MONTHYEARML0606004582006-01-31031 January 2006 Westinghouse Electric Company LLC LTR-CDME-05-209-NP, Steam Generator Tube Alternate Repair Criteria for the Portion of the Tube within the Tubesheet at the Wolf Creek Generating Station. Project stage: Request ET 06-0015, Supplement to Revision to Technical Specifications - Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process2006-03-28028 March 2006 Supplement to Revision to Technical Specifications - Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process Project stage: Request ML0609001572006-04-10010 April 2006 Withholding from Public Disclosure, LTR-CDME-05-209-P, MD0197 Project stage: Other ML0616500992006-06-27027 June 2006 Request for Additional Information (RAI) Related to License Amendment Request (LAR) to Revise the Steam Generator Program Project stage: RAI WO 07-0012, Response to Request for Additional Information Related to License Amendment Request to Revise the Steam Generator Program2007-05-0303 May 2007 Response to Request for Additional Information Related to License Amendment Request to Revise the Steam Generator Program Project stage: Response to RAI ML0716504002007-06-19019 June 2007 Notice of Meeting with Wolf Creek Nuclear Corp Regarding Nrc'S Request for Additional Information on 2/21/06 Licensee Amendment Request Re SG Tube Surveillance Program, Wolf Creek Generating Station Project stage: RAI ML0719303772007-07-11011 July 2007 Handouts (NRC and Licensee) for Meeting with Representatives of Wolf Creek Nuclear Operating Corporation Project stage: Meeting ML0719802032007-08-0707 August 2007 Summary of Meeting with Representatives of Wolf Creek Nuclear Operating Corporation for Wolf Creek Generating Station to Discuss Second Request for Additional Information for Steam Generator Tube Surveillance Program LAR Project stage: RAI ML0722700022007-08-30030 August 2007 Topical Report, Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ET 07-0043, Response to Request for Additional Information Related to License Amendment Request to Revise the Steam Generator Program2007-09-27027 September 2007 Response to Request for Additional Information Related to License Amendment Request to Revise the Steam Generator Program Project stage: Response to RAI ML0730901272007-11-0808 November 2007 Notice of Meeting with Wolf Creek Nuclear Operating Corporation to Discuss NRC Staff'S Request for Additional Information on Licensee'S Supplemental Letter to Letter Dated September 27, 2007, to Application Dated February 21, 2006 Project stage: RAI ML0732500032007-11-21021 November 2007 Memo to Thomas G. Hiltz Key Issues for Discussion for November 28, 2007 Meeting on Steam Generator Tube Inspection License Amendment (Tac MD0197) Project stage: Meeting ML0733004182007-11-29029 November 2007 Topical Report Withholding Information from Public Disclosure (Tac No. MD0197) Project stage: Other ML0733700452008-01-0404 January 2008 Summary of Meeting with Wolf Creek Nuclear Operating Corporation Representatives Re Steam Generator Tube Surveillance Program Project stage: Meeting ML0803706102008-01-11011 January 2008 Westinghouse Electric Company LLC, LTR-CDME-08-2, Rev. 1 NP-Attachment, Meeting Handouts from the December 13, 2007 Meeting with Wolf Creek and NRR on H*/B*. Project stage: Request ML0804300062008-02-27027 February 2008 Request for Withholding Information from Public Disclosure, 01/11/2008 Affidavit Executed by J. A. Gresham, Westinghouse Electric Company LLC Project stage: Withholding Request Acceptance ML0804501852008-02-28028 February 2008 Withdrawal of License Amendment Request on Steam Generator Tube Inspections Project stage: Withdrawal RS-08-047, Withdrawal of License Amendment Request Related Steam Generator Tube Alternate Repair Criteria2008-04-0101 April 2008 Withdrawal of License Amendment Request Related Steam Generator Tube Alternate Repair Criteria Project stage: Withdrawal 2007-06-19
[Table View] |
|
---|
Category:Letter type:ET
MONTHYEARET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components ET 23-0005, 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peen2023-03-16016 March 2023 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened ET 23-0003, License Amendment Request (LAR) for Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications2023-03-0101 March 2023 License Amendment Request (LAR) for Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ET 23-0002, Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2023-02-0707 February 2023 Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ET 23-0004, Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements2023-01-26026 January 2023 Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ET 22-0006, Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2022-12-0101 December 2022 Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ET 22-0010, License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements2022-08-0202 August 2022 License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ET 22-0012, Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2022-07-12012 July 2022 Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 22-0011, Withdrawal of 10 CFR 50.55a Request I4R-08, Relief for Extension of Follow-up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surface2022-05-31031 May 2022 Withdrawal of 10 CFR 50.55a Request I4R-08, Relief for Extension of Follow-up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surface ET 22-0005, Response to Request for Additional Information Regarding License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2022-04-13013 April 2022 Response to Request for Additional Information Regarding License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 22-0003, CFR 50.55a Request I4R-09 for the Fourth Inservice Inspection Program Interval, Relief from Examination of Reactor Vessel Flange Threads2022-04-0606 April 2022 CFR 50.55a Request I4R-09 for the Fourth Inservice Inspection Program Interval, Relief from Examination of Reactor Vessel Flange Threads ET 22-0002, Operating Corp 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head .2022-04-0404 April 2022 Operating Corp 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head . ET 22-0004, Operating Corp - Response to Request for Confirmation of Information (RCI) Regarding Steam Generator Tube Inspection Report2022-03-15015 March 2022 Operating Corp - Response to Request for Confirmation of Information (RCI) Regarding Steam Generator Tube Inspection Report ET 22-0001, Removal of the Table of Contents from the Technical Specifications2022-01-12012 January 2022 Removal of the Table of Contents from the Technical Specifications ET 21-0017, Response to Request for Additional Information Regarding License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2021-12-22022 December 2021 Response to Request for Additional Information Regarding License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ET 21-0009, Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage2021-11-0101 November 2021 Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage ET 21-0015, Withdrawal of License Amendment Request for a Risk-Informed Resolution to GSI-1912021-10-20020 October 2021 Withdrawal of License Amendment Request for a Risk-Informed Resolution to GSI-191 ET 21-0012, Supplement to License Amendment Request for a Risk-Informed Resolution to GSI-1912021-10-11011 October 2021 Supplement to License Amendment Request for a Risk-Informed Resolution to GSI-191 ET 21-0004, License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2021-09-29029 September 2021 License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 21-0010, License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2021-09-29029 September 2021 License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ET 21-0005, Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-1912021-08-12012 August 2021 Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-191 ET 20-0013, Response to Request for Additional Information Re Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (TSTF-415)2020-10-26026 October 2020 Response to Request for Additional Information Re Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (TSTF-415) ET 20-0011, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2020-10-0101 October 2020 Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ET 20-0007, License Amendment Request for Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap Changers2020-06-0808 June 2020 License Amendment Request for Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap Changers ET 20-0008, Operating Corporation Update for Full Implementation of Open Phase Detection System2020-05-20020 May 2020 Operating Corporation Update for Full Implementation of Open Phase Detection System ET 20-0004, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2020-04-27027 April 2020 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) ET 20-0002, Response to Request for Additional Information Regarding Utilizing Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 12020-01-29029 January 2020 Response to Request for Additional Information Regarding Utilizing Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 ET 19-0021, Errata for Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation2019-12-0909 December 2019 Errata for Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation ET 19-0020, Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation2019-11-13013 November 2019 Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation ET 19-0019, Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation2019-09-10010 September 2019 Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation ET 19-0018, Supplement to License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation2019-08-22022 August 2019 Supplement to License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation ET 19-0014, Lnserv1ce Inspection (ISI) Program Relief Request Number 14R-07, to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, D1v1s1on 12019-08-15015 August 2019 Lnserv1ce Inspection (ISI) Program Relief Request Number 14R-07, to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, D1v1s1on 1 ET 19-0002, License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-03-18018 March 2019 License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ET 19-0008, Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption.2019-03-0505 March 2019 Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption. ET 19-0003, License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Remove Use of a Blind Flange2019-02-25025 February 2019 License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Remove Use of a Blind Flange ET 19-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 42019-01-23023 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 ET 18-0032, Operating Corporation Change of Date for Full Implementation of Open Phase Detection System2018-12-0707 December 2018 Operating Corporation Change of Date for Full Implementation of Open Phase Detection System ET 18-0035, Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-12-0606 December 2018 Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 18-0029, (WCGS) - Results of the Twenty First Steam Generator Tube Inservice Inspection2018-10-31031 October 2018 (WCGS) - Results of the Twenty First Steam Generator Tube Inservice Inspection ET 18-0018, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-06-19019 June 2018 Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 18-0014, Response to Request for Additional Information Regarding the License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System.2018-05-29029 May 2018 Response to Request for Additional Information Regarding the License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System. ET 18-0016, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information2018-05-29029 May 2018 Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information ET 18-0013, Relief Request Number I4R-06, Request for Relief from ASME Code Case N-729-4 for Reactor Vessel Head Penetration Nozzle Weld2018-05-0202 May 2018 Relief Request Number I4R-06, Request for Relief from ASME Code Case N-729-4 for Reactor Vessel Head Penetration Nozzle Weld ET 18-0011, (WCGS) - Guarantee of Payment of Deferred Premiums2018-04-30030 April 2018 (WCGS) - Guarantee of Payment of Deferred Premiums ET 18-0012, Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-04-19019 April 2018 Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 18-0010, Financial Protection Levels2018-03-29029 March 2018 Financial Protection Levels ET 18-0007, Supplement to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System.2018-02-15015 February 2018 Supplement to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System. ET 18-0005, Withdrawal of License Amendment Request for Revision to the Emergency Plan2018-02-0505 February 2018 Withdrawal of License Amendment Request for Revision to the Emergency Plan ET 18-0004, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-01-29029 January 2018 Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 17-0025, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term2017-11-14014 November 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term 2023-05-17
[Table view] |
Text
W0LF CREEK'NUCLEAR OPERATING CORPORATION September 27, 2007 Terry J. Garrett Vice President, Engineering ET 07-0043 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Reference:
- 1) Letter ET 06-0004, dated February 21, 2006, from T. J.
Garrett, WCNOC, to USNRC
- 2) Letter dated June 27, 2006, from J. N. Donohew, USNRC, to R. A. Muench, WCNOC
- 3) Letter WO 07-0012, dated May 3, 2007, from S. E. Hedges, WCNOC, to USNRC
Subject:
Docket No. 50-482: Response to Request for Additional Information Related to License Amendment Request to Revise the Steam Generator Program Gentlemen:
Reference 1 provided Wolf Creek Nuclear Operating Corporation's (WCNOC) application to revise Technical Specification 5.5.9, "Steam Generator Tube Surveillance Program," to exclude portions of the tube below the top of the tubesheet in the Wolf Creek Generating Station (WCGS) steam generators from periodic steam generator tube inspections. Amendment No.
164 dated May 8, 2006, revised the title of TS 5.5.9 to "Steam Generator (SG) Program."
Reference 2 provided a request for additional information (RAI) based on the NRC staff review of Reference 1. Reference 3 provided WCNOC's response to the RAI.
The NRC provided by electronic mail on June 22, 2007 a second request for additional information. A meeting was held on July 11, 2007 between the NRC staff and WCNOC staff to provide a dialogue on the questions and an:understanding of what information the NRC staff needed to complete its review of the license amendment request. The meeting resulted in some changes to the questions that are reflected in the Attachment and Enclosure I.
Ac I P.O. Box 411 / Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNVET
ET 07-0043 Page 2 of 4 Enclosure I provides the proprietary Westinghouse Electric Company LLC LTR-CDME-07-198 P-Attachment, "Response to NRC Request for Additional Information Relating to LTR-CDME-07-72 P-Attachment and LTR-CDME-05-209-P of the Wolf Creek Generating Station (WCGS)
Permanent B* License Amendment Request." Enclosure II provides the non- proprietary Westinghouse Electric Company LLC LTR-CDME-07-198 NP-Attachment, "Response to NRC Request for Additional Information Relating to LTR-CDME-07-72 P-Attachment and LTR-CDME-05-209-P of the Wolf Creek Generating Station (WCGS) Permanent B* License Amendment Request." As Enclosure I contains information proprietary to Westinghouse Electric Company LLC, it is supported by an affidavit signed by Westinghouse Electric Company LLC, the owner of the information. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR 2.390 of the Commission's regulations.
Accordingly, it is respectfully requested that the information, which is proprietary to Westinghouse, be withheld from public disclosure in accordance with 2.390 of the Commission's regulations. This affidavit, along with Westinghouse authorization letter, CAW-07-2335, "Application for Withholding Proprietary Information from Public Disclosure," is contained in Enclosure Ill.
Attachment I provides responses to questions 30 through 36. Attachment II provides revised markups of changes to the current TSs. Enclosure I contains LTR-CDME-07-198 P-Attachment that provides proprietary responses to questions 1-29. Enclosure II contains LTR-CDM-07-198 NP-Attachment that provides non-proprietary responses to questions 1-29. Enclosure III contains the affidavit for withholding proprietary information. Enclosure IV and Enclosure V provide specific referenced documents requested by the NRC in response to question 25.
Some of the documents requested are information prepared by organizations other than WCNOC. These documents are beyond the control of WCNOC and cannot be verified and validated by WCNOC. In providing information responsive to the request, WCNOC makes no representation as to its accuracy or completeness.
The additional information provided in the Attachments and Enclosures do not impact the conclusions of the No Significant Hazards Consideration provided in Reference 1. In accordance with 10 CFR 50.91, a copy of this submittal is being provided to the designated Kansas State official.
ET 07-0043 Page 3 of 4 This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4084, or Mr. Kevin Moles at (620) 364-4126.
Sincerely 7 Terry J. Garrett TJG/rlt Attachment Enclosures I - Westinghouse Electric Company LLC LTR-CDME-07-198 P-Attachment, "Response to NRC Request for Additional Information Relating to LTR-CDME-07-72 P-Attachment and LTR-CDME-05-209-P of the Wolf Creek Generating Station (WCGS) Permanent B* License Amendment Request" II - Westinghouse Electric Company LLC LTR-CDME-07-198 NP-Attachment, "Response to NRC Request for Additional Information Relating to LTR-CDME-07-72 P-Attachment and LTR-CDME-05-209-P of the Wolf Creek Generating Station (WCGS) Permanent B* License Amendment Request."
III - Westinghouse Electric Company LLC LTR CAW-07-2335, "Application for Withholding Proprietary Information from Public Disclosure" IV - Detection and Accommodation of Outliers in Normally Distributed Data Sets V - A Note on the Robustness of Dixon's Ratio Test in Small Samples cc: E. E. Collins (NRC), w/a, w/e T. A. Conley (KDHE), w/a, w/e (Enclosure II only)
J. N. Donohew (NRC), w/a, w/e V. G. Gaddy (NRC), w/a, w/e Senior Resident Inspector (NRC), w/a, w/e
ET 07-0043 Page 4 of 4 STATE OF KANSAS )
COUNTY OF COFFEY )
Terry J. Garrett, of lawful age, being first duly sworn upon oath says that he is Vice President Engineering of Wolf Creek Nuclear Operating Corporation; that he has read the foregoing document and knows the contents thereof; that he has executed the same for and on behalf of said Corporation with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
Terry ~,*Garrett Vice resident Engineering SUBSCRIBED and sworn to before me this ý1/day of.5VMlbf,7.
- 17 /YVI /7 J- 14 A Notary Public v Expiration Date(./ .
Attachment I to ET 07-0043 Page 1 of 3 RESPONSE TO SECOND REQUEST FOR ADDITIONAL INFORMATION The Nuclear Regulatory Commission (NRC) provided by electronic mail on June 22, 2007 a second request for additional information. A meeting was held on July 11, 2007 between the NRC staff and Wolf Creek Nuclear Operating Corporation (WCNOC) staff to provide a dialogue on the questions and an understanding of what information the NRC staff needed to complete its review of the license amendment request. The meeting resulted in some changes to the questions that are reflected in this Attachment and Enclosure I. This Attachment provides WCNOC specific responses to questions 30 through 36. Enclosure I provides responses to questions 1 through 29. The NRC questions are italicized.
- 30. Reference 2, Attachment I/ - Proposed TS 5.5.9.c states that, "The following alternatetube repaircriteria may be applied as an alternative to the 40% depth-based criteria." This appears to mean that you are proposing that the implementation of the alternate tube repair criterion is optional. It is the NRC staff's position that the word "may" should be "shall." Discuss and explain your proposed use of the word "may." Alternatively, the proposed inspection exclusion zone in TS 5.5.9.d could be revised to make the exclusion conditional on implementation of the alternate repaircriterion in TS 5.5.9.c. 1.
Response: The license amendment request did not propose any changes to the stated sentence in the above question. The wording currently in the technical specifications was based on NRC approved Revision 4 of Technical Specification Task Force (TSTF) 449, "Steam Generator Tube Integrity," which has been incorporated into NUREG-1431, "Standard Technical Specifications Westinghouse Plants," Rev. 3.1. This wording was approved by the NRC for WCGS in Amendment No. 164 on May 8, 2006. In the meeting on July 11, 2007, the NRC indicated the wording should be changed to "shall" to ensure that the steam generator tube inspection provisions require the use of the alternate tube repair criteria when tube inspection depths are not the entire length of the tubesheet. Based on this interpretation by the NRC staff, WCNOC is revising the sentence in TS 5.5.9c. as follows: "The following alternate tube repair criteria shall be applied as an alternative to the 40% depth-based criteria:"
- 31. Reference 2, Attachment // - The first sentence of proposed TS 5.5.9.c. 1 states, "Fortubes fully expanded into the tubesheet, degradation found in the portion of the tube below the depth identified in the below tables from the top of the tubesheet does not require plugging." Discuss your plans for revising this sentence to clarify what constitutes a fully expanded tube (e.g.,
through the use of a footnote) and for clarifying the rest of the sentence. For example, the word "degradation"should be replaced with 'Tubes with flaws." This is consistent with the rest of TS 5.5.9 which uses the word "flaws"ratherthan the word "degradation." In addition, it is tubes which are plugged, not flaws. As another example, it is believed that clarity can be gained by revising the sentence to state, ".... tubes with flaws located below the depths identified in the following tables..."
Response: WCNOC letter ET 06-0004 identified that one tube in Steam Generator B (RI 1, C121) was determined to not be fully expanded in the hot leg during the manufacturing process.
In Refueling Outage 16 (Spring 2008), WCNOC plans to plug this tube which will eliminate the need for the wording "For tubes fully expanded into the tubesheet."
Attachment I to ET 07-0043 Page 2 of 3 This question also recommends replacing the word "degradation" with "tubes with flaws." The word "degradation" was utilized in the proposed changes as this wording had been previously approved in two one-cycle license amendments (Amendment No. 162 and No. 169). As discussed at the July 11, 2007 meeting, WCNOC had concerns with the use of "flaw" in lieu of "degradation, and during the meeting, it was agreed to use "service-induced volumetric or crack-like flaws." Based on the agreement at the July 11, 2007, meeting, WCNOC is revising the proposed technical specifications.
- 32. Reference 2, Attachment II - The second sentence of proposed TS 5.5.9.c. 1 states, "All tubes with degradation identified in the portion of tube within the region from the top of the tubesheet to the depth identified in the below tables shall be removed from service. Discuss and explain the proposed use of the word "degradation"instead of the word "flaws." The use of the word "flaws" is consistent with the rest of TS 5.5.9 which uses the word "flaws" rather than the word "degradation." In addition, the NRC staff suggests the licensee may wish to consider replacing the words "belowtables" with "following tables."
Response: This question is in part a duplicate of portions of Question 31. See the response to Question 31. Additionally, WCNOC is revising the proposed technical specifications from "below tables" to "following tables" as suggested by the NRC staff.
- 33. Reference 2, Attachment II - The proposed revision to TS 5.5.9.d includes the following sentence, "Fortubes fully expanded into the tubesheet, the portion of the tube below the top of the tubesheet identified in C. I above is excluded." This sentence is confusing as to what is intended by the sentence. Discuss and clarify [what] this sentence is intended to mean. For example, the sentence could be clarified by stating, "...the portion of the tube below the inspection depths from the top of the tubesheet identified in C. I above is excluded."
Response: See the response to Question 31 for the portion of the sentence referring to tubes fully expanded into the tubesheet.
TS 5.5.9d. provides the requirements for steam generator tube inspections. The specification requires the entire length of the tube in the tube sheet be inspected with a qualified probe. The intent of the subject sentence is to specify that portion of the tube below the top of the tubesheet that is not required to meet the tube inspection requirements. The proposed technical specifications will be clarified by revising the wording to state: "The portion of the tube below the inspection depths from the top of the tubesheet identified in c.1 above is excluded."
- 34. Reference 2, Attachment II - Proposed specification TS 5.6. 1O.h - Discuss and clarify the words "for each indication" in the phrase "for each service-induced indication within the thickness of the tubesheet."
Response: Based on the July 11, 2007 meeting and the meeting minutes issued on August 7, 2007, the question was restated as follows: "Reference 2, Attachment II - Proposed specification TS 5.6.10.h - In listing what should be included in the SG tube inspection report, you have used the phrase "for each indication" in proposed item h. Discuss and clarify what is meant by this phrase and consider using what is more clear phrase "for each service-induced
Attachment I to ET 07-0043 Page 3 of 3 indication within the thickness of the tubesheet." As discussed in the response to Question 31, the wording "service-induced volumetric or crack-like flaws" will be used in lieu of "for each indication." Additionally, the wording is revised to indicate that this reporting criterion applies to area within the thickness of the tubesheet.
- 35. Reference 2, Attachment II - Proposed specification TS 5.6.1Oj - Discuss and clarify the used [use] of the words "is determined"in the second sentence. The NRC staff suggests that the words "is determined"in the second sentence should be replaced to read "was determined."
Response: The proposed technical specifications are revised from "is determined" to "was determined."
- 36. The proposed technical specification amendment would apply to both the hot and cold leg side; however, the NRC staff notes there have been no reported instances of cracks in the tubesheet region for plants with Alloy 600 thermally treated tubing and, thus, there seems to be little compelling reason to extend the applicability of the requested amendment to the cold leg side. Discuss and explain why the amendment request should apply to both the hot leg side and the cold leg side. It is the NRC staff's position that the amendment request should not apply to cold leg side.
Response: The H* and B* analysis was performed for both the hot leg and cold leg portion of the tubesheet. With the technical basis available for both the hot leg and cold leg, inclusion of the inspection in the technical specifications would encompass any unforeseen future degradation in the cold leg. Including the cold leg portion of the tubeseet in the technical specifications would limit the inspection depths that may be needed in the future.
Attachment II to ET 07-0043 Page 1 of 5 Revised Markups of Current Technical Specification Pages
Attachment II to ET 07-0043 Page 2 of 5 Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Steam Generator (SG) Pro-ram (continued)
- 3. The operational LEAKAGE performance criterion is specified in LCO 3.4.13, "RCS Operational LEAKAGE."
- c. Provisions for SG tube repair criteria. Tubes found by inservice inspection to contain flaws with a depth equal to or exceeding 40% of the nominal tube wall thickness shall be plugged.
The following alternate tube repair criteria be applied as an alternative to the 40% depth-based criteria:
- 1. For Reueli*ng Qi~age 15 anblhe sxub, equent e]eratingcycle, de te*dationjund in thpeportionof the tube elow 1 7/ 6 ches .rm WSE_ hetop offfhe hot leg.tbesheet does no tequire pJugging. AIIl tubes ith degraOltion ideptified in th, portion 9ftlubew e yin the regipfrom the top of theot leg ,tulehsheet,to17 incs & belo the
!9 of thet)esheet/sall be removed fro7 'iservic.
- d. Provisions for SG tube inspections. Periodic SG tube inspections shall be performed. The number and portions of the tubes inspected and methods of inspection shall be performed with the objective of detecting flaws of any type (e.g., volumetric flaws, axial and circumferential cracks) that may be present along the length of the tube, from the tube-to-tubesheet weld at mav the aif tube inlet tea to the tube-to-tubesheet weld atlhe e repair criteria. FogrReftube lin outlet, and that 0g-)tg-*
A,*.,ifrir, e p eot Je* tu shees, e, h* *~ex : The tube-to-
/ tubesheet weld i op f te tube. In addition to meeting the S requirements of d.1, d.2, and d.3 below, the inspection scope, inspection methods, and inspection intervals shall be such as to ensure that SG tube integrity is maintained until the next SG inspection. An assessment of degradation shall be performed to determine the type and location of flaws to which the tubes may be susceptible and, based on this assessment, to determine which inspection methods need to be employed and at what locations.
- 1. Inspect 100% of the tubes in each SG during the first refueling outage following SG replacement.
Trhe_ Pr~orf 'ovYF +V +L.4b~e- +Vie-z~ £~-Fonu 4
+/-p of V~e_ +u~e Sex-t ide~n~i{r iýA v;A C/Ia~v- CSecLAA (continued)
Wolf Creek - Unit 1 5.0-12 Amendment No. 123 , 2 ,, 169
Attachment II to ET 07-0043 Page 3 of 5 INSERT 5.0-12 Tubes with service-induced volumetric or crack-like flaws located below the depths identified in the following tables do not require plugging. All tubes with service-induced volumetric or crack-like flaws located within the region from the top of the tubesheet to the depth identified in the following tables shall be removed from service.
STEAM GENERATOR TUBE INSPECTION DEPTHS STEAM GENERATOR HOT LEG Inspection Depth Zones H1 H2 H3 Radius of the Zone from the Vertical Centerline of the 2 - 37 >37 - 50 >50 - 59 Tubesheet (inches)
Depth for the Zone (inches) 13.5 11.0 7.0 STEAM GENERATOR COLD LEG Inspection Depth Zones C1 C2 Radius of the Zone from the Vertical Centerline of the 2 - 37 >37 - 59 Tubesheet (inches)
Depth for the Zone (inches) 15.0 11.0
Attachment II to ET 07-0043 Page 4 of 5 Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.10 Steam Generator Tube Inspection Report A report shall be submitted within 180 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with the Specification 5.5.9, Steam Generator (SG) Program. The report shall include:
- a. The scope of inspections performed on each SG;
- b. Active degradation mechanisms found;
- c. Nondestructive examination techniques utilized for each degradation mechanism;
- d. Location, orientation (if linear), and measured sizes (if available) of service induced indications;
- e. Number of tubes plugged during the inspection outage for each active degradation mechanism;
- f. Total number and percentage of tubes plugged to date; and
- g. The results of condition monitoring, including the results of tube pulls and in-situ testing.
Wolf Creek - Unit 1 5.0-26 Amendment No. 423, -42,-158, 164
Attachment II to ET 07-0043 Page 5 of 5 INSERT 5.0-26
- h. The number of indications and location, size, orientation, and whether initiated on primary or secondary side for each service-induced volumetric or crack-like flaw within the thickness of the tubesheet;
- i. The primary to secondary LEAKAGE rate observed in each SG (if it is not practical to assign the LEAKAGE to an individual SG, the entire primary to secondary LEAKAGE should be conservatively assumed to be from one SG) during the cycle proceeding the inspection which is the subject of the report; and
- j. The calculated accident leakage rate from the portion of the tubes below the depths identified in the Tables in TS 5.5.9 c.1. for the most limiting accident in the most limiting SG. In addition, if the calculated accident leakage rate from the most limiting accident is less than 2 times the maximum primary to secondary LEAKAGE rate, the report should describe how it was determined.