Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:November 29, 2007Mr. J. A. GreshamManager, Regulatory Compliance and Plant Licensing Nuclear Services Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 | | {{#Wiki_filter:November 29, 2007 Mr. J. A. Gresham Manager, Regulatory Compliance and Plant Licensing Nuclear Services Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| TOPICAL REPORT FOR WOLF CREEK GENERATING STATION - REQUESTFOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MD0197) | | TOPICAL REPORT FOR WOLF CREEK GENERATING STATION - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MD0197) |
|
| |
|
| ==Dear Mr. Gresham:== | | ==Dear Mr. Gresham:== |
|
| |
|
| By letter dated September 25, 2007 (CAW-07-2335), Westinghouse Electric Company(WEC) submitted an affidavit (CAW-07-2335) also dated September 25, 2007, executed by you, requesting that information designated proprietary in the topical report entitled, LTR-CDME-07-198-P, "Response to NRC Request for Additional Information Relating to | | By letter dated September 25, 2007 (CAW-07-2335), Westinghouse Electric Company (WEC) submitted an affidavit (CAW-07-2335) also dated September 25, 2007, executed by you, requesting that information designated proprietary in the topical report entitled, LTR-CDME-07-198-P, "Response to NRC Request for Additional Information Relating to |
| [topical report] LTR-CDME-05-209-P of the Wolf Creek Generating Station (WCGS) Permanent B* License Amendment Request," dated September 24, 2007, be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2,Section 390. The topical report and the WEC letter are Enclosures I and III, respectively, to theletter dated September 27, 2007 (ET 07-0043), from the Wolf Creek Nuclear Operating Corporation (WCNOC) to the Nuclear Regulatory Commission (NRC), for the Wolf Creek Generating Station.A nonproprietary copy of the document designated LTR-CDME-07-198-NP, which isEnclosure II to the above September 27, 2007, letter from WCNOC, has been placed in the NRC's Public Document Room and added to the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room (ADAMS AccessionNo. ML072750610).The affidavit stated that the submitted information should be considered exempt frommandatory public disclosure for the following reasons:Under that system, information is held in confidence if it falls in or more of several types,the release of which might result in the loss of an existing or potential competitive advantage, as follows:(a)The information reveals the distinguishing aspects of a process (orcomponent, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies. | | [topical report] LTR-CDME-05-209-P of the Wolf Creek Generating Station (WCGS) Permanent B* License Amendment Request," dated September 24, 2007, be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 390. The topical report and the WEC letter are Enclosures I and III, respectively, to the letter dated September 27, 2007 (ET 07-0043), from the Wolf Creek Nuclear Operating Corporation (WCNOC) to the Nuclear Regulatory Commission (NRC), for the Wolf Creek Generating Station. |
| J. A. Gresham-2-(c)Its use by a competitor would reduce his expenditure of resources orimprove his competitive position in the design, manufacturer, shipment, installation, assurance of quality, or licensing a similar product.(e)It reveals aspects of past, present, or future Westinghouse or customerfunded development plans and programs of potential economic value to Westinghouse.We have reviewed your application and the material designated as proprietary in topical reportLTR-CDME-07-198-P, dated September 24, 2007, in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the information marked as proprietary in topical report LTR-CDME-07-198-P, dated September 24, 2007, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.Withholding from public inspection shall not affect the right, if any, of persons properly anddirectly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.If the basis for withholding this information from public inspection should change in the futuresuch that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.If you have any questions regarding this matter, I may be reached at (301) 415-1307.Sincerely,/RA/Jack N. Donohew, Senior Project ManagerPlant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-483 cc: See next page J. A. Gresham-2-(c)Its use by a competitor would reduce his expenditure of resources orimprove his competitive position in the design, manufacturer, shipment, installation, assurance of quality, or licensing a similar product.(e)It reveals aspects of past, present, or future Westinghouse or customerfunded development plans and programs of potential economic value to Westinghouse.We have reviewed your application and the material designated as proprietary in topical reportLTR-CDME-07-198-P, dated September 24, 2007, in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the information marked as proprietary in topical report LTR-CDME-07-198-P, dated September 24, 2007, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.Withholding from public inspection shall not affect the right, if any, of persons properly anddirectly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.If the basis for withholding this information from public inspection should change in the futuresuch that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.If you have any questions regarding this matter, I may be reached at (301) 415-1307.Sincerely,/RA/Jack N. Donohew, Senior Project ManagerPlant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-483 cc: See next pageDISTRIBUTION
| | A nonproprietary copy of the document designated LTR-CDME-07-198-NP, which is Enclosure II to the above September 27, 2007, letter from WCNOC, has been placed in the NRC's Public Document Room and added to the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room (ADAMS Accession No. ML072750610). |
| : PUBLIC LPL4 Reading RidsNrrDorl RidsNrrDorlLpl4RidsNrrDorlDprRidsNrrPMJDonohew RidsNrrLAJBurkhardt RidsOgcRpRidsAcrsAcnwMailCenterRidsRgn4MailCenter RidsNrrDciCsgb EMurphy, NRR/DCI/CSGBADAMS ACCESSION NO.: ML073300418NRR-084OFFICEDORL/LPL4/PMDORL/LPL4/LADCI/CSGB/BCDORL/LPL4/BCNAMEJDonohewJBurkhardtAHiserTHiltz DATE11/28/0711/27/0711/27/0711/28/07OFFICIAL RECORD COPY February 2006Wolf Creek Generating Station cc:Jay Silberg, Esq.
| | The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: |
| Pillsbury Winthrop Shaw Pittman LLP 2300 N Street, NW Washington, D.C. 20037Regional Administrator, Region IVU.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011Senior Resident InspectorU.S. Nuclear Regulatory Commission P.O. Box 311 Burlington, KS 66839Chief Engineer, Utilities DivisionKansas Corporation Commission 1500 SW Arrowhead Road Topeka, KS 66604-4027Office of the GovernorState of Kansas Topeka, KS 66612Attorney General120 S.W. 10 th Avenue, 2 nd FloorTopeka, KS 66612-1597County ClerkCoffey County Courthouse 110 South 6 th StreetBurlington, KS 66839Chief, Radiation and Asbestos Control Section Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366Vice President Operations/Plant ManagerWolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839Supervisor LicensingWolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839U.S. Nuclear Regulatory CommissionResident Inspectors Office/Callaway Plant
| | Under that system, information is held in confidence if it falls in or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows: |
| | (a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies. |
|
| |
|
| 8201 NRC Road Steedman, MO 65077-1032Mr. Rick A. MuenchPresident and Chief Executive Officer Wolf Creek Nuclear Operating Corporation Post Office Box 411 Burlington, KS 66839}} | | J. A. Gresham (c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacturer, shipment, installation, assurance of quality, or licensing a similar product. |
| | (e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential economic value to Westinghouse. |
| | We have reviewed your application and the material designated as proprietary in topical report LTR-CDME-07-198-P, dated September 24, 2007, in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the information marked as proprietary in topical report LTR-CDME-07-198-P, dated September 24, 2007, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. |
| | Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. |
| | If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. |
| | If you have any questions regarding this matter, I may be reached at (301) 415-1307. |
| | Sincerely, |
| | /RA/ |
| | Jack N. Donohew, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483 cc: See next page |
| | |
| | J. A. Gresham (c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacturer, shipment, installation, assurance of quality, or licensing a similar product. |
| | (e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential economic value to Westinghouse. |
| | We have reviewed your application and the material designated as proprietary in topical report LTR-CDME-07-198-P, dated September 24, 2007, in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the information marked as proprietary in topical report LTR-CDME-07-198-P, dated September 24, 2007, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. |
| | Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. |
| | If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. |
| | If you have any questions regarding this matter, I may be reached at (301) 415-1307. |
| | Sincerely, |
| | /RA/ |
| | Jack N. Donohew, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483 cc: See next page DISTRIBUTION: |
| | PUBLIC RidsNrrDorlDpr RidsAcrsAcnwMailCenter LPL4 Reading RidsNrrPMJDonohew RidsRgn4MailCenter RidsNrrDorl RidsNrrLAJBurkhardt RidsNrrDciCsgb RidsNrrDorlLpl4 RidsOgcRp EMurphy, NRR/DCI/CSGB ADAMS ACCESSION NO.: ML073300418 NRR-084 OFFICE DORL/LPL4/PM DORL/LPL4/LA DCI/CSGB/BC DORL/LPL4/BC NAME JDonohew JBurkhardt AHiser THiltz DATE 11/28/07 11/27/07 11/27/07 11/28/07 OFFICIAL RECORD COPY |
| | |
| | Wolf Creek Generating Station cc: |
| | Jay Silberg, Esq. Chief, Radiation and Asbestos Control Pillsbury Winthrop Shaw Pittman LLP Section 2300 N Street, NW Kansas Department of Health Washington, D.C. 20037 and Environment Bureau of Air and Radiation Regional Administrator, Region IV 1000 SW Jackson, Suite 310 U.S. Nuclear Regulatory Commission Topeka, KS 66612-1366 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Vice President Operations/Plant Manager Wolf Creek Nuclear Operating Corporation Senior Resident Inspector P.O. Box 411 U.S. Nuclear Regulatory Commission Burlington, KS 66839 P.O. Box 311 Burlington, KS 66839 Supervisor Licensing Wolf Creek Nuclear Operating Corporation Chief Engineer, Utilities Division P.O. Box 411 Kansas Corporation Commission Burlington, KS 66839 1500 SW Arrowhead Road Topeka, KS 66604-4027 U.S. Nuclear Regulatory Commission Resident Inspectors Office/Callaway Plant Office of the Governor 8201 NRC Road State of Kansas Steedman, MO 65077-1032 Topeka, KS 66612 Mr. Rick A. Muench Attorney General President and Chief Executive Officer 120 S.W. 10th Avenue, 2nd Floor Wolf Creek Nuclear Operating Corporation Topeka, KS 66612-1597 Post Office Box 411 Burlington, KS 66839 County Clerk Coffey County Courthouse 110 South 6th Street Burlington, KS 66839 February 2006}} |
Letter Sequence Other |
---|
TAC:MD0197, Steam Generator Tube Integrity (Withdrawn, Closed) |
|
MONTHYEARML0606004582006-01-31031 January 2006 Westinghouse Electric Company LLC LTR-CDME-05-209-NP, Steam Generator Tube Alternate Repair Criteria for the Portion of the Tube within the Tubesheet at the Wolf Creek Generating Station. Project stage: Request ET 06-0015, Supplement to Revision to Technical Specifications - Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process2006-03-28028 March 2006 Supplement to Revision to Technical Specifications - Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process Project stage: Request ML0609001572006-04-10010 April 2006 Withholding from Public Disclosure, LTR-CDME-05-209-P, MD0197 Project stage: Other ML0616500992006-06-27027 June 2006 Request for Additional Information (RAI) Related to License Amendment Request (LAR) to Revise the Steam Generator Program Project stage: RAI WO 07-0012, Response to Request for Additional Information Related to License Amendment Request to Revise the Steam Generator Program2007-05-0303 May 2007 Response to Request for Additional Information Related to License Amendment Request to Revise the Steam Generator Program Project stage: Response to RAI ML0716504002007-06-19019 June 2007 Notice of Meeting with Wolf Creek Nuclear Corp Regarding Nrc'S Request for Additional Information on 2/21/06 Licensee Amendment Request Re SG Tube Surveillance Program, Wolf Creek Generating Station Project stage: RAI ML0719303772007-07-11011 July 2007 Handouts (NRC and Licensee) for Meeting with Representatives of Wolf Creek Nuclear Operating Corporation Project stage: Meeting ML0719802032007-08-0707 August 2007 Summary of Meeting with Representatives of Wolf Creek Nuclear Operating Corporation for Wolf Creek Generating Station to Discuss Second Request for Additional Information for Steam Generator Tube Surveillance Program LAR Project stage: RAI ML0722700022007-08-30030 August 2007 Topical Report, Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ET 07-0043, Response to Request for Additional Information Related to License Amendment Request to Revise the Steam Generator Program2007-09-27027 September 2007 Response to Request for Additional Information Related to License Amendment Request to Revise the Steam Generator Program Project stage: Response to RAI ML0730901272007-11-0808 November 2007 Notice of Meeting with Wolf Creek Nuclear Operating Corporation to Discuss NRC Staff'S Request for Additional Information on Licensee'S Supplemental Letter to Letter Dated September 27, 2007, to Application Dated February 21, 2006 Project stage: RAI ML0732500032007-11-21021 November 2007 Memo to Thomas G. Hiltz Key Issues for Discussion for November 28, 2007 Meeting on Steam Generator Tube Inspection License Amendment (Tac MD0197) Project stage: Meeting ML0733004182007-11-29029 November 2007 Topical Report Withholding Information from Public Disclosure (Tac No. MD0197) Project stage: Other ML0733700452008-01-0404 January 2008 Summary of Meeting with Wolf Creek Nuclear Operating Corporation Representatives Re Steam Generator Tube Surveillance Program Project stage: Meeting ML0803706102008-01-11011 January 2008 Westinghouse Electric Company LLC, LTR-CDME-08-2, Rev. 1 NP-Attachment, Meeting Handouts from the December 13, 2007 Meeting with Wolf Creek and NRR on H*/B*. Project stage: Request ML0804300062008-02-27027 February 2008 Request for Withholding Information from Public Disclosure, 01/11/2008 Affidavit Executed by J. A. Gresham, Westinghouse Electric Company LLC Project stage: Withholding Request Acceptance ML0804501852008-02-28028 February 2008 Withdrawal of License Amendment Request on Steam Generator Tube Inspections Project stage: Withdrawal RS-08-047, Withdrawal of License Amendment Request Related Steam Generator Tube Alternate Repair Criteria2008-04-0101 April 2008 Withdrawal of License Amendment Request Related Steam Generator Tube Alternate Repair Criteria Project stage: Withdrawal 2007-06-19
[Table View] |
|
---|
Category:Letter
MONTHYEARULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 IR 05000483/20230042024-01-19019 January 2024 Integrated Inspection Report 05000483/2023004 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23317A0012024-01-12012 January 2024 Audit Summary Regarding LAR to Clarify Support System Requirements for the Residual Heat Removal and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML24011A1492024-01-11011 January 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information (05000483/2024011) ULNRC-06847, Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01)2023-12-21021 December 2023 Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01) ULNRC-06849, License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds2023-12-20020 December 2023 License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds ML23346A0392023-12-14014 December 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Relief from Requirements of ASME Code, Section Xl, Examination and Testing Unbonded Post-Tensioning System ULNRC-06844, Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification2023-12-0707 December 2023 Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification 05000483/LER-2023-001, Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications2023-11-29029 November 2023 Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2023-11-20020 November 2023 Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) IR 05000483/20230102023-11-15015 November 2023 NRC License Renewal Phase 1 Inspection Report 05000483 2023010 IR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23297A2502023-11-0606 November 2023 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination and Opportunity for a Hearing (EPID L-2022-LLA-0176) - Letter IR 05000483/20240122023-10-24024 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000483/2024012) ML23293A2652023-10-24024 October 2023 3rd Quarter 2023 Integrated Inspection Report ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) ML23234A1522023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Letter) ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23270B9662023-09-27027 September 2023 10 CFR 50.55a(z)(I) Request for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23261C3852023-09-25025 September 2023 Safety Evaluation for Operating Quality Assurance Manual Revision 36A ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML23206A1992023-09-15015 September 2023 Regulatory Audit Summary Regarding License Amendment and Regulatory Exemptions Request for Fuel Transition to Framatome Gaia Fuel (Epids L-2022-LLA-0150 and L-2022-LLE-0030) IR 05000483/20234012023-09-13013 September 2023 NRC Security Baseline Inspection Report 05000483/2023401 ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20230052023-08-23023 August 2023 Updated Inspection Plan for Callaway Nuclear Power Plant, Unit 1 (Report 05000483/2023005) - Mid Cycle Letter 2023 ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ML23219A1392023-08-15015 August 2023 Request for Withholding Information from Public Disclosure ULNRC-06830, Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak2023-08-15015 August 2023 Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak ML23215A1972023-08-0303 August 2023 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) ULNRC-06223, Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004)2023-07-25025 July 2023 Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004) ULNRC-06799, Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications2023-07-13013 July 2023 Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications IR 05000483/20230022023-07-10010 July 2023 Integrated Inspection Report 05000483/2023002 ML23174A1272023-06-23023 June 2023 Cw FFD Document Request List 2023 ML23171A9942023-06-22022 June 2023 Acceptance of Request for Approval of Operating Quality Assurance Manual Revision 36a ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) IR 05000483/20230112023-06-15015 June 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000483/2023011 ULNRC-06822, Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a2023-06-14014 June 2023 Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a ML23158A1462023-06-13013 June 2023 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000483/2023010) ULNRC-06815, Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a2023-06-0505 June 2023 Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a ULNRC-06818, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate .2023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate . ML23093A0952023-05-10010 May 2023 Issuance of Amendment No. 232 Regarding Technical Specification Changes for Spent Fuel Storage ULNRC-06816, Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015)2023-05-0909 May 2023 Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015) ML23129A7942023-05-0909 May 2023 Post-Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (Iepid L-2022-LLA-0150 and EPID L-2022-LLE-0030) ML23122A3172023-05-0808 May 2023 Review of the Spring 2022 Steam Generator Tube Inservice Inspections ML23118A3492023-05-0808 May 2023 Request for Withholding Information from Public Disclosure 2024-01-29
[Table view] Category:Proprietary Information Review
MONTHYEARML23219A1392023-08-15015 August 2023 Request for Withholding Information from Public Disclosure ML23118A3492023-05-0808 May 2023 Request for Withholding Information from Public Disclosure ML23093A2092023-04-14014 April 2023 Request for Withholding Information from Public Disclosure ML23093A0462023-04-14014 April 2023 Request for Withholding Information from Public Disclosure ML22048C2192022-02-22022 February 2022 Request for Withholding Information from Public Disclosure ML21274A0012021-10-14014 October 2021 Request for Withholding Information from Public Disclosure ML20253A2532020-09-29029 September 2020 Request for Withholding Information from Public Disclosure (EPID L-2020-LLA-0142 (COVID-19)) ML20212L3652020-08-0606 August 2020 Request for Withholding Information from Public Disclosure (EPID L-2020-LLA-0142) (COVID-19) ML1108310262011-03-30030 March 2011 Request for Withholding Information from Public Disclosure - Proposed Denial of Request to Daryl M. Shapiro, Legal Counsel for Ameren Missouri ML0733004182007-11-29029 November 2007 Topical Report Withholding Information from Public Disclosure (Tac No. MD0197) ML0704705172007-02-21021 February 2007 Request for Withholding Information from Public Disclosure, TAC No. MD2654 ML0700302902007-01-24024 January 2007 Topical Report for Wolf Creek Generating Station - Request for Withholding Information from Public Disclosure ML0620704312006-07-31031 July 2006 Withholding of Information - Letter of Intent to Submit Combined License Application for Future Unit(S) at the Callaway Plant Site ML0524201542005-09-0707 September 2005 Withholding from Public Disclosure, Responses to NRC Request for Additional Information on WCAP-16265-P, Rev. 0, 'Callaway Replacement Steam Generator Program NSSS Licensing Report,' Dated February 2005 (CAW-05-1944) ML0524300462005-09-0707 September 2005 Withholding from Public Disclosure, Setpoint Methodology Portion of the Response to (NRC) Request for Additional Information, Questions 1 and 2 (CAW-05-1998) ML0524301332005-09-0707 September 2005 Callaway - Request for Withholding Information from Public Disclosure (CAW-05-2007) (Tac. MC4437) ML0410602032004-04-14014 April 2004 Request for Withholding Information from Public Disclosure for the Wolf Creek Generating Station and the Callaway Plant, Unit 1 ML0332406502003-11-20020 November 2003 Request for Withholding Information from Public Disclosure ML0319800992003-07-16016 July 2003 7/16/03 Callaway-Request for Withholding Info. from Public Disclosure-Application for Amd. Related to Steam Generator Tube Surveillance Program (CAW-03-1649/CAW-03-1650) (Tac. MB6478) ML0228805232002-11-0404 November 2002 Withholding from Public Disclosure, Steam Generator Tube Surveillance Program, TAC MB6478, CAW-02-1558 ML0212807042002-05-23023 May 2002 Withholding from Public Disclosure, Re Issuance of Amendment on Steam Generator Tube Surveillance Program ML0211400622002-05-0202 May 2002 Memo to File, Request for Withholding Information from Public for a Supplemental Letter on the Electrosleeve License Amendment Request for Callaway (Tac No. MB1214) 2023-08-15
[Table view] |
Text
November 29, 2007 Mr. J. A. Gresham Manager, Regulatory Compliance and Plant Licensing Nuclear Services Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355
SUBJECT:
TOPICAL REPORT FOR WOLF CREEK GENERATING STATION - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MD0197)
Dear Mr. Gresham:
By letter dated September 25, 2007 (CAW-07-2335), Westinghouse Electric Company (WEC) submitted an affidavit (CAW-07-2335) also dated September 25, 2007, executed by you, requesting that information designated proprietary in the topical report entitled, LTR-CDME-07-198-P, "Response to NRC Request for Additional Information Relating to
[topical report] LTR-CDME-05-209-P of the Wolf Creek Generating Station (WCGS) Permanent B* License Amendment Request," dated September 24, 2007, be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 390. The topical report and the WEC letter are Enclosures I and III, respectively, to the letter dated September 27, 2007 (ET 07-0043), from the Wolf Creek Nuclear Operating Corporation (WCNOC) to the Nuclear Regulatory Commission (NRC), for the Wolf Creek Generating Station.
A nonproprietary copy of the document designated LTR-CDME-07-198-NP, which is Enclosure II to the above September 27, 2007, letter from WCNOC, has been placed in the NRC's Public Document Room and added to the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room (ADAMS Accession No. ML072750610).
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
Under that system, information is held in confidence if it falls in or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
J. A. Gresham (c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacturer, shipment, installation, assurance of quality, or licensing a similar product.
(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential economic value to Westinghouse.
We have reviewed your application and the material designated as proprietary in topical report LTR-CDME-07-198-P, dated September 24, 2007, in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the information marked as proprietary in topical report LTR-CDME-07-198-P, dated September 24, 2007, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at (301) 415-1307.
Sincerely,
/RA/
Jack N. Donohew, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483 cc: See next page
J. A. Gresham (c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacturer, shipment, installation, assurance of quality, or licensing a similar product.
(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential economic value to Westinghouse.
We have reviewed your application and the material designated as proprietary in topical report LTR-CDME-07-198-P, dated September 24, 2007, in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the information marked as proprietary in topical report LTR-CDME-07-198-P, dated September 24, 2007, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at (301) 415-1307.
Sincerely,
/RA/
Jack N. Donohew, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483 cc: See next page DISTRIBUTION:
PUBLIC RidsNrrDorlDpr RidsAcrsAcnwMailCenter LPL4 Reading RidsNrrPMJDonohew RidsRgn4MailCenter RidsNrrDorl RidsNrrLAJBurkhardt RidsNrrDciCsgb RidsNrrDorlLpl4 RidsOgcRp EMurphy, NRR/DCI/CSGB ADAMS ACCESSION NO.: ML073300418 NRR-084 OFFICE DORL/LPL4/PM DORL/LPL4/LA DCI/CSGB/BC DORL/LPL4/BC NAME JDonohew JBurkhardt AHiser THiltz DATE 11/28/07 11/27/07 11/27/07 11/28/07 OFFICIAL RECORD COPY
Wolf Creek Generating Station cc:
Jay Silberg, Esq. Chief, Radiation and Asbestos Control Pillsbury Winthrop Shaw Pittman LLP Section 2300 N Street, NW Kansas Department of Health Washington, D.C. 20037 and Environment Bureau of Air and Radiation Regional Administrator, Region IV 1000 SW Jackson, Suite 310 U.S. Nuclear Regulatory Commission Topeka, KS 66612-1366 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Vice President Operations/Plant Manager Wolf Creek Nuclear Operating Corporation Senior Resident Inspector P.O. Box 411 U.S. Nuclear Regulatory Commission Burlington, KS 66839 P.O. Box 311 Burlington, KS 66839 Supervisor Licensing Wolf Creek Nuclear Operating Corporation Chief Engineer, Utilities Division P.O. Box 411 Kansas Corporation Commission Burlington, KS 66839 1500 SW Arrowhead Road Topeka, KS 66604-4027 U.S. Nuclear Regulatory Commission Resident Inspectors Office/Callaway Plant Office of the Governor 8201 NRC Road State of Kansas Steedman, MO 65077-1032 Topeka, KS 66612 Mr. Rick A. Muench Attorney General President and Chief Executive Officer 120 S.W. 10th Avenue, 2nd Floor Wolf Creek Nuclear Operating Corporation Topeka, KS 66612-1597 Post Office Box 411 Burlington, KS 66839 County Clerk Coffey County Courthouse 110 South 6th Street Burlington, KS 66839 February 2006