMfLo41 o               sq,o9q   n__
: 19. Unit Service Factor
: 20. Unit Availability Factor
                                                    ]  I
                                                      #
: 21. Unit Capacity Factor (Using MDC Net)           7         NA UNTIL C0FNERCIAL OPERATION
: 22. Unit Capacity Factor (Using DER Net)
: 23. Unit Forced Outage Rate
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:
None November 22, 1979
None
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:       November 22, 1979
: 26. Units in Test Status t Prior to Commercial Operationi:
: 26. Units in Test Status t Prior to Commercial Operationi:                     Forecast           Achiesed INITIA L CRITICA LITY
Forecast Achiesed INITIA L CRITICA LITY 5-78 INITIAL ELECTRICITY
                                                                                      -
-w h 78 COMMERCIAL OPER ATION Jan. 1980' " ' " '1361 339  
12-5-78 w h 78 INITIAL ELECTRICITY                                       -
>4 1 50-368'UNIT SIIUTDOWNS AND POWER RLDUCTIONS DOCKETNO.7NO-Unit 2
COMMERCIAL OPER ATION                                 Jan. 1980
*UNI r N A%IE DATE 3714/79 REPORT A10NTil October 005tPLE IED BY R. 3. Penderaraft TEl.EPilONE 501-968-2519
                                                                                                                  '"'"'
,,...: c.5 '?3$ $l'Licensee g-r, y *., Cause & Coniective
1361         339
, No.Dale&53 4 is5 Event?'s '?Action to jE 5 5 iji =Repors =EU 5'Preseni Recurrente H g u e C.79-22 10-4-79 S 667 H 2 None IF AIRDRY loss of Instrument Air caused Unit to trip on same day as scheduled outage was to occur. Outage was scheduled for Reactor Internals Inspection.
 
-u I 2 3 4~F; Fosted Reason: hie hixt: 1%1 obit G - Instinctions S Scheduled A Equipnent Failure (17.xplain) '
                                                                                                                                                                  >
l htanual for Psep. nation ol' Data
4 1
^*U.htaintenance or l'est 2-hf annal Scram.
                                                                                                                                                              '
I'ntr> Sheci> t'or I i.ensee
DOCKETNO.            50-368 UNIT SIIUTDOWNS AND POWER RLDUCTIONS                                       7NO-Unit 2
*C Refieling 3- Autoinatic Sstam.
* UNI r N A%IE DATE 3714/79 005tPLE IED BY R. 3. Penderaraft REPORT A10NTil October                              TEl.EPilONE       501-968-2519
laent Repois (1.1 R1 l ile (NilRI G-C-D Regulatory Restriction 4 Osher (Lsplain) 01611 l' Openalor Ts.sinnig & I hense I sananation F- A d nu nist rai n e 5 G. Opes ational i e sor (l.splaia l L sinbei 1 Saux Souice 08/77)11 Other (INplaini  
                                                                ,,.
*<REFUELING INFORMATION 1.Name of facility.
                                                          ..     :                             c
Arkansas Nuclear One - Unit 2 2.Scheduled date for next refueling shutdown.
                              ,        .5 '?     3       $ $l'         Licensee     g-r,       y *.,                 Cause & Coniective No.         Dale     &       53           4     is5           Event       ?'
9 1/g1 3.Scheduled date for restart following refueling.
EU s '?                       Action to H      jE           5     5 iji =
3/1/q1 4.Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
e Repors =
u 5'                   Preseni Recurrente g
C
                                                                                                                                                            .
79-22     10-4-79     S         667         H         2         None         IF       AIRDRY     loss of Instrument Air caused Unit to trip on same day as scheduled outage was to occur. Outage was scheduled for Reactor Internals Inspection.
-
u
~
I                   2                                                       3                                 4 F; Fosted         Reason:                                                 hie hixt:                           1%1 obit G - Instinctions S Scheduled       A Equipnent Failure (17.xplain) '                       l htanual                           for Psep. nation ol' Data
  ^*                       U.htaintenance or l'est                                 2-hf annal Scram.                   I'ntr> Sheci> t'or I i.ensee
* C Refieling                                             3- Autoinatic Sstam.               laent Repois (1.1 R1 l ile (NilRI G-C-                         D Regulatory Restriction                               4 Osher (Lsplain)                   01611 l' Openalor Ts.sinnig & I hense I sananation F- A d nu nist rai n e                                                                 5 G. Opes ational i e sor (l.splaia l                                                         L sinbei 1 Saux Souice 08/77)               11 Other (INplaini
 
  *
<
REFUELING INFORMATION
: 1. Name of facility.       Arkansas Nuclear One - Unit 2
: 2. Scheduled date for next refueling shutdown.       9 1/g1
: 3. Scheduled date for restart following refueling. 3/1/q1
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If answer is yes, what, in general, will these be?
If answer is yes, what, in general, will these be?
If answer is no, has tha reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?
If answer is no, has tha reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?
Yes.Description of effects of new core loading 5.Scheduled date(s) for submitting proposed licensing action and supporting information.
Yes. Description of effects of new core loading
12/1/80.6.Important licensing considerations 2:sociated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
: 5. Scheduled date(s) for submitting proposed licensing action and supporting information. 12/1/80
NONE 7.The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
                                                                            .
a)_177 b)0 8.The present lic nsed spent fuel pool storage capacity and the size of any incr:sse in licensed storage capacity that has been requested or is planned.
: 6. Important licensing considerations 2:sociated with refueling, e.g.,
.'n number of fuel assemblies.
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
present 486 increase size by 566 9.The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
NONE
DATE: 1993 136!341  
: 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool. a)_    177                b)   0
*e NRC MONTHLY OPERATING REPORT OPERATING  
: 8. The present lic nsed spent fuel pool storage capacity and the size of any incr:sse in licensed storage capacity that has been requested or is planned. .'n number of fuel assemblies.
present         486               increase size by     566
: 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
DATE:     1993 136! 341
* e NRC MONTHLY OPERATING REPORT OPERATING  


==SUMMARY==
==SUMMARY==
Line 72: Line 110:
At 0600 on 10-4, the reactor was manually tripped when all instrument air was lost due to an inoperable instrument air dryer valve. This trip occurred on the same day as the scheduled outage was to occur.
At 0600 on 10-4, the reactor was manually tripped when all instrument air was lost due to an inoperable instrument air dryer valve. This trip occurred on the same day as the scheduled outage was to occur.
The unit has remained at 0 power for the remainder of the month while reactor internals inspection and diesel generator replacement is being accomplished.
The unit has remained at 0 power for the remainder of the month while reactor internals inspection and diesel generator replacement is being accomplished.
b h.hbk}}
b   h .hbk}}

Revision as of 12:47, 19 October 2019

Monthly Operating Rept for Oct 1979
ML19210C942
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 11/14/1979
From: Pendergraft R
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML19210C937 List:
References
NUDOCS 7911200347
Download: ML19210C942 (5)


Text

L AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-368 UNIT ANO-2 DATE 11/la/70 COMPLETED BY _R. A. Pendergraft TELEPHONE 501-968-2519 MONTH mtnher 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL IMWe Net) g gwe.geg, 1 307 ,7 0

2 __

389 jg 0 3 398 0 39 4 }01 20 0 5 0 0 21 6 0 22 0 7 0 23 8

0 24 0 9 0 0 25 10 0 0 26 11 0 0 27 12 0 0 28 13 0 0 29 14 0 0 30 0

15 33 0 16 0 1361 338 INSTRUCTIONS On this tormat, hst the ascrage dail) unit pimer leselin MWe Net for each day in the reporting inonth. Compute to the nearest whole megawatt.

19/77) 7911200 h [

'

4 OPERATING DATA REPORT DOCKET NO. 50-368 DATE 11/'a /'o COMPLETED BY R. A.eP' ndergraft TELEPHONE 501-968-2519 OPERATING STATUS Notes

1. Unit Name: Jrkansas Niiclew nnn _ tin ; , ,
2. Reporting Penod: October 1-31. 1979
3. Licensed Thermal Power (MWt): 2815
4. Nameplate Rating (Gross MWel 959
5. Design Electrical Rating (Net MWel: 912 NA
6. Maximum Dependable C:pacity (Gross MWe): _
7. Maximum Depnuable Capacity (Net MWe).
8. If Char.ges Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

Non+

9. Powet Lesel To which Restricted. lf Anv (Net MWel: None
10. Reasons For Restricticas. If Any: NA This Month Yr..to-Date Cumulatise I1. Ilours in Reporting Period 745.0 7296 n an4o n
12. Number Of ' aurs Reactor was Critical 78.0 2787.6 3999 s
13. Reactor Rewne Shutdown Hours 0.0 2142.9 2285.1
14. Ilours Generator On.Line 78.0 2447.0 2493.8
15. Unit Resene Shutdown Hours 0.0 21.7 71 _7
16. Gross Thermal Energy Generated (MWill 105867.0 2638959.0 2683537.0
17. Gross Eleevical Energy Generated iMWH) 31215.0 796971 n - 7non_n
18. Net Electrical Energy Generated (MWHi 28698.0 __fMfLo41 o sq,o9q n__
19. Unit Service Factor
20. Unit Availability Factor

] I

21. Unit Capacity Factor (Using MDC Net) 7 NA UNTIL C0FNERCIAL OPERATION
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup: November 22, 1979
26. Units in Test Status t Prior to Commercial Operationi: Forecast Achiesed INITIA L CRITICA LITY

-

12-5-78 w h 78 INITIAL ELECTRICITY -

COMMERCIAL OPER ATION Jan. 1980

'"'"'

1361 339

>

4 1

'

DOCKETNO. 50-368 UNIT SIIUTDOWNS AND POWER RLDUCTIONS 7NO-Unit 2

  • UNI r N A%IE DATE 3714/79 005tPLE IED BY R. 3. Penderaraft REPORT A10NTil October TEl.EPilONE 501-968-2519

,,.

..  : c

, .5 '? 3 $ $l' Licensee g-r, y *., Cause & Coniective No. Dale & 53 4 is5 Event  ?'

EU s '? Action to H jE 5 5 iji =

e Repors =

u 5' Preseni Recurrente g

C

.

79-22 10-4-79 S 667 H 2 None IF AIRDRY loss of Instrument Air caused Unit to trip on same day as scheduled outage was to occur. Outage was scheduled for Reactor Internals Inspection.

-

u

~

I 2 3 4 F; Fosted Reason: hie hixt: 1%1 obit G - Instinctions S Scheduled A Equipnent Failure (17.xplain) ' l htanual for Psep. nation ol' Data

^* U.htaintenance or l'est 2-hf annal Scram. I'ntr> Sheci> t'or I i.ensee

  • C Refieling 3- Autoinatic Sstam. laent Repois (1.1 R1 l ile (NilRI G-C- D Regulatory Restriction 4 Osher (Lsplain) 01611 l' Openalor Ts.sinnig & I hense I sananation F- A d nu nist rai n e 5 G. Opes ational i e sor (l.splaia l L sinbei 1 Saux Souice 08/77) 11 Other (INplaini

<

REFUELING INFORMATION

1. Name of facility. Arkansas Nuclear One - Unit 2
2. Scheduled date for next refueling shutdown. 9 1/g1
3. Scheduled date for restart following refueling. 3/1/q1
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If answer is yes, what, in general, will these be?

If answer is no, has tha reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?

Yes. Description of effects of new core loading

5. Scheduled date(s) for submitting proposed licensing action and supporting information. 12/1/80

.

6. Important licensing considerations 2:sociated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

NONE

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool. a)_ 177 b) 0
8. The present lic nsed spent fuel pool storage capacity and the size of any incr:sse in licensed storage capacity that has been requested or is planned. .'n number of fuel assemblies.

present 486 increase size by 566

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

DATE: 1993 136! 341

  • e NRC MONTHLY OPERATING REPORT OPERATING

SUMMARY

- OCTOBER, 1979 UNIT II The 50% power plateau testing continued from the previous month.

At 0600 on 10-4, the reactor was manually tripped when all instrument air was lost due to an inoperable instrument air dryer valve. This trip occurred on the same day as the scheduled outage was to occur.

The unit has remained at 0 power for the remainder of the month while reactor internals inspection and diesel generator replacement is being accomplished.

b h .hbk