ML18242A173: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:/RA/}}
{{#Wiki_filter:December 20, 2018 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852
 
==SUBJECT:==
DRAFT SAFETY EVALUATIONS OF TECHNICAL SPECIFICATIONS TASK FORCE TSTF-566, REVISION 0, REVISE ACTIONS FOR INOPERABLE RHR SHUTDOWN COOLING SUBSYSTEMS (EPID L-2018-PMP-0001)
 
==Dear Members of the Technical Specifications Task Force:==
 
By letter dated January 19, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18019B187), the Technical Specifications Task Force (TSTF) submitted to the U.S. Nuclear Regulatory Commission (NRC) for review and approval Traveler TSTF-566, Revision 0, Revise Actions for Inoperable RHR [Residual Heat Removal] Shutdown Cooling Subsystems. The NRC staffs draft safety evaluation (SE) of the traveler and a draft model SE are enclosed.
Thirty calendar days are provided for you to comment on any factual errors or clarity concerns contained in the enclosed draft SEs. The final SEs will be issued by April 18, 2019, after making any necessary changes. To facilitate the NRC staff's review of your comments, please provide a marked-up copy of the draft SEs showing proposed changes and provide a summary table of the proposed changes.
If you have any questions, please contact Michelle Honcharik at 301-415-1774 or via e-mail at Michelle.Honcharik@nrc.gov.
Sincerely,
                                            /RA/
Victor G. Cusumano, Chief Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation Project No. 753
 
==Enclosures:==
: 1. Draft Traveler SE
: 2. Draft Model SE cc: See next page
 
Technical Specifications Task Force                                              Project No. 753 cc:
Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com James P. Miksa Entergy Nuclear Operations, Inc.
Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Email: jmiksa@entergy.com Jordan L. Vaughan Duke Energy EC07C / P.O. Box 1006 Charlotte, NC 28202 Email: jordan.vaughan@duke-energy.com Ryan M. Joyce Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-274-EC Birmingham, AL 35243 Email: rmjoyce@southernco.com David M. Gullott Exelon Generation 4300 Winfield Road Warrenville IL 60555 Email: David.Gullott@exeloncorp.com Wesley Sparkman Southern Nuclear Operating Company 42 Inverness Center Parkway / Bin B237 Birmingham, AL 35242 Email: wasparkm@southernco.com
 
Package: ML18242A176, Cover letter: ML18242A173, Draft traveler SE: ML18242A172, Draft model SE: ML18242A171
                                                *concurred via e-mail      NRR-106 OFFICE NRR/DSS/SRXB/BC*              NRR/DORL/LSPB/LA*        NRR/DORL/LPLII-1/BC*
NAME      JWhitman                  JBurkhardt                MMarkley DATE      09/08/2018                09/19/2018                10/1/2018 OFFICE OGC/NLO*                      NRR/DSS/STSB/PM          NRR/DSS/STSB/BC NAME      DRoth                    MHoncharik                VCusumano DATE      12/12/2018                12/18/2018                12/ 20 /2018}}

Latest revision as of 16:46, 20 October 2019

Cover Letter Transmitting Draft SEs of TSTF-566, Revision 0, Revise Actions for Inoperable RHR (Residual Heat Removal) Shutdown Cooling Subsystems
ML18242A173
Person / Time
Site: Technical Specifications Task Force
Issue date: 12/20/2018
From: Victor Cusumano
NRC/NRR/DSS/STSB
To:
Technical Specifications Task Force
Honcharik M
Shared Package
ML18242A176 List:
References
EPID L-2018-PMP-0001
Download: ML18242A173 (3)


Text

December 20, 2018 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852

SUBJECT:

DRAFT SAFETY EVALUATIONS OF TECHNICAL SPECIFICATIONS TASK FORCE TSTF-566, REVISION 0, REVISE ACTIONS FOR INOPERABLE RHR SHUTDOWN COOLING SUBSYSTEMS (EPID L-2018-PMP-0001)

Dear Members of the Technical Specifications Task Force:

By letter dated January 19, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18019B187), the Technical Specifications Task Force (TSTF) submitted to the U.S. Nuclear Regulatory Commission (NRC) for review and approval Traveler TSTF-566, Revision 0, Revise Actions for Inoperable RHR [Residual Heat Removal] Shutdown Cooling Subsystems. The NRC staffs draft safety evaluation (SE) of the traveler and a draft model SE are enclosed.

Thirty calendar days are provided for you to comment on any factual errors or clarity concerns contained in the enclosed draft SEs. The final SEs will be issued by April 18, 2019, after making any necessary changes. To facilitate the NRC staff's review of your comments, please provide a marked-up copy of the draft SEs showing proposed changes and provide a summary table of the proposed changes.

If you have any questions, please contact Michelle Honcharik at 301-415-1774 or via e-mail at Michelle.Honcharik@nrc.gov.

Sincerely,

/RA/

Victor G. Cusumano, Chief Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation Project No. 753

Enclosures:

1. Draft Traveler SE
2. Draft Model SE cc: See next page

Technical Specifications Task Force Project No. 753 cc:

Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com James P. Miksa Entergy Nuclear Operations, Inc.

Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Email: jmiksa@entergy.com Jordan L. Vaughan Duke Energy EC07C / P.O. Box 1006 Charlotte, NC 28202 Email: jordan.vaughan@duke-energy.com Ryan M. Joyce Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-274-EC Birmingham, AL 35243 Email: rmjoyce@southernco.com David M. Gullott Exelon Generation 4300 Winfield Road Warrenville IL 60555 Email: David.Gullott@exeloncorp.com Wesley Sparkman Southern Nuclear Operating Company 42 Inverness Center Parkway / Bin B237 Birmingham, AL 35242 Email: wasparkm@southernco.com

Package: ML18242A176, Cover letter: ML18242A173, Draft traveler SE: ML18242A172, Draft model SE: ML18242A171

  • concurred via e-mail NRR-106 OFFICE NRR/DSS/SRXB/BC* NRR/DORL/LSPB/LA* NRR/DORL/LPLII-1/BC*

NAME JWhitman JBurkhardt MMarkley DATE 09/08/2018 09/19/2018 10/1/2018 OFFICE OGC/NLO* NRR/DSS/STSB/PM NRR/DSS/STSB/BC NAME DRoth MHoncharik VCusumano DATE 12/12/2018 12/18/2018 12/ 20 /2018