{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Orenak, Michael Sent: Thursday, May 12, 2016 9:08 AM To: Joyce, Ryan M.
{{#Wiki_filter:NRR-PMDAPEm Resource From:                             Orenak, Michael Sent:                             Thursday, May 12, 2016 9:08 AM To:                               Joyce, Ryan M.
Cc:McElroy, G. Ken; CRPIERCE@southernco.com
Cc:                               McElroy, G. Ken; CRPIERCE@southernco.com


==Subject:==
==Subject:==
NRC Acceptance Review for Alte rnative Request HNP-ISI-ALT-05-02Ryan, By letter dated May 6, 2016, Southern Nuclear Operating Company, Inc. submitted a request for alternative for Edwin I. Hatch Nuclear Plant (HNP), Unit 2 (ADAMS Accession No. ML16127A191; TAC No. MF7692) to perform the VT-2 visual examination during a system leakage test of Class 1 components with mechanical joint connections at a pressure lower than the Code-required pressure following repair and replacement activities on several SRVs installed in HNP, Unit 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear  
NRC Acceptance Review for Alternative Request HNP-ISI-ALT-05-02
: Ryan, By letter dated May 6, 2016, Southern Nuclear Operating Company, Inc. submitted a request for alternative for Edwin I. Hatch Nuclear Plant (HNP), Unit 2 (ADAMS Accession No. ML16127A191; TAC No. MF7692) to perform the VT-2 visual examination during a system leakage test of Class 1 components with mechanical joint connections at a pressure lower than the Code-required pressure following repair and replacement activities on several SRVs installed in HNP, Unit 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this alternative request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
Michael D. Orenak Hatch Project Manager NRR - Division of Operating Reactor Licensing Phone: 301-415-3229 e-mail: Michael.Orenak@nrc.gov 1


Regulatory Commission (NRC) staff's acceptance review of this alternative request. The acceptance review was performed to determine if there is sufficient te chnical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Hearing Identifier:   NRR_PMDA Email Number:         2840 Mail Envelope Properties  (Michael.Orenak@nrc.gov20160512090700)
 
The NRC staff has reviewed your application and concluded that it does provide technical information in
 
sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that
 
impact the NRC staff's ability to complete the detailed te chnical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
 
If you have any questions, please contact me.
 
Michael D. Orenak Hatch Project Manager NRR - Division of Operating Reactor Licensing  Phone: 301-415-3229 e-mail: Michael.Orenak@nrc.gov
 
Hearing Identifier: NRR_PMDA Email Number: 2840   Mail Envelope Properties  (Michael.Orenak@nrc.gov20160512090700)


==Subject:==
==Subject:==
NRC Acceptance Review for Alternative Request HNP-ISI-ALT-05-02 Sent Date:   5/12/2016 9:07:31 AM Received Date: 5/12/2016 9:07:00 AM From:   Orenak, Michael Created By:   Michael.Orenak@nrc.gov Recipients:     "McElroy, G. Ken" <GKMCELRO@southernco.com>
NRC Acceptance Review for Alternative Request HNP-ISI-ALT-05-02 Sent Date:           5/12/2016 9:07:31 AM Received Date:       5/12/2016 9:07:00 AM From:                 Orenak, Michael Created By:           Michael.Orenak@nrc.gov Recipients:
Tracking Status: None "CRPIERCE@southernco.com" <CRPIERCE@southernco.com> Tracking Status: None "Joyce, Ryan M." <RMJOYCE@southernco.com> Tracking Status: None  
"McElroy, G. Ken" <GKMCELRO@southernco.com>
Tracking Status: None "CRPIERCE@southernco.com" <CRPIERCE@southernco.com>
Tracking Status: None "Joyce, Ryan M." <RMJOYCE@southernco.com>
Tracking Status: None Post Office:
Files                        Size                    Date & Time MESSAGE                      2025                  5/12/2016 9:07:00 AM Options Priority:                    Standard Return Notification:          No Reply Requested:              No Sensitivity:                  Normal Expiration Date:
Recipients Received:


Post Office:      Files    Size      Date & Time MESSAGE    2025      5/12/2016 9:07:00 AM Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
NRR-PMDAPEm Resource From:                             Orenak, Michael Sent:                             Thursday, May 12, 2016 9:08 AM To:                               Joyce, Ryan M.
1 NRR-PMDAPEm Resource From: Orenak, Michael Sent: Thursday, May 12, 2016 9:08 AM To: Joyce, Ryan M.
Cc:                               McElroy, G. Ken; CRPIERCE@southernco.com
Cc:McElroy, G. Ken; CRPIERCE@southernco.com


==Subject:==
==Subject:==
NRC Acceptance Review for Alte rnative Request HNP-ISI-ALT-05-02Ryan, By letter dated May 6, 2016, Southern Nuclear Operating Company, Inc. submitted a request for alternative for Edwin I. Hatch Nuclear Plant (HNP), Unit 2 (ADAMS Accession No. ML16127A191; TAC No. MF7692) to perform the VT-2 visual examination during a system leakage test of Class 1 components with mechanical joint connections at a pressure lower than the Code-required pressure following repair and replacement activities on several SRVs installed in HNP, Unit 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear  
NRC Acceptance Review for Alternative Request HNP-ISI-ALT-05-02
: Ryan, By letter dated May 6, 2016, Southern Nuclear Operating Company, Inc. submitted a request for alternative for Edwin I. Hatch Nuclear Plant (HNP), Unit 2 (ADAMS Accession No. ML16127A191; TAC No. MF7692) to perform the VT-2 visual examination during a system leakage test of Class 1 components with mechanical joint connections at a pressure lower than the Code-required pressure following repair and replacement activities on several SRVs installed in HNP, Unit 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this alternative request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
Michael D. Orenak Hatch Project Manager NRR - Division of Operating Reactor Licensing Phone: 301-415-3229 e-mail: Michael.Orenak@nrc.gov 1


Regulatory Commission (NRC) staff's acceptance review of this alternative request. The acceptance review was performed to determine if there is sufficient te chnical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Hearing Identifier:   NRR_PMDA Email Number:         2840 Mail Envelope Properties  (Michael.Orenak@nrc.gov20160512090700)
 
The NRC staff has reviewed your application and concluded that it does provide technical information in
 
sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that
 
impact the NRC staff's ability to complete the detailed te chnical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
 
If you have any questions, please contact me.
 
Michael D. Orenak Hatch Project Manager NRR - Division of Operating Reactor Licensing  Phone: 301-415-3229 e-mail: Michael.Orenak@nrc.gov
 
Hearing Identifier: NRR_PMDA Email Number: 2840   Mail Envelope Properties  (Michael.Orenak@nrc.gov20160512090700)


==Subject:==
==Subject:==
NRC Acceptance Review for Alternative Request HNP-ISI-ALT-05-02 Sent Date:   5/12/2016 9:07:31 AM Received Date: 5/12/2016 9:07:00 AM From:   Orenak, Michael Created By:   Michael.Orenak@nrc.gov Recipients:     "McElroy, G. Ken" <GKMCELRO@southernco.com>
NRC Acceptance Review for Alternative Request HNP-ISI-ALT-05-02 Sent Date:           5/12/2016 9:07:31 AM Received Date:       5/12/2016 9:07:00 AM From:                 Orenak, Michael Created By:           Michael.Orenak@nrc.gov Recipients:
Tracking Status: None "CRPIERCE@southernco.com" <CRPIERCE@southernco.com> Tracking Status: None "Joyce, Ryan M." <RMJOYCE@southernco.com> Tracking Status: None  
"McElroy, G. Ken" <GKMCELRO@southernco.com>
 
Tracking Status: None "CRPIERCE@southernco.com" <CRPIERCE@southernco.com>
Post Office:     Files     Size     Date & Time MESSAGE   2025     5/12/2016 9:07:00 AM Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Tracking Status: None "Joyce, Ryan M." <RMJOYCE@southernco.com>
Tracking Status: None Post Office:
Files                         Size                   Date & Time MESSAGE                       2025                   5/12/2016 9:07:00 AM Options Priority:                     Standard Return Notification:         No Reply Requested:             No Sensitivity:                 Normal Expiration Date:
Recipients Received:}}

Revision as of 20:04, 30 October 2019

NRC Acceptance Review for Alternative Request HNP-ISI-ALT-05-02
ML16133A120
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 05/12/2016
From: Michael Orenak
Plant Licensing Branch II
To: Joyce R
Southern Nuclear Operating Co
References
MF7692
Download: ML16133A120 (2)


Text

NRR-PMDAPEm Resource From: Orenak, Michael Sent: Thursday, May 12, 2016 9:08 AM To: Joyce, Ryan M.

Cc: McElroy, G. Ken; CRPIERCE@southernco.com

Subject:

NRC Acceptance Review for Alternative Request HNP-ISI-ALT-05-02

Ryan, By letter dated May 6, 2016, Southern Nuclear Operating Company, Inc. submitted a request for alternative for Edwin I. Hatch Nuclear Plant (HNP), Unit 2 (ADAMS Accession No. ML16127A191; TAC No. MF7692) to perform the VT-2 visual examination during a system leakage test of Class 1 components with mechanical joint connections at a pressure lower than the Code-required pressure following repair and replacement activities on several SRVs installed in HNP, Unit 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this alternative request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Michael D. Orenak Hatch Project Manager NRR - Division of Operating Reactor Licensing Phone: 301-415-3229 e-mail: Michael.Orenak@nrc.gov 1

Hearing Identifier: NRR_PMDA Email Number: 2840 Mail Envelope Properties (Michael.Orenak@nrc.gov20160512090700)

Subject:

NRC Acceptance Review for Alternative Request HNP-ISI-ALT-05-02 Sent Date: 5/12/2016 9:07:31 AM Received Date: 5/12/2016 9:07:00 AM From: Orenak, Michael Created By: Michael.Orenak@nrc.gov Recipients:

"McElroy, G. Ken" <GKMCELRO@southernco.com>

Tracking Status: None "CRPIERCE@southernco.com" <CRPIERCE@southernco.com>

Tracking Status: None "Joyce, Ryan M." <RMJOYCE@southernco.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2025 5/12/2016 9:07:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

NRR-PMDAPEm Resource From: Orenak, Michael Sent: Thursday, May 12, 2016 9:08 AM To: Joyce, Ryan M.

Cc: McElroy, G. Ken; CRPIERCE@southernco.com

Subject:

NRC Acceptance Review for Alternative Request HNP-ISI-ALT-05-02

Ryan, By letter dated May 6, 2016, Southern Nuclear Operating Company, Inc. submitted a request for alternative for Edwin I. Hatch Nuclear Plant (HNP), Unit 2 (ADAMS Accession No. ML16127A191; TAC No. MF7692) to perform the VT-2 visual examination during a system leakage test of Class 1 components with mechanical joint connections at a pressure lower than the Code-required pressure following repair and replacement activities on several SRVs installed in HNP, Unit 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this alternative request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Michael D. Orenak Hatch Project Manager NRR - Division of Operating Reactor Licensing Phone: 301-415-3229 e-mail: Michael.Orenak@nrc.gov 1

Hearing Identifier: NRR_PMDA Email Number: 2840 Mail Envelope Properties (Michael.Orenak@nrc.gov20160512090700)

Subject:

NRC Acceptance Review for Alternative Request HNP-ISI-ALT-05-02 Sent Date: 5/12/2016 9:07:31 AM Received Date: 5/12/2016 9:07:00 AM From: Orenak, Michael Created By: Michael.Orenak@nrc.gov Recipients:

"McElroy, G. Ken" <GKMCELRO@southernco.com>

Tracking Status: None "CRPIERCE@southernco.com" <CRPIERCE@southernco.com>

Tracking Status: None "Joyce, Ryan M." <RMJOYCE@southernco.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2025 5/12/2016 9:07:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: