ML17223A162: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:AC CELE P~TED Dl BI'TI O~DEMON STPQTIOY SYSTEM DOCKET 05000389  
{{#Wiki_filter:AC CELE P~TED         Dl       BI'TIO~       DEMON STPQTIOY             SYSTEM (2) f REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8906090135            DOC.DATE:  89/06/05    NOTARIZED: NO              DOCKET FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power            &  Light  Co.      05000389 AUTH. NAME            AUTHOR AFFILIATION WOODY,C.O.            Florida  Power & Light Co.
RECIP..NAME          RECIPIENT AFFILIATION Document Control Branch (Document.        Control Desk)


==SUBJECT:==
==SUBJECT:==
Special rept: on 890406,2A emergency diesel generator failure.DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR ENCL SIZE: TITLE: 50.73/50.9 Licensee Event Report (LER), ncident Rpt, etc.NOTES: (2)f REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8906090135 DOC.DATE: 89/06/05 NOTARIZED:
Special rept: on     890406,2A emergency diesel generator failure.
NO FACIL:50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION WOODY,C.O.
DISTRIBUTION CODE: IE22D         COPIES RECEIVED:LTR         ENCL       SIZE:
Florida Power&Light Co.RECIP..NAME RECIPIENT AFFILIATION Document Control Branch (Document.
TITLE: 50.73/50.9 Licensee Event Report (LER),             ncident Rpt, etc.
Control Desk)RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,J INTERNAL: ACRS MICHELSON ACRS WYLIE AEOD/DS P/TPAB DEDRO NRR/DEST/ADE 8H NRR/DEST/CEB 8H NRR/DEST/ICSB 7 NRR/DEST/MTB 9H NRR/DEST/RSB 8E NRR/DLPQ/HFB 10 NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RES/DSIR/EIB RGN2 FILE 01 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1'1 1 1 1 1 1,1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD ACRS MOELLER AEOD/DOA AEOD/ROAB/
NOTES:
DS P IRM/DCTS/DAB NRR/DEST/ADS 7E NRR/DEST/ESB 8 D NRR/DEST/MEB 9H NRR/DEST/PSB 8D NRR/DEST/SGB 8D NRR/DLPQ/PEB 10 F RPB 10 EG FIL 02 R SR/PRAB COPIES LTTR ENCL 1 1 2 2 1 1 2 2 1 1 1 0 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 h EXTERNAL EG&G WI LLIAMS g S 4 4 L ST LOBBY WARD 1 1 NRC PDR 1 1 NSIC MURPHY'~A 1 1 FORD BLDG HOY~A 1 1 LPDR 1 1 NSIC MAYS,G 1 1 I D NCTE K)ALL"RIDS" RECIPIENTS PLEASE HELP US'IO iKDUCE WASTE!CXWZACZ'IHE DOCUMEhl7 CGVZROL DESK, RXN Pl-37 (EXP.20079)%0 EZJ2GXATE VCR NAME PBCH DIBTEGBUTIGN-LISTS FOR DOCUMENZS YOU DGN~T NEEDt TOTAL NUMBER OF COPIES REQUIRED: LTTR 43 ENCL 42 9 D S P.O.Box 14000, Juno Beach, FL 33408 0420 JUNE 5 1989 L-89-185 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
RECIPIENT           COPIES            RECIPIENT           COPIES ID   CODE/NAME         LTTR ENCL      ID  CODE/NAME        LTTR ENCL PD2-2 LA                 1    1    PD2-2 PD                  1    1              h NORRIS,J                 1    1 INTERNAL: ACRS MICHELSON             1    1    ACRS MOELLER              2    2 ACRS WYLIE               1    1    AEOD/DOA                  1    1 AEOD/DS P/TPAB           1    1    AEOD/ROAB/DS P            2    2 DEDRO                     1    '1    IRM/DCTS/DAB              1    1 NRR/DEST/ADE 8H           1    1    NRR/DEST/ADS    7E      1    0 NRR/DEST/CEB 8H NRR/DEST/ICSB 7 NRR/DEST/MTB 9H 1,1 1
Re: St.Lucie Unit 2 Docket No.50-389 Date of Event: April 6, 1989 S ecial Re ort on Diesel Generator Failure The attached Special Report is being transmitted pursuant to the requirements of Technical Specification 4.8.1.1.3 to provide notification of a 2A Emergency Diesel Generator failure.Very truly yours, C~>.C.O.~~oody Acting Senior-Vice President-Nuclear COW/GRJ1/gp Attachment cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant 8~0<0901,=-:5 89060(PDj@DOCK 0":000=%'DC SPECIAL REPORT DIESEL GENERATOR FAILURES 2A DIESEL GENERATOR FAILURE: In accordance with NRC Regulatory Guide 1.108, Section C.2.e, this event is considered to be a valid diesel generator failure.At 1640 on April 6, 1989, the 2A diesel (D/G)was started and loaded for a one hour surveillance run before declaring the D/G back in service after maintenance.
1 1
Approximately 55 minutes into the run, a utility operator stationed at the D/G noticed sparks coming from the south cooling fan due to contact with its shroud housing on the 16 cylinder engine.The D/G was immediately stopped.The cause of the cooling fan axial displacement and contact against its shroud was due to a thrust bearing failure on the fan shaft.The root cause of the thrust bearing failure was due to excessive clearance between the bearing collar and the fan shaft.The small clearance measured was sufficient to permit movement between the bearing collar and the fan shaft which lead to fatigue failure of.the collar.The bearing collar is held onto the shaft with set screws.The design tolerance was never specified in any plant drawing, and therefore was not considered critical or required to be measured.The failure of the 2A D/G was the third failure in the past 100 valid tests.The current 2A D/G test frequency is once per 31 days'he following corrective actions were implemented:
1 NRR/DEST/ESB NRR/DEST/MEB NRR/DEST/PSB 8D 9H 8D 1
1)The cooling fan blades and shroud were repaired.2)The thrust bearing was replaced and the new clearance between the shaft and bearing collar was determined to be satisfactory by the bearing manufacturer.
1 1
3)Other D/G fan shaft bearings susceptible to this failure mechanism were inspected on both the 2A and 2B D/G's.A total of 40 bearings were inspected which included fan shaft, idler shaft, and drive shaft bearings.Five thrust bearings and two floating bearings were replaced.Maintenance procedures will be revised to require periodic inspection of the D/G fan shaft bearings".
1 1
4)The south fan on the 2A 12 cylinder engine was found to have a damaged shaft due to excessive shaft to collar clearance.
1 NRR/DEST/RSB 8E          1    1    NRR/DEST/SGB     8D       1    1 NRR/DLPQ/HFB 10          1    1    NRR/DLPQ/PEB     10       1     1 NRR/DOEA/EAB 11          1     1             F  RPB 10        2     2 NUDOCS-ABSTRACT          1     1       EG  FIL        02      1     1 RES/DSIR/EIB              1     1     R      SR/PRAB            1     1 RGN2    FILE 01          1     1 EXTERNAL   EG&G WILLIAMSg S         4     4     FORD BLDG HOY ~ A        1    1 L ST LOBBY WARD           1     1    LPDR                      1    1 NRC PDR                   1    1    NSIC MAYS,G              1     1 NSIC MURPHY'     ~ A     1     1                                                   I D
A new fan shaft was manufactured for the 2A D/G and installed with satisfactory shaft to bearing collar clearance.
9 D
A similar condition was found on a fan drive shaft for the 2B D/G.A new shaft was manufactured and installed on the 2B D/G.5)A surveillance run was performed and the 2A D/G was declared back in service on April 11, 1989.}}
NCTE K) ALL "RIDS" RECIPIENTS S
PLEASE HELP US 'IO iKDUCE WASTE! CXWZACZ 'IHE DOCUMEhl7 CGVZROL DESK, RXN Pl-37 (EXP. 20079) %0 EZJ2GXATE VCR NAME PBCH DIBTEGBUTIGN-LISTS FOR DOCUMENZS YOU DGN~T NEEDt TOTAL NUMBER OF COPIES REQUIRED: LTTR             43   ENCL   42
 
P.O. Box 14000, Juno Beach, FL 33408 0420 JUNE       5 1989 L-89-185 U. S. Nuclear Regulatory Commission Attn:     Document Control Desk Washington, D. C. 20555 Gentlemen:
Re:   St. Lucie Unit     2 Docket No. 50-389 Date of Event: April 6, 1989 S   ecial Re   ort on Diesel Generator Failure The attached Special Report is being transmitted pursuant to the requirements of Technical Specification 4.8.1.1.3 to provide notification of a 2A Emergency Diesel Generator failure.
Very truly yours, C~
>.C. O.~~oody Acting Senior -Vice President     Nuclear COW/GRJ1/gp Attachment cc:   Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC 8~0<0901,=-:5 89060(
PDj   @DOCK 0":000=%'DC
 
SPECIAL REPORT DIESEL GENERATOR FAILURES 2A DIESEL GENERATOR FAILURE:
In accordance with         NRC Regulatory Guide 1.108, Section C.2.e, this event     is considered to be a valid diesel generator failure.
At 1640 on April 6, 1989, the 2A diesel (D/G) was started and loaded for a one hour surveillance run before declaring the D/G back in service after maintenance.           Approximately 55 minutes into the run, a utility operator stationed at the D/G noticed sparks coming from the south cooling fan due to contact with its shroud housing on the         16   cylinder engine. The D/G was   immediately stopped.
The cause     of the cooling fan axial displacement     and contact against its     shroud was due to a thrust bearing failure on the fan shaft.
The root cause of the thrust bearing failure was due to excessive clearance between the bearing collar and the fan shaft. The small clearance measured was sufficient to permit movement between the bearing collar and the fan shaft which lead to fatigue failure of             .
the collar.         The bearing collar is held onto the shaft with set screws.       The design tolerance was never specified in any plant drawing, and therefore was not considered critical or required to be measured.
The failure of the 2A D/G         was the third failure in the past 100 valid tests. The current           2A D/G test frequency is once per 31 days'he following corrective actions were implemented:
: 1) The cooling fan blades and shroud were repaired.
: 2) The thrust bearing was replaced and the new clearance between the shaft and bearing collar was determined to be satisfactory by the bearing manufacturer.
: 3) Other   D/G   fan shaft bearings     susceptible   to this failure mechanism were inspected on both the 2A and 2B D/G's. A total of 40 bearings were inspected which included fan shaft, idler shaft, and drive shaft bearings. Five thrust bearings and two floating bearings were replaced. Maintenance procedures will be revised to require periodic inspection of the D/G fan shaft bearings".
: 4) The south fan on the 2A 12 cylinder engine was found to have a damaged shaft due to excessive shaft to collar clearance.
A new fan shaft was manufactured for the 2A D/G and installed with satisfactory shaft to bearing collar clearance.               A similar condition was found on a fan drive shaft for the           2B D/G. A new shaft was manufactured and installed on the             2B D/G.
: 5) A   surveillance run was performed and the     2A D/G was   declared back in service on April 11, 1989.}}

Latest revision as of 23:00, 29 October 2019

Special Rept:On 890406,emergency Diesel Generator 2A Failed. Caused by Thrust Bearing Failure Due to Excessive Clearance Between Bearing Collar & Fan Shaft.Cooling Fan Blades & Shroud Repaired
ML17223A162
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/05/1989
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-185, NUDOCS 8906090135
Download: ML17223A162 (3)


Text

AC CELE P~TED Dl BI'TIO~ DEMON STPQTIOY SYSTEM (2) f REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8906090135 DOC.DATE: 89/06/05 NOTARIZED: NO DOCKET FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION WOODY,C.O. Florida Power & Light Co.

RECIP..NAME RECIPIENT AFFILIATION Document Control Branch (Document. Control Desk)

SUBJECT:

Special rept: on 890406,2A emergency diesel generator failure.

DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), ncident Rpt, etc.

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 1 PD2-2 PD 1 1 h NORRIS,J 1 1 INTERNAL: ACRS MICHELSON 1 1 ACRS MOELLER 2 2 ACRS WYLIE 1 1 AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 AEOD/ROAB/DS P 2 2 DEDRO 1 '1 IRM/DCTS/DAB 1 1 NRR/DEST/ADE 8H 1 1 NRR/DEST/ADS 7E 1 0 NRR/DEST/CEB 8H NRR/DEST/ICSB 7 NRR/DEST/MTB 9H 1,1 1

1 1

1 NRR/DEST/ESB NRR/DEST/MEB NRR/DEST/PSB 8D 9H 8D 1

1 1

1 1

1 NRR/DEST/RSB 8E 1 1 NRR/DEST/SGB 8D 1 1 NRR/DLPQ/HFB 10 1 1 NRR/DLPQ/PEB 10 1 1 NRR/DOEA/EAB 11 1 1 F RPB 10 2 2 NUDOCS-ABSTRACT 1 1 EG FIL 02 1 1 RES/DSIR/EIB 1 1 R SR/PRAB 1 1 RGN2 FILE 01 1 1 EXTERNAL EG&G WILLIAMSg S 4 4 FORD BLDG HOY ~ A 1 1 L ST LOBBY WARD 1 1 LPDR 1 1 NRC PDR 1 1 NSIC MAYS,G 1 1 NSIC MURPHY' ~ A 1 1 I D

9 D

NCTE K) ALL "RIDS" RECIPIENTS S

PLEASE HELP US 'IO iKDUCE WASTE! CXWZACZ 'IHE DOCUMEhl7 CGVZROL DESK, RXN Pl-37 (EXP. 20079) %0 EZJ2GXATE VCR NAME PBCH DIBTEGBUTIGN-LISTS FOR DOCUMENZS YOU DGN~T NEEDt TOTAL NUMBER OF COPIES REQUIRED: LTTR 43 ENCL 42

P.O. Box 14000, Juno Beach, FL 33408 0420 JUNE 5 1989 L-89-185 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: St. Lucie Unit 2 Docket No. 50-389 Date of Event: April 6, 1989 S ecial Re ort on Diesel Generator Failure The attached Special Report is being transmitted pursuant to the requirements of Technical Specification 4.8.1.1.3 to provide notification of a 2A Emergency Diesel Generator failure.

Very truly yours, C~

>.C. O.~~oody Acting Senior -Vice President Nuclear COW/GRJ1/gp Attachment cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC 8~0<0901,=-:5 89060(

PDj @DOCK 0":000=%'DC

SPECIAL REPORT DIESEL GENERATOR FAILURES 2A DIESEL GENERATOR FAILURE:

In accordance with NRC Regulatory Guide 1.108, Section C.2.e, this event is considered to be a valid diesel generator failure.

At 1640 on April 6, 1989, the 2A diesel (D/G) was started and loaded for a one hour surveillance run before declaring the D/G back in service after maintenance. Approximately 55 minutes into the run, a utility operator stationed at the D/G noticed sparks coming from the south cooling fan due to contact with its shroud housing on the 16 cylinder engine. The D/G was immediately stopped.

The cause of the cooling fan axial displacement and contact against its shroud was due to a thrust bearing failure on the fan shaft.

The root cause of the thrust bearing failure was due to excessive clearance between the bearing collar and the fan shaft. The small clearance measured was sufficient to permit movement between the bearing collar and the fan shaft which lead to fatigue failure of .

the collar. The bearing collar is held onto the shaft with set screws. The design tolerance was never specified in any plant drawing, and therefore was not considered critical or required to be measured.

The failure of the 2A D/G was the third failure in the past 100 valid tests. The current 2A D/G test frequency is once per 31 days'he following corrective actions were implemented:

1) The cooling fan blades and shroud were repaired.
2) The thrust bearing was replaced and the new clearance between the shaft and bearing collar was determined to be satisfactory by the bearing manufacturer.
3) Other D/G fan shaft bearings susceptible to this failure mechanism were inspected on both the 2A and 2B D/G's. A total of 40 bearings were inspected which included fan shaft, idler shaft, and drive shaft bearings. Five thrust bearings and two floating bearings were replaced. Maintenance procedures will be revised to require periodic inspection of the D/G fan shaft bearings".
4) The south fan on the 2A 12 cylinder engine was found to have a damaged shaft due to excessive shaft to collar clearance.

A new fan shaft was manufactured for the 2A D/G and installed with satisfactory shaft to bearing collar clearance. A similar condition was found on a fan drive shaft for the 2B D/G. A new shaft was manufactured and installed on the 2B D/G.

5) A surveillance run was performed and the 2A D/G was declared back in service on April 11, 1989.