{{#Wiki_filter:Keith J. Poison P.O. Box 63 Vice President-Nine Mile Point Lycoming, New York 13093 315.349.5200 315.349.1321 Fax 0 Constellation Energy Nine Mile Point Nuclear Station July 30, 2007 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
{{#Wiki_filter:Keith J. Poison                                                           P.O. Box 63 Vice President-Nine Mile Point                                             Lycoming, New York 13093 315.349.5200 315.349.1321 Fax 0   Constellation Energy Nine Mile Point Nuclear Station July 30, 2007 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001


==SUBJECT:==
==SUBJECT:==
Nine Mile Point Nuclear Station Unit No. 2; Docket No. 50-410 Application for Technical Specification Change TSTF-477, Revision 3,"Add Action for Two Inoperable Control Room AC Subsystems" to the Technical Specifications Using Consolidated Line Item Improvement Process Pursuant to 10 CFR 50.90, Nine Mile Point Nuclear Station, LLC, (NMPNS) hereby requests an amendment to Nine Mile Point Unit 2 (NMP2) Renewed Operating License NPF-69. The proposed amendment would modify the Technical Specifications (TS) by adding an action statement for two inoperable control room air conditioning (AC) subsystems to the plant specific TS.Attachment (1) provides a description of the proposed change, the requested confirmation of applicability, and plant-specific verifications.
Nine Mile Point Nuclear Station Unit No. 2; Docket No. 50-410 Application for Technical Specification Change TSTF-477, Revision 3, "Add Action for Two Inoperable Control Room AC Subsystems" to the Technical Specifications Using Consolidated Line Item Improvement Process Pursuant to 10 CFR 50.90, Nine Mile Point Nuclear Station, LLC, (NMPNS) hereby requests an amendment to Nine Mile Point Unit 2 (NMP2) Renewed Operating License NPF-69. The proposed amendment would modify the Technical Specifications (TS) by adding an action statement for two inoperable control room air conditioning (AC) subsystems to the plant specific TS.
Attachment (2) provides the existing TS pages marked up to show the proposed change. Attachmnent (3) provides the existing TS Bases pages marked up to show the proposed change in accordance with 10 CFR 50.36(a).
Attachment (1) provides a description of the proposed change, the requested confirmation of applicability, and plant-specific verifications. Attachment (2) provides the existing TS pages marked up to show the proposed change. Attachmnent (3) provides the existing TS Bases pages marked up to show the proposed change in accordance with 10 CFR 50.36(a). TS Bases changes are provided for information only and will be processed in accordance with TS 5.5.10, "Technical Specifications (TS) Bases Control Program."
TS Bases changes are provided for information only and will be processed in accordance with TS 5.5.10, "Technical Specifications (TS) Bases Control Program." NMPNS requests approval of the proposed license amendment by January 30, 2008 with the amendment being implemented within 60 days of receipt of the approved amendment.
NMPNS requests approval of the proposed license amendment by January 30, 2008 with the amendment being implemented within 60 days of receipt of the approved amendment.
In accordance with 10 CFR 50.91, a copy of this license amendment application, with attachments, is being provided to the appropriate state representative.
In accordance with 10 CFR 50.91, a copy of this license amendment application, with attachments, is being provided to the appropriate state representative.
Document Control Desk July 30, 2007 Page 2 Should you have any questions regarding the information in this submittal, please contact T. F. Syrell, Licensing Director, at (315) 349-5219.Very truly yours, STATE OF NEW YORK TO WIT: COUNTY OF OSWEGO I, Keith J. Poison, being duly sworn, state that I am Vice President-Nine Mile Point, and that I am duly authorized to execute and file this request on behalf of Nine Mile Point Nuclear Station, LLC. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other Nine Mile Point employees and/or consultants.
 
Such information has been reviewed in accordance with company practice and I believe it to be reliable.Subscribed and sworn before me, a Notary Public in and for the State of New York and County of Oswego, this 30C"-day of 2007.WITNESS my Hand and Notarial Seal: .(-Notary Public My Commission Expires: 0o/z 5/o j Date SANDRA A. OSWALD Notary Public, State of New York No. 01OS6032276 Qualified in Oswego County Commission Expires ,o-2 KJ.P/GB Attachments:
Document Control Desk July 30, 2007 Page 2 Should you have any questions regarding the information in this submittal, please contact T. F. Syrell, Licensing Director, at (315) 349-5219.
(1) Description and Assessment of the Proposed Changes (2) Proposed Technical Specification (TS) Changes (Marked Up Pages)(3) Proposed Technical Specification (TS) Bases Changes (Marked Up Pages)
Very truly yours, STATE OF NEW YORK TO WIT:
Document Control Desk July 30, 2007 Page 3 cc: S. J. Collins, NRC Region I Administrator E. C. Knutson, Senior NRC Resident Inspector M. J. David, NRC Project Manager J. P. Spath, NYSERDA ATTACHMENT (1)DESCRIPTION AND ASSESSMENT OF THE PROPOSED CHANGES TABLE OF CONTENTS 1. DESCRIPTION
COUNTY OF OSWEGO I, Keith J. Poison, being duly sworn, state that I am Vice President-Nine Mile Point, and that I am duly authorized to execute and file this request on behalf of Nine Mile Point Nuclear Station, LLC. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other Nine Mile Point employees and/or consultants. Such information has been reviewed in accordance with company practice and I believe it to be reliable.
Subscribed and sworn before me, a Notary Public in and for the State of New York and County of Oswego, this 30C"-day of
* 2007.
WITNESS my Hand and Notarial Seal:                                                   .(-
Notary Public My Commission Expires:                                                     0o/z 5/o j Date SANDRA A. OSWALD Notary Public, State of New York No. 01OS6032276 Qualified in Oswego County Commission Expires ,o-2 *-V KJ.P/GB Attachments:     (1)       Description and Assessment of the Proposed Changes (2)       Proposed Technical Specification (TS) Changes (Marked Up Pages)
(3)       Proposed Technical Specification (TS) Bases Changes (Marked Up Pages)
 
Document Control Desk July 30, 2007 Page 3 cc:     S. J. Collins, NRC Region I Administrator E. C. Knutson, Senior NRC Resident Inspector M. J. David, NRC Project Manager J. P. Spath, NYSERDA
 
ATTACHMENT (1)
DESCRIPTION AND ASSESSMENT OF THE PROPOSED CHANGES TABLE OF CONTENTS
: 1. DESCRIPTION
: 2. ASSESSMENT
: 2. ASSESSMENT
: 3. REGULATORY ANALYSIS 4. ENVIRONMENTAL EVALUATION
: 3. REGULATORY ANALYSIS
: 5. REFERENCES Nine Mile Point Nuclear Station, LLC July 30, 2007 ATTACHMENT (1)DESCRIPTION AND ASSESSMENT OF PROPOSED CHANGES  
: 4. ENVIRONMENTAL EVALUATION
: 5. REFERENCES Nine Mile Point Nuclear Station, LLC July 30, 2007
 
ATTACHMENT (1)
DESCRIPTION AND ASSESSMENT OF PROPOSED CHANGES
 
==1.0      DESCRIPTION==
 
This letter is a request to amend Operating License 50-4 10 for Nine Mile Point Unit 2 (NMP2).
The proposed amendment would modify Technical Specifications (TS) 3.7.3, "Control Room Envelope Air Conditioning (AC) System," by adding an Action Statement to the Limiting Condition for Operation (LCO). The new Action Statement allows a finite time to restore one control room envelope AC subsystem to operable status and requires verification that the control room temperature remains < 900 F every 4 hours.
The changes are consistent with Nuclear Regulatory Commission (NRC) approved Industry/Technical Specification Task Force (TSTF) TSTF-477, Revision 3 (Reference 1). The availability of this TS improvement was published in the FederalRegister on March 26, 2007 (72 FR 14143) (Reference 2) as part of the consolidated line item improvement process (CLIIP).
2.0      ASSESSMENT 2.1      Applicability of TSTF-477, and Published Safety Evaluation Nine Mile Point Nuclear Station, LLC (NMPNS) has reviewed TSTF-477, Revision 3, and the NRC model safety evaluation (SE) (Reference 3) as part of the CLIIP. NMPNS has concluded that the information in TSTF-477, as well as the SE prepared by the NRC staff are applicable to NMP2 and justify this amendment for the incorporation of the changes to the NMP2 TS.
2.2      Optional Changes and Variations NMPNS is not proposing any significant variations or deviations from the TS changes described in TSTF-477 or the NRC staff s model safety evaluation dated December 18, 2006. The NMP2 TS 3.7.3 does contains one minor deviation from the TS changes provided in the TSTF for the BWR 4 model.
Specifically, NMP2 TS 3.7.3 Condition A contains two applicable conditions which stipulate that if the condition of "One control room envelope AC subsystem inoperable" OR "Two control room envelope AC subsystems inoperable with safety function maintained," take required Action A.1. The Control Room Envelope AC System consists of two 100% capacity air conditioning subsystems. During normal operation, at least one subsystem operates. The ability of the Control Room Envelope AC System to maintain control room envelope temperature within limits is an implicit assumption of the safety analysis evaluated in the Updated Safety Analysis Report (USAR) Chapter 6, Engineering Safety Features, and Chapter 15, Accident Analysis. Due to the design of the system, when both subsystems are inoperable, the capability for the Control Room Envelope AC System to perform its design function may still exist by having sufficient components operable from both subsystems to meet its safety function. This TS deviation was part of the NMP2 conversion to the Standard Technical Specifications (STS) and does not impact or alter the application of the SE.
Since Condition A includes two inoperable subsystems with the safety function maintained, new Condition B is modified to specify that the condition is for two inoperable subsystems without the safety function being maintained.
Page 1 of 3
 
ATTACHMENT (1)
DESCRIPTION AND ASSESSMENT OF PROPOSED CHANGES
 
==3.0      REGULATORY ANALYSIS==
 
3.1      No Significant Hazards Consideration Determination NMPNS has reviewed the proposed no significant hazards consideration determination (NSHC) published in the FederalRegister as part of the CLIIP. NMPNS has concluded that the proposed NSHC presented in the Federal Register notice is applicable to NMP2 and is hereby incorporated by reference to satisfy the requirements of 10 CFR 50.9 1(a).
3.2      Verification and Commitments As discussed in the notice of availability published in the FederalRegister on March 26, 2007 for this TS improvement, plant-specific verifications were performed as follows:
NMPNS has reviewed References 1 and 2, and the model Safety Evaluation published on December 18, 2006 (71 FR 75774) as part of the CLIIP Notice for Comment. NMPNS has utilized References 1 and 2 to develop the proposed TS changes. NMPNS has also concluded that the justification presented in TSTF-477, Revision 3 and the model Safety Evaluation prepared by the NRC staff is applicable to NMP2, and justify this amendment for the incorporation of the changes to the NMP2 TS.
In addition, NMPNS has proposed TS Bases consistent with TSTF-477 which provide guidance and details on how to implement the new requirements. Finally, NMPNS has a Bases Control Program consistent with Section 5.5 of the Standard Technical Specifications (STS).
4.0      ENVIRONMENTAL EVALUATION The amendment changes requirements with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR part 20. The NRC staff has determined that the amendment adopting TSTF-477, Revision 3, involves no significant increase in the amounts or no significant change in the types of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that TSTF-477, Revision 3, involves no significant hazards considerations, and there has been no public comment on the finding in FederalRegister Notice 71 FR 75774, December 18, 2006. Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
 
==5.0      REFERENCES==
: 1.      TSTF-477, Revision 3, "Adding Action Statement for Two Inoperable Control Room AC Subsystems."
: 2.      FederalRegister Notice: "Notice of Availability Concerning Technical Specification Improvement to Add an Action Statement for Two Inoperable Control Room Air Conditioning Subsystems to the Technical Specifications Using the Consolidated Line Item Improvement Process," published on March 26, 2007 (72 FR 14143).
Page 2 of 3


==1.0 DESCRIPTION==
ATTACHMENT (1)
DESCRIPTION AND ASSESSMENT OF PROPOSED CHANGES
: 3. FederalRegister Notice: "Notice of Opportunity To Comment on Model Safety Evaluation and Model License Amendment Request on Technical Specification Improvement Regarding Adding an Action Statement for Two Inoperable Control Room Air Conditioning Subsystems," published on December 18, 2006 (71 FR 75774).
Page 3 of 3


This letter is a request to amend Operating License 50-4 10 for Nine Mile Point Unit 2 (NMP2).The proposed amendment would modify Technical Specifications (TS) 3.7.3, "Control Room Envelope Air Conditioning (AC) System," by adding an Action Statement to the Limiting Condition for Operation (LCO). The new Action Statement allows a finite time to restore one control room envelope AC subsystem to operable status and requires verification that the control room temperature remains < 900 F every 4 hours.The changes are consistent with Nuclear Regulatory Commission (NRC) approved Industry/Technical Specification Task Force (TSTF) TSTF-477, Revision 3 (Reference 1). The availability of this TS improvement was published in the Federal Register on March 26, 2007 (72 FR 14143) (Reference
ATTACHMENT (2)
: 2) as part of the consolidated line item improvement process (CLIIP).2.0 ASSESSMENT 2.1 Applicability of TSTF-477, and Published Safety Evaluation Nine Mile Point Nuclear Station, LLC (NMPNS) has reviewed TSTF-477, Revision 3, and the NRC model safety evaluation (SE) (Reference
PROPOSED TECHNICAL SPECIFICATION (TS) CHANGES (MARKED UP PAGES)
: 3) as part of the CLIIP. NMPNS has concluded that the information in TSTF-477, as well as the SE prepared by the NRC staff are applicable to NMP2 and justify this amendment for the incorporation of the changes to the NMP2 TS.2.2 Optional Changes and Variations NMPNS is not proposing any significant variations or deviations from the TS changes described in TSTF-477 or the NRC staff s model safety evaluation dated December 18, 2006. The NMP2 TS 3.7.3 does contains one minor deviation from the TS changes provided in the TSTF for the BWR 4 model.Specifically, NMP2 TS 3.7.3 Condition A contains two applicable conditions which stipulate that if the condition of "One control room envelope AC subsystem inoperable" OR "Two control room envelope AC subsystems inoperable with safety function maintained," take required Action A.1. The Control Room Envelope AC System consists of two 100% capacity air conditioning subsystems.
TS Page 3.7.3-1 TS Page 3.7.3-2 TS Page 3.7.3-3 Nine Mile Point Nuclear Station, LLC July 30, 2007
During normal operation, at least one subsystem operates.
The ability of the Control Room Envelope AC System to maintain control room envelope temperature within limits is an implicit assumption of the safety analysis evaluated in the Updated Safety Analysis Report (USAR) Chapter 6, Engineering Safety Features, and Chapter 15, Accident Analysis.
Due to the design of the system, when both subsystems are inoperable, the capability for the Control Room Envelope AC System to perform its design function may still exist by having sufficient components operable from both subsystems to meet its safety function.
This TS deviation was part of the NMP2 conversion to the Standard Technical Specifications (STS) and does not impact or alter the application of the SE.Since Condition A includes two inoperable subsystems with the safety function maintained, new Condition B is modified to specify that the condition is for two inoperable subsystems without the safety function being maintained.
Page 1 of 3 ATTACHMENT (1)DESCRIPTION AND ASSESSMENT OF PROPOSED CHANGES 3.0 REGULATORY ANALYSIS 3.1 No Significant Hazards Consideration Determination NMPNS has reviewed the proposed no significant hazards consideration determination (NSHC) published in the Federal Register as part of the CLIIP. NMPNS has concluded that the proposed NSHC presented in the Federal Register notice is applicable to NMP2 and is hereby incorporated by reference to satisfy the requirements of 10 CFR 50.9 1(a).3.2 Verification and Commitments As discussed in the notice of availability published in the Federal Register on March 26, 2007 for this TS improvement, plant-specific verifications were performed as follows: NMPNS has reviewed References 1 and 2, and the model Safety Evaluation published on December 18, 2006 (71 FR 75774) as part of the CLIIP Notice for Comment. NMPNS has utilized References 1 and 2 to develop the proposed TS changes. NMPNS has also concluded that the justification presented in TSTF-477, Revision 3 and the model Safety Evaluation prepared by the NRC staff is applicable to NMP2, and justify this amendment for the incorporation of the changes to the NMP2 TS.In addition, NMPNS has proposed TS Bases consistent with TSTF-477 which provide guidance and details on how to implement the new requirements.
Finally, NMPNS has a Bases Control Program consistent with Section 5.5 of the Standard Technical Specifications (STS).4.0 ENVIRONMENTAL EVALUATION The amendment changes requirements with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR part 20. The NRC staff has determined that the amendment adopting TSTF-477, Revision 3, involves no significant increase in the amounts or no significant change in the types of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure.
The Commission has previously issued a proposed finding that TSTF-477, Revision 3, involves no significant hazards considerations, and there has been no public comment on the finding in Federal Register Notice 71 FR 75774, December 18, 2006. Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.


==5.0 REFERENCES==
Control Room Envelope AC System 3.7.3 3.7 PLANT SYSTEMS 3.7.3               Control Room Envelope Air Conditioning (AC) System LCO 3.7.3                   Two control room envelope AC subsystems shall be OPERABLE.
: 1. TSTF-477, Revision 3, "Adding Action Statement for Two Inoperable Control Room AC Subsystems." 2. Federal Register Notice: "Notice of Availability Concerning Technical Specification Improvement to Add an Action Statement for Two Inoperable Control Room Air Conditioning Subsystems to the Technical Specifications Using the Consolidated Line Item Improvement Process," published on March 26, 2007 (72 FR 14143).Page 2 of 3 ATTACHMENT (1)DESCRIPTION AND ASSESSMENT OF PROPOSED CHANGES 3. Federal Register Notice: "Notice of Opportunity To Comment on Model Safety Evaluation and Model License Amendment Request on Technical Specification Improvement Regarding Adding an Action Statement for Two Inoperable Control Room Air Conditioning Subsystems," published on December 18, 2006 (71 FR 75774).Page 3 of 3 ATTACHMENT (2)PROPOSED TECHNICAL SPECIFICATION (TS) CHANGES (MARKED UP PAGES)TS Page 3.7.3-1 TS Page 3.7.3-2 TS Page 3.7.3-3 Nine Mile Point Nuclear Station, LLC July 30, 2007 Control Room Envelope AC System 3.7.3 3.7 PLANT SYSTEMS 3.7.3 Control Room Envelope Air Conditioning (AC) System LCO 3.7.3 APPLICABILITY:
APPLICABILITY:              MODES 1, 2, and 3, During movement of irradiated fuel assemblies in the secondary containment, During CORE ALTERATIONS, During operations with a potential for draining the reactor vessel (OPDRVs).
Two control room envelope AC subsystems shall be OPERABLE.MODES 1, 2, and 3, During movement of irradiated fuel assemblies in the secondary containment, During CORE ALTERATIONS, During operations with a potential for draining the reactor vessel (OPDRVs).ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One control room envelope AC subsystem inoperable.
ACTIONS CONDITION                     REQUIRED ACTION                 COMPLETION TIME A.         One control room             A.1      Restore control room          30 days envelope AC subsystem                   envelope AC inoperable.                            subsystem(s) to OPERABLE status.
OR Two control room envelope AC subsystems inoperable with safety function maintained.
OR Two control room envelope AC subsystems inoperable with safety function maintained.
A.1 Restore control room envelope AC subsystem(s) to OPERABLE status.30 days_.._C, C,'N Required Action and 1 Be in MODE 3. 12 hours' Associated Completion Time of Condition A o,, 13 AND not met in MODE 1,2, C.or 3. '&2 Be in MODE 4. 36 hours-lwsr-RiV  
_.._
'i.j " (continued)
C,                                         C,
NMP2 3.7.3-1 Amendment' l,_
    'N         Required Action and             1     Be in MODE 3.                 12 hours
INSERT "1" B. Two control room envelope AC subsystems inoperable with safety function not maintained in MODES 1, 2, or 3.B.1 Verify control room envelope area temperature
              ' Associated Completion Time of Condition A o,, 13   AND not met in MODE 1,2,         C.
< 90'F.Once per 4 hours 72 hours AND B.2 Restore one control room envelop AC subsystem to OPERABLE status.
or 3.                       '&2         Be in MODE 4.               36 hours (continued)
      -lwsr-RiV                 'i.j "
NMP2                                                 3.7.3-1                               Amendment' l,_
 
INSERT "1" B. Two control room           B.1 Verify control room  Once per 4 hours envelope AC subsystems         envelope area inoperable with safety         temperature < 90'F.
function not maintained in MODES 1, 2, or 3.         AND B.2 Restore one control 72 hours room envelop AC subsystem to OPERABLE status.
 
Control Room Envelope AC System 3.7.3 ACTIONS (continued)
Control Room Envelope AC System 3.7.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME b.NS, Required Action and ------------
CONDITION                         REQUIRED ACTION                 COMPLETION TIME b.
NOTE ----------
NS, Required Action and           ------------ NOTE           ----------
associated Completion LCO 3.0.3 is not applicable.
associated Completion             LCO 3.0.3 is not applicable.
Time of Condition A -not met during b, movement of irradiated "6,,1 Place OPERABLE Immediately fuel assemblies in the components of control secondary containment, room envelope AC during CORE subsystem(s)
Time of Condition A               -
ALTERATIONS, or during equivalent to a OPDRVs. single control room envelope AC subsystem in operation.
not met during                   b, movement of irradiated           "6,,1     Place OPERABLE             Immediately fuel assemblies in the                     components of control secondary containment,                     room envelope AC during CORE                               subsystem(s)
OR b."G.2.1 Suspend movement of Immediately irradiated fuel assemblies in the secondary containment.
ALTERATIONS, or during                     equivalent to a OPDRVs.                                   single control room envelope AC subsystem in operation.
AND"6,2.2 Suspend CORE Immediately ALTERATIONS.
OR b.
AND b3,",?.3 Initiate action to Immediately ID&#xfd;To o m D. 1 Enter LCO 3.0.3.. e envelope AC subsy inoperable with safety function not maintained in M OD._D5 .-'-",&#xfd;(continued)
                                    "G.2.1       Suspend movement of         Immediately irradiated fuel assemblies in the secondary containment.
NMP2 3.7.3-2 Control Room Envelope AC System 3.7.3 ACTIONS (continued)
AND "6,2.2     Suspend CORE               Immediately ALTERATIONS.
CONDITION REQUIRED ACTION COMPLETION TIME E. pgoonrl om-< e..-,~ r~I A- "tA ' ki +I-r~ r~-NOTE -------------------
AND b3,
                                    ",?.3       Initiate action to         Immediately ID&#xfd;To o             m                 D.1       Enter LCO 3.0.3..                   e envelope AC subsy inoperable with safety function not maintained in MOD._D5 .- '-",&#xfd; (continued)
NMP2                                           3.7.3-2                             Amendment'94*j
 
Control Room Envelope AC System 3.7.3 ACTIONS (continued)
CONDITION                         REQUIRED ACTION                       COMPLETION TIME E.                         om pgoonrl                                                   -NOTE
                                                                    -------------------
    - <e..-,~  r~I    A-"tA'  ki  r~+I-r~
LCO 3.0.3 is not applicable.
LCO 3.0.3 is not applicable.
inpoablc with sa3fety rpee during movement of irradiated fuel assemblies in the secondary containment, during CORE ALTERATIONS, or during OPDRVs.T(9o mpk2,' 1(i 1,0t-- iief-i E.1 Suspend movement of irradiated fuel assemblies in the secondary containment.
inpoablc with sa3fety rpee             during               E.1      Suspend movement of              Immediately movement of irradiated                           irradiated fuel fuel assemblies in the                          assemblies in the secondary containment,                           secondary during CORE                                     containment.
AND Immediately Immediately Immediately E.2 Suspend CORE ALTERATIONS.
ALTERATIONS, or during OPDRVs.                               AND E.2      Suspend CORE                    Immediately ALTERATIONS.
AND E.3 Initiate action to suspend OPDRVs.SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 Verify each control room envelope AC 24 months subsystem has the capability to remove the assumed heat load.NMP2 3.7.3-3 Amendment X)
T(9o                         mpk2,' 1(i   AND 1,0t-- iief-i                               E.3      Initiate action to              Immediately suspend OPDRVs.
ATTACHMENT (3)PROPOSED TECHNICAL SPECIFICATION (TS) BASES CHANGES (MARKED UP PAGES)TS Bases Page B 3.7.3-3 TS Bases Page B 3.7.3-4 TS Bases Page B 3.7.3-5 Nine Mile Point Nuclear Station, LLC July 30, 2007 Control Room Envelope AC System B 3.7.3 BASES APPLICABILITY (continued) temperature limitations in these MODES. Therefore, maintaining the Control Room Envelope AC System OPERABLE is not required in MODE 4 or 5, except for the following situations under which significant radioactive releases can be postulated:
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                        FREQUENCY SR 3.7.3.1                 Verify each control room envelope AC                         24 months subsystem has the capability to remove the assumed heat load.
: a. During movement of irradiated fuel assemblies in the secondary containment;
NMP2                                                 3.7.3-3                                 Amendment X)
: b. During CORE ALTERATIONS; and c. During operations with a potential for draining the reactor vessel (OPDRVs).ACTIONS A.1 With one control room envelope AC subsystem inoperable, or with both control room envelope AC subsystems inoperable but the Control Room Envelope AC System safety function maintained, the inoperable control room envelope AC subsystem(s) must be restored to OPERABLE status within 30 days. The Control Room Envelope AC System safety function is maintained when the Control Room Envelope AC System components equivalent to one control room envelope AC subsystem are OPERABLE.
 
With the unit in this condition, the remaining OPERABLE control room envelope AC subsystem (or OPERABLE components in both subsystems) is adequate to perform the control room envelope air conditioning function.However, the overall reliability is reduced because a single failure in the OPERABLE subsystem (or remaining OPERABLE portions of the subsystems, as applicable) could result in loss of the control room envelope air conditioning function.The 30 day Completion Time is based on the low probability of an event occurring requiring control room envelope isolation, the consideration that the remaining subsystem (or components in both subsystems) can provide the required INS E- I.f protection, and the availability of alternate cooling methods.C'Ia. 1 and2 In MODE 1, 2, or 3, if the inoperable control room envelope AC subsystem(s) cannot be restored to OPERABLE status within the associated Completion Time, the unit must be placed in a MODE that minimizes risk. To achieve this status the unit (continued)
ATTACHMENT (3)
NMP2 B 3.7.3-3 RevisionN)
PROPOSED TECHNICAL SPECIFICATION (TS) BASES CHANGES (MARKED UP PAGES)
INSERT "BI" B.1 and B.2 If both control room envelope AC subsystems are inoperable, and the safety function can not be maintained, the Control Room Envelope AC System may not be capable of performing its intended function.Therefore, the control room envelope area temperature is required to be monitored to ensure that temperature is being maintained low enough that equipment in the control room envelope is not adversely affected.
TS Bases Page B 3.7.3-3 TS Bases Page B 3.7.3-4 TS Bases Page B 3.7.3-5 Nine Mile Point Nuclear Station, LLC July 30, 2007
With the control room envelope temperature being maintained within the temperature limit of < 90' F (Reference 2), 72 hours is allowed to restore a control room envelope AC subsystem to OPERABLE status. This completion time is reasonable considering that the control room envelope temperature is being maintained within limits and the low probability of an event occurring requiring control room isolation.
 
Control Room Envelope AC System B 3.7.3 BASES C ACTIONS -B.1 and-B-2 (continued) must be placed in at least MODE 3 within 12 hours and in MODE 4 within 36 hours. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.b 1 bb-'.1-e'V.2.1  
Control Room Envelope AC System B 3.7.3 BASES APPLICABILITY temperature limitations in these MODES. Therefore, (continued)  maintaining the Control Room Envelope AC System OPERABLE is not required in MODE 4 or 5, except for the following situations under which significant radioactive releases can be postulated:
,-@.2.2, and--&.2.3 LCO 3.0.3 is not applicable while in MODE 4 or 5. However, since irradiated fuel assembly movement caii occur in MODE 1, 2, or 3, the Required Actions of Condition--are modified by a Note indicating that LCO 3.0.3 does not apply. If moving irradiated fuel assemblies while in MODE 1, 2, or 3, the fuel movement is independent of reactor operations.
: a.     During movement of irradiated fuel assemblies in the secondary containment;
Entering LCO 3.0.3 while in MODE 1, 2, or 3 would require the unit to be shutdown, but would not require immediate suspension of movement of irradiated fuel assemblies.
: b. During CORE ALTERATIONS; and
The Note to the ACTIONS, "LCO 3.0.3 is not applicable," ensures that the actions for immediate suspension of irradiated fuel assembly movement are not postponed due to entry into LCO 3.0.3.During movement of irradiated fuel assemblies in the secondary containment, during CORE ALTERATIONS, or during OPDRVs, if Required Action A.1 cannot be completed within the required Completion Time, the OPERABLE components of the control room envelope AC subsystem(s) equivalent to a single control room envelope AC subsystem (e.g., the control building chilled water subsystem and air conditioning units do not have to be powered from the same electrical division)may be placed immediately in operation.
: c.     During operations with a potential for draining the reactor vessel (OPDRVs).
This action ensures that the remaining subsystem (or components in both subsystems equivalent to a single control room envelope AC subsystem) is OPERABLE, that no failures that would prevent actuation will occur, and that any active failure will be readily detected.An alternative to Required is to immediately suspend activities that present a potential for releasing radioactivity that might require isolation of the control room envelope.
ACTIONS       A.1 With one control room envelope AC subsystem inoperable, or with both control room envelope AC subsystems inoperable but the Control Room Envelope AC System safety function maintained, the inoperable control room envelope AC subsystem(s) must be restored to OPERABLE status within 30 days. The Control Room Envelope AC System safety function is maintained when the Control Room Envelope AC System components equivalent to one control room envelope AC subsystem are OPERABLE. With the unit in this condition, the remaining OPERABLE control room envelope AC subsystem (or OPERABLE components in both subsystems) is adequate to perform the control room envelope air conditioning function.
This places the unit in a condition that minimizes risk.(continued)
However, the overall reliability is reduced because a single failure in the OPERABLE subsystem (or remaining OPERABLE portions of the subsystems, as applicable) could result in loss of the control room envelope air conditioning function.
NMP2 B 3.7.3-4 Revision-6 2
The 30 day Completion Time is based on the low probability of an event occurring requiring control room envelope isolation, the consideration that the remaining subsystem (or components in both subsystems) can provide the required INS E-   I.f       protection, and the availability of alternate cooling methods.
Control Room Envelope AC System B 3.7.3 BASES ACTIONS D., , b, bD.&1,N&.2.1,&2.2, andN,2.3 (continued)
C' Ia. 1 and2 In MODE 1, 2, or 3, if the inoperable control room envelope AC subsystem(s) cannot be restored to OPERABLE status within the associated Completion Time, the unit must be placed in a MODE that minimizes risk. To achieve this status the unit (continued)
If applicable, CORE ALTERATIONS and movement of irradiated fuel assemblies in the secondary containment must be suspended immediately.
NMP2                             B 3.7.3-3                                 RevisionN)
Suspension of these activities shall not preclude completion of movement of a component to a safe position.
 
Also, if applicable, action must be initiated immediately to suspend OPDRVs to minimize the probability of a vessel draindown and subsequent potential for fission product release. Action must continue until the OPDRVs are suspended.
INSERT "BI" B.1 and B.2 If both control room envelope AC subsystems are inoperable, and the safety function can not be maintained, the Control Room Envelope AC System may not be capable of performing its intended function.
If-athcntrol room envelope AC subsystems are n " wihteEvlope AC. S .,e~~'e y function not maintaine in MODE 1, ontrol Room Envelope AC System ma a alofprrmgh-tended E.1, E.2, and E.3 LCO 3.0.3 is not applicable while in MODE 4 or 5. However, since irradiated fuel assembly movement can occur in MODE 1, 2, or 3, the Required Actions of Condition E are modified by a Note indicating that LCO 3.0.3 does not apply. If moving irradiated fuel assemblies while in MODE 1, 2, or 3, the fuel movement is independent of reactor operations.
Therefore, the control room envelope area temperature is required to be monitored to ensure that temperature is being maintained low enough that equipment in the control room envelope is not adversely affected. With the control room envelope temperature being maintained within the temperature limit of < 90' F (Reference 2), 72 hours is allowed to restore a control room envelope AC subsystem to OPERABLE status. This completion time is reasonable considering that the control room envelope temperature is being maintained within limits and the low probability of an event occurring requiring control room isolation.
Entering LCO 3.0.3 while in MODE 1, 2, or 3 would require the unit to be shutdown, but would not require immediate suspension of movement of irradiated fuel assemblies.
 
The Note to the ACTIONS, "LCO 3.0.3 is not applicable," ensures that the actions for immediate suspension of irradiated fuel assembly movement are not postponed due to entry into LCO 3.0.3.During movement of irradiated fuel assemblies in the j Isecondary containment, during CORE ALTERATIONS, or during function not mainptined, action must be taken to immediately suspend activities that present a potential for releasing radioactivity that might require isolation of the control room envelope.
Control Room Envelope AC System B 3.7.3 BASES C
This places the unit in a condition that minimizes risk.(continued)
ACTIONS -B.1 and-B-2 (continued) must be placed in at least MODE 3 within 12 hours and in MODE 4 within 36 hours. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.
NMP2 B 3.7.3-5 RevisioA, INSERT "B2" if Required Actions B. 1 and B.2 cannot be met within the required Completion Times,}}
b     1     bb
        -'.1-e'V.2.1 ,-@.2.2, and--&.2.3 LCO 3.0.3 is not applicable while in MODE 4 or 5. However, since irradiated fuel assembly movement caii occur in MODE 1, 2, or 3, the Required Actions of Condition--are modified by a Note indicating that LCO 3.0.3 does not apply. If moving irradiated fuel assemblies while in MODE 1, 2, or 3, the fuel movement is independent of reactor operations.
Entering LCO 3.0.3 while in MODE 1, 2, or 3 would require the unit to be shutdown, but would not require immediate suspension of movement of irradiated fuel assemblies. The Note to the ACTIONS, "LCO 3.0.3 is not applicable," ensures that the actions for immediate suspension of irradiated fuel assembly movement are not postponed due to entry into LCO 3.0.3.
During movement of irradiated fuel assemblies in the secondary containment, during CORE ALTERATIONS, or during OPDRVs, if Required Action A.1 cannot be completed within the required Completion Time, the OPERABLE components of the control room envelope AC subsystem(s) equivalent to a single control room envelope AC subsystem (e.g., the control building chilled water subsystem and air conditioning units do not have to be powered from the same electrical division) may be placed immediately in operation. This action ensures that the remaining subsystem (or components in both subsystems equivalent to a single control room envelope AC subsystem) is OPERABLE, that no failures that would prevent actuation will occur, and that any active failure will be readily detected.
An alternative to Required Action-e*1 is to immediately suspend activities that present a potential for releasing radioactivity that might require isolation of the control room envelope. This places the unit in a condition that minimizes risk.
(continued)
NMP2                         B 3.7.3-4                                 Revision-62
 
Control Room Envelope AC System B 3.7.3 BASES D.,&1,N&.2.1,&2.2, b,      bD.,  andN,2.3 (continued)
ACTIONS If applicable, CORE ALTERATIONS and movement of irradiated fuel assemblies in the secondary containment must be suspended immediately. Suspension of these activities shall not preclude completion of movement of a component to a safe position. Also, if applicable, action must be initiated immediately to suspend OPDRVs to minimize the probability of a vessel draindown and subsequent potential for fission product release. Action must continue until the OPDRVs are suspended.
If-athcntrol room envelope AC subsystems are n                       "
wihteEvlope                         AC. S .,e~~'e     y function not maintaine in MODE 1,                   ontrol Room Envelope AC System ma             a alofprrmgh-tended E.1, E.2, and E.3 LCO 3.0.3 is not applicable while in MODE 4 or 5. However, since irradiated fuel assembly movement can occur in MODE 1, 2, or 3, the Required Actions of Condition E are modified by a Note indicating that LCO 3.0.3 does not apply. If moving irradiated fuel assemblies while in MODE 1, 2, or 3, the fuel movement is independent of reactor operations.
Entering LCO 3.0.3 while in MODE 1, 2, or 3 would require the unit to be shutdown, but would not require immediate suspension of movement of irradiated fuel assemblies. The Note to the ACTIONS, "LCO 3.0.3 is not applicable," ensures that the actions for immediate suspension of irradiated fuel assembly movement are not postponed due to entry into LCO 3.0.3.
During movement of irradiated fuel assemblies in the jIsecondary              containment, during CORE ALTERATIONS, or during function not mainptined, action must be taken to immediately suspend activities that present a potential for releasing radioactivity that might require isolation of the control room envelope. This places the unit in a condition that minimizes risk.
(continued)
NMP2                                     B 3.7.3-5                                   RevisioA,
 
INSERT "B2" if Required Actions B. 1 and B.2 cannot be met within the required Completion Times,}}

Revision as of 03:46, 23 November 2019

Application for Technical Specification Change TSTF-477, Rev. 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement Process
ML072190605
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/30/2007
From: Polson K
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TSTF-477, Rev 3
Download: ML072190605 (18)


Text

Keith J. Poison P.O. Box 63 Vice President-Nine Mile Point Lycoming, New York 13093 315.349.5200 315.349.1321 Fax 0 Constellation Energy Nine Mile Point Nuclear Station July 30, 2007 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Nine Mile Point Nuclear Station Unit No. 2; Docket No. 50-410 Application for Technical Specification Change TSTF-477, Revision 3, "Add Action for Two Inoperable Control Room AC Subsystems" to the Technical Specifications Using Consolidated Line Item Improvement Process Pursuant to 10 CFR 50.90, Nine Mile Point Nuclear Station, LLC, (NMPNS) hereby requests an amendment to Nine Mile Point Unit 2 (NMP2) Renewed Operating License NPF-69. The proposed amendment would modify the Technical Specifications (TS) by adding an action statement for two inoperable control room air conditioning (AC) subsystems to the plant specific TS.

Attachment (1) provides a description of the proposed change, the requested confirmation of applicability, and plant-specific verifications. Attachment (2) provides the existing TS pages marked up to show the proposed change. Attachmnent (3) provides the existing TS Bases pages marked up to show the proposed change in accordance with 10 CFR 50.36(a). TS Bases changes are provided for information only and will be processed in accordance with TS 5.5.10, "Technical Specifications (TS) Bases Control Program."

NMPNS requests approval of the proposed license amendment by January 30, 2008 with the amendment being implemented within 60 days of receipt of the approved amendment.

In accordance with 10 CFR 50.91, a copy of this license amendment application, with attachments, is being provided to the appropriate state representative.

Document Control Desk July 30, 2007 Page 2 Should you have any questions regarding the information in this submittal, please contact T. F. Syrell, Licensing Director, at (315) 349-5219.

Very truly yours, STATE OF NEW YORK TO WIT:

COUNTY OF OSWEGO I, Keith J. Poison, being duly sworn, state that I am Vice President-Nine Mile Point, and that I am duly authorized to execute and file this request on behalf of Nine Mile Point Nuclear Station, LLC. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other Nine Mile Point employees and/or consultants. Such information has been reviewed in accordance with company practice and I believe it to be reliable.

Subscribed and sworn before me, a Notary Public in and for the State of New York and County of Oswego, this 30C"-day of

  • 2007.

WITNESS my Hand and Notarial Seal: .(-

Notary Public My Commission Expires: 0o/z 5/o j Date SANDRA A. OSWALD Notary Public, State of New York No. 01OS6032276 Qualified in Oswego County Commission Expires ,o-2 *-V KJ.P/GB Attachments: (1) Description and Assessment of the Proposed Changes (2) Proposed Technical Specification (TS) Changes (Marked Up Pages)

(3) Proposed Technical Specification (TS) Bases Changes (Marked Up Pages)

Document Control Desk July 30, 2007 Page 3 cc: S. J. Collins, NRC Region I Administrator E. C. Knutson, Senior NRC Resident Inspector M. J. David, NRC Project Manager J. P. Spath, NYSERDA

ATTACHMENT (1)

DESCRIPTION AND ASSESSMENT OF THE PROPOSED CHANGES TABLE OF CONTENTS

1. DESCRIPTION
2. ASSESSMENT
3. REGULATORY ANALYSIS
4. ENVIRONMENTAL EVALUATION
5. REFERENCES Nine Mile Point Nuclear Station, LLC July 30, 2007

ATTACHMENT (1)

DESCRIPTION AND ASSESSMENT OF PROPOSED CHANGES

1.0 DESCRIPTION

This letter is a request to amend Operating License 50-4 10 for Nine Mile Point Unit 2 (NMP2).

The proposed amendment would modify Technical Specifications (TS) 3.7.3, "Control Room Envelope Air Conditioning (AC) System," by adding an Action Statement to the Limiting Condition for Operation (LCO). The new Action Statement allows a finite time to restore one control room envelope AC subsystem to operable status and requires verification that the control room temperature remains < 900 F every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

The changes are consistent with Nuclear Regulatory Commission (NRC) approved Industry/Technical Specification Task Force (TSTF) TSTF-477, Revision 3 (Reference 1). The availability of this TS improvement was published in the FederalRegister on March 26, 2007 (72 FR 14143) (Reference 2) as part of the consolidated line item improvement process (CLIIP).

2.0 ASSESSMENT 2.1 Applicability of TSTF-477, and Published Safety Evaluation Nine Mile Point Nuclear Station, LLC (NMPNS) has reviewed TSTF-477, Revision 3, and the NRC model safety evaluation (SE) (Reference 3) as part of the CLIIP. NMPNS has concluded that the information in TSTF-477, as well as the SE prepared by the NRC staff are applicable to NMP2 and justify this amendment for the incorporation of the changes to the NMP2 TS.

2.2 Optional Changes and Variations NMPNS is not proposing any significant variations or deviations from the TS changes described in TSTF-477 or the NRC staff s model safety evaluation dated December 18, 2006. The NMP2 TS 3.7.3 does contains one minor deviation from the TS changes provided in the TSTF for the BWR 4 model.

Specifically, NMP2 TS 3.7.3 Condition A contains two applicable conditions which stipulate that if the condition of "One control room envelope AC subsystem inoperable" OR "Two control room envelope AC subsystems inoperable with safety function maintained," take required Action A.1. The Control Room Envelope AC System consists of two 100% capacity air conditioning subsystems. During normal operation, at least one subsystem operates. The ability of the Control Room Envelope AC System to maintain control room envelope temperature within limits is an implicit assumption of the safety analysis evaluated in the Updated Safety Analysis Report (USAR) Chapter 6, Engineering Safety Features, and Chapter 15, Accident Analysis. Due to the design of the system, when both subsystems are inoperable, the capability for the Control Room Envelope AC System to perform its design function may still exist by having sufficient components operable from both subsystems to meet its safety function. This TS deviation was part of the NMP2 conversion to the Standard Technical Specifications (STS) and does not impact or alter the application of the SE.

Since Condition A includes two inoperable subsystems with the safety function maintained, new Condition B is modified to specify that the condition is for two inoperable subsystems without the safety function being maintained.

Page 1 of 3

ATTACHMENT (1)

DESCRIPTION AND ASSESSMENT OF PROPOSED CHANGES

3.0 REGULATORY ANALYSIS

3.1 No Significant Hazards Consideration Determination NMPNS has reviewed the proposed no significant hazards consideration determination (NSHC) published in the FederalRegister as part of the CLIIP. NMPNS has concluded that the proposed NSHC presented in the Federal Register notice is applicable to NMP2 and is hereby incorporated by reference to satisfy the requirements of 10 CFR 50.9 1(a).

3.2 Verification and Commitments As discussed in the notice of availability published in the FederalRegister on March 26, 2007 for this TS improvement, plant-specific verifications were performed as follows:

NMPNS has reviewed References 1 and 2, and the model Safety Evaluation published on December 18, 2006 (71 FR 75774) as part of the CLIIP Notice for Comment. NMPNS has utilized References 1 and 2 to develop the proposed TS changes. NMPNS has also concluded that the justification presented in TSTF-477, Revision 3 and the model Safety Evaluation prepared by the NRC staff is applicable to NMP2, and justify this amendment for the incorporation of the changes to the NMP2 TS.

In addition, NMPNS has proposed TS Bases consistent with TSTF-477 which provide guidance and details on how to implement the new requirements. Finally, NMPNS has a Bases Control Program consistent with Section 5.5 of the Standard Technical Specifications (STS).

4.0 ENVIRONMENTAL EVALUATION The amendment changes requirements with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR part 20. The NRC staff has determined that the amendment adopting TSTF-477, Revision 3, involves no significant increase in the amounts or no significant change in the types of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that TSTF-477, Revision 3, involves no significant hazards considerations, and there has been no public comment on the finding in FederalRegister Notice 71 FR 75774, December 18, 2006. Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.

5.0 REFERENCES

1. TSTF-477, Revision 3, "Adding Action Statement for Two Inoperable Control Room AC Subsystems."
2. FederalRegister Notice: "Notice of Availability Concerning Technical Specification Improvement to Add an Action Statement for Two Inoperable Control Room Air Conditioning Subsystems to the Technical Specifications Using the Consolidated Line Item Improvement Process," published on March 26, 2007 (72 FR 14143).

Page 2 of 3

ATTACHMENT (1)

DESCRIPTION AND ASSESSMENT OF PROPOSED CHANGES

3. FederalRegister Notice: "Notice of Opportunity To Comment on Model Safety Evaluation and Model License Amendment Request on Technical Specification Improvement Regarding Adding an Action Statement for Two Inoperable Control Room Air Conditioning Subsystems," published on December 18, 2006 (71 FR 75774).

Page 3 of 3

ATTACHMENT (2)

PROPOSED TECHNICAL SPECIFICATION (TS) CHANGES (MARKED UP PAGES)

TS Page 3.7.3-1 TS Page 3.7.3-2 TS Page 3.7.3-3 Nine Mile Point Nuclear Station, LLC July 30, 2007

Control Room Envelope AC System 3.7.3 3.7 PLANT SYSTEMS 3.7.3 Control Room Envelope Air Conditioning (AC) System LCO 3.7.3 Two control room envelope AC subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3, During movement of irradiated fuel assemblies in the secondary containment, During CORE ALTERATIONS, During operations with a potential for draining the reactor vessel (OPDRVs).

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One control room A.1 Restore control room 30 days envelope AC subsystem envelope AC inoperable. subsystem(s) to OPERABLE status.

OR Two control room envelope AC subsystems inoperable with safety function maintained.

_.._

C, C,

'N Required Action and 1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

' Associated Completion Time of Condition A o,, 13 AND not met in MODE 1,2, C.

or 3. '&2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)

-lwsr-RiV 'i.j "

NMP2 3.7.3-1 Amendment' l,_

INSERT "1" B. Two control room B.1 Verify control room Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> envelope AC subsystems envelope area inoperable with safety temperature < 90'F.

function not maintained in MODES 1, 2, or 3. AND B.2 Restore one control 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> room envelop AC subsystem to OPERABLE status.

Control Room Envelope AC System 3.7.3 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME b.

NS, Required Action and ------------ NOTE ----------

associated Completion LCO 3.0.3 is not applicable.

Time of Condition A -

not met during b, movement of irradiated "6,,1 Place OPERABLE Immediately fuel assemblies in the components of control secondary containment, room envelope AC during CORE subsystem(s)

ALTERATIONS, or during equivalent to a OPDRVs. single control room envelope AC subsystem in operation.

OR b.

"G.2.1 Suspend movement of Immediately irradiated fuel assemblies in the secondary containment.

AND "6,2.2 Suspend CORE Immediately ALTERATIONS.

AND b3,

",?.3 Initiate action to Immediately IDýTo o m D.1 Enter LCO 3.0.3.. e envelope AC subsy inoperable with safety function not maintained in MOD._D5 .- '-",ý (continued)

NMP2 3.7.3-2 Amendment'94*j

Control Room Envelope AC System 3.7.3 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E. om pgoonrl -NOTE


- <e..-,~ r~I A-"tA' ki r~+I-r~

LCO 3.0.3 is not applicable.

inpoablc with sa3fety rpee during E.1 Suspend movement of Immediately movement of irradiated irradiated fuel fuel assemblies in the assemblies in the secondary containment, secondary during CORE containment.

ALTERATIONS, or during OPDRVs. AND E.2 Suspend CORE Immediately ALTERATIONS.

T(9o mpk2,' 1(i AND 1,0t-- iief-i E.3 Initiate action to Immediately suspend OPDRVs.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 Verify each control room envelope AC 24 months subsystem has the capability to remove the assumed heat load.

NMP2 3.7.3-3 Amendment X)

ATTACHMENT (3)

PROPOSED TECHNICAL SPECIFICATION (TS) BASES CHANGES (MARKED UP PAGES)

TS Bases Page B 3.7.3-3 TS Bases Page B 3.7.3-4 TS Bases Page B 3.7.3-5 Nine Mile Point Nuclear Station, LLC July 30, 2007

Control Room Envelope AC System B 3.7.3 BASES APPLICABILITY temperature limitations in these MODES. Therefore, (continued) maintaining the Control Room Envelope AC System OPERABLE is not required in MODE 4 or 5, except for the following situations under which significant radioactive releases can be postulated:

a. During movement of irradiated fuel assemblies in the secondary containment;
b. During CORE ALTERATIONS; and
c. During operations with a potential for draining the reactor vessel (OPDRVs).

ACTIONS A.1 With one control room envelope AC subsystem inoperable, or with both control room envelope AC subsystems inoperable but the Control Room Envelope AC System safety function maintained, the inoperable control room envelope AC subsystem(s) must be restored to OPERABLE status within 30 days. The Control Room Envelope AC System safety function is maintained when the Control Room Envelope AC System components equivalent to one control room envelope AC subsystem are OPERABLE. With the unit in this condition, the remaining OPERABLE control room envelope AC subsystem (or OPERABLE components in both subsystems) is adequate to perform the control room envelope air conditioning function.

However, the overall reliability is reduced because a single failure in the OPERABLE subsystem (or remaining OPERABLE portions of the subsystems, as applicable) could result in loss of the control room envelope air conditioning function.

The 30 day Completion Time is based on the low probability of an event occurring requiring control room envelope isolation, the consideration that the remaining subsystem (or components in both subsystems) can provide the required INS E- I.f protection, and the availability of alternate cooling methods.

C' Ia. 1 and2 In MODE 1, 2, or 3, if the inoperable control room envelope AC subsystem(s) cannot be restored to OPERABLE status within the associated Completion Time, the unit must be placed in a MODE that minimizes risk. To achieve this status the unit (continued)

NMP2 B 3.7.3-3 RevisionN)

INSERT "BI" B.1 and B.2 If both control room envelope AC subsystems are inoperable, and the safety function can not be maintained, the Control Room Envelope AC System may not be capable of performing its intended function.

Therefore, the control room envelope area temperature is required to be monitored to ensure that temperature is being maintained low enough that equipment in the control room envelope is not adversely affected. With the control room envelope temperature being maintained within the temperature limit of < 90' F (Reference 2), 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is allowed to restore a control room envelope AC subsystem to OPERABLE status. This completion time is reasonable considering that the control room envelope temperature is being maintained within limits and the low probability of an event occurring requiring control room isolation.

Control Room Envelope AC System B 3.7.3 BASES C

ACTIONS -B.1 and-B-2 (continued) must be placed in at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.

b 1 bb

-'.1-e'V.2.1 ,-@.2.2, and--&.2.3 LCO 3.0.3 is not applicable while in MODE 4 or 5. However, since irradiated fuel assembly movement caii occur in MODE 1, 2, or 3, the Required Actions of Condition--are modified by a Note indicating that LCO 3.0.3 does not apply. If moving irradiated fuel assemblies while in MODE 1, 2, or 3, the fuel movement is independent of reactor operations.

Entering LCO 3.0.3 while in MODE 1, 2, or 3 would require the unit to be shutdown, but would not require immediate suspension of movement of irradiated fuel assemblies. The Note to the ACTIONS, "LCO 3.0.3 is not applicable," ensures that the actions for immediate suspension of irradiated fuel assembly movement are not postponed due to entry into LCO 3.0.3.

During movement of irradiated fuel assemblies in the secondary containment, during CORE ALTERATIONS, or during OPDRVs, if Required Action A.1 cannot be completed within the required Completion Time, the OPERABLE components of the control room envelope AC subsystem(s) equivalent to a single control room envelope AC subsystem (e.g., the control building chilled water subsystem and air conditioning units do not have to be powered from the same electrical division) may be placed immediately in operation. This action ensures that the remaining subsystem (or components in both subsystems equivalent to a single control room envelope AC subsystem) is OPERABLE, that no failures that would prevent actuation will occur, and that any active failure will be readily detected.

An alternative to Required Action-e*1 is to immediately suspend activities that present a potential for releasing radioactivity that might require isolation of the control room envelope. This places the unit in a condition that minimizes risk.

(continued)

NMP2 B 3.7.3-4 Revision-62

Control Room Envelope AC System B 3.7.3 BASES D.,&1,N&.2.1,&2.2, b, bD., andN,2.3 (continued)

ACTIONS If applicable, CORE ALTERATIONS and movement of irradiated fuel assemblies in the secondary containment must be suspended immediately. Suspension of these activities shall not preclude completion of movement of a component to a safe position. Also, if applicable, action must be initiated immediately to suspend OPDRVs to minimize the probability of a vessel draindown and subsequent potential for fission product release. Action must continue until the OPDRVs are suspended.

If-athcntrol room envelope AC subsystems are n "

wihteEvlope AC. S .,e~~'e y function not maintaine in MODE 1, ontrol Room Envelope AC System ma a alofprrmgh-tended E.1, E.2, and E.3 LCO 3.0.3 is not applicable while in MODE 4 or 5. However, since irradiated fuel assembly movement can occur in MODE 1, 2, or 3, the Required Actions of Condition E are modified by a Note indicating that LCO 3.0.3 does not apply. If moving irradiated fuel assemblies while in MODE 1, 2, or 3, the fuel movement is independent of reactor operations.

Entering LCO 3.0.3 while in MODE 1, 2, or 3 would require the unit to be shutdown, but would not require immediate suspension of movement of irradiated fuel assemblies. The Note to the ACTIONS, "LCO 3.0.3 is not applicable," ensures that the actions for immediate suspension of irradiated fuel assembly movement are not postponed due to entry into LCO 3.0.3.

During movement of irradiated fuel assemblies in the jIsecondary containment, during CORE ALTERATIONS, or during function not mainptined, action must be taken to immediately suspend activities that present a potential for releasing radioactivity that might require isolation of the control room envelope. This places the unit in a condition that minimizes risk.

(continued)

NMP2 B 3.7.3-5 RevisioA,

INSERT "B2" if Required Actions B. 1 and B.2 cannot be met within the required Completion Times,