{{#Wiki_filter:November 5, 2010  
{{#Wiki_filter:UNITED STATES
Joseph A. Kowalewski, Vice President, Operations Entergy Operations, Inc. Waterford Steam Electric Station, Unit 3  
                                    NUC LE AR RE G ULATO RY C O M M I S S I O N
17265 River Road Killona, LA 70057-0751  
                                                      R E GI ON I V
SUBJECT: Waterford Unit 3 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000382/2011301  
                                          612 EAST LAMAR BLVD , SU I TE 400
Dear Mr. Kowalewski:  
                                            AR LI N GTON , TEXAS 76011-4125
In a telephone conversation on October 26, 2010 between Messrs. John Signorelli and Chris Steely, Chief Examiner, arrangements were made for the administration of licensing examinations at Waterford 3 during the week of March 21, 2011.  
                                              November 5, 2010
Joseph A. Kowalewski, Vice President, Operations
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are  
Entergy Operations, Inc.
administered.  
Waterford Steam Electric Station, Unit 3
  To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by January 7, 2011. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by January 21, 2011.
17265 River Road
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate  
Killona, LA 70057-0751
enclosure and appropriately marked. Any delay in receiving the required examinations and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for on-site validation of the examinations is required during the week of February 21, 2011.  
SUBJECT:         Waterford Unit 3 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and  
                EXAMINATION 05000382/2011301
to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Dear Mr. Kowalewski:
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
In a telephone conversation on October 26, 2010 between Messrs. John Signorelli and
Joseph A. Kowalewski - 2 -
Chris Steely, Chief Examiner, arrangements were made for the administration of licensing
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
examinations at Waterford 3 during the week of March 21, 2011.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
As agreed during the telephone conversation, your staff will prepare the examinations based on
senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date.  If the applications are not received at least 30 days before the examination date, a postponement may be necessary.  Signed applications certifying that all training has been completed should
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power
be submitted at least 14 days before the first examination date.
Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for
This letter contains information collections that are subject to the Paperwork Reduction Act of
Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will
1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013.  The public reporting burden for this collection of information is estimated to average 50 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and
discuss with your staff any changes that might be necessary before the examinations are
reviewing the collection of information.  Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.  The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
administered.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
To meet the above schedule, it will be necessary for your staff to furnish the examination
enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.  Thank you for your cooperation in this matter.  Mr. Signorelli has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Steely at 817-276-4432, or myself at 817-860-8159.  
outlines by January 7, 2011. The written examinations, operating tests, and supporting
reference materials identified in Attachment 3 to ES-201 will be due by January 21, 2011.
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
outlines, examinations, and tests before they are submitted to the NRC for review and approval.
All materials shall be complete and ready-to-use. We request that any personal, proprietary,
sensitive unclassified, or safeguards information in your response be contained in a separate
enclosure and appropriately marked. Any delay in receiving the required examinations and
reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled. In addition, your support for on-site validation of the
examinations is required during the week of February 21, 2011.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.


        Sincerely, 
Joseph A. Kowalewski                          -2-
/RA/        Mark S. Haire, Chief Operations Branch      Division of Reactor Safety
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
Docket:  50-382
effect while the written examinations and operating tests are being administered.
License:  NPF-38 
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
Joseph A. Kowalewski - 3 -
senior operator license applications (Office of Management and Budget (OMB) approval number
cc: John T. Herron  Entergy Services, Inc. President and CEO 
3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if
Nuclear Operations/CNO P.O. Box 31995 Jackson, MS  39286-1995
any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If
Jeff Forbes
the applications are not received at least 30 days before the examination date, a postponement
Senior Vice President and   Chief Operating Officer Entergy Operations, Inc. P. O. Box 31995 Jackson, MS  39286-1995
may be necessary. Signed applications certifying that all training has been completed should
Thomas Palmisano
be submitted at least 14 days before the first examination date.
Vice President, Oversight Entergy Operations, Inc. P. O. Box 31995 Jackson, MS  39286-1995
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
Senior Manager, Nuclear Safety  and Licensing Entergy Services, Inc. P. O. Box 31995 Jackson, MS  39286-1995
approval number 3150-0018, which expires on February 28, 2013. The public reporting burden
for this collection of information is estimated to average 50 hours per response, including the
time for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRCs Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the
electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-
rm/adams.html.
Thank you for your cooperation in this matter. Mr. Signorelli has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRCs
examination procedures and guidelines, please contact Mr. Steely at 817-276-4432, or myself at
817-860-8159.
                                                Sincerely,
                                                /RA/
                                                Mark S. Haire, Chief
                                                Operations Branch
                                                Division of Reactor Safety
Docket: 50-382
License: NPF-38


  Bob Murillo Manager, Licensing and Regulatory Affairs Entergy Operations, Inc. Waterford Steam Electric Station, Unit 3  
Joseph A. Kowalewski                    -3-
17265 River Road Killona, LA 70057-0751  
cc:
Kenny J. Christian, Director Nuclear Safety Assurance  
John T. Herron
Entergy Operations, Inc. 17265 River Road Killona, LA 70057-0751  
Entergy Services, Inc.
Joseph A. Aluise Associate General Council - Nuclear Entergy Services, Inc.  
President and CEO
639 Loyola Avenue New Orleans, LA 70113  
Nuclear Operations/CNO
 
P.O. Box 31995
Joseph A. Kowalewski - 4 -
Jackson, MS 39286-1995
Charles F. Arnone General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc.
Jeff Forbes
17265 River Road Killona, LA  70057-0751
Senior Vice President and
Manager, Licensing Entergy Operations, Inc.
  Chief Operating Officer
17265 River Road Killona, LA  70057-0751
Entergy Operations, Inc.
Chairman Louisiana Public Service Commission P. O. Box 91154 Baton Rouge, LA  70821-9154
P. O. Box 31995
Jackson, MS 39286-1995
Thomas Palmisano
Vice President, Oversight
Entergy Operations, Inc.
P. O. Box 31995
Jackson, MS 39286-1995
Senior Manager, Nuclear Safety
  and Licensing
Entergy Services, Inc.
P. O. Box 31995
Jackson, MS 39286-1995
Bob Murillo
Manager, Licensing and Regulatory Affairs
Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3
17265 River Road
Killona, LA 70057-0751
Kenny J. Christian, Director
Nuclear Safety Assurance
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751
Joseph A. Aluise
Associate General Council - Nuclear
Entergy Services, Inc.
639 Loyola Avenue
New Orleans, LA 70113


Parish President Council St. Charles Parish P. O. Box 302 Hahnville, LA 70057  
Joseph A. Kowalewski                  -4-
Charles F. Arnone
General Manager, Plant Operations
Waterford 3 SES
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751
Manager, Licensing
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751
Chairman
Louisiana Public Service Commission
P. O. Box 91154
Baton Rouge, LA 70821-9154
Parish President Council
St. Charles Parish
P. O. Box 302
Hahnville, LA 70057
St. Charles Parish
Dept. of Emergency Preparedness
Emergency Operations Center
P.O. Box 302
Hahnville, LA 70057
Director, Nuclear Safety & Licensing
Entergy, Operations, Inc.
440 Hamilton Avenue
White Plains, NY 10601
Louisiana Department of Environmental Quality
Radiological Emergency Planning
  and Response Division
P. O. Box 4312
Baton Rouge, LA 70821-4312
Chief, Technological Hazards
  Branch
FEMA Region VI
800 North Loop 288
Federal Regional Center
Denton, TX 76209


St. Charles Parish Dept. of Emergency Preparedness Emergency Operations Center P.O. Box 302
Joseph A. Kowalewski                       -5-
Hahnville, LA  70057
Electronic distribution by RIV:
Director, Nuclear Safety & Licensing Entergy, Operations, Inc. 440 Hamilton Avenue
Regional Administrator (Elmo.Collins@nrc.gov)
White Plains, NY 10601
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
Louisiana Department of Environmental Quality  Radiological Emergency Planning    and Response Division
DRP Director (Kriss.Kennedy@nrc.gov)
P. O. Box 4312 Baton Rouge, LA 70821-4312
DRP Deputy Director (Anton.Vegel@nrc.gov)
Chief, Technological Hazards    Branch FEMA Region VI 800 North Loop 288
DRS Director (Roy.Caniano@nrc.gov)
Federal Regional Center Denton, TX  76209
DRS Deputy Director (Troy.Pruett@nrc.gov)
 
Senior Resident Inspector (Marlone.Davis@nrc.gov)
Joseph A. Kowalewski - 5 -  
Resident Inspector (Dean.Overland@nrc.gov)
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Chuck.Casto@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov)  
Branch Chief, DRP/E (Jeff.Clark@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov) DRS Director (Roy.Caniano@nrc.gov) DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (Marlone.Davis@nrc.gov) Resident Inspector (Dean.Overland@nrc.gov)  
Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)
Branch Chief, DRP/E (Jeff.Clark@nrc.gov) Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov) Project Engineer (William.Schaup@nrc.gov) WAT Administrative Assistant (Linda.Dufrene@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Kaly.Kalyanam@nrc.gov)  
Project Engineer (William.Schaup@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Acting Regional Counsel (David.Roth@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
WAT Administrative Assistant (Linda.Dufrene@nrc.gov)
OEMail Resource OEDO RIV Coordinator (Geoffrey.Miller@nrc.gov)  
Public Affairs Officer (Victor.Dricks@nrc.gov)
 
Public Affairs Officer (Lara.Uselding@nrc.gov)
   
Project Manager (Kaly.Kalyanam@nrc.gov)
R:\       ADAMS ML ADAMS:   No       Yes SUNSI Review Complete Reviewer Initials:  
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
  Publicly Available   Non-Sensitive  
RITS Coordinator (Marisa.Herrera@nrc.gov)
  Non-publicly Available   Sensitive OE: OB C: OB   CD Steely M Haire   /RA/ /RA/   11/5/2010 11/5/2010   OFFICIAL RECORD COPY                                         T=Telephone           E=E-mail       F=Fax
Regional Counsel (Karla.Fuller@nrc.gov)
Acting Regional Counsel (David.Roth@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
OEDO RIV Coordinator (Geoffrey.Miller@nrc.gov)
R:\                                                         ADAMS ML
ADAMS:       No     6 Yes       6 SUNSI Review Complete       Reviewer Initials:
                                  6 Publicly Available           6 Non-Sensitive
                                    Non-publicly Available         Sensitive
OE: OB                 C: OB
CD Steely               M Haire
/RA/                   /RA/
11/5/2010               11/5/2010
OFFICIAL RECORD COPY                                   T=Telephone     E=E-mail     F=Fax
}}
}}

Latest revision as of 07:31, 13 November 2019

Notification of Nrc Initial Operator Licensing Examination 05000382/2011301
ML103120077
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/05/2010
From: Mark Haire
Operations Branch IV
To: Kowalewski J
Entergy Operations
References
50-382/11-301
Download: ML103120077 (5)


See also: IR 05000382/2011301

Text

UNITED STATES

NUC LE AR RE G ULATO RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

November 5, 2010

Joseph A. Kowalewski, Vice President, Operations

Entergy Operations, Inc.

Waterford Steam Electric Station, Unit 3

17265 River Road

Killona, LA 70057-0751

SUBJECT: Waterford Unit 3 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING

EXAMINATION 05000382/2011301

Dear Mr. Kowalewski:

In a telephone conversation on October 26, 2010 between Messrs. John Signorelli and

Chris Steely, Chief Examiner, arrangements were made for the administration of licensing

examinations at Waterford 3 during the week of March 21, 2011.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power

Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for

Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will

discuss with your staff any changes that might be necessary before the examinations are

administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by January 7, 2011. The written examinations, operating tests, and supporting

reference materials identified in Attachment 3 to ES-201 will be due by January 21, 2011.

Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations

(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the

outlines, examinations, and tests before they are submitted to the NRC for review and approval.

All materials shall be complete and ready-to-use. We request that any personal, proprietary,

sensitive unclassified, or safeguards information in your response be contained in a separate

enclosure and appropriately marked. Any delay in receiving the required examinations and

reference materials, or the submittal of inadequate or incomplete materials, may cause the

examinations to be rescheduled. In addition, your support for on-site validation of the

examinations is required during the week of February 21, 2011.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Joseph A. Kowalewski -2-

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and

senior operator license applications (Office of Management and Budget (OMB) approval number

3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if

any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If

the applications are not received at least 30 days before the examination date, a postponement

may be necessary. Signed applications certifying that all training has been completed should

be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on February 28, 2013. The public reporting burden

for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the

time for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the

electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-

rm/adams.html.

Thank you for your cooperation in this matter. Mr. Signorelli has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRCs

examination procedures and guidelines, please contact Mr. Steely at 817-276-4432, or myself at

817-860-8159.

Sincerely,

/RA/

Mark S. Haire, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-382

License: NPF-38

Joseph A. Kowalewski -3-

cc:

John T. Herron

Entergy Services, Inc.

President and CEO

Nuclear Operations/CNO

P.O. Box 31995

Jackson, MS 39286-1995

Jeff Forbes

Senior Vice President and

Chief Operating Officer

Entergy Operations, Inc.

P. O. Box 31995

Jackson, MS 39286-1995

Thomas Palmisano

Vice President, Oversight

Entergy Operations, Inc.

P. O. Box 31995

Jackson, MS 39286-1995

Senior Manager, Nuclear Safety

and Licensing

Entergy Services, Inc.

P. O. Box 31995

Jackson, MS 39286-1995

Bob Murillo

Manager, Licensing and Regulatory Affairs

Entergy Operations, Inc.

Waterford Steam Electric Station, Unit 3

17265 River Road

Killona, LA 70057-0751

Kenny J. Christian, Director

Nuclear Safety Assurance

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

Joseph A. Aluise

Associate General Council - Nuclear

Entergy Services, Inc.

639 Loyola Avenue

New Orleans, LA 70113

Joseph A. Kowalewski -4-

Charles F. Arnone

General Manager, Plant Operations

Waterford 3 SES

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

Manager, Licensing

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

Chairman

Louisiana Public Service Commission

P. O. Box 91154

Baton Rouge, LA 70821-9154

Parish President Council

St. Charles Parish

P. O. Box 302

Hahnville, LA 70057

St. Charles Parish

Dept. of Emergency Preparedness

Emergency Operations Center

P.O. Box 302

Hahnville, LA 70057

Director, Nuclear Safety & Licensing

Entergy, Operations, Inc.

440 Hamilton Avenue

White Plains, NY 10601

Louisiana Department of Environmental Quality

Radiological Emergency Planning

and Response Division

P. O. Box 4312

Baton Rouge, LA 70821-4312

Chief, Technological Hazards

Branch

FEMA Region VI

800 North Loop 288

Federal Regional Center

Denton, TX 76209

Joseph A. Kowalewski -5-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Marlone.Davis@nrc.gov)

Resident Inspector (Dean.Overland@nrc.gov)

Branch Chief, DRP/E (Jeff.Clark@nrc.gov)

Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)

Project Engineer (William.Schaup@nrc.gov)

WAT Administrative Assistant (Linda.Dufrene@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Kaly.Kalyanam@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Acting Regional Counsel (David.Roth@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

OEDO RIV Coordinator (Geoffrey.Miller@nrc.gov)

R:\ ADAMS ML

ADAMS: No 6 Yes 6 SUNSI Review Complete Reviewer Initials:

6 Publicly Available 6 Non-Sensitive

Non-publicly Available Sensitive

OE: OB C: OB

CD Steely M Haire

/RA/ /RA/

11/5/2010 11/5/2010

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax