{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Regner, Lisa Sent: Wednesday, April 13, 2016 12:48 PM To: Sterling, Lance (lsterling@STPEGS.COM)
{{#Wiki_filter:NRR-PMDAPEm Resource From:                                 Regner, Lisa Sent:                                 Wednesday, April 13, 2016 12:48 PM To:                                   Sterling, Lance (lsterling@STPEGS.COM)
Cc:Gonzales, Rafael
Cc:                                   Gonzales, Rafael


==Subject:==
==Subject:==
Acceptance Review: STP Un it 2 Relief Request (MF7428)By letter dated March 3, 2016, the STP Nuclear Operating Company submitted a relief request for the South Texas Project, Unit 2, for relief from the requirements of ASME Boiler and Pressure Vessel Code. The licensee proposed an alternative frequency of inservice inspection for the reactor pressure vessel cold leg nozzle butt  
Acceptance Review: STP Unit 2 Relief Request (MF7428)
By letter dated March 3, 2016, the STP Nuclear Operating Company submitted a relief request for the South Texas Project, Unit 2, for relief from the requirements of ASME Boiler and Pressure Vessel Code. The licensee proposed an alternative frequency of inservice inspection for the reactor pressure vessel cold leg nozzle butt welds.
The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this licensing action. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
Lisa M Regner, Sr. Project Manager, Branch LPLIV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Lisa.Regner@NRC.Gov Office: O8D08 Mail Stop: O8B01 (301) 415-1906 1


welds. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this licensing action. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to a llow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Hearing Identifier:       NRR_PMDA Email Number:             2774 Mail Envelope Properties       (6b461d43a0104fbc81cc9aa7e5d8bd8f)
The NRC staff has reviewed your application and concluded that it does provide technical information in
 
sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that
 
impact the NRC staff's ability to complete the detailed te chnical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
 
Lisa M Regner, Sr. Project Manager , Branch LPLIV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Lisa.Regner@NRC.Gov Office: O8D08 Mail Stop: O8B01 (301) 415-1906
 
Hearing Identifier: NRR_PMDA Email Number: 2774   Mail Envelope Properties   (6b461d43a0104fbc81cc9aa7e5d8bd8f)


==Subject:==
==Subject:==
Acceptance Review: STP Unit 2 Relief Request (MF7428) Sent Date:   4/13/2016 12:48:19 PM Received Date: 4/13/2016 12:48:20 PM From:   Regner, Lisa Created By:   Lisa.Regner@nrc.gov Recipients:     "Gonzales, Rafael" <rjgonzales@STPEGS.COM>
Acceptance Review: STP Unit 2 Relief Request (MF7428)
Tracking Status: None "Sterling, Lance (lsterling@STPEGS.COM)" <lsterling@STPEGS.COM>
Sent Date:                 4/13/2016 12:48:19 PM Received Date:             4/13/2016 12:48:20 PM From:                     Regner, Lisa Created By:               Lisa.Regner@nrc.gov Recipients:
Tracking Status: None Post Office:   HQPWMSMRS01.nrc.gov
"Gonzales, Rafael" <rjgonzales@STPEGS.COM>
Tracking Status: None "Sterling, Lance (lsterling@STPEGS.COM)" <lsterling@STPEGS.COM>
Tracking Status: None Post Office:               HQPWMSMRS01.nrc.gov Files                            Size                  Date & Time MESSAGE                          1949                  4/13/2016 12:48:20 PM Options Priority:                        Standard Return Notification:              No Reply Requested:                  No Sensitivity:                      Normal Expiration Date:
Recipients Received:


Files    Size      Date & Time MESSAGE    1949      4/13/2016 12:48:20 PM 
NRR-PMDAPEm Resource From:                                 Regner, Lisa Sent:                                 Wednesday, April 13, 2016 12:48 PM To:                                   Sterling, Lance (lsterling@STPEGS.COM)
 
Cc:                                   Gonzales, Rafael
Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
1 NRR-PMDAPEm Resource From: Regner, Lisa Sent: Wednesday, April 13, 2016 12:48 PM To: Sterling, Lance (lsterling@STPEGS.COM)
Cc:Gonzales, Rafael


==Subject:==
==Subject:==
Acceptance Review: STP Un it 2 Relief Request (MF7428)By letter dated March 3, 2016, the STP Nuclear Operating Company submitted a relief request for the South Texas Project, Unit 2, for relief from the requirements of ASME Boiler and Pressure Vessel Code. The licensee proposed an alternative frequency of inservice inspection for the reactor pressure vessel cold leg nozzle butt  
Acceptance Review: STP Unit 2 Relief Request (MF7428)
By letter dated March 3, 2016, the STP Nuclear Operating Company submitted a relief request for the South Texas Project, Unit 2, for relief from the requirements of ASME Boiler and Pressure Vessel Code. The licensee proposed an alternative frequency of inservice inspection for the reactor pressure vessel cold leg nozzle butt welds.
The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this licensing action. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
Lisa M Regner, Sr. Project Manager, Branch LPLIV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Lisa.Regner@NRC.Gov Office: O8D08 Mail Stop: O8B01 (301) 415-1906 1


welds. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this licensing action. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to a llow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Hearing Identifier:       NRR_PMDA Email Number:             2774 Mail Envelope Properties       (6b461d43a0104fbc81cc9aa7e5d8bd8f)
The NRC staff has reviewed your application and concluded that it does provide technical information in
 
sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that
 
impact the NRC staff's ability to complete the detailed te chnical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
 
Lisa M Regner, Sr. Project Manager , Branch LPLIV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Lisa.Regner@NRC.Gov Office: O8D08 Mail Stop: O8B01 (301) 415-1906
 
Hearing Identifier: NRR_PMDA Email Number: 2774   Mail Envelope Properties   (6b461d43a0104fbc81cc9aa7e5d8bd8f)


==Subject:==
==Subject:==
Acceptance Review: STP Unit 2 Relief Request (MF7428) Sent Date:   4/13/2016 12:48:19 PM Received Date: 4/13/2016 12:48:20 PM From:   Regner, Lisa Created By:   Lisa.Regner@nrc.gov Recipients:     "Gonzales, Rafael" <rjgonzales@STPEGS.COM>
Acceptance Review: STP Unit 2 Relief Request (MF7428)
Tracking Status: None "Sterling, Lance (lsterling@STPEGS.COM)" <lsterling@STPEGS.COM>
Sent Date:                 4/13/2016 12:48:19 PM Received Date:             4/13/2016 12:48:20 PM From:                     Regner, Lisa Created By:               Lisa.Regner@nrc.gov Recipients:
Tracking Status: None Post Office:   HQPWMSMRS01.nrc.gov
"Gonzales, Rafael" <rjgonzales@STPEGS.COM>
 
Tracking Status: None "Sterling, Lance (lsterling@STPEGS.COM)" <lsterling@STPEGS.COM>
Files     Size     Date & Time MESSAGE   1949     4/13/2016 12:48:20 PM
Tracking Status: None Post Office:               HQPWMSMRS01.nrc.gov Files                             Size                   Date & Time MESSAGE                           1949                   4/13/2016 12:48:20 PM Options Priority:                         Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
 
Recipients Received:}}
Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}

Revision as of 20:59, 30 October 2019

Relief Request from ASME Code Timeliness Requirements, RPV Nozzle to Safe-End Welds
ML16105A455
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 04/13/2016
From: Lisa Regner
Plant Licensing Branch IV
To: Sterling L
South Texas
References
MF7428
Download: ML16105A455 (2)


Text

NRR-PMDAPEm Resource From: Regner, Lisa Sent: Wednesday, April 13, 2016 12:48 PM To: Sterling, Lance (lsterling@STPEGS.COM)

Cc: Gonzales, Rafael

Subject:

Acceptance Review: STP Unit 2 Relief Request (MF7428)

By letter dated March 3, 2016, the STP Nuclear Operating Company submitted a relief request for the South Texas Project, Unit 2, for relief from the requirements of ASME Boiler and Pressure Vessel Code. The licensee proposed an alternative frequency of inservice inspection for the reactor pressure vessel cold leg nozzle butt welds.

The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this licensing action. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Lisa M Regner, Sr. Project Manager, Branch LPLIV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Lisa.Regner@NRC.Gov Office: O8D08 Mail Stop: O8B01 (301) 415-1906 1

Hearing Identifier: NRR_PMDA Email Number: 2774 Mail Envelope Properties (6b461d43a0104fbc81cc9aa7e5d8bd8f)

Subject:

Acceptance Review: STP Unit 2 Relief Request (MF7428)

Sent Date: 4/13/2016 12:48:19 PM Received Date: 4/13/2016 12:48:20 PM From: Regner, Lisa Created By: Lisa.Regner@nrc.gov Recipients:

"Gonzales, Rafael" <rjgonzales@STPEGS.COM>

Tracking Status: None "Sterling, Lance (lsterling@STPEGS.COM)" <lsterling@STPEGS.COM>

Tracking Status: None Post Office: HQPWMSMRS01.nrc.gov Files Size Date & Time MESSAGE 1949 4/13/2016 12:48:20 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

NRR-PMDAPEm Resource From: Regner, Lisa Sent: Wednesday, April 13, 2016 12:48 PM To: Sterling, Lance (lsterling@STPEGS.COM)

Cc: Gonzales, Rafael

Subject:

Acceptance Review: STP Unit 2 Relief Request (MF7428)

By letter dated March 3, 2016, the STP Nuclear Operating Company submitted a relief request for the South Texas Project, Unit 2, for relief from the requirements of ASME Boiler and Pressure Vessel Code. The licensee proposed an alternative frequency of inservice inspection for the reactor pressure vessel cold leg nozzle butt welds.

The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this licensing action. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Lisa M Regner, Sr. Project Manager, Branch LPLIV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Lisa.Regner@NRC.Gov Office: O8D08 Mail Stop: O8B01 (301) 415-1906 1

Hearing Identifier: NRR_PMDA Email Number: 2774 Mail Envelope Properties (6b461d43a0104fbc81cc9aa7e5d8bd8f)

Subject:

Acceptance Review: STP Unit 2 Relief Request (MF7428)

Sent Date: 4/13/2016 12:48:19 PM Received Date: 4/13/2016 12:48:20 PM From: Regner, Lisa Created By: Lisa.Regner@nrc.gov Recipients:

"Gonzales, Rafael" <rjgonzales@STPEGS.COM>

Tracking Status: None "Sterling, Lance (lsterling@STPEGS.COM)" <lsterling@STPEGS.COM>

Tracking Status: None Post Office: HQPWMSMRS01.nrc.gov Files Size Date & Time MESSAGE 1949 4/13/2016 12:48:20 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: