{{#Wiki_filter:SEQUOYAH NUCLEAR PLANT  
{{#Wiki_filter:SEQUOYAH NUCLEAR PLANT 1305 NRC SIMULATOR JPM A


1305 NRC SIMULATOR JPM A
SIM JPM A Page 2 of 9 RO/SRO JOB PERFORMANCE MEASURE Task:              0-SI-OPS-085-011.0 Reactivity Control Systems Moveable Control Assemblies Task #:            0010010201 Task Standard:      The examinee will perform 0-SI-OPS-085-011.0 Reactivity Control Systems Moveable Control Assemblies starting with Control Bank Bank D. Following the uncontrolled rod movement, the examinee will trip the reactor using AOP-C.01, Rod Control System Malfunctions Alternate Path:            YES:        X      NO:
Time Critical Task:        YES:                NO:        X K/A Reference/Ratings:      001.A2.11 (4.4/4.7)
Method of Testing:
Simulated Performance:                        Actual Performance:          X Evaluation Method:
Simulator        X      In-Plant                Classroom Main Control Room                                Mock-up Performer:
Trainee Name Evaluator:                                        /
Name / Signature                                      DATE Performance Rating:      SAT:                    UNSAT:
Validation Time:            10 min                            Total Time:
Performance Time:          Start Time:                      Finish Time:
COMMENTS


SIM JPM A Page 2 of 9 RO/SRO JOB PERFORMANCE MEASURE Task: 0-SI-OPS-085-011.0 Reactivity Control Systems Moveable Control Assemblies Task #: 0010010201
SIM JPM A Page 3 of 9 SPECIAL INSTRUCTIONS:
 
: 1. Ensure Simulator Operator Checklist is complete
Task Standard:
: 2. Reset to IC 15, 96% power BOL.
The examinee will perform 0-SI-OPS-085-011.0 Reactivity Control Systems Moveable Control Assemblies starting with Control Bank Bank D. Following the uncontrolled rod movement, the examinee will trip the reactor using AOP-C.01, Rod Control System Malfunctions Alternate Path: YES: X NO:
: 3. If IC XX is not available perform the following:
Time Critical Task:
Reset to IC 15, 96% power BOL.
YES:  NO: X K/A Reference/Ratings:
Ensure Rod Control Mode Selector Switch in CB C position.
001.A2.11 (4.4/4.7)
Run SCN file 1305 NRC JPM A
Method of Testing:
: 4. Display the following on ICS:
Simulated Performance:  Actual Performance: X Evaluation Method:
RPI for CB D Computer point T0499A Computer point T0496A
Simulator X In-Plant  Classroom              Main Control Room  Mock-up Performer:
: 5. PLACE SIMULATOR IN RUN
Trainee Name Evaluator:
: 6. An extra operator will be required to acknowledge alarms.
/    Name / Signature DATE  Performance Rating: SAT:  UNSAT:
: 7. ACKNOWLEDGE ALARMS
Validation Time:  10 min  Total Time:        Performance Time:
: 8. FREEZE SIMULATOR.
Start Time:  Finish Time:
: 9. Provide a copy of 0-SI-OPS-085-011.0 REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES.
COMMENTS SIM JPM A Page 3 of 9 SPECIAL INSTRUCTIONS:
: 10. Save as a temporary IC, if repeat runs of JPM will be desired.
: 1. Ensure Simulator Operator Checklist is complete 2. Reset to IC 15, 96% power BOL. 3. If IC XX is not available perform the following: Reset to IC 15, 96% power BOL. Ensure Rod Control Mode Selector Switch in CB C position. Run SCN file 1305 NRC JPM A 4. Display the following on ICS: RPI for CB D Computer point T0499A Computer point T0496A 5. PLACE SIMULATOR IN RUN 6. An extra operator will be required to acknowledge alarms. 7. ACKNOWLEDGE ALARMS 8. FREEZE SIMULATOR.
: 11. PLACE SIMULATOR IN RUN
: 9. Provide a copy of 0-SI-OPS-085-011.0 REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES. 10. Save as a temporary IC, if repeat runs of JPM will be desired.
: 12. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
: 11. PLACE SIMULATOR IN RUN 12. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted. 13. When the candidate begins inserting Control Bank D, insert Malfunction RD02 (uncontrolled insertion for Bank D group 2)
: 13. When the candidate begins inserting Control Bank D, insert Malfunction RD02 (uncontrolled insertion for Bank D group 2)
Tools/Equipment/Procedures Needed:
Tools/Equipment/Procedures Needed:


==References:==
==References:==


Reference Title Rev No.
Reference                                     Title                                 Rev No.
: 1. 0-SI-OPS-085-011.0 REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES 34 2. AOP-C.01 ROD CONTROL SYSTEM MALFUNCTIONS 22 SIM JPM A Page 4 of 9 DIRECTIONS TO TRAINEE:
REACTIVITY CONTROL SYSTEMS MOVEABLE
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
: 1. 0-SI-OPS-085-011.0                                                                       34 CONTROL ASSEMBLIES
INITIAL CONDITIONS: 1. Unit 1 is in MODE 1, 96% power, BOL. 2. 0-SI-OPS-085-011.0 REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES is in progress at section 6.1.8. INITIATING CUES: 1. Perform 0-SI-OPS-085-011.0 REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES to verify rod operability for Control Bank D starting at section 6.1.8 step 1. 2. Inform the SRO when complete.  
: 2. AOP-C.01               ROD CONTROL SYSTEM MALFUNCTIONS                                 22
 
SIM JPM A Page 4 of 9 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
: 1.       Unit 1 is in MODE 1, 96% power, BOL.
: 2.       0-SI-OPS-085-011.0 REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES is in progress at section 6.1.8.
INITIATING CUES:
: 1.       Perform 0-SI-OPS-085-011.0 REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES to verify rod operability for Control Bank D starting at section 6.1.8 step 1.
: 2.       Inform the SRO when complete.
 
SIM JPM A Page 5 of 9 Start Time STEP    1  :                                                                        SAT Obtain a copy of 0-SI-OPS-085-011.0, REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES.                                  UNSAT Standard:    Examinee obtains a copy of 0-SI-OPS-085-011.0, REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES.
Cue:        Provide a marked up copy of 0-SI-OPS-085-011.0, REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES.
Comment STEP    2  :                                                                          SAT UNSAT Standard:    Examinee addresses the step as N/A.
Comment


SIM JPM A Page 5 of 9 Start Time STEP 1 : Obtain a copy of 0-SI-OPS-085-011.0, REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES.
SIM JPM A Page 6 of 9 STEP   3   :                                                                         SAT UNSAT Standard:  Examinee places HS-85-51110, Rod Control Mode Selector Switch to Critical Step Control Bank D.
SAT      UNSAT   Standard: Examinee obtains a copy of 0-SI-OPS-085-011.0, REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES.
Comment STEP   4   :                                                                         SAT UNSAT Examinee places HS-85-51111, Rod Control to IN and obtains > a 10 Standard:  step movement of Control Bank D Group 1 and Group 1 by 1-XI   Critical Step 5105D1 and D2.
Cue: Provide a marked up copy of 0-SI-OPS-085-011.0, REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES.
Comment
Comment    STEP 2 :    SAT     UNSAT   Standard: Examinee addresses the step as N/A. Comment SIM JPM A Page 6 of 9 STEP 3 :    SAT      UNSAT   Standard: Examinee places HS-85-51110, Rod Control Mode Selector Switch to Control Bank D. Critical Step Comment     STEP 4 :   SAT     UNSAT   Standard: Examinee places HS-85-51111, Rod Control to IN and obtains > a 10 step movement of Control Bank D Group 1 and Group 1 by 1-XI 5105D1 and D2. Critical Step Comment SIM JPM A Page 7 of 9 STEP 5 :    SAT      UNSAT  Standard: The examinee verifies Control Bank D Step Counters and Individual Rod Position Indicators have moved > 10 steps.
Comment   STEP 6 :    SAT      UNSAT  Standard: Examinee places HS-85-51111, Rod Control to OUT and observes Control Bank D Group 2 inserting continuously.
Examiner Note: The examinee may elect to trip the Reactor. If the examinee trips the reactor, go to JPM step 9.
Comment    STEP 7 :    SAT      UNSAT  Standard: The examinee transitions to AOP-C.01, ROD CONTROL SYSTEM MALFUNCTIONS section 2.1.
Comment SIM JPM A Page 8 of 9 STEP 8 : ALTERNATE PATH SAT      UNSAT  Standard: The examinee places HS-85-51110, Rod Control Mode Selector Switch to MANUAL, checks Control Bank D is still inserting, and transitions to the RNO.
Comment    STEP 9 :    SAT      UNSAT  Standard: The examinee places 1-RT-1 or 1-RT-2 to TRIP. Critical Step Comment    Terminating Cue: When the examinee trips the reactor provide the following cue, "Another operator will complete the remaining steps of this procedure.". STOP  Stop Time 


JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
SIM JPM A Page 7 of 9 STEP    5  :                                                                          SAT UNSAT Standard:  The examinee verifies Control Bank D Step Counters and Individual Rod Position Indicators have moved > 10 steps.
INITIAL CONDITIONS: 1. Unit 1 is in MODE 1, 96% power, BOL. 2. 0-SI-OPS-085-011.0 REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES is in progress at section 6.1.8. INITIATING CUES: 1. Perform 0-SI-OPS-085-011.0 REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES to verify rod operability for Control Bank D starting at section 6.1.8 step 1. 2. Inform the SRO when complete.
Comment STEP    6   :                                                                         SAT UNSAT Examinee places HS-85-51111, Rod Control to OUT and observes Standard:
Acknowledge to the examiner when you are ready to begin.
Control Bank D Group 2 inserting continuously.
HAND THIS PAPER BACK TO YO UR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
Examiner    The examinee may elect to trip the Reactor. If the examinee trips the Note:    reactor, go to JPM step 9.
Comment STEP    7  :                                                                          SAT UNSAT Standard:  The examinee transitions to AOP-C.01, ROD CONTROL SYSTEM MALFUNCTIONS section 2.1.
Comment


SEQUOYAH NUCLEAR PLANT
SIM JPM A Page 8 of 9 ALTERNATE PATH STEP    8  :                                                                              SAT UNSAT The examinee places HS-85-51110, Rod Control Mode Selector Standard:  Switch to MANUAL, checks Control Bank D is still inserting, and transitions to the RNO.
Comment STEP    9  :                                                                              SAT UNSAT Standard:  The examinee places 1-RT-1 or 1-RT-2 to TRIP.                          Critical Step Comment Terminating  When the examinee trips the reactor provide the following cue, Cue:      Another operator will complete the remaining steps of this                STOP procedure..
Stop Time


1305 NRC SIMULATOR JPM
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
: 1. Unit 1 is in MODE 1, 96% power, BOL.
: 2. 0-SI-OPS-085-011.0 REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES is in progress at section 6.1.8.
INITIATING CUES:
: 1. Perform 0-SI-OPS-085-011.0 REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES to verify rod operability for Control Bank D starting at section 6.1.8 step 1.
: 2. Inform the SRO when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.


SIM JPM B Page 2 of 16 RO/SRO JOB PERFORMANCE MEASURE Task: Align ECCS Pumps to the Containment Sump Task #: 3010060601
SEQUOYAH NUCLEAR PLANT 1305 NRC SIMULATOR JPM B


Task Standard:
SIM JPM B Page 2 of 16 RO/SRO JOB PERFORMANCE MEASURE Task:              Align ECCS Pumps to the Containment Sump Task #:            3010060601 Task Standard:     The examinee will align CCP and SI pump flowpath for sump recirculation using ES-1.3 TRANSFER TO RHR CONTAINMENT.
The examinee will align CCP and SI pump flowpath for sump recirculation using ES-1.3 TRANSFER TO RHR CONTAINMENT.
Alternate Path:             YES:     X       NO:
Alternate Path: YES: X NO:
Time Critical Task:         YES:             NO:         X K/A Reference/Ratings:       006 A4.07 (4.4/4.4)
Time Critical Task:
YES: NO: X K/A Reference/Ratings:
006 A4.07 (4.4/4.4)
Method of Testing:
Method of Testing:
Simulated Performance:   Actual Performance: X Evaluation Method:
Simulated Performance:                       Actual Performance:         X Evaluation Method:
Simulator X In-Plant Classroom             Main Control Room   Mock-up Performer:
Simulator         X       In-Plant               Classroom Main Control Room                               Mock-up Performer:
Trainee Name Evaluator:  
Trainee Name Evaluator:                                       /
/    Name / Signature DATE Performance Rating: SAT: UNSAT:
Name / Signature                                     DATE Performance Rating:     SAT:                   UNSAT:
Validation Time: 15 min Total Time:       Performance Time:
Validation Time:             15 min                         Total Time:
Start Time:   Finish Time:
Performance Time:           Start Time:                     Finish Time:
COMMENTS SIM JPM B Page 3 of 16 SPECIAL INSTRUCTIONS:
COMMENTS
: 1. Ensure Simulator Operator Checklist is complete 2. Reset to IC 302 3. If IC 302 is not available perform the following: Reset to IC 24 IOR ZDIHS7421A f:0 {global95[5670]} DOR ZDIHS7421A 4. An extra operator will be required to acknowledge alarms. 5. ACKNOWLEDGE ALARMS 6. FREEZE SIMULATOR.
 
SIM JPM B Page 3 of 16 SPECIAL INSTRUCTIONS:
: 1. Ensure Simulator Operator Checklist is complete
: 2. Reset to IC 302
: 3. If IC 302 is not available perform the following:
Reset to IC 24 IOR ZDIHS7421A f:0
{global95[5670]} DOR ZDIHS7421A
: 4. An extra operator will be required to acknowledge alarms.
: 5. ACKNOWLEDGE ALARMS
: 6. FREEZE SIMULATOR.
: 7. Save as a temporary IC, if repeat runs of JPM will be desired.
: 7. Save as a temporary IC, if repeat runs of JPM will be desired.
: 8. Provide a copy of ES-1.3 TRANSFER TO RHR CONTAINMENT SUMP.
: 8. Provide a copy of ES-1.3 TRANSFER TO RHR CONTAINMENT SUMP.
: 9. PLACE SIMULATOR IN RUN 10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
: 9. PLACE SIMULATOR IN RUN
: 10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
SPECIAL INSTRUCTIONS TO EVALUATOR:
SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. Critical steps are identified in step SAT/UNSAT column by bold print 'Critical Step.' 2. Any UNSAT requires comments.
: 1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
: 2. Any UNSAT requires comments.
Tools/Equipment/Procedures Needed:
Tools/Equipment/Procedures Needed:


==References:==
==References:==


Reference Title Rev No.
Reference                                     Title                                 Rev No.
: 1. ES-1.3 TRANSFER TO RHR CONTAINMENT SUMP 19 2 1-AR-M6-E MISCELLANEOUS 23  
: 1. ES-1.3                   TRANSFER TO RHR CONTAINMENT SUMP                                   19 2     1-AR-M6-E               MISCELLANEOUS                                                       23


SIM JPM B Page 4 of 16 DIRECTIONS TO TRAINEE:
SIM JPM B Page 4 of 16 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
INITIAL CONDITIONS: 1. A LOCA is in progress on Unit 1. 2. ECCS pumps are running taking a suction from the RWST. INITIATING CUES: 1. When conditions permit, you are directed to perform ES-1.3, Transfer to Cold Leg Recirculation. 2. Inform the SRO when complete.  
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
: 1.       A LOCA is in progress on Unit 1.
: 2.       ECCS pumps are running taking a suction from the RWST.
INITIATING CUES:
: 1.       When conditions permit, you are directed to perform ES-1.3, Transfer to Cold Leg Recirculation.
: 2.       Inform the SRO when complete.
 
SIM JPM B Page 5 of 16 Start Time STEP    1  :                                                                        SAT UNSAT Standard:  Examinee acknowledges alarm and transitions to ES-1.3 TRANSFER TO RHR CONTAINMENT SUMP.
Comment STEP    2  :                                                                        SAT Obtain a copy of ES-1.3 TRANSFER TO RHR CONTAINMENT SUMP UNSAT Standard:  Examinee obtains a copy of ES-1.3 TRANSFER TO RHR CONTAINMENT SUMP.
Cue:      Provide a copy of ES-1.3 TRANSFER TO RHR CONTAINMENT SUMP.
Comment
 
SIM JPM B Page 6 of 16 STEP    3  :                                                                SAT UNSAT Standard:  Examinee addresses procedure step.
Cue      If directed, acknowledge direction.
Comment STEP    4  :                                                                SAT UNSAT Standard:  Examinee verifies both Containment Spray pumps running by observing red indicating lights above pump handswitches ON.
Comment
 
SIM JPM B Page 7 of 16 STEP    5  :                                                                          SAT UNSAT Examinee places the A OR B Containment Spray 1-HS-72-27A or 1-Standard:  HS-72-10A handswitch in PULL-TO-LOCK within 2 minutes of the        Critical Step RWST Level Lo Alarm.
Comment Examiner    Annotate the stop time for stopping the Containment Spray pump Note:    here. ______
STEP    6  :                                                                          SAT UNSAT Standard:  Examinee verifies containment pressure by observing PDI-30-45, PDI-30-44, PDI-30-43, or PDI-30-42.
Comment
 
SIM JPM B Page 8 of 16 STEP    7  :                                                                        SAT UNSAT RNO Standard:  Examinee places both Containment Spray reset pushbuttons 1-HS-72 43 and 1-HS-72 42 to RESET.
Critical Step Comment STEP    8  :                                                                        SAT UNSAT Examinee places the remaining running Containment Spray Pump Standard:  handswitch to STOP, both Containment Spray Pump handswitches to A-AUTO, places Containment Spray discharge valve handswitches Critical Step FCV-72-39 and FCV-72-2 to close and proceeds to step 3.
Comment
 
SIM JPM B Page 9 of 16 STEP    9  :                                                                    SAT UNSAT Standard:  Examinee checks containment sump level greater than 11% by observing LI-63-176, LI-63-177, LI-63-178, or LI-63-179.
Comment STEP    10  :                                                                    SAT UNSAT Standard:  Examinee verifies FCV-63-73 and FCV-63-73 OPEN by observing the red lights above 1-HS-63-72A and 1-HS-63-73A ON.
Comment
 
SIM JPM B Page 10 of 16 STEP    11  :                                                                      SAT UNSAT ALTERNATE PATH Examinee places containment sump valve 1-HS-74-21A to OPEN Standard:                                                                  Critical Step Examinee checks RHR suction valves FCV-74-3 CLOSING by observing the red and green lights above 1-HS-74-3A ON (Not Critical).
Comment STEP    12  :                                                                      SAT UNSAT Examinee monitors RWST LVL LO-LO alarm DARK on [M-6E, E4] by Standard:  observing alarm window OFF and RWST level greater than 8% by observing LI-63-50, LI-63-51, LI-63-52, or LI-63-53.
Comment STEP    13  :                                                                      SAT UNSAT Standard:  Examinee monitors RHR pumps RUNNING by observing the red lights above 1-HS-74-10A and 1-HS-74-20A ON.
Comment
 
SIM JPM B Page 11 of 16 STEP    14  :                                                                              SAT UNSAT Standard:  Examinee directs another operator to perform step 6 and proceeds to step 7.
Cue      Acknowledge direction from the examinee Comment Examiner    The station standard practice is for the BOP operator to perform Note      manipulations outside the At The Controls Area during this evolution.
STEP    15  :                                                                              SAT UNSAT Examinee monitors containment sump valves FCV-63-72 and FCV  Standard:  73 OPEN by observing the red indicating lights above 1-HS-63-72A and 1-HS-63-73A ON.
Comment
 
SIM JPM B Page 12 of 16 STEP    16  :                                                                        SAT UNSAT Examinee ensures RWST to RHR suction valves FCV-74-3 and FCV-Standard:  74-21 CLOSED by observing the green indicating lights above 1-HS-74-3A and 1-HS-74-21A ON.
Comment STEP    17  :                                                                        SAT UNSAT Standard:  Examinee monitors RCS pressure less than 1500 psig by observing PI-68-62, PI-68-69 or other installed plant instrumentation.
Comment
 
SIM JPM B Page 13 of 16 STEP    18  :                                                                  SAT UNSAT Standard:  Examinee places 1-HS-63-3A AND 1-HS-63-4A AND 1-HS-63-175A Critical Step to CLOSE Comment STEP    19  :                                                                  SAT UNSAT Standard:  Examinee places 1-HS-74-33A AND 1-HS-74-35A to CLOSE      Critical Step Comment


SIM JPM B Page 5 of 16 Start Time STEP 1 :   SAT      UNSAT  Standard: Examinee acknowledges alarm and transitions to ES-1.3 TRANSFER TO RHR CONTAINMENT SUMP.
SIM JPM B Page 14 of 16 STEP    20 :                                                         SAT UNSAT Standard:  Examinee places 1-HS-63-7A AND 1-HS-63-6A to OPEN Critical Step Comment STEP   21 :                                                         SAT UNSAT Standard:   Examinee places 1-HS-63-8A to OPEN.               Critical Step Comment
Comment    STEP 2 : Obtain a copy of ES-1.3 TRANSFER TO RHR CONTAINMENT SUMP SAT      UNSAT  Standard: Examinee obtains a copy of ES-1.3 TRANSFER TO RHR CONTAINMENT SUMP.
Cue: Provide a copy of ES-1.3 TRANSFER TO RHR CONTAINMENT SUMP. Comment SIM JPM B Page 6 of 16 STEP 3 :    SAT      UNSAT  Standard: Examinee addresses procedure step.
Cue If directed, acknowledge direction.
Comment    STEP 4 :    SAT      UNSAT  Standard: Examinee verifies both Containment Spray pumps running by observing red indicating lights above pump handswitches ON.
Comment SIM JPM B Page 7 of 16 STEP 5 :    SAT      UNSAT  Standard: Examinee places the A OR B Containment Spray 1-HS-72-27A or 1-HS-72-10A handswitch in PULL-TO-LOCK within 2 minutes of the RWST Level Lo Alarm. Critical Step Comment  Examiner Note: Annotate the stop time for stopping the Containment Spray pump here. ______
STEP 6 :    SAT      UNSAT  Standard: Examinee verifies containment pressure by observing PDI-30-45, PDI-30-44, PDI-30-43, or PDI-30-42.
Comment SIM JPM B Page 8 of 16 STEP 7 : RNO    SAT      UNSAT  Standard: Examinee places both Containment Spray reset pushbuttons 1-HS-72 43 and 1-HS-72 42 to RESET. Critical Step Comment    STEP 8 :        SAT      UNSAT  Standard: Examinee places the remaining running Containment Spray Pump handswitch to STOP, both Containment Spray Pump handswitches to A-AUTO, places Containment Spray discharge valve handswitches FCV-72-39 and FCV-72-2 to close and proceeds to step 3. Critical Step Comment SIM JPM B Page 9 of 16 STEP 9 :    SAT      UNSAT  Standard: Examinee checks containment sump level greater than 11% by observing LI-63-176, LI-63-177, LI-63-178, or LI-63-179.
Comment    STEP 10 :
SAT      UNSAT  Standard: Examinee verifies FCV-63-73 and FCV-63-73 OPEN by observing the red lights above 1-HS-63-72A and 1-HS-63-73A ON.
Comment SIM JPM B Page 10 of 16 STEP 11 :
SAT      UNSAT  Standard: ALTERNATE PATH Examinee places containment sump valve 1-HS-74-21A to OPEN Examinee checks RHR suction valves FCV-74-3 CLOSING by observing the red and green lights above 1-HS-74-3A ON (Not Critical). Critical Step Comment    STEP 12 :
SAT      UNSAT  Standard: Examinee monitors RWST LVL LO-LO alarm DARK on [M-6E, E4] by observing alarm window OFF and RWST level greater than 8% by observing LI-63-50, LI-63-51, LI-63-52, or LI-63-53.
Comment    STEP 13 :
SAT      UNSAT  Standard: Examinee monitors RHR pumps RUNNING by observing the red lights above 1-HS-74-10A and 1-HS-74-20A ON.
Comment SIM JPM B Page 11 of 16 STEP 14 :
SAT      UNSAT  Standard: Examinee directs another operator to perform step 6 and proceeds to step 7. Cue Acknowledge direction from the examinee Comment  Examiner Note The station standard practice is for the BOP operator to perform manipulations outside the "At The Controls Area" during this evolution.
STEP 15 :
SAT     UNSAT   Standard: Examinee monitors containment sump valves FCV-63-72 and FCV-63-73 OPEN by observing the red indicating lights above 1-HS-63-72A and 1-HS-63-73A ON.
Comment SIM JPM B Page 12 of 16 STEP 16 :
SAT      UNSAT   Standard: Examinee ensures RWST to RHR suction valves FCV-74-3 and FCV-74-21 CLOSED by observing the green indicating lights above 1-HS-74-3A and 1-HS-74-21A ON.
Comment    STEP 17 :
SAT      UNSAT  Standard: Examinee monitors RCS pressure less than 1500 psig by observing PI-68-62, PI-68-69 or other installed plant instrumentation.
Comment SIM JPM B Page 13 of 16 STEP 18 :
SAT      UNSAT  Standard: Examinee places 1-HS-63-3A AND 1-HS-63-4A AND 1-HS-63-175A to CLOSE Critical Step Comment    STEP 19 :
SAT      UNSAT  Standard: Examinee places 1-HS-74-33A AND 1-HS-74-35A to CLOSE Critical Step Comment SIM JPM B Page 14 of 16 STEP 20 :
SAT      UNSAT  Standard: Examinee places 1-HS-63-7A AND 1-HS-63-6A to OPEN Critical Step Comment    STEP 21 :
SAT     UNSAT   Standard: Examinee places 1-HS-63-8A to OPEN. Critical Step Comment SIM JPM B Page 15 of 16 STEP 22 :
SAT      UNSAT  Standard: Examinee places 1-HS-63-11A to OPEN. Critical Step Comment    Terminating Cue: Provide the following cue "Another operator will perform the remaining steps of this procedure."
STOP  Stop Time 


JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
SIM JPM B Page 15 of 16 STEP    22  :                                                                     SAT UNSAT Standard:   Examinee places 1-HS-63-11A to OPEN.                         Critical Step Comment Terminating  Provide the following cue Another operator will perform Cue:                                                                        STOP the remaining steps of this procedure.
INITIAL CONDITIONS: 1. A LOCA is in progress on Unit 1. 2. ECCS pumps are running taking a suction from the RWST. INITIATING CUES: 1. When conditions permit, you are directed to perform ES-1.3, Transfer to Cold Leg Recirculation. 2. Inform the SRO when complete. Acknowledge to the examiner when you are ready to begin.
Stop Time
HAND THIS PAPER BACK TO YO UR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.


SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
: 1. A LOCA is in progress on Unit 1.
: 2. ECCS pumps are running taking a suction from the RWST.
INITIATING CUES:
: 1. When conditions permit, you are directed to perform ES-1.3, Transfer to Cold Leg Recirculation.
: 2. Inform the SRO when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.


1305 NRC SIMULATOR JPM C
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1305 NRC SIMULATOR JPM C


SIM JPM C Page 2 of 10 Rev. 15   RO/SRO JOB PERFORMANCE MEASURE Task: Terminate SI and Re-Establish Charging Flow Task #: 0001000501 Task Standard:
SIM JPM C Page 2 of 10 Rev. 15 RO/SRO JOB PERFORMANCE MEASURE Task:               Terminate SI and Re-Establish Charging Flow Task #:             0001000501 Task Standard:     Safety Injection is terminated using E-0 resulting in one of the CCPs in A-Auto and the alternate charging supply valve open due to the failure of the normal charging supply valve.
Safety Injection is terminated using E-0 resulting in one of the CCPs in A-Auto and the alternate charging supply valve open due to the failure of the normal charging supply valve.
Alternate Path:             YES:         X       NO:
Alternate Path: YES: X NO:
Time Critical Task:         YES:                 NO:         X K/A Reference/Ratings:     EPE E02 EA1.1 (4.0/3.9)
Time Critical Task:
YES: NO: X K/A Reference/Ratings: EPE E02 EA1.1 (4.0/3.9)
Method of Testing:
Method of Testing:
Simulated Performance:   Actual Performance: X Evaluation Method:
Simulated Performance:                         Actual Performance:           X Evaluation Method:
Simulator X In-Plant Classroom             Main Control Room   Mock-up Performer:
Simulator         X     In-Plant                 Classroom Main Control Room                                 Mock-up Performer:
Trainee Name Evaluator:  
Trainee Name Evaluator:                                         /
/    Name / Signature DATE Performance Rating: SAT: UNSAT:
Name / Signature                                       DATE Performance Rating:     SAT:                     UNSAT:
Validation Time: 14 min Total Time:       Performance Time:
Validation Time:             14 min                           Total Time:
Start Time:   Finish Time:
Performance Time:           Start Time:                       Finish Time:
COMMENTS SIM JPM C Page 3 of 10 Rev. 15 SPECIAL INSTRUCTIONS:
COMMENTS
: 1. Ensure Simulator Operator Checklist is complete 2. Reset to IC 309
 
: 3. If IC 309 is not available perform the following: a) Reset to IC 16 b) Insert IMF RP04B ON [False Auto SIS, Hi Cntmt Press.] c) Insert override ZDIHS6286A to CLOSE to override normal charging valve closed. d) Perform E-0 (including ES-0.5) through step #14. 4. An extra operator will be required to acknowledge alarms.
SIM JPM C Page 3 of 10 Rev. 15 SPECIAL INSTRUCTIONS:
: 5. ACKNOWLEDGE ALARMS 6. FREEZE SIMULATOR. 7. Provide a copy of E-0, REACTOR TRIP OR SAFETY INJECTION marked up through step 14.
: 1. Ensure Simulator Operator Checklist is complete
: 2. Reset to IC 309
: 3. If IC 309 is not available perform the following:
a) Reset to IC 16 b) Insert IMF RP04B ON [False Auto SIS, Hi Cntmt Press.]
c) Insert override ZDIHS6286A to CLOSE to override normal charging valve closed.
d) Perform E-0 (including ES-0.5) through step #14.
: 4. An extra operator will be required to acknowledge alarms.
: 5. ACKNOWLEDGE ALARMS
: 6. FREEZE SIMULATOR.
: 7. Provide a copy of E-0, REACTOR TRIP OR SAFETY INJECTION marked up through step 14.
: 8. Save as a temporary IC, if repeat runs of JPM will be desired.
: 8. Save as a temporary IC, if repeat runs of JPM will be desired.
: 9. PLACE SIMULATOR IN RUN
: 9. PLACE SIMULATOR IN RUN
: 10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
: 10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
SPECIAL INSTRUCTIONS TO EVALUATOR:
SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. Critical steps are identified in step SAT/UNSAT column by bold print 'Critical Step.' 2. Any UNSAT requires comments.
: 1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
: 2. Any UNSAT requires comments.
Tools/Equipment/Procedures Needed:
Tools/Equipment/Procedures Needed:


==References:==
==References:==


Reference Title Rev No.
Reference                                     Title                                 Rev No.
: 1. E-0 REACTOR TRIP OR SAFETY INJECTION 35 2.
: 1. E-0                     REACTOR TRIP OR SAFETY INJECTION                                   35 2.
SIM JPM C Page 4 of 10 Rev. 15 DIRECTIONS TO TRAINEE:
 
SIM JPM C Page 4 of 10 Rev. 15 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS: 1. Unit 1 is in MODE 3 following a spurious Safety Injection 2. The crew completed E-0, REACTOR TRIP OR SAFETY INJECTION through step 14. INITIATING CUES: 1. The US has directed you to stop one charging pump, isolate the CCPIT and establish charging flow using E-0, REACTOR TRIP OR SAFETY INJECTION starting at step 15. 2. Inform the US when charging flow and seal injection flow have been established.  
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
: 1.       Unit 1 is in MODE 3 following a spurious Safety Injection
: 2.       The crew completed E-0, REACTOR TRIP OR SAFETY INJECTION through step 14.
INITIATING CUES:
: 1.       The US has directed you to stop one charging pump, isolate the CCPIT and establish charging flow using E-0, REACTOR TRIP OR SAFETY INJECTION starting at step 15.
: 2.       Inform the US when charging flow and seal injection flow have been established.
 
SIM JPM C Page 5 of 10 Rev. 15 Start Time Obtain a copy of E-0, REACTOR TRIP OR SAFETY INJECTION.
STEP    1  :                                                                            SAT UNSAT Standard:  Operator obtains a copy of E-0, REACTOR TRIP OR SAFETY INJECTION.
Cue      Provide a copy of E-0, REACTOR TRIP OR SAFETY INJECTION.
Comment STEP    2  :                                                                            SAT UNSAT Standard:  Operator depresses SI Reset pushbuttons.                            Critical Step Comment STEP    3  :                                                                            SAT UNSAT Standard:  Operator addresses the procedure step.
Cue      Provide the following cue, The CRO will monitor the shutdown boards.
Comment
 
SIM JPM C Page 6 of 10 Rev. 15 STEP    5  :                                                                              SAT UNSAT Standard:  Operator places ONE Charging Pump in STOP.                            Critical Step Comment STEP    6  :                                                                              SAT UNSAT Standard:  Operator verifies RCS pressure stable or rising by observing installed instrumentation.
Comment Examiner Note:


SIM JPM C Page 5 of 10 Rev. 15   Start Time STEP 1 : Obtain a copy of E-0, REACTOR TRIP OR SAFETY INJECTION.
SIM JPM C Page 7 of 10 Rev. 15 STEP    7   :                                                                         SAT UNSAT Operator places CCPIT inlet valves HS-63-39A AND HS-63-40A OR Standard:                                                                      Critical Step Operator places CCPIT outlet valves HS 25A AND HS 26A To CLOSE.
SAT      UNSAT  Standard: Operator obtains a copy of E-0, REACTOR TRIP OR SAFETY INJECTION.
Comment STEP   8   :                                                                         SAT UNSAT Standard:   Operator closes FCV-62-89 by adjusting controller FIC-62-89 CCW to Critical Step CLOSE (Maximum output.).
Cue Provide a copy of E-0, REACTOR TRIP OR SAFETY INJECTION.
Comment
Comment   STEP 2 :    SAT      UNSAT   Standard: Operator depresses SI Reset pushbuttons. Critical Step Comment    STEP 3 :   SAT     UNSAT   Standard: Operator addresses the procedure step.
Cue Provide the following cue, "The CRO will monitor the shutdown boards."  Comment SIM JPM C Page 6 of 10 Rev. 15  STEP 5 :    SAT      UNSAT  Standard: Operator places ONE Charging Pump in STOP. Critical Step Comment    STEP 6 :    SAT      UNSAT  Standard: Operator verifies RCS pressure stable or rising by observing installed instrumentation.
Comment  Examiner Note:
SIM JPM C Page 7 of 10 Rev. 15  STEP 7 :    SAT      UNSAT  Standard:
Operator places CCPIT inlet valves HS-63-39A AND HS-63-40A OR Operator places CCPIT outlet valves HS 25A AND HS 26A To CLOSE. Critical Step Comment    STEP 8 :     SAT     UNSAT   Standard:
Operator closes FCV-62-89 by adjusting controller FIC-62-89 CCW to CLOSE (Maximum output.). Critical Step Comment SIM JPM C Page 8 of 10 Rev. 15  STEP 9 :    SAT      UNSAT  Standard: Operator places charging isolation valves HS-62-90A and HS-62-91A to OPEN Critical Step Comment    STEP 12 :
SAT      UNSAT  Standard: Operator places FCV-62-86 to OPEN. Operator observes when 1-HS 86A is turned to the right OPEN position, green light remains lit on HS and operator transitions to the RNO.
Comment   STEP 13 :
RNO    SAT      UNSAT  Standard: Operator places 1-HS-62-85 Alternate Charging Isolation to OPEN. Critical Step Comment SIM JPM C Page 9 of 10 Rev. 15  STEP 14 :
SAT      UNSAT  Standard: Operator addresses the procedure step. Comment  Terminating Cue: Provide the following cue, "Another operator will complete the remaining steps of this procedure." STOP  Stop Time 


JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
SIM JPM C Page 8 of 10 Rev. 15 STEP    9  :                                                                              SAT UNSAT Standard:  Operator places charging isolation valves HS-62-90A and HS-62-91A Critical Step to OPEN Comment STEP    12  :                                                                               SAT UNSAT Operator places FCV-62-86 to OPEN. Operator observes when 1-HS -
INITIAL CONDITIONS: 1. Unit 1 is in MODE 3 following a spurious Safety Injection 2. The crew completed E-0, REACTOR TRIP OR SAFETY INJECTION through step 14. INITIATING CUES: 1. The US has directed you to stop one charging pump, isolate the CCPIT and establish charging flow using E-0, REACTOR TRIP OR SAFETY INJECTION starting at step 15. 2. Inform the US when charging flow and seal injection flow have been established.
Standard:   62-86A is turned to the right OPEN position, green light remains lit on HS and operator transitions to the RNO.
Acknowledge to the examiner when you are ready to begin.  
Comment STEP    13  :                                                                              SAT RNO UNSAT Standard:  Operator places 1-HS-62-85 Alternate Charging Isolation to OPEN.       Critical Step Comment


HAND THIS PAPER BACK TO YO UR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SIM JPM C Page 9 of 10 Rev. 15 STEP    14  :                                                                        SAT UNSAT Standard:  Operator addresses the procedure step.
Comment Terminating  Provide the following cue, Another operator will complete the Cue:                                                                            STOP remaining steps of this procedure.
Stop Time


SEQUOYAH NUCLEAR PLANT
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
: 1. Unit 1 is in MODE 3 following a spurious Safety Injection
: 2. The crew completed E-0, REACTOR TRIP OR SAFETY INJECTION through step 14.
INITIATING CUES:
: 1. The US has directed you to stop one charging pump, isolate the CCPIT and establish charging flow using E-0, REACTOR TRIP OR SAFETY INJECTION starting at step 15.
: 2. Inform the US when charging flow and seal injection flow have been established.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.


1305 NRC SIMULATOR JPM D
SEQUOYAH NUCLEAR PLANT 1305 NRC SIMULATOR JPM D


SIM JPM D Page 2 of 16 RO/SRO JOB PERFORMANCE MEASURE Task: Respond to RCP High Stator temperature Al arm using AOP-R.04 REACTOR COOLANT PUMP MALFUNCTIONS.
SIM JPM D Page 2 of 16 RO/SRO JOB PERFORMANCE MEASURE Task:               Respond to RCP High Stator temperature Alarm using AOP-R.04 REACTOR COOLANT PUMP MALFUNCTIONS.
Task #: 0030010101 Task Standard:
Task #:             0030010101 Task Standard:     The examinee manually stops the #2 Reactor Coolant Pump and closes RCS Loop 2 Pressurizer Spray Valve.
The examinee manually stops the #2 Reactor C oolant Pump and closes RCS Loop 2 Pressurizer Spray Valve.
Alternate Path:         YES:     X     NO:
Alternate Path: YES: X NO:
Time Critical Task:         YES:             NO:         X K/A Reference/Ratings:     APE 015/017 AA1.03 (3.7/3.8)
Time Critical Task:
YES: NO: X K/A Reference/Ratings: APE 015/017 AA1.03 (3.7/3.8)
Method of Testing:
Method of Testing:
Simulated Performance:   Actual Performance: X Evaluation Method:
Simulated Performance:                     Actual Performance:         X Evaluation Method:
Simulator X In-Plant Classroom             Main Control Room   Mock-up Performer:
Simulator         X     In-Plant               Classroom Main Control Room                               Mock-up Performer:
Trainee Name Evaluator:  
Trainee Name Evaluator:                                       /
/    Name / Signature DATE Performance Rating: SAT: UNSAT:
Name / Signature                                 DATE Performance Rating:     SAT:                 UNSAT:
Validation Time: 15 mins Total Time:       Performance Time:
Validation Time:             15 mins                       Total Time:
Start Time:   Finish Time:
Performance Time:           Start Time:                     Finish Time:
COMMENTS SIM JPM D Page 3 of 16 SPECIAL INSTRUCTIONS:
COMMENTS
: 1. Ensure Simulator Operator Checklist is complete 2. Reset to IC 324.
 
: 3. If IC 324 is not available, perform the following: Reset to IC 7 Open reactor Trip Breakers 4. Place MODE 3 sign on Panel M-4
SIM JPM D Page 3 of 16 SPECIAL INSTRUCTIONS:
: 1. Ensure Simulator Operator Checklist is complete
: 2. Reset to IC 324.
: 3. If IC 324 is not available, perform the following:
Reset to IC 7 Open reactor Trip Breakers
: 4. Place MODE 3 sign on Panel M-4
: 5. Set NR-45 to display one SRM and one IRM
: 5. Set NR-45 to display one SRM and one IRM
: 6. An extra operator will be required to acknowledge alarms.
: 6. An extra operator will be required to acknowledge alarms.
Line 217: Line 313:
: 10. Booth operator standby to insert the SCN File 1305 JPM D.scn (from exams folder) when the examinee assumes the shift.
: 10. Booth operator standby to insert the SCN File 1305 JPM D.scn (from exams folder) when the examinee assumes the shift.
SPECIAL INSTRUCTIONS TO EVALUATOR:
SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. Critical steps are identified in step SAT/UNSAT column by bold print 'Critical Step.' 2. Any UNSAT requires comments.
: 1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
: 2. Any UNSAT requires comments.
Tools/Equipment/Procedures Needed:
Tools/Equipment/Procedures Needed:
1-SO-68-2 Reactor Coolant Pumps AOP- R.04 Reactor Coolant Pump Malfunctions
1-SO-68-2 Reactor Coolant Pumps AOP- R.04 Reactor Coolant Pump Malfunctions
Line 223: Line 320:
==References:==
==References:==


Reference Title Rev No.
Reference                                   Title                             Rev No.
: 1. 1-SO-68-2 Reactor Coolant Pumps 33 2. AOP- R.04 Reactor Coolant Pump Malfunctions 27 3 1-AR-M5-B CVCS Seal Water and RCP 39 SIM JPM D Page 4 of 16 DIRECTIONS TO TRAINEE:
: 1. 1-SO-68-2               Reactor Coolant Pumps                                         33
I will explain the initial conditions, and state the ta sk to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
: 2. AOP- R.04               Reactor Coolant Pump Malfunctions                             27 3     1-AR-M5-B               CVCS Seal Water and RCP                                       39
 
SIM JPM D Page 4 of 16 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS: 1. Unit 1 is in MODE 3 INITIATING CUES: 1. You are the OATC. 2. Respond to plant conditions.  
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
 
INITIAL CONDITIONS:
SIM JPM D Page 5 of 16 STEP 1 :    SAT      UNSAT  Standard:
: 1. Unit 1 is in MODE 3 INITIATING CUES:
Examinee acknowledges alarm and observes rise in RCP motor stator temperatures.
: 1. You are the OATC.
Comment SIM JPM D Page 6 of 16
: 2. Respond to plant conditions.
 
STEP 2 : STOP Loop 2 RCP SAT      UNSAT  Standard:
Examinee places 1-HS-68-31A #2 RCP handswitch to STOP.
Critical Step Comment    Examiner Note The following steps are from the Annunciator Response Procedure 1-AR-M5-B. STEP 3 :    SAT      UNSAT  Standard:
Examinee determines the #2 RCP in alarm by observing the ICS display. Comment SIM JPM D Page 7 of 16


STEP 4 :   SAT     UNSAT   Standard:
SIM JPM D Page 5 of 16 STEP   1  :                                                                     SAT UNSAT Standard:   Examinee acknowledges alarm and observes rise in RCP motor stator temperatures.
Engineering is contacted to obtain engineering assistance in determining the validity of the alarm.
Comment
Cue If asked, provide the following cue, "Time has been compressed, Engineering has been contacted and has validated the alarm."
Comment   STEP 5 :    SAT      UNSAT  Standard:
Examinee monitors or directs m onitoring parameters by observing indications on installed instrumentation and determines indications


normal. Cue If asked, provide the following cue, "The AUO is monitoring RCP Vibration."
SIM JPM D Page 6 of 16 STOP Loop 2 RCP STEP    2  :                                                                          SAT UNSAT Standard:  Examinee places 1-HS-68-31A #2 RCP handswitch to STOP.             Critical Step Comment Examiner    The following steps are from the Annunciator Response Procedure 1-Note      AR-M5-B.
Comment SIM JPM D Page 8 of 16
STEP    3  :                                                                          SAT UNSAT Standard:  Examinee determines the #2 RCP in alarm by observing the ICS display.
Comment


STEP 6 :   SAT     UNSAT   Standard:
SIM JPM D Page 7 of 16 STEP     4  :                                                                       SAT UNSAT Standard:   Engineering is contacted to obtain engineering assistance in determining the validity of the alarm.
Examinee verifies ERCW aligned to pump cooler by observing red light above 1-HS-67-102 on 0-M-27A ON.
Cue     If asked, provide the following cue, Time has been compressed, Engineering has been contacted and has validated the alarm.
Comment    STEP 7 :    SAT     UNSAT  Standard:
Comment STEP     5  :                                                                       SAT UNSAT Examinee monitors or directs monitoring parameters by observing Standard:  indications on installed instrumentation and determines indications normal.
Examinee verifies ERCW system te mperature and pressure normal by observing indications 0-M-27A.
Cue      If asked, provide the following cue, The AUO is monitoring RCP Vibration.
Comment   STEP 8 :   SAT     UNSAT   Standard:
Comment
Examinee verifies lower compartment air temperature normal by observing indications on ICS and other installed plant instrumentation.
Comment SIM JPM D Page 9 of 16


STEP 9 :   SAT     UNSAT   Standard:
SIM JPM D Page 8 of 16 STEP   6  :                                                                           SAT UNSAT Standard:   Examinee verifies ERCW aligned to pump cooler by observing red light above 1-HS-67-102 on 0-M-27A ON.
Examinee refers to 1-SO-68-2 Appendix D for the operating limits.
Comment STEP   :                                                                           SAT UNSAT Standard:   Examinee verifies ERCW system temperature and pressure normal by observing indications 0-M-27A.
Comment    STEP 10 :
Comment STEP   :                                                                           SAT UNSAT Standard:   Examinee verifies lower compartment air temperature normal by observing indications on ICS and other installed plant instrumentation.
STOP Loop 2 RCP SAT     UNSAT   Standard:
Comment
Examinee places 1-HS-68-31A #2 RCP handswitch to STOP.
Critical Step Comment    STEP 11 :
SAT     UNSAT   Standard:
Examinee verifies pump amps normal by observing EI-68-8 less than 400 amps.
Comment SIM JPM D Page 10 of 16


STEP 12 :
SIM JPM D Page 9 of 16 STEP     9  :                                                                         SAT UNSAT Standard:   Examinee refers to 1-SO-68-2 Appendix D for the operating limits.
SAT     UNSAT   Standard:
Comment STOP Loop 2 RCP STEP    10  :                                                                        SAT UNSAT Standard:  Examinee places 1-HS-68-31A #2 RCP handswitch to STOP.           Critical Step Comment STEP    11  :                                                                        SAT UNSAT Standard:  Examinee verifies pump amps normal by observing EI-68-8 less than 400 amps.
Examinee observes the motor winding temperature is greater than 311°F using the ICS and goes to AOP-R.04.
Comment
Cue Respond as Engineering "Alarm is valid."
Comment SIM JPM D Page 11 of 16


STEP 13 :
SIM JPM D Page 10 of 16 STEP   12  :                                                                     SAT UNSAT Standard:   Examinee observes the motor winding temperature is greater than 311°F using the ICS and goes to AOP-R.04.
SAT     UNSAT   Standard:
Cue      Respond as Engineering Alarm is valid.
Examinee goes to AOP-R.04 section 2.6 Comment SIM JPM D Page 12 of 16
Comment


STEP 14 :
SIM JPM D Page 11 of 16 STEP   13  :                                           SAT UNSAT Standard:   Examinee goes to AOP-R.04 section 2.6 Comment
Alternate Path SAT     UNSAT   Standard:
Examinee determines the motor winding temperature is greater than 311°F by observing the ICS and goes to the RNO column and


ultimately to Section 2.1.
SIM JPM D Page 12 of 16 STEP    14  : Alternate Path                                                        SAT UNSAT Examinee determines the motor winding temperature is greater than Standard:  311°F by observing the ICS and goes to the RNO column and ultimately to Section 2.1.
Comment SIM JPM D Page 13 of 16
Comment


STEP 15 :
SIM JPM D Page 13 of 16 STEP   15 :                                                                     SAT UNSAT Standard:   Examinee determines the Unit is in MODE 3 and proceeds to RNO Comment STEP   16 :                                                                     SAT UNSAT Standard:   Examinee places handswitch 1-HS-68-31A #2 RCP to STOP.       Critical Step Comment
SAT     UNSAT   Standard:
Examinee determines the Unit is in MODE 3 and proceeds to RNO Comment    STEP 16 :
SAT     UNSAT   Standard: Examinee places handswitch 1-HS-68-31A #2 RCP to STOP.
Critical Step Comment SIM JPM D Page 14 of 16


STEP 17 :
SIM JPM D Page 14 of 16 STEP   17 :                                                                     SAT UNSAT Standard:   Examinee determines that seal leakoff within normal values and continues to step 4.
SAT     UNSAT   Standard:
Comment STEP   18 :                                                                     SAT UNSAT Standard:   Examinee places XS-68-2D (T) and XS-68-2M (T-avg) in PULL TO Critical Step DEFEAT Comment
Examinee determines that seal leakoff within normal values and continues to step 4.
Comment     STEP 18 :
SAT     UNSAT   Standard: Examinee places XS-68-2D (T) and XS-68-2M (T-avg) in PULL TO DEFEAT Critical Step Comment SIM JPM D Page 15 of 16


STEP 19 :
SIM JPM D Page 15 of 16 STEP   19 :                                                                             SAT UNSAT Standard:   Examinee identifies #2 RCP as effected pump and proceeds to RNO column.
SAT     UNSAT   Standard:
Comment STEP   20 :                                                                             SAT UNSAT Standard:   Operator closes the Loop 2 Pressurizer Spray Valve by placing Critical Step controller 1-PIC-68-340B to CLOSE (minimum output).
Examinee identifies #2 RCP as effected pump and proceeds to RNO column. Comment     STEP 20 :
Comment Terminating   Provide the following cue Another operator will perform the Cue:                                                                              STOP remaining steps of this procedure.
SAT     UNSAT   Standard:
Stop Time
Operator closes the Loop 2 Pressurizer Spray Valve by placing controller 1-PIC-68-340B to CLOSE (minimum output).
Critical Step Comment     Terminating Cue: Provide the following cue "Another operator will perform the remaining steps of this procedure."
STOP  Stop Time


JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS: 1. Unit 1 is in MODE 3 INITIATING CUES: 1. You are the OATC. 2. Respond to plant conditions. Acknowledge to the examiner when you are ready to begin.
INITIAL CONDITIONS:
: 1. Unit 1 is in MODE 3 INITIATING CUES:
: 1. You are the OATC.
: 2. Respond to plant conditions.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.


SEQUOYAH NUCLEAR PLANT  
SEQUOYAH NUCLEAR PLANT 1305 NRC SIMULATOR JPM E


1305 NRC SIMULATOR JPM E
SIM JPM E Page 2 of 12 RO/SRO JOB PERFORMANCE MEASURE Task:              Operate the Motor Driven AFW pump.
Task #:            0610050101 Task Standard:      The examinee will align Essential Raw Cooling Water (Service Water) to the motor driven Auxiliary Feed Pumps (AFW) suction using EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW Alternate Path:              YES:              NO:        X Time Critical Task:          YES:              NO:        X K/A Reference/Ratings:      EPE E05 EA 1.1 (4.1/4.0)
Method of Testing:
Simulated Performance:                      Actual Performance:          X Evaluation Method:
Simulator        X      In-Plant              Classroom Main Control Room                                Mock-up Performer:
Trainee Name Evaluator:                                        /
Name / Signature                                      DATE Performance Rating:      SAT:                  UNSAT:
Validation Time:            5 min                          Total Time:
Performance Time:            Start Time:                    Finish Time:
COMMENTS


SIM JPM E Page 2 of 12 RO/SRO JOB PERFORMANCE MEASURE Task: Operate the Motor Driven AFW pump.
SIM JPM E Page 3 of 12 SPECIAL INSTRUCTIONS:
Task #: 0610050101
: 1. Ensure Simulator Operator Checklist is complete
: 2. Reset to IC 331
: 3. If IC 331 is not available perform the following:
Reset to IC 17 IMF ED01 f:1 IMF FW23C f:40 IMF CN05 f:100 IMF FW07C f:1 IOR ZDIHS3116AA f:0 IOR ZLOHS3116AA_GREEN1 f:1 IOR ZLOHS3116AA_GREEN2 f:1 IOR ZDIHS3126AA f:0 IOR ZLOHS3126AA_GREEN1 f:1 IOR ZLOHS3126AA_GREEN2 f:1
{global95[4811]} DOR ZDIHS3116AA
{global95[4811]} DOR ZLOHS3116AA_GREEN1
{global95[4811]} DOR ZLOHS3116AA_GREEN2
{global95[4822]} DOR ZDIHS3126AA
{global95[4822]} DOR ZLOHS3126AA_GREEN1
{global95[4822]} DOR ZLOHS3126AA_GREEN2
: 4. PLACE SIMULATOR IN RUN
: 5. An extra operator will be required to acknowledge alarms.
: 6. ACKNOWLEDGE ALARMS
: 7. FREEZE SIMULATOR.
: 8. Save as a temporary IC, if repeat runs of JPM will be desired.


Task Standard:
SIM JPM E Page 4 of 12
The examinee will align Essential Raw Cooling Water (Service Wate r) to the motor driven Auxiliary Feed Pumps (AFW) suction using EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW  Alternate Path: YES:  NO: X Time Critical Task:
: 9. Place pink tags on the following:
YES:  NO: X K/A Reference/Ratings: EPE E05 EA 1.1 (4.1/4.0)
HS-3-148A AFP 1B-B LCV to S/G #3.
Method of Testing:
HS-3-172 S/G #3 Turbine AFP LCV.
Simulated Performance:  Actual Performance: X Evaluation Method:
: 10. PLACE SIMULATOR IN RUN Tools/Equipment/Procedures Needed:
Simulator X In-Plant  Classroom              Main Control Room  Mock-up Performer:
Trainee Name Evaluator:
/    Name / Signature DATE  Performance Rating: SAT:  UNSAT:
Validation Time:  5 min  Total Time:        Performance Time:
Start Time:  Finish Time:
COMMENTS SIM JPM E Page 3 of 12 SPECIAL INSTRUCTIONS:
: 1. Ensure Simulator Operator Checklist is complete 2. Reset to IC 331 3. If IC 331 is not available perform the following:  Reset to IC 17  IMF ED01 f:1  IMF FW23C f:40  IMF CN05 f:100  IMF FW07C f:1  IOR ZDIHS3116AA f:0  IOR ZLOHS3116AA_GREEN1 f:1  IOR ZLOHS3116AA_GREEN2 f:1  IOR ZDIHS3126AA f:0  IOR ZLOHS3126AA_GREEN1 f:1  IOR ZLOHS3126AA_GREEN2 f:1  {global95[4811]} DOR ZDIHS3116AA  {global95[4811]} DOR ZLOHS3116AA_GREEN1  {global95[4811]} DOR ZLOHS3116AA_GREEN2  {global95[4822]} DOR ZDIHS3126AA  {global95[4822]} DOR ZLOHS3126AA_GREEN1  {global95[4822]} DOR ZLOHS3126AA_GREEN2 4. PLACE SIMULATOR IN RUN 5. An extra operator will be required to acknowledge alarms.
: 6. ACKNOWLEDGE ALARMS 7. FREEZE SIMULATOR. 8. Save as a temporary IC, if repeat runs of JPM will be desired.
SIM JPM E Page 4 of 12 9. Place pink tags on the following: HS-3-148A AFP 1B-B LCV to S/G #3. HS-3-172 S/G #3 Turbine AFP LCV. 10. PLACE SIMULATOR IN RUN Tools/Equipment/Procedures Needed:
EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW
EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW


==References:==
==References:==


Reference Title Rev No.
Reference                             Title         Rev No.
: 1. EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW 2 2.
: 1. EA-3-10               ESTABLISHING MOTOR DRIVEN AFW FLOW   2 2.
 
SIM JPM E Page 5 of 12 DIRECTIONS TO TRAINEE:
SIM JPM E Page 5 of 12 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
INITIAL CONDITIONS: 1. Unit 1 is in MODE 3. 2. A Loss of offsite power is in progress. 3. #3 Steam Generator in faulted.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
: 4. The Turbine Driven AFW pump has tripped.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
: 5. Unit 1 Condensate Storage tank is 5% and lowering rapidly. INITIATING CUES: 1. The SRO has directed you to align ERCW to the motor Driven AFW pumps using EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW. 2. Inform the SRO when complete.  
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
: 1.       Unit 1 is in MODE 3.
: 2.       A Loss of offsite power is in progress.
: 3.       #3 Steam Generator in faulted.
: 4.       The Turbine Driven AFW pump has tripped.
: 5.       Unit 1 Condensate Storage tank is 5% and lowering rapidly.
INITIATING CUES:
: 1.       The SRO has directed you to align ERCW to the motor Driven AFW pumps using EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW.
: 2.       Inform the SRO when complete.
 
SIM JPM E Page 6 of 12 Start Time STEP    1  :                                                                          SAT Obtain a copy of EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW                                                                    UNSAT Standard:  Examinee obtains a copy of EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW Cue:      Provide a copy of EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW.
Comment STEP    2  :                                                                          SAT UNSAT Standard:  Examinee selects Unit 1 as the affected unit.
When alarm 2C D6 CONDENSATE STORAGE TANK B LEVEL LO Cue:      LO annunciates provide the following cue, Another operator will address 2C D6 CONDENSATE STORAGE TANK B LEVEL LO LO.
Comment
 
SIM JPM E Page 7 of 12 STEP    3  :                                            SAT UNSAT Standard:  The examinee addresses the step as N/A.
Comment STEP    4  :                                            SAT UNSAT Standard:  The examinee addresses the step as N/A.
Comment
 
SIM JPM E Page 8 of 12 STEP    5  :                                            SAT UNSAT Standard:  The examinee addresses the step as N/A.
Comment STEP    6  :                                            SAT UNSAT Standard:  The examinee addresses the step as N/A.
Comment
 
SIM JPM E Page 9 of 12 STEP    7  :                                                                    SAT UNSAT Standard:  The examinee selects section 4.10 as the applicable section.
Comment STEP    8  :                                                                    SAT UNSAT Standard:  The examinee places HS-3-116-A/A ERCW Header A AFW Supply to Critical Step OPEN.
Comment


SIM JPM E Page 6 of 12 Start Time STEP 1 : Obtain a copy of EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW  SAT      UNSAT  Standard: Examinee obtains a copy of EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW Cue: Provide a copy of EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW. Comment    STEP 2 :    SAT      UNSAT  Standard: Examinee selects Unit 1 as the affected unit.
SIM JPM E Page 10 of 12 STEP    9 :                                                                   SAT UNSAT Standard:  The examinee addresses the procedure step.
Cue: When alarm 2C D6 CONDENSATE STORAGE TANK B LEVEL LO LO annunciates provide the following cue, "Another operator will address 2C D6 CONDENSATE STORAGE TANK B LEVEL LO LO."
Cue     Provide the following cue, AUO Acknowledges close ERCW tell tale drain valve 1-3-807.
Comment SIM JPM E Page 7 of 12 STEP 3 :    SAT      UNSAT  Standard: The examinee addresses the step as N/A.
Comment STEP   10 :                                                                   SAT UNSAT Standard:   The examinee places HS-3-126-A/A ERCW Header B AFW Supply to Critical Step OPEN.
Comment     STEP 4 :    SAT      UNSAT  Standard: The examinee addresses the step as N/A.
Comment
Comment SIM JPM E Page 8 of 12 STEP 5 :    SAT      UNSAT  Standard: The examinee addresses the step as N/A.
Comment    STEP 6 :    SAT      UNSAT  Standard: The examinee addresses the step as N/A.
Comment SIM JPM E Page 9 of 12 STEP 7 :   SAT     UNSAT   Standard: The examinee selects section 4.10 as the applicable section.
Comment    STEP 8 :    SAT      UNSAT   Standard: The examinee places HS-3-116-A/A ERCW Header A AFW Supply to OPEN. Critical Step Comment SIM JPM E Page 10 of 12 STEP 9 :    SAT      UNSAT  Standard: The examinee addresses the procedure step.
Cue Provide the following cue, "AUO Acknowledges close ERCW tell tale drain valve 1-3-807."
Comment    STEP 10 :
SAT     UNSAT   Standard: The examinee places HS-3-126-A/A ERCW Header B AFW Supply to OPEN. Critical Step Comment SIM JPM E Page 11 of 12 STEP 9 :    SAT      UNSAT  Standard: The examinee addresses the procedure step.
Cue Provide the following cue, "AUO Acknowledges close ERCW tell tale drain valve 1-3-808."
Comment   Terminating Cue: Provide the following cue, "Another operator will complete the remaining steps of this procedure." STOP  Stop Time 


JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
SIM JPM E Page 11 of 12 STEP    9  :                                                                        SAT UNSAT Standard:  The examinee addresses the procedure step.
INITIAL CONDITIONS: 1. Unit 1 is in MODE 3. 2. A Loss of offsite power is in progress. 3. #3 Steam Generator in faulted. 4. The Turbine Driven AFW pump has tripped.
Cue      Provide the following cue, AUO Acknowledges close ERCW tell tale drain valve 1-3-808.
: 5. Unit 1 Condensate Storage tank is 5% and lowering rapidly. INITIATING CUES: 1. The SRO has directed you to align ERCW to the motor Driven AFW pumps using EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW. 2. Inform the SRO when complete. Acknowledge to the examiner when you are ready to begin.
Comment Terminating  Provide the following cue, Another operator will complete the Cue:                                                                          STOP remaining steps of this procedure.
HAND THIS PAPER BACK TO YO UR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
Stop Time


SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
: 1. Unit 1 is in MODE 3.
: 2. A Loss of offsite power is in progress.
: 3.    #3 Steam Generator in faulted.
: 4. The Turbine Driven AFW pump has tripped.
: 5. Unit 1 Condensate Storage tank is 5% and lowering rapidly.
INITIATING CUES:
: 1. The SRO has directed you to align ERCW to the motor Driven AFW pumps using EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW.
: 2. Inform the SRO when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.


1305 NRC SIMULATOR JPM F
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1305 NRC SIMULATOR JPM F


SIM JPM F Page 2 of 12 RO/SRO JOB PERFORMANCE MEASURE Task: Start Up A-A Hydrogen Recombiner Task #: 0881010401 Task Standard:
SIM JPM F Page 2 of 12 RO/SRO JOB PERFORMANCE MEASURE Task:               Start Up A-A Hydrogen Recombiner Task #:             0881010401 Task Standard:     "A-A" Hydrogen Recombiner is placed in service using EA-268-1, Placing Hydrogen Recombiner in Service.
"A-A" Hydrogen Recombiner is placed in service using EA-268-1, Placing Hydrogen Recombiner in Service.
Alternate Path:             YES:             NO:         X Time Critical Task:         YES:             NO:         X K/A Reference/Ratings:       028 A4.01 (4.0/4.0)
Alternate Path: YES: NO: X Time Critical Task:
YES: NO: X K/A Reference/Ratings: 028 A4.01 (4.0/4.0)
Method of Testing:
Method of Testing:
Simulated Performance:   Actual Performance: X Evaluation Method:
Simulated Performance:                       Actual Performance:         X Evaluation Method:
Simulator X In-Plant Classroom             Main Control Room   Mock-up Performer:
Simulator         X       In-Plant               Classroom Main Control Room                               Mock-up Performer:
Trainee Name Evaluator:  
Trainee Name Evaluator:                                       /
/    Name / Signature DATE Performance Rating: SAT: UNSAT:
Name / Signature                                     DATE Performance Rating:       SAT:                 UNSAT:
Validation Time: 5 min Total Time:       Performance Time:
Validation Time:             5 min                           Total Time:
Start Time:   Finish Time:
Performance Time:           Start Time:                     Finish Time:
COMMENTS SIM JPM F Page 3 of 12 SPECIAL INSTRUCTIONS:
COMMENTS
: 1. Ensure Simulator Operator Checklist is complete 2. Reset to IC 312, (Post LOCA.)
 
: 3. If IC 312 is not available, perform the following: a) Reset to IC 24.
SIM JPM F Page 3 of 12 SPECIAL INSTRUCTIONS:
b) ENSURE the controllers for both Hydrogen Recombiners are set to Zero (0) after simulator initialization. c) Insert malfunctions to establish 5 psig on Containment Pressure Indicators: IMF CH01A f:37.5 IMF CH01B f:37.5 IMF CH01C f:37.5 IMF CH01D f:37.5 d) Put Containment Hydrogen Analyzer Fans A and B in service by placing 1-HS- 43-200A and -210A in ANALYZE. 4. ENSURE white lights (1-XI-43-200 and 210 located on M-10) are NOT LIT indicating normal flow through the Hydrogen Analyzers. 5. Ensure Train A Recombiner Power Adjust potentiometer set at 100
: 1. Ensure Simulator Operator Checklist is complete
: 6. The reference power value used in JPM step 9 (46.98 kw) must be verified correct prior to JPM performance. 7. An extra operator will be required to acknowledge alarms. 8. ACKNOWLEDGE ALARMS 9. FREEZE SIMULATOR.
: 2. Reset to IC 312, (Post LOCA.)
: 3. If IC 312 is not available, perform the following:
a) Reset to IC 24.
b) ENSURE the controllers for both Hydrogen Recombiners are set to Zero (0) after simulator initialization.
c) Insert malfunctions to establish 5 psig on Containment Pressure Indicators:
IMF CH01A f:37.5 IMF CH01B f:37.5 IMF CH01C f:37.5 IMF CH01D f:37.5 d) Put Containment Hydrogen Analyzer Fans A and B in service by placing 1-HS- 43-200A and -210A in ANALYZE.
: 4. ENSURE white lights (1-XI-43-200 and 210 located on M-10) are NOT LIT indicating normal flow through the Hydrogen Analyzers.
: 5. Ensure Train A Recombiner Power Adjust potentiometer set at 100
: 6. The reference power value used in JPM step 9 (46.98 kw) must be verified correct prior to JPM performance.
: 7. An extra operator will be required to acknowledge alarms.
: 8. ACKNOWLEDGE ALARMS
: 9. FREEZE SIMULATOR.
: 10. Provide a copy of EA-268-1, Placing Hydrogen Recombiner in Service
: 10. Provide a copy of EA-268-1, Placing Hydrogen Recombiner in Service
: 11. Save as a temporary IC, if repeat runs of JPM will be desired.
: 11. Save as a temporary IC, if repeat runs of JPM will be desired.
: 12. PLACE SIMULATOR IN RUN 13. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, if a temporary IC has been deleted.
: 12. PLACE SIMULATOR IN RUN
: 13. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, if a temporary IC has been deleted.
 
SIM JPM F Page 4 of 12 SPECIAL INSTRUCTIONS TO EVALUATOR:
SIM JPM F Page 4 of 12 SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. Critical steps are identified in step SAT/UNSAT column by bold print 'Critical Step.' 2. Any UNSAT requires comments.
: 1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
: 2. Any UNSAT requires comments.
Tools/Equipment/Procedures Needed:
Tools/Equipment/Procedures Needed:
: 1. EA-268-1, Placing Hydrogen Recombiner in Service 2. Calculator  
: 1. EA-268-1, Placing Hydrogen Recombiner in Service
: 2. Calculator


==References:==
==References:==


Reference Title Rev No. 1. EA-268-1 Placing Hydrogen Recombiner in Service 4 2.
Reference                                     Title                         Rev No.
: 1. EA-268-1                 Placing Hydrogen Recombiner in Service                     4 2.
 
SIM JPM F Page 5 of 12 DIRECTIONS TO TRAINEE:
SIM JPM F Page 5 of 12 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS: 1. Unit 1 has had an event. 2. Containment pressure indicators1-PDI-30-45, 44, 43 and 42 are indicating 5 psig.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
: 3. The Hydrogen Analyzers have been in service for > 30 minutes.
INITIAL CONDITIONS:
: 4. Containment Hydrogen concentration is 2.2% INITIATING CUES: 1. The US has directed you to place "A-A" Hydrogen Recombiner in service using EA-268-1, Placing Hydrogen Recombiner in Service. 2. Inform the US when complete.  
: 1.       Unit 1 has had an event.
: 2.       Containment pressure indicators1-PDI-30-45, 44, 43 and 42 are indicating 5 psig.
: 3.       The Hydrogen Analyzers have been in service for > 30 minutes.
: 4.       Containment Hydrogen concentration is 2.2%
INITIATING CUES:
: 1.       The US has directed you to place "A-A" Hydrogen Recombiner in service using EA-268-1, Placing Hydrogen Recombiner in Service.
: 2.       Inform the US when complete.
 
SIM JPM F Page 6 of 12 Start Time Obtain a copy of EA-268-1, Placing Hydrogen Recombiner in Service.
STEP    1  :                                                                                SAT UNSAT Standard:  Operator obtains EA-268-1, Placing Hydrogen Recombiner in Service.
Cue      Provide a copy of EA-268-1, Placing Hydrogen Recombiner in Service.
Comment STEP    2  :                                                                                SAT UNSAT Standard:  Operator determines that section 4.2 is the appropriate section.
Comment
 
SIM JPM F Page 7 of 12 STEP    3  :                                                                            SAT UNSAT Standard:  Operator determines that Unit 1 is the appropriate unit.
Comment STEP    4  :                                                                            SAT UNSAT Standard:  Operator determines that the A Train Recombiner will be started from the initiating cue.
Comment STEP    5  :                                                                            SAT UNSAT Standard:  Operator records Containment press from at least one of the PAM instruments.
Comment
 
SIM JPM F Page 8 of 12 STEP    6  :                                                                        SAT UNSAT Standard:  Operator addresses the step as N/A Comment STEP    7  :                                                                        SAT UNSAT Standard:  Operator verifies "PWR AVAILABLE white light is ON for "A-A" Recombiner on M-10.
Comment STEP    8  :                                                                        SAT UNSAT Operator places "A-A" Hydrogen power adjust potentiometer CCW to Standard:  000.                                                            Critical Step Operator addresses Train B as N/A (not critical).
Comment
 
SIM JPM F Page 9 of 12 STEP    9  :                                                                            SAT UNSAT Standard:  Operator places "A-A" Recombiner "PWR OUT SW" in UP (ON)          Critical Step position.
Comment STEP    10  :                                                                            SAT UNSAT Operator determines the correction factor (Pressure Factor) to be ~
Standard:  1.41 (1.4 - 1.45), by using the 5 psig Containment Pressure line and Critical Step intersection on curve.
Comment STEP    11  :                                                                            SAT UNSAT Standard:  Operator enters the reference power obtained from the Reference Power Data Plate or from Cue. (46.98 kW)
Cue      Provide the following cue, Reference power is 46.98 kW.
Comment
 
SIM JPM F Page 10 of 12 STEP    12  :                                                                            SAT UNSAT Operator calculates the hydrogen recombiner power setting by performing the following calculation:
Standard:  Pressure Factor X Reference Power= Setting KW Critical Step 1.41 (1.4 to 1.45%) X 46.98 KW = 66.24 KW (Acceptable Range 65.77 to 68.12 KW)
Comment STEP    13  :                                                                            SAT UNSAT Standard:  Operator records power setting, 66.24KW (65.77 to 68.12) in the Train A 25 Minute Table, KW reading column, and checks the box.
Comment


SIM JPM F Page 6 of 12 Start Time STEP 1 : Obtain a copy of EA-268-1, Placing Hydrogen Recombiner in Service.
SIM JPM F Page 11 of 12 STEP    14 :                                                                           SAT UNSAT Standard:  Operator places XS-83-5003 Power Adjust potentiometer CW until 5 +
SAT      UNSAT  Standard: Operator obtains EA-268-1, Placing Hydrogen Recombiner in Service.
0.5 KW is obtained.
Cue Provide a copy of EA-268-1, Placing Hydrogen Recombiner in Service.
Critical Step Comment Terminating   Provide the following cue, Another operator will complete the Cue:                                                                              STOP remaining steps of this procedure.
Comment    STEP 2 :   SAT      UNSAT  Standard: Operator determines that section 4.2 is the appropriate section.
Stop Time
Comment SIM JPM F Page 7 of 12 STEP 3 :    SAT      UNSAT  Standard: Operator determines that Unit 1 is the appropriate unit.
Comment    STEP 4 :    SAT      UNSAT  Standard: Operator determines that the A Train Recombiner will be started from the initiating cue.
Comment    STEP 5 :    SAT      UNSAT  Standard: Operator records Containment press from at least one of the PAM instruments.
Comment SIM JPM F Page 8 of 12 STEP 6 :    SAT      UNSAT  Standard: Operator addresses the step as N/A Comment    STEP 7 :    SAT      UNSAT  Standard: Operator verifies "PWR AVAILABLE" white light is ON for "A-A" Recombiner on M-10.
Comment    STEP 8 :    SAT      UNSAT  Standard: Operator places "A-A" Hydrogen power adjust potentiometer CCW to 000. Operator addresses Train B as N/A (not critical). Critical Step Comment SIM JPM F Page 9 of 12 STEP 9 :    SAT      UNSAT  Standard: Operator places "A-A" Recombiner "PWR OUT SW" in 'UP' (ON) position. Critical Step Comment    STEP 10 :
SAT      UNSAT  Standard: Operator determines the correction factor (Pressure Factor) to be ~ 1.41 (1.4 - 1.45), by using the 5 psig Containment Pressure line and intersection on curve. Critical Step Comment    STEP 11 :
SAT      UNSAT  Standard: Operator enters the reference power obtained from the Reference Power Data Plate or from Cue. (46.98 kW)
Cue Provide the following cue, "Reference power is 46.98 kW."
Comment SIM JPM F Page 10 of 12 STEP 12 :
SAT     UNSAT   Standard: Operator calculates the hydrogen recombiner power setting by performing the following calculation: Pressure Factor X Reference Power= Setting KW 1.41 (1.4 to 1.45%)  X 46.98 KW = 66.24 KW (Acceptable Range 65.77 to 68.12 KW) Critical Step Comment    STEP 13 :
SAT      UNSAT  Standard: Operator records power setting, 66.24KW (65.77 to 68.12) in the Train A 25 Minute Table, KW reading column, and checks the box.
Comment SIM JPM F Page 11 of 12 STEP 14 :
SAT      UNSAT   Standard: Operator places XS-83-5003 Power Adjust potentiometer CW until 5 + 0.5 KW is obtained. Critical Step Comment   Terminating Cue: Provide the following cue, "Another operator will complete the remaining steps of this procedure." STOP  Stop Time


JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
INITIAL CONDITIONS: 1. Unit 1 has had an event. 2. Containment pressure indicators1-PDI-30-45, 44, 43 and 42 are indicating 5 psig. 3. The Hydrogen Analyzers have been in service for > 30 minutes. 4. Containment Hydrogen concentration is 2.2% INITIATING CUES: 1. The US has directed you to place "A-A" Hydrogen Recombiner in service using EA-268-1, Placing Hydrogen Recombiner in Service. 2. Inform the US when complete.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
: 1. Unit 1 has had an event.
: 2. Containment pressure indicators1-PDI-30-45, 44, 43 and 42 are indicating 5 psig.
: 3. The Hydrogen Analyzers have been in service for > 30 minutes.
: 4. Containment Hydrogen concentration is 2.2%
INITIATING CUES:
: 1. The US has directed you to place "A-A" Hydrogen Recombiner in service using EA-268-1, Placing Hydrogen Recombiner in Service.
: 2. Inform the US when complete.
Acknowledge to the examiner when you are ready to begin.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YO UR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.


SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1305 NRC SIMULATOR JPM G


1305 NRC SIMULATOR JPM G SIM JPM G Page 2 of 10 RO/SRO JOB PERFORMANCE MEASURE Task: Transfer 1A-A 6.9 KV SD Bd from Alternate to Normal Supply Task #: 0620520201 Task Standard:
SIM JPM G Page 2 of 10 RO/SRO JOB PERFORMANCE MEASURE Task:               Transfer 1A-A 6.9 KV SD Bd from Alternate to Normal Supply Task #:             0620520201 Task Standard:     1A-A 6.9 kv Shutdown Board is energized by manually starting the 1A-A EDG.
1A-A 6.9 kv Shutdown Board is energized by manually starting the 1A-A EDG.
Alternate Path:             YES:       X     NO:
Alternate Path: YES: X NO:
Time Critical Task:         YES:             NO:         X K/A Reference/Ratings:     EPE E02 EA1.1 (4.0/3.9)
Time Critical Task:
YES: NO: X K/A Reference/Ratings: EPE E02 EA1.1 (4.0/3.9)
Method of Testing:
Method of Testing:
Simulated Performance:   Actual Performance: X Evaluation Method:
Simulated Performance:                     Actual Performance:         X Evaluation Method:
Simulator X In-Plant Classroom             Main Control Room   Mock-up Performer:
Simulator         X     In-Plant               Classroom Main Control Room                               Mock-up Performer:
Trainee Name Evaluator:  
Trainee Name Evaluator:                                       /
/    Name / Signature DATE Performance Rating: SAT: UNSAT:
Name / Signature                                   DATE Performance Rating:     SAT:                 UNSAT:
Validation Time: 7 min Total Time:       Performance Time:
Validation Time:           7 min                           Total Time:
Start Time:   Finish Time:
Performance Time:           Start Time:                     Finish Time:
COMMENTS SIM JPM G Page 3 of 10 SPECIAL INSTRUCTIONS:
COMMENTS
: 1. Ensure Simulator Operator Checklist is complete 2. Reset to IC 313.
 
: 3. If IC 313 is not available perform the following. a) Reset to IC 14 b) Transfer 1A-A 6.9 Kv Shutdown Board to the alternate feeder. c) Insert IMF EG08A - D/G 1A-A Fails to Auto Start. d) Insert Override ZDIHS5744A - Trip 6.9 KV SD Bd 1A-A Alt. Fdr. Bkr. 1716. 4. An extra operator will be required to acknowledge alarms.
SIM JPM G Page 3 of 10 SPECIAL INSTRUCTIONS:
: 1. Ensure Simulator Operator Checklist is complete
: 2. Reset to IC 313.
: 3. If IC 313 is not available perform the following.
a) Reset to IC 14 b) Transfer 1A-A 6.9 Kv Shutdown Board to the alternate feeder.
c) Insert IMF EG08A - D/G 1A-A Fails to Auto Start.
d) Insert Override ZDIHS5744A - Trip 6.9 KV SD Bd 1A-A Alt. Fdr. Bkr. 1716.
: 4. An extra operator will be required to acknowledge alarms.
: 5. ACKNOWLEDGE ALARMS
: 5. ACKNOWLEDGE ALARMS
: 6. FREEZE SIMULATOR. 7. Provide a copy of 0-SO-202-4, 6900V Shutdown Boards completed through 8.1.5 step 2. 8. PLACE SIMULATOR IN RUN SPECIAL INSTRUCTIONS TO EVALUATOR:
: 6. FREEZE SIMULATOR.
: 1. Critical steps are identified in step SAT/UNSAT column by bold print 'Critical Step.' 2. Any UNSAT requires comments. Tools/Equipment/Procedures Needed:
: 7. Provide a copy of 0-SO-202-4, 6900V Shutdown Boards completed through 8.1.5 step 2.
: 8. PLACE SIMULATOR IN RUN SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
: 2. Any UNSAT requires comments.
Tools/Equipment/Procedures Needed:
0-SO-202-4, 6900V Shutdown Boards
0-SO-202-4, 6900V Shutdown Boards


==References:==
==References:==


Reference Title Rev No.
Reference                                   Title                         Rev No.
: 1. 0-SO-202-4 6900V Shutdown Boards 35 SIM JPM G Page 4 of 10 DIRECTIONS TO TRAINEE:
: 1. 0-SO-202-4               6900V Shutdown Boards                                     35
 
SIM JPM G Page 4 of 10 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS: 1. Units 1 and 2 are in MODE 1. 2. Relay testing has been completed on normal feeder to 1A-A 6.9 Kv Shutdown Board.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
: 3. 1B-B, 2A-A, and 2B-B 6.9kV Shutdown Boards are aligned to Normal Power supply. INITIATING CUES: 1. You have been directed to transfer 1A-A 6.9kV Shutdown Board to Normal Feeder at 1-M-1 using 0-SO-202-4, 6900V Shutdown Boards, Section 8.1.5, starting at step 3. 2. 0-SO-202-4, 6900V Shutdown Boards, Section 8.1.1 has been completed.
INITIAL CONDITIONS:
: 3. Another operator has been assigned and will provide concurrent verification.
: 1.       Units 1 and 2 are in MODE 1.
: 4. Inform the SRO when complete.  
: 2.       Relay testing has been completed on normal feeder to 1A-A 6.9 Kv Shutdown Board.
: 3.       1B-B, 2A-A, and 2B-B 6.9kV Shutdown Boards are aligned to Normal Power supply.
INITIATING CUES:
: 1.       You have been directed to transfer 1A-A 6.9kV Shutdown Board to Normal Feeder at 1-M-1 using 0-SO-202-4, 6900V Shutdown Boards, Section 8.1.5, starting at step 3.
: 2.       0-SO-202-4, 6900V Shutdown Boards, Section 8.1.1 has been completed.
: 3.       Another operator has been assigned and will provide concurrent verification.
: 4.       Inform the SRO when complete.
 
SIM JPM G Page 5 of 10 Start Time Obtain a copy of 0-SO-202-4 6900V Shutdown Boards, Section 8.1.5 STEP    1  :                                                                        SAT UNSAT Standard:  Examinee obtains a copy of 0-SO-202-4 6900V Shutdown Boards, Section 8.1.5 Cue      Provide a marked up copy of 0-SO-202-4 6900V Shutdown Boards, Section 8.1.5 completed through step 2 Comment Procedure Note:
STEP    2  :                                                                        SAT UNSAT Standard:  Examinee observes 1-XS-57-39 6.9kV Shutdown Board 1A-A voltmeter selector switch in the SDBD 1A position.
Comment


SIM JPM G Page 5 of 10 Start Time STEP 1 : Obtain a copy of 0-SO-202-4 6900V Shutdown Boards, Section 8.1.5 SAT      UNSAT  Standard: Examinee obtains a copy of 0-SO-202-4 6900V Shutdown Boards, Section 8.1.5 Cue Provide a marked up copy of 0-SO-202-4 6900V Shutdown Boards, Section 8.1.5 completed through step 2 Comment    Procedure Note:  STEP 2 :    SAT      UNSAT  Standard: Examinee observes 1-XS-57-39 6.9kV Shutdown Board 1A-A voltmeter selector switch in the SDBD 1A position.
SIM JPM G Page 6 of 10 Examiner Note STEP     3 :                                                                       SAT UNSAT Standard:   Examinee places 1-HS-57-44A control switch for [1718] to CLOSE. Critical Step Comment Cue     Respond to the examinee when asked to provide a concurrent verification, Operator concurs.
Comment SIM JPM G Page 6 of 10 Examiner Note   STEP 3 :   SAT     UNSAT   Standard: Examinee places 1-HS-57-44A control switch for [1718] to CLOSE. Critical Step Comment   Cue Respond to the examinee when asked to provide a concurrent verification, "Operator concurs."
STEP     4 :                                                                       SAT UNSAT Standard:   Examinee places 1-HS-57-41A control switch for [1716] to TRIP. Critical Step Comment Cue     Respond to the examinee when asked to provide a concurrent verification, Operator concurs.
STEP 4 :   SAT     UNSAT   Standard: Examinee places 1-HS-57-41A control switch for [1716] to TRIP. Critical Step Comment   Cue Respond to the examinee when asked to provide a concurrent verification, "Operator concurs."


SIM JPM G Page 7 of 10 NOTE:   STEP 5 :   SAT     UNSAT   Standard: Examinee observes ACB 1718 fails to close resulting in a loss of 6.9 KV SD Bd. 1A-A.
SIM JPM G Page 7 of 10 NOTE:
Comment   Examiner Note ACB 1718 fails to close resulting in a loss of 6.9 KV SD Bd. 1A-A followed by failure of D/G's to auto start and re-energize SD Bd. 1A-A.
STEP   5   :                                                                           SAT UNSAT Standard:   Examinee observes ACB 1718 fails to close resulting in a loss of 6.9 KV SD Bd. 1A-A.
STEP 6 :   SAT     UNSAT   Standard: Examinee observes no bus voltage indicated on 6.9 kv SD Bus 1A-A voltmeter 1-EI-57-39.
Comment Examiner   ACB 1718 fails to close resulting in a loss of 6.9 KV SD Bd. 1A-A Note      followed by failure of D/Gs to auto start and re-energize SD Bd. 1A-A.
Comment     STEP 7 :   SAT     UNSAT   Standard: Examinee releases 1-HS-57-44A control switch for [1718] to MID position Comment SIM JPM G Page 8 of 10 Examiner Note  STEP 8 :  SAT      UNSAT  Standard: Examinee observes diesel generators did not start, recognizes DG RUN green light ON. [M-1]
STEP   6   :                                                                           SAT UNSAT Standard:   Examinee observes no bus voltage indicated on 6.9 kv SD Bus 1A-A voltmeter 1-EI-57-39.
Comment    STEP 9 : Alternate Path SAT      UNSAT  Standard: Examinee places 1-HS-82-15, D/G EMERG START 1A-A, 2A-A, 1B-B, 1B-B to EMERG START position  OR Examinee places 0-HS-82-16A, DG 1A-A Emergency Start, to EMERG START position. Critical Step Comment SIM JPM G Page 9 of 10 STEP 10 :
Comment STEP   7   :                                                                           SAT UNSAT Standard:   Examinee releases 1-HS-57-44A control switch for [1718] to MID position Comment
SAT      UNSAT  Standard: Examinee verifies DG emergency breaker 1912 closed, by observing red light above 1-HS-57-46A ON [M-26] or Breaker 1912 indicating light ON
[M-1]  Comment  Cue Respond to the examinee when asked to provide a concurrent verification, "Operator concurs."
Terminating Cue: Provide the following cue "Another operator will perform the remaining steps of this procedure." STOP    Stop Time 


SIM JPM G Page 10 of 10 JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
SIM JPM G Page 8 of 10 Examiner Note STEP    8  :                                                                            SAT UNSAT Standard:  Examinee observes diesel generators did not start, recognizes DG RUN green light ON. [M-1]
INITIAL CONDITIONS: 1. Units 1 and 2 are in MODE 1. 2. Relay testing has been completed on normal feeder to 1A-A 6.9 Kv Shutdown Board.
Comment Alternate Path STEP    9  :                                                                           SAT UNSAT Examinee places 1-HS-82-15, D/G EMERG START 1A-A, 2A-A, 1B-B, 1B-B to EMERG START position Standard:           OR                                                          Critical Step Examinee places 0-HS-82-16A, DG 1A-A Emergency Start, to EMERG START position.
: 3. 1B-B, 2A-A, and 2B-B 6.9kV Shutdown Boards are aligned to Normal Power supply. INITIATING CUE: 1. You have been directed to transfer 1A-A 6.9kV Shutdown Board to Normal Feeder at 1-M-1 using 0-SO-202-4, 6900V Shutdown Boards, Section 8.1.5, starting at step 3. 2. 0-SO-202-4, 6900V Shutdown Boards, Section 8.1.1 has been completed.
Comment
: 3. Another operator has been assigned and will provide concurrent verification.
: 4. Inform the SRO when complete. Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YO UR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.


SEQUOYAH NUCLEAR PLANT
SIM JPM G Page 9 of 10 STEP    10  :                                                                            SAT UNSAT Examinee verifies DG emergency breaker 1912 closed, by observing red Standard:  light above 1-HS-57-46A ON [M-26] or Breaker 1912 indicating light ON
[M-1]
Comment Cue      Respond to the examinee when asked to provide a concurrent verification, Operator concurs.
Terminating  Provide the following cue Another operator will perform the Cue:                                                                              STOP remaining steps of this procedure.
Stop Time


1305 NRC SIMULATOR JPM
SIM JPM G Page 10 of 10 JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
: 1. Units 1 and 2 are in MODE 1.
: 2. Relay testing has been completed on normal feeder to 1A-A 6.9 Kv Shutdown Board.
: 3. 1B-B, 2A-A, and 2B-B 6.9kV Shutdown Boards are aligned to Normal Power supply.
INITIATING CUE:
: 1. You have been directed to transfer 1A-A 6.9kV Shutdown Board to Normal Feeder at 1-M-1 using 0-SO-202-4, 6900V Shutdown Boards, Section 8.1.5, starting at step 3.
: 2. 0-SO-202-4, 6900V Shutdown Boards, Section 8.1.1 has been completed.
: 3. Another operator has been assigned and will provide concurrent verification.
: 4. Inform the SRO when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.


SIM JPM H Page 2 of 10 RO/SRO JOB PERFORMANCE MEASURE Task: Shut down the Containment Purge System.
SEQUOYAH NUCLEAR PLANT 1305 NRC SIMULATOR JPM H
Task #: 0290030101


Task Standard:
SIM JPM H Page 2 of 10 RO/SRO JOB PERFORMANCE MEASURE Task:              Shut down the Containment Purge System.
The examinee will shut down the Containment Purge System using 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION.
Task #:            0290030101 Task Standard:     The examinee will shut down the Containment Purge System using 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION.
Alternate Path: YES: NO: X Time Critical Task:
Alternate Path:             YES:             NO:         X Time Critical Task:         YES:             NO:         X K/A Reference/Ratings:     029 A1.03 (3.0 / 3.3)
YES: NO: X K/A Reference/Ratings: 029 A1.03 (3.0 / 3.3)
Method of Testing:
Method of Testing:
Simulated Performance:   Actual Performance: X Evaluation Method:
Simulated Performance:                     Actual Performance:         X Evaluation Method:
Simulator X In-Plant Classroom             Main Control Room   Mock-up Performer:
Simulator         X     In-Plant               Classroom Main Control Room                               Mock-up Performer:
Trainee Name Evaluator:  
Trainee Name Evaluator:                                       /
/    Name / Signature DATE Performance Rating: SAT: UNSAT:
Name / Signature                                   DATE Performance Rating:     SAT:                 UNSAT:
Validation Time: 5 min Total Time:       Performance Time:
Validation Time:           5 min                           Total Time:
Start Time:   Finish Time:
Performance Time:           Start Time:                     Finish Time:
COMMENTS SIM JPM H Page 3 of 10 SPECIAL INSTRUCTIONS:
COMMENTS
: 1. Ensure Simulator Operator Checklist is complete 2. Reset to IC 329 If IC 329 is not available perform the following Reset to IC 182. Ensure Lower Containment Purge "A" Train is in service using 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION. 3. Place MODE 5 sign on panel M-4 4. PLACE SIMULATOR IN RUN 5. An extra operator will be required to acknowledge alarms.
 
SIM JPM H Page 3 of 10 SPECIAL INSTRUCTIONS:
: 1. Ensure Simulator Operator Checklist is complete
: 2. Reset to IC 329 If IC 329 is not available perform the following Reset to IC 182.
Ensure Lower Containment Purge A Train is in service using 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION.
: 3. Place MODE 5 sign on panel M-4
: 4. PLACE SIMULATOR IN RUN
: 5. An extra operator will be required to acknowledge alarms.
: 6. ACKNOWLEDGE ALARMS
: 6. ACKNOWLEDGE ALARMS
: 7. FREEZE SIMULATOR.
: 7. FREEZE SIMULATOR.
: 8. Save as a temporary IC, if repeat runs of JPM will be desired. 9. PLACE SIMULATOR IN RUN 10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
: 8. Save as a temporary IC, if repeat runs of JPM will be desired.
: 9. PLACE SIMULATOR IN RUN
: 10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
Tools/Equipment/Procedures Needed:
Tools/Equipment/Procedures Needed:
0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION.
0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION.
Line 504: Line 704:
==References:==
==References:==


Reference Title Rev No. 1. 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION. 46 2.
Reference                                     Title                                 Rev No.
: 1. 0-SO-30-3                 CONTAINMENT PURGE SYSTEM OPERATION.                                 46 2.
 
SIM JPM H Page 4 of 10 DIRECTIONS TO TRAINEE:
SIM JPM H Page 4 of 10 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
INITIAL CONDITIONS: 1. Unit 1 is in MODE 5. 2. Lower Containment Purge "A" Train is in service. INITIATING CUES: 1. You have been directed to shutdown the Lower Containment Purge System using 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION section 7.3. 2. Inform the SRO when complete.  
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
: 1.       Unit 1 is in MODE 5.
: 2.       Lower Containment Purge A Train is in service.
INITIATING CUES:
: 1.       You have been directed to shutdown the Lower Containment Purge System using 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION section 7.3.
: 2.       Inform the SRO when complete.
 
SIM JPM H Page 5 of 10 Start Time STEP    1  :                                                                    SAT Obtain a copy of 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION.                                                          UNSAT Standard:  Examinee obtains a copy of 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION section 7.1.
Cue:      Provide a marked up copy of 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION section 7.1..
Comment STEP    2  :                                                                    SAT UNSAT Standard:  Examinee addresses the step as N/A.
Comment
 
SIM JPM H Page 6 of 10 STEP    3  :                                                                  SAT UNSAT Standard:  Examinee places HS-30-2 Purge Air Supply Fan 1A Discharge Critical Step damper to CLOSE.
Comment STEP    4  :                                                                  SAT UNSAT Standard:  Examinee places HS-30-14, Lower Containment Purge Isolation Critical Step dampers FCV-30-14 and 56 to CLOSE.
Comment STEP    5  :                                                                  SAT UNSAT Standard:  Examinee places HS-30-15, Lower Containment Purge Isolation Critical Step dampers FCV-30-15 and 57 to CLOSE.
Comment
 
SIM JPM H Page 7 of 10 STEP    6  :                                                                SAT UNSAT Standard:  Examinee addresses the procedure step.
Comment STEP    7  :                                                                SAT UNSAT Standard:  Examinee addresses the procedure step.
Comment STEP    8  :                                                                SAT UNSAT Standard:  Examinee places HS-30-61 Purge Air Exhaust Fan 1A Suction Critical Step Damper to CLOSE.
Comment
 
SIM JPM H Page 8 of 10 STEP    9  :                                                                      SAT UNSAT Standard:  Examinee places HS-30-1A Air Purge Supply and Exhaust fan 1A to CRITICAL STOP.
Comment STEP    10  :                                                                      SAT UNSAT Standard:  Examinee places HS-30-1A Air Purge Supply and Exhaust fan 1A in CRITICAL the PULL TO LOCK position.
Comment STEP    11  :                                                                      SAT UNSAT Standard:  Examinee verifies all dampers CLOSED by observing green lights ON for XI-30-1A, XI-30-1B, XI-30-294, and XI-30-295.
Comment


SIM JPM H Page 5 of 10 Start Time STEP 1 : Obtain a copy of 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION.
SIM JPM H Page 9 of 10 STEP   12 :                                                                       SAT UNSAT Standard:  Examinee places HS-30-213 Purge Air Exhaust Fan 1A Discharge CRITICAL Isolation to CLOSE.
SAT      UNSAT  Standard: Examinee obtains a copy of 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION section 7.1.
Comment Terminating   Provide the following cue, Another operator will complete the Cue:                                                                          STOP remaining steps of this procedure.
Cue: Provide a marked up copy of 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION section 7.1..
Stop Time
Comment      STEP 2 :    SAT      UNSAT Standard: Examinee addresses the step as N/A.
Comment SIM JPM H Page 6 of 10 STEP 3 :   SAT     UNSAT   Standard: Examinee places HS-30-2 Purge Air Supply Fan 1A Discharge damper to CLOSE. Critical Step Comment    STEP 4 :    SAT      UNSAT  Standard: Examinee places HS-30-14, Lower Containment Purge Isolation dampers FCV-30-14 and 56 to CLOSE. Critical Step Comment    STEP 5 :    SAT      UNSAT   Standard: Examinee places HS-30-15, Lower Containment Purge Isolation dampers FCV-30-15 and 57 to CLOSE. Critical Step Comment SIM JPM H Page 7 of 10 STEP 6 :    SAT      UNSAT  Standard: Examinee addresses the procedure step.
Comment    STEP 7 :    SAT      UNSAT  Standard: Examinee addresses the procedure step. Comment    STEP 8 :    SAT      UNSAT  Standard: Examinee places HS-30-61 Purge Air Exhaust Fan 1A Suction Damper to CLOSE. Critical Step Comment SIM JPM H Page 8 of 10 STEP 9 :    SAT      UNSAT  Standard: Examinee places HS-30-1A Air Purge Supply and Exhaust fan 1A to STOP. CRITICAL Comment    STEP 10 :
SAT      UNSAT  Standard: Examinee places HS-30-1A Air Purge Supply and Exhaust fan 1A in the PULL TO LOCK position. CRITICAL Comment    STEP 11 :
SAT      UNSAT  Standard: Examinee verifies all dampers CLOSED by observing green lights ON for XI-30-1A, XI-30-1B, XI-30-294, and XI-30-295.
Comment SIM JPM H Page 9 of 10 STEP 12 :
SAT      UNSAT  Standard: Examinee places HS-30-213 Purge Air Exhaust Fan 1A Discharge Isolation to CLOSE.
CRITICAL Comment     Terminating Cue: Provide the following cue, "Another operator will complete the remaining steps of this procedure." STOP  Stop Time


JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
INITIAL CONDITIONS: 1. Unit 1 is in MODE 5. 2. Lower Containment Purge "A" Train is in service. INITIATING CUES: 1. You have been directed to shutdown the Lower Containment Purge System using 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION section 7.3. 2. Inform the SRO when complete. Acknowledge to the examiner when you are ready to begin.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
HAND THIS PAPER BACK TO YO UR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
INITIAL CONDITIONS:
: 1. Unit 1 is in MODE 5.
: 2. Lower Containment Purge A Train is in service.
INITIATING CUES:
: 1. You have been directed to shutdown the Lower Containment Purge System using 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION section 7.3.
: 2. Inform the SRO when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.


SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1305 NRC PLANT JPM I


1305 NRC PLANT JPM I PLANT JPM I Page 2 of 10 RO/SRO JOB PERFORMANCE MEASURE Task: Local Operation of 1A-A D/G (Idle Start & Stop)
PLANT JPM I Page 2 of 10 RO/SRO JOB PERFORMANCE MEASURE Task:             Local Operation of 1A-A D/G (Idle Start & Stop)
Task #: 0640020104 Task Standard:
Task #:             0640020104 Task Standard:   D/G 1A-A is successfully started using local controls and cooling is established by local operation of the ERCW FCV using 0-SO-82-1 Diesel Generator 1A-A.
D/G 1A-A is successfully started using local controls and cooling is established by local operation of the ERCW FCV using 0-SO-82-1 Diesel Generator 1A-A.
Alternate Path:           YES:     X     NO:
Alternate Path: YES: X NO:
Time Critical Task:       YES:             NO:         X K/A Reference/Ratings:     064A4.01 (4.0/4.3)
Time Critical Task:
YES: NO: X K/A Reference/Ratings:
064A4.01 (4.0/4.3)
Method of Testing:
Method of Testing:
Simulated Performance: X Actual Performance:
Simulated Performance:         X         Actual Performance:
Evaluation Method:
Evaluation Method:
Simulator In-Plant X Classroom             Main Control Room   Mock-up Performer:
Simulator               In-Plant       X     Classroom Main Control Room                             Mock-up Performer:
Trainee Name Evaluator:  
Trainee Name Evaluator:                                     /
/    Name / Signature DATE Performance Rating: SAT: UNSAT:
Name / Signature                                 DATE Performance Rating:   SAT:                 UNSAT:
Validation Time: 12 min Total Time:       Performance Time:
Validation Time:           12 min                       Total Time:
Start Time:   Finish Time:
Performance Time:         Start Time:                   Finish Time:
COMMENTS PLANT JPM I Page 3 of 10 SPECIAL INSTRUCTIONS TO EVALUATOR:
COMMENTS
: 1. SM approval will be required to enter the "Trip Hazard Zone" in backup control room. 2. Critical steps are identified in step SAT/UNSAT column by bold print 'Critical Step.' 3. Any UNSAT requires comments.
 
PLANT JPM I Page 3 of 10 SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. SM approval will be required to enter the Trip Hazard Zone in backup control room.
: 2. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
: 3. Any UNSAT requires comments.
Tools/Equipment/Procedures Needed:
Tools/Equipment/Procedures Needed:
0-SO-82-1 section 8.2 and Appendices B and C.  
0-SO-82-1 section 8.2 and Appendices B and C.


==References:==
==References:==


Reference Title Rev No.
Reference                                     Title                   Rev No.
0-SO-82-1 Diesel Generator 1A-A 37 PLANT JPM I Page 4 of 10 READ TO OPERATOR HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
0-SO-82-1                             Diesel Generator 1A-A                         37
 
PLANT JPM I Page 4 of 10 READ TO OPERATOR HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
DIRECTIONS TO EXAMINEE:
DIRECTIONS TO EXAMINEE:
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM.
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.
WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
When you complete the task successfully, the objective for this job performance measure will be  
INITIAL CONDITIONS:
: 1. Unit 1 is in MODE 1.
: 2. 1A-A D/G has now been declared INOPERABLE for scheduled maintenance.
: 3. 0-SO-82-1 Diesel Generator 1A-A section 8.2 is in progress and has been completed through step 4.
: 4. Both of the Unit SROs have given approval to perform this procedure.
: 5. All prerequisites of 0-SO-82-1 Diesel Generator 1A-A are complete.
INITIATING CUES:
: 1. You have been directed to perform 0-SO-82-1 Diesel Generator 1A-A section 8.2 starting at step 5.
: 2. Inform the SRO when complete.
 
PLANT JPM I Page 5 of 10 Start Time Obtain a copy of 0-SO-82-1 Diesel Generator 1A-A section 8.2 and STEP    1  :                                                                              SAT Appendices B and C.
UNSAT Standard:  Examinee obtains a copy of 0-SO-82-1 Diesel Generator 1A-A section 8.2 and Appendices B and C.
Cue      Provide a marked up copy of 0-SO-82-1 Diesel Generator 1A-A section 8.2 and Appendices B and C.
Comment STEP    2  :                                                                              SAT UNSAT Standard:  Examinee simulates depressing 0-HS-82-22                                Critical Step Cue:      Provide the following cue, 0-HS-82-22 went in and returned to out.
Comment
 
PLANT JPM I Page 6 of 10 STEP    3  :                                                                    SAT UNSAT Standard:  Examinee verifies LRX1A TRIPPED to local.
Provide the following cue, LRX1A relay switch is 45 degrees Cue:      clockwise from 12 oclock position AND red flag above handswitch is present.
Comment STEP    4  :                                                                    SAT UNSAT Standard:  Examinee addresses the procedure step.
Examiner Note:    The step was addressed in the initial conditions.
Comment


satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you
PLANT JPM I Page 7 of 10 STEP    5  :                                                                            SAT UNSAT Standard:  Examinee simulates placing HS-82-23 in the MAINTENANCE Critical Step (clockwise) position.
Cue:      Provide the following cue, Red light above HS-82-23 is ON green light is OFF.
Comment STEP    6  :                                                                            SAT UNSAT Standard:  Examinee addresses the procedure step.
Cue:      Provide the following cue, The UO will place out-of-service time in SI.
Comment STEP    7  :                                                                            SAT UNSAT Standard:  Examinee simulates depressing HS-82-23.                              Critical Step Cue:      Provide the following cue, You hear a rumbling rotational sound from the diesel engines.
Comment


have completed your assigned task return the handout sheet I provided you.
PLANT JPM I Page 8 of 10 STEP    8   :                                                               SAT UNSAT Standard:  Examinee addresses the procedure step.
INITIAL CONDITIONS: 1. Unit 1 is in MODE 1. 2. 1A-A D/G has now been declared INOPERABLE for scheduled maintenance.
Cue:      Provide the following cue, The UO will log the time.
: 3. 0-SO-82-1 Diesel Generator 1A-A section 8.2 is in progress and has been completed through step
Comment STEP   9   :                                                               SAT UNSAT Standard:   Examinee addresses the procedure step.
: 4. 4. Both of the Unit SROs have given approval to perform this procedure.
Cue:     Provide the following cue, Engine speed is ~ 400 rpm.
: 5. All prerequisites of 0-SO-82-1 Diesel Generator 1A-A are complete.
Comment
INITIATING CUES: 1. You have been directed to perform 0-SO-82-1 Diesel Generator 1A-A section 8.2 starting at step 5. 2. Inform the SRO when complete.
PLANT JPM I Page 5 of 10 Start Time STEP 1 : Obtain a copy of 0-SO-82-1 Diesel Generator 1A-A section 8.2 and Appendices B and C.
SAT      UNSAT  Standard: Examinee obtains a copy of 0-SO 1 Diesel Generator 1A-A section 8.2 and Appendices B and C.
Cue Provide a marked up copy of 0-SO-82-1 Diesel Generator 1A-A section 8.2 and Appendices B and C.
Comment    STEP 2 :    SAT      UNSAT  Standard:
Examinee simulates depressing 0-HS-82-22 Critical Step Cue: Provide the following cue, "0-HS-82-22 went in and returned to out."
Comment PLANT JPM I Page 6 of 10 STEP 3 :   SAT      UNSAT   Standard: Examinee verifies LRX1A TRIPPED to local.
Cue: Provide the following cue, "LRX1A relay switch is 45 degrees clockwise from 12 o'clock position AND red flag above handswitch is present."
Comment    STEP 4 :    SAT     UNSAT   Standard:
Examinee addresses the procedure step.
Examiner Note: The step was addressed in the initial conditions.
Comment PLANT JPM I Page 7 of 10 STEP 5 :    SAT      UNSAT  Standard:
Examinee simulates placing HS-82-23 in the MAINTENANCE (clockwise) position.
Critical Step Cue: Provide the following cue , "Red light above HS-82-23 is ON green light is OFF."
Comment    STEP 6 :    SAT      UNSAT   Standard:
Examinee addresses the procedure step.
Cue: Provide the following cue, "The UO will place out-of-service time in SI."  Comment    STEP 7 :    SAT      UNSAT  Standard:
Examinee simulates depressing HS-82-23.
Critical Step Cue: Provide the following cue , "You hear a rumbling rotational sound from the diesel engines."
Comment PLANT JPM I Page 8 of 10 STEP 8 :    SAT     UNSAT  Standard:
Examinee addresses the procedure step.
Cue: Provide the following cue, "The UO will log the time."
Comment    STEP 9 :   SAT     UNSAT   Standard:
Examinee addresses the procedure step.
Cue: Provide the following cue , "Engine speed is ~ 400 rpm."
Comment PLANT JPM I Page 9 of 10 STEP 10 :
SAT      UNSAT  Standard:
Examinee recognizes FCV-67-66 closed by use of position indicator on the valve motor OR recognizes no flow indicated on FI-67-69, &


277. Cue: Provide the following cue , "Both lights above HS-67-66 are OFF."
PLANT JPM I Page 9 of 10 STEP    10  :                                                                              SAT UNSAT Examinee recognizes FCV-67-66 closed by use of position indicator Standard:  on the valve motor OR recognizes no flow indicated on FI-67-69, &
Cue: Provide the following cue , "When Examinee looks at position indicator (or flow indicator), state valve indicates closed (or flow is 0 gpm)."
277.
Comment    STEP 11 :
Cue:     Provide the following cue, Both lights above HS-67-66 are OFF.
SAT     UNSAT   Standard:
Provide the following cue, When Examinee looks at position Cue:      indicator (or flow indicator), state valve indicates closed (or flow is 0 gpm).
Examinee simulates opening FCV-67-68 Emerg Dsl Htxs A1 & A2 Sup Vlv From Hdr B by placing HS-67-68 clockwise or manually operates FCV-67-68 CCW.
Comment STEP   11 :                                                                               SAT UNSAT Examinee simulates opening FCV-67-68 Emerg Dsl Htxs A1 & A2 Sup Standard:  Vlv From Hdr B by placing HS-67-68 clockwise or manually operates       Critical Step FCV-67-68 CCW.
Critical Step Cue: Before FCV-67-68 operation provide the following cue, "Green light above HS-67-68 is ON, red light is OFF."
Cue:     Before FCV-67-68 operation provide the following cue, Green light above HS-67-68 is ON, red light is OFF.
Cue: After FCV-67-68 operation provide the following cue, "Green light above HS-67-68 is OFF, red light is ON."
Cue:     After FCV-67-68 operation provide the following cue, Green light above HS-67-68 is OFF, red light is ON.
Comment   Terminating Cue: Provide the following cue; "Another operator will complete the remaining steps of this procedure."
Comment Terminating   Provide the following cue; Another operator will complete the Cue:                                                                                  STOP remaining steps of this procedure.
STOP  Stop Time
Stop Time


JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:
JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:
All steps shall be simulated for this JPM.
All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job  
INITIAL CONDITIONS:
 
: 1. Unit 1 is in MODE 1.
performance measure will be satisfied. Ensure y ou indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
: 2. 1A-A D/G has now been declared INOPERABLE for scheduled maintenance.
INITIAL CONDITIONS: 1. Unit 1 is in MODE 1. 2. 1A-A D/G has now been declared INOPERABLE for scheduled maintenance.
: 3. 0-SO-82-1 Diesel Generator 1A-A section 8.2 is in progress and has been completed through step 4.
: 3. 0-SO-82-1 Diesel Generator 1A-A section 8.2 is in progress and has been completed through step
: 4. Both of the Unit SROs have given approval to perform this procedure.
: 4. 4. Both of the Unit SROs have given approval to perform this procedure.
: 5. All prerequisites of 0-SO-82-1 Diesel Generator 1A-A are complete.
: 5. All prerequisites of 0-SO-82-1 Diesel Generator 1A-A are complete.
INITIATING CUES: 1. You have been directed to perform 0-SO-82-1 Diesel Generator 1A-A section 8.2 starting at step 5. 2. Inform the SRO when complete.
INITIATING CUES:
: 1. You have been directed to perform 0-SO-82-1 Diesel Generator 1A-A section 8.2 starting at step 5.
: 2. Inform the SRO when complete.
Acknowledge to the examiner when you are ready to begin.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.


SEQUOYAH NUCLEAR PLANT  
SEQUOYAH NUCLEAR PLANT 1305 NRC PLANT JPM J
 
1305 NRC PLANT JPM J


PLANT JPM J Page 2 of 9 RO/SRO JOB PERFORMANCE MEASURE Task: Locally align U2 TDAFW LCV Back-up Air Supply Task #: 0000140504 Task Standard:
PLANT JPM J Page 2 of 9 RO/SRO JOB PERFORMANCE MEASURE Task:             Locally align U2 TDAFW LCV Back-up Air Supply Task #:             0000140504 Task Standard:
The examinee will align back-up air to the Unit 2 TDAFW LCV using EA-3-4 Local Alignment TD AFW LCV Back-Up Air Supply.
The examinee will align back-up air to the Unit 2 TDAFW LCV using EA-3-4 Local Alignment TD AFW LCV Back-Up Air Supply.
Alternate Path: YES: NO: X Time Critical Task:
Alternate Path:           YES:             NO:         X Time Critical Task:       YES:             NO:         X K/A Reference/Ratings:
YES: NO: X K/A Reference/Ratings:
Method of Testing:
Method of Testing:
Simulated Performance: X Actual Performance:
Simulated Performance:         X         Actual Performance:
Evaluation Method:
Evaluation Method:
Simulator In-Plant X Classroom             Main Control Room   Mock-up Performer:
Simulator               In-Plant       X     Classroom Main Control Room                             Mock-up Performer:
Trainee Name Evaluator:  
Trainee Name Evaluator:                                     /
/    Name / Signature DATE Performance Rating: SAT: UNSAT:
Name / Signature                                   DATE Performance Rating:     SAT:               UNSAT:
Validation Time: 8 min Total Time:       Performance Time:
Validation Time:           8 min                         Total Time:
Start Time:   Finish Time:
Performance Time:         Start Time:                   Finish Time:
COMMENTS PLANT JPM J Page 3 of 9 SPECIAL INSTRUCTIONS TO EVALUATOR:
COMMENTS
: 1. SM approval will be required to enter the "Trip Hazard Zone" in backup control room. 2. Critical steps are identified in step SAT/UNSAT column by bold print 'Critical Step.' 3. Any UNSAT requires comments.
 
PLANT JPM J Page 3 of 9 SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. SM approval will be required to enter the Trip Hazard Zone in backup control room.
: 2. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
: 3. Any UNSAT requires comments.
Tools/Equipment/Procedures Needed:
Tools/Equipment/Procedures Needed:
: 1. EA-3-4 Local Alignment of TD AFW LCV Back-Up Air Supply  
: 1. EA-3-4 Local Alignment of TD AFW LCV Back-Up Air Supply


==References:==
==References:==


Reference Title Rev No. 1 EA-3-4 Local Alignment of TD AFW LCV Back-Up Air Supply ====================================================================================
Reference                                       Title                       Rev No.
1       EA-3-4                               Local Alignment of TD AFW LCV Back-Up Air             4 Supply
====================================================================================
READ TO EXAMINEE HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
READ TO EXAMINEE HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
DIRECTIONS TO EXAMINEE:
DIRECTIONS TO EXAMINEE:
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM.
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.
WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
When you complete the task successfully, the objective for this job performance measure will be  
INITIAL CONDITIONS:
: 1. Unit 1 and Unit 2 have experienced a Loss of ERCW.
: 2. AOP-M.01 LOSS OF ESSENTIAL RAW COOLING WATER is in progress.
INITIATING CUES:
: 1. You have been directed to locally align the back-up air supply to the Unit 2 TDAFW LCVs using EA-3-4 Local Alignment of TD AFW LCV Back-Up Air Supply.
: 2. Inform the SRO when complete.
 
PLANT JPM J Page 4 of 9 Start Time STEP    1  :                                                                            SAT Obtain a copy of EA-3-4 Local Alignment of TD AFW LCV Back-Up Air Supply.                                                                    UNSAT Standard:  Examinee obtains a copy of EA-3-4 Local Alignment of TD AFW LCV Back-Up Air Supply.
Cue      Provide a copy of EA-3-4 Local Alignment of TD AFW LCV Back-Up Air Supply.
Comment STEP    2  :                                                                            SAT UNSAT Standard:  Examinee selects section 4.2 as the applicable section.
Comment
 
PLANT JPM J Page 5 of 9 STEP    3  :                                                                      SAT UNSAT Standard:  The examinee selects Unit 2 as the applicable Unit.
Comment STEP    4  :                                                                      SAT UNSAT Standard:  The examinee simulates obtaining hand held lighting and a radio.
Comment


satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you
PLANT JPM J Page 6 of 9 STEP    5  :                                                                                SAT UNSAT Standard:  The examinee addresses the step as N/A.
Comment STEP    6  :                                                                                SAT UNSAT Standard:  The examinee simulates turning the handwheel for U-2 ISV-32-1950E, Critical Step Isolation valve for Unit 2 LCV-3-172 in the counter clockwise direction.
After the examinee simulates opening ISV-32-1950E, provide the Cue:      following cue, Handwheel turns several turns in the CCW direction and movement stops.
Comment


have completed your assigned task return the handout sheet I provided you.
PLANT JPM J Page 7 of 9 STEP    7  :                                                                                SAT UNSAT Standard:  The examinee simulates turning the handwheel for U-2 ISV-32-1969E, Critical Step Isolation valve for Unit 2 LCV-3-173 in the counter clockwise direction.
INITIAL CONDITIONS: 1. Unit 1 and Unit 2 have experienced a Loss of ERCW. 2. AOP-M.01 LOSS OF ESSENTIAL RAW COOLING WATER is in progress.
After the examinee simulates opening ISV-32-1969E, provide the Cue:      following cue, Handwheel turns several turns in the CCW direction and movement stops.
INITIATING CUES: 1. You have been directed to locally align the back-up air supply to the Unit 2 TDAFW LCVs using EA-3-4 Local Alignment of TD AFW LCV Back-Up Air Supply. 2. Inform the SRO when complete.
Comment STEP   8  :                                                                                 SAT UNSAT Standard:   The examinee simulates turning the handwheel for U-2 ISV-32-1866E, Critical Step Isolation valve for Unit 2 LCV-3-175 in the counter clockwise direction.
PLANT JPM J Page 4 of 9 Start Time STEP 1 : Obtain a copy of EA-3-4 Local Alignment of TD AFW LCV Back-Up Air Supply. SAT     UNSAT   Standard: Examinee obtains a copy of EA-3-4 Local Alignment of TD AFW LCV Back-Up Air Supply.
After the examinee simulates opening ISV-32-1866E, provide the Cue:      following cue, Handwheel turns several turns in the CCW direction and movement stops.
Cue Provide a copy of EA-3-4 Local Alignment of TD AFW LCV Back-Up Air Supply. Comment    STEP 2 :   SAT     UNSAT  Standard:
Comment
Examinee selects section 4.2 as the applicable section.
Comment    


PLANT JPM J Page 5 of 9 STEP 3 :   SAT      UNSAT  Standard:
PLANT JPM J Page 8 of 9 STEP    9   :                                                                                 SAT UNSAT Standard:  The examinee simulates turning the handwheel for U-2 ISV-32-1974E, Critical Step Isolation valve for Unit 2 LCV-3-174 in the counter clockwise direction.
The examinee selects Unit 2 as the applicable Unit.
After the examinee simulates opening ISV-32-1974E, provide the Cue:      following cue, Handwheel turns several turns in the CCW direction and movement stops.
Comment    STEP 4 :    SAT      UNSAT   Standard:
Comment Terminating   Provide the following cue, another Operator will complete the Cue:                                                                                  STOP remaining steps of this procedure.
The examinee simulates obtaining hand held lighting and a radio.
Stop Time
Comment PLANT JPM J Page 6 of 9 STEP 5 :   SAT     UNSAT   Standard:
The examinee addresses the step as N/A.
Comment    STEP 6 :    SAT      UNSAT   Standard:
The examinee simulates turning the handwheel for U-2 ISV-32-1950E, Isolation valve for Unit 2 LCV-3-172 in the counter clockwise direction.
Critical Step Cue: After the examinee simulates opening ISV-32-1950E, provide the following cue, "Handwheel turns several turns in the CCW direction and movement stops".
Comment PLANT JPM J Page 7 of 9 STEP 7 :    SAT      UNSAT  Standard:
The examinee simulates turning the handwheel for U-2 ISV-32-1969E, Isolation valve for Unit 2 LCV-3-173 in the counter clockwise direction.
Critical Step Cue: After the examinee simulates opening ISV-32-1969E, provide the following cue, "Handwheel turns several turns in the CCW direction and movement stops".
Comment    STEP 8 :    SAT      UNSAT  Standard:
The examinee simulates turning the handwheel for U-2 ISV-32-1866E, Isolation valve for Unit 2 LCV-3-175 in the counter clockwise direction.
Critical Step Cue: After the examinee simulates opening ISV-32-1866E, provide the following cue, "Handwheel turns several turns in the CCW direction and movement stops".
Comment PLANT JPM J Page 8 of 9 STEP 9 :    SAT     UNSAT  Standard:
The examinee simulates turning the handwheel for U-2 ISV-32-1974E, Isolation valve for Unit 2 LCV-3-174 in the counter clockwise direction.
Critical Step Cue: After the examinee simulates opening ISV-32-1974E, provide the following cue, "Handwheel turns several turns in the CCW direction and movement stops".
Comment     Terminating Cue: Provide the following cue, another Operator will complete the remaining steps of this procedure.
STOP  Stop Time


JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:
JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:
All steps shall be simulated for this JPM.
All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job  
INITIAL CONDITIONS:
 
: 1. Unit 1 and Unit 2 have experienced a Loss of ERCW.
performance measure will be satisfied. Ensure y ou indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
: 2. AOP-M.01 LOSS OF ESSENTIAL RAW COOLING WATER is in progress.
INITIAL CONDITIONS: 1. Unit 1 and Unit 2 have experienced a Loss of ERCW. 2. AOP-M.01 LOSS OF ESSENTIAL RAW COOLING WATER is in progress.
INITIATING CUES:
INITIATING CUES: 1. You have been directed to locally align the back-up air supply to the Unit 2 TDAFW LCVs using EA-3-4 Local Alignment of TD AFW LCV Back-Up Air Supply. 2. Inform the SRO when complete.
: 1. You have been directed to locally align the back-up air supply to the Unit 2 TDAFW LCVs using EA-3-4 Local Alignment of TD AFW LCV Back-Up Air Supply.
: 2. Inform the SRO when complete.
Acknowledge to the examiner when you are ready to begin.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.


SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1305 NRC PLANT JPM K
 
1305 NRC PLANT JPM K


PLANT JPM K Page 2 of 12 RO/SRO JOB PERFORMANCE MEASURE Task: Respond to Loss of Control Air System Task #: 0000900501 Task Standard:
PLANT JPM K Page 2 of 12 RO/SRO JOB PERFORMANCE MEASURE Task:             Respond to Loss of Control Air System Task #:             0000900501 Task Standard:   The examinee will reset and start Control & Service Air Compressor(s). using EA-32-2, Establishing Control and Service Air.
The examinee will reset and start Control &
Alternate Path:           YES:             NO:         X Time Critical Task:       YES:             NO:         X K/A Reference/Ratings:         APE 065 AA1.04 (3.5/3.4)
Service Air Compressor(s). using EA-32-2, Establishing Control and Service Air.
Alternate Path: YES: NO: X Time Critical Task:
YES: NO: X K/A Reference/Ratings: APE 065 AA1.04 (3.5/3.4)
Method of Testing:
Method of Testing:
Simulated Performance: X Actual Performance:
Simulated Performance:         X         Actual Performance:
Evaluation Method:
Evaluation Method:
Simulator In-Plant X Classroom             Main Control Room   Mock-up Performer:
Simulator               In-Plant       X     Classroom Main Control Room                             Mock-up Performer:
Trainee Name Evaluator:  
Trainee Name Evaluator:                                     /
/    Name / Signature DATE Performance Rating: SAT: UNSAT:
Name / Signature                                     DATE Performance Rating:     SAT:               UNSAT:
Validation Time: 10 min Total Time:       Performance Time:
Validation Time:           10 min                       Total Time:
Start Time:   Finish Time:
Performance Time:         Start Time:                   Finish Time:
COMMENTS PLANT JPM K Page 3 of 12 SPECIAL INSTRUCTIONS TO EVALUATOR:
COMMENTS
: 1. SM approval will be required to enter the "Trip Hazard Zone" in backup control room. 2. Critical steps are identified in step SAT/UNSAT column by bold print 'Critical Step.' 3. Any UNSAT requires comments.
 
PLANT JPM K Page 3 of 12 SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. SM approval will be required to enter the Trip Hazard Zone in backup control room.
: 2. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
: 3. Any UNSAT requires comments.
Tools/Equipment/Procedures Needed:
Tools/Equipment/Procedures Needed:
: 1. EA-32-2, Establishing Control and Service Air  
: 1. EA-32-2, Establishing Control and Service Air


==References:==
==References:==


Reference Title Rev No.
Reference                                       Title                   Rev No.
EA-32-2 Establishing Control and Service Air 3
EA-32-2                               Establishing Control and Service Air             3
 
PLANT JPM K Page 4 of 12 READ TO OPERATOR HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
PLANT JPM K Page 4 of 12 READ TO OPERATOR HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
DIRECTIONS TO EXAMINEE:
DIRECTIONS TO EXAMINEE:
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM.
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.
WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
When you complete the task successfully, the objective for this job performance measure will be  
INITIAL CONDITIONS:
: 1. Units 1 and 2 are in MODE 3 following a Loss of Offsite Power.
: 2. The Aux. Air Compressors are not in service.
: 3. EA-32-2, Establishing Control and Service Air is in progress, completed through section 4.2 step 3.
INITIATING CUES:
: 1. You have been directed to start and manually load the Station Air Compressors using EA-32-2, Establishing Control and Service Air section 4.2 starting at step 4.
: 2. Inform the SRO when complete.
 
PLANT JPM K Page 5 of 12 Start Time Obtain a copy of EA-32-2, Establishing Control and Service Air.
STEP    1  :                                                                                  SAT UNSAT Standard:  Examinee obtains a copy of EA-32-2, Establishing Control and Service Air.
Cue      Provide a marked up copy of EA-32-2, Establishing Control and Service Air, completed through section 4.2 step 3.
Comment STEP    2  :                                                                                  SAT UNSAT Standard:  Examinee simulates depressing 0-HS-32-25B to reset air comp trip Critical Step signals.
Cue      Following simulated operation provide the following cue, 0-HS-32 25B went in and returned to out..
Comment
 
PLANT JPM K Page 6 of 12 STEP    3  :                                                                          SAT UNSAT Standard:  Examinee observes Compressor A Trip lights DARK.
Cue      When asked provide the following cue, All Compressor A trip lights are DARK.
Comment STEP    4  :                                                                          SAT UNSAT Standard:  Examinee observes Compressor A Trip lights DARK.
Cue      When asked provide the following cue, All Compressor B trip lights are DARK.
Comment
 
PLANT JPM K Page 7 of 12 STEP    5  :                                                                        SAT UNSAT Standard:  Examinee simulates placing 0-HS-32-25D to HAND.                  Critical Step Cue      When asked provide the following cue, 0-HS-32-25D is positioned counter-clockwise to HAND.
Comment STEP    6  :                                                                        SAT UNSAT Standard:  Examinee simulates placing 0-HS-32-26A to HAND.                  Critical Step Cue      When asked provide the following cue, 0-HS-32-26A is positioned counter-clockwise to HAND.
Comment
 
PLANT JPM K Page 8 of 12 STEP    7  :                                                                            SAT UNSAT Standard:  Examinee simulates placing HS-32-25A in Position 1.
Cue      When asked provide the following cue, HS-32-25A is positioned counter-clockwise to Position 1.
Comment STEP    8  :                                                                            SAT UNSAT Standard:  Examinee simulates placing 0-HS-32-25F for comp A in PULL TO Critical Step START position.
Cue      When asked provide the following cue, HS-32-25F is in maintained in the pull out position.
Comment
 
PLANT JPM K Page 9 of 12 STEP    9  :                                                                      SAT UNSAT Standard:  Examinee simulates depressing 0-HS-32-25E.                      Critical Step Cue      When asked provide the following cue, You hear a mechanical rotational noise from Compressor A.
Comment STEP    10  :                                                                      SAT UNSAT Standard:  Examinee simulates placing 0-HS-32-43A and 0-HS-32-43B in ON Critical Step (clockwise) position to fully load comp A.
Cue      When asked provide the following cue, You hear the rotational sound lowering then recovering from Compressor A.
Comment


satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you
PLANT JPM K Page 10 of 12 STEP    11  :                                                                          SAT UNSAT Standard:  Examinee simulates placing 0-HS-32-26D for comp A in PULL TO Critical Step START position.
Cue      When asked provide the following cue, HS-32-26D is maintained in the pull out position.
Comment STEP    12  :                                                                          SAT UNSAT Standard:  Examinee simulates depressing 0-HS-32-26B.                        Critical Step Cue      When asked provide the following cue, You hear a mechanical rotational noise from Compressor B.
Comment


have completed your assigned task return the handout sheet I provided you.
PLANT JPM K Page 11 of 12 STEP    13 :                                                                             SAT UNSAT Standard:  Examinee simulates placing 0-HS-32-38A and 0-HS-32-38B in ON Critical Step (clockwise) position to fully load Air Compressor B.
INITIAL CONDITIONS: 1. Units 1 and 2 are in MODE 3 following a Loss of Offsite Power. 2. The Aux. Air Compressors are not in service.
Cue     When asked provide the following cue, You hear the rotational sound lowering then recovering from Compressor B.
: 3. EA-32-2, Establishing Control and Service Air is in progress, completed through section 4.2 step 3.
Comment Terminating   Provide the following cue, Another operator will perform the Cue:                                                                                STOP remaining ste4ps of this procedure.
INITIATING CUES: 1. You have been directed to start and manually load the Station Air Compressors using EA-32-2, Establishing Control and Service Air section 4.2 starting at step 4. 2. Inform the SRO when complete.
Stop Time
PLANT JPM K Page 5 of 12 Start Time STEP 1 : Obtain a copy of EA-32-2, Establishing Control and Service Air.
SAT      UNSAT  Standard:
Examinee obtains a copy of EA-32-2, Establishing Control and Service Air. Cue Provide a marked up copy of EA-32-2, Establishing Control and Service Air, completed through section 4.2 step 3.
Comment   STEP 2 :    SAT      UNSAT  Standard:
Examinee simulates depressing 0-HS-32-25B to reset air comp trip signals. Critical Step Cue Following simulated operation provide the following cue, "0-HS-32 25B went in and returned to out.". Comment PLANT JPM K Page 6 of 12 STEP 3 :    SAT      UNSAT  Standard:
Examinee observes Compressor A Trip lights DARK.
Cue When asked provide the following cue, "
All Compressor A trip lights are DARK."
Comment    STEP 4 :    SAT      UNSAT  Standard:
Examinee observes Compressor A Trip lights DARK.
Cue When asked provide the following cue, "
All Compressor B trip lights are DARK."
Comment PLANT JPM K Page 7 of 12 STEP 5 :    SAT      UNSAT  Standard:
Examinee simulates placing 0-HS-32-25D to HAND.
Critical Step Cue When asked provide the following cue, "0-HS-32-25D is positioned counter-clockwise to "HAND."
Comment    STEP 6 :    SAT      UNSAT  Standard:
Examinee simulates placing 0-HS-32-26A to HAND.
Critical Step Cue When asked provide the following cue, "0-HS-32-26A is positioned counter-clockwise to "HAND."
Comment PLANT JPM K Page 8 of 12 STEP 7 :    SAT      UNSAT  Standard:
Examinee simulates placing HS-32-25A in Position 1.
Cue When asked provide the following cue, "HS-32-25A is positioned counter-clockwise to Position 1."
Comment    STEP 8 :    SAT      UNSAT  Standard:
Examinee simulates placing 0-HS-32-25F for comp A in PULL TO START position.
Critical Step Cue When asked provide the following cue, "HS-32-25F is in maintained in the pull out position."
Comment PLANT JPM K Page 9 of 12 STEP 9 :    SAT      UNSAT  Standard:
Examinee simulates depressing 0-HS-32-25E.
Critical Step Cue When asked provide the following cue, "You hear a mechanical rotational noise from Compressor A."
Comment    STEP 10 :
SAT      UNSAT  Standard:
Examinee simulates placing 0-HS-32-43A and 0-HS-32-43B in ON (clockwise) position to fully load comp A.
Critical Step Cue When asked provide the following cue, "You hear the rotational sound lowering then recovering from Compressor A." Comment PLANT JPM K Page 10 of 12 STEP 11 :
SAT      UNSAT  Standard:
Examinee simulates placing 0-HS-32-26D for comp A in PULL TO START position.
Critical Step Cue When asked provide the following cue, "HS-32-26D is maintained in the pull out position."
Comment    STEP 12 :
SAT     UNSAT   Standard:
Examinee simulates depressing  0-HS-32-26B.
Critical Step Cue When asked provide the following cue, "You hear a mechanical rotational noise from Compressor B."
Comment PLANT JPM K Page 11 of 12 STEP 13 :
SAT      UNSAT   Standard:
Examinee simulates placing 0-HS-32-38A and 0-HS-32-38B in ON (clockwise) position to fully load Air Compressor B.
Critical Step Cue When asked provide the following cue, "You hear the rotational sound lowering then recovering from Compressor B.Comment   Terminating Cue: Provide the following cue, "Another operator will perform the remaining ste4ps of this procedure.
STOP  Stop Time


JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:
JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:
All steps shall be simulated for this JPM.
All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job  
INITIAL CONDITIONS:
 
: 1. Units 1 and 2 are in MODE 3 following a Loss of Offsite Power.
performance measure will be satisfied. Ensure y ou indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
: 2. The Aux. Air Compressors are not in service.
INITIAL CONDITIONS: 1. Units 1 and 2 are in MODE 3 following a Loss of Offsite Power. 2. The Aux. Air Compressors are not in service.
: 3. EA-32-2, Establishing Control and Service Air is in progress, completed through section 4.2 step 3.
: 3. EA-32-2, Establishing Control and Service Air is in progress, completed through section 4.2 step 3.
INITIATING CUES: 1. You have been directed to start and manually load the Station Air Compressors using EA-32-2, Establishing Control and Service Air section 4.2 starting at step 4. 2. Inform the SRO when complete.
INITIATING CUES:
: 1. You have been directed to start and manually load the Station Air Compressors using EA-32-2, Establishing Control and Service Air section 4.2 starting at step 4.
: 2. Inform the SRO when complete.
Acknowledge to the examiner when you are ready to begin.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.}}
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.}}

Latest revision as of 13:10, 4 November 2019

301 Draft Simulator and in Plant JPMs
ML13297A330
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/18/2013
From:
NRC/RGN-II
To:
Tennessee Valley Authority
References
Download: ML13297A330 (126)


Text

SEQUOYAH NUCLEAR PLANT 1305 NRC SIMULATOR JPM A

SIM JPM A Page 2 of 9 RO/SRO JOB PERFORMANCE MEASURE Task: 0-SI-OPS-085-011.0 Reactivity Control Systems Moveable Control Assemblies Task #: 0010010201 Task Standard: The examinee will perform 0-SI-OPS-085-011.0 Reactivity Control Systems Moveable Control Assemblies starting with Control Bank Bank D. Following the uncontrolled rod movement, the examinee will trip the reactor using AOP-C.01, Rod Control System Malfunctions Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X K/A Reference/Ratings: 001.A2.11 (4.4/4.7)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 10 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM A Page 3 of 9 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 15, 96% power BOL.
3. If IC XX is not available perform the following:

Reset to IC 15, 96% power BOL.

Ensure Rod Control Mode Selector Switch in CB C position.

Run SCN file 1305 NRC JPM A

4. Display the following on ICS:

RPI for CB D Computer point T0499A Computer point T0496A

5. PLACE SIMULATOR IN RUN
6. An extra operator will be required to acknowledge alarms.
7. ACKNOWLEDGE ALARMS
8. FREEZE SIMULATOR.
9. Provide a copy of 0-SI-OPS-085-011.0 REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES.
10. Save as a temporary IC, if repeat runs of JPM will be desired.
11. PLACE SIMULATOR IN RUN
12. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
13. When the candidate begins inserting Control Bank D, insert Malfunction RD02 (uncontrolled insertion for Bank D group 2)

Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

REACTIVITY CONTROL SYSTEMS MOVEABLE

1. 0-SI-OPS-085-011.0 34 CONTROL ASSEMBLIES
2. AOP-C.01 ROD CONTROL SYSTEM MALFUNCTIONS 22

SIM JPM A Page 4 of 9 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1, 96% power, BOL.
2. 0-SI-OPS-085-011.0 REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES is in progress at section 6.1.8.

INITIATING CUES:

1. Perform 0-SI-OPS-085-011.0 REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES to verify rod operability for Control Bank D starting at section 6.1.8 step 1.
2. Inform the SRO when complete.

SIM JPM A Page 5 of 9 Start Time STEP 1  : SAT Obtain a copy of 0-SI-OPS-085-011.0, REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES. UNSAT Standard: Examinee obtains a copy of 0-SI-OPS-085-011.0, REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES.

Cue: Provide a marked up copy of 0-SI-OPS-085-011.0, REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES.

Comment STEP 2  : SAT UNSAT Standard: Examinee addresses the step as N/A.

Comment

SIM JPM A Page 6 of 9 STEP 3  : SAT UNSAT Standard: Examinee places HS-85-51110, Rod Control Mode Selector Switch to Critical Step Control Bank D.

Comment STEP 4  : SAT UNSAT Examinee places HS-85-51111, Rod Control to IN and obtains > a 10 Standard: step movement of Control Bank D Group 1 and Group 1 by 1-XI Critical Step 5105D1 and D2.

Comment

SIM JPM A Page 7 of 9 STEP 5  : SAT UNSAT Standard: The examinee verifies Control Bank D Step Counters and Individual Rod Position Indicators have moved > 10 steps.

Comment STEP 6  : SAT UNSAT Examinee places HS-85-51111, Rod Control to OUT and observes Standard:

Control Bank D Group 2 inserting continuously.

Examiner The examinee may elect to trip the Reactor. If the examinee trips the Note: reactor, go to JPM step 9.

Comment STEP 7  : SAT UNSAT Standard: The examinee transitions to AOP-C.01, ROD CONTROL SYSTEM MALFUNCTIONS section 2.1.

Comment

SIM JPM A Page 8 of 9 ALTERNATE PATH STEP 8  : SAT UNSAT The examinee places HS-85-51110, Rod Control Mode Selector Standard: Switch to MANUAL, checks Control Bank D is still inserting, and transitions to the RNO.

Comment STEP 9  : SAT UNSAT Standard: The examinee places 1-RT-1 or 1-RT-2 to TRIP. Critical Step Comment Terminating When the examinee trips the reactor provide the following cue, Cue: Another operator will complete the remaining steps of this STOP procedure..

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1, 96% power, BOL.
2. 0-SI-OPS-085-011.0 REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES is in progress at section 6.1.8.

INITIATING CUES:

1. Perform 0-SI-OPS-085-011.0 REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES to verify rod operability for Control Bank D starting at section 6.1.8 step 1.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1305 NRC SIMULATOR JPM B

SIM JPM B Page 2 of 16 RO/SRO JOB PERFORMANCE MEASURE Task: Align ECCS Pumps to the Containment Sump Task #: 3010060601 Task Standard: The examinee will align CCP and SI pump flowpath for sump recirculation using ES-1.3 TRANSFER TO RHR CONTAINMENT.

Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X K/A Reference/Ratings: 006 A4.07 (4.4/4.4)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 15 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM B Page 3 of 16 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 302
3. If IC 302 is not available perform the following:

Reset to IC 24 IOR ZDIHS7421A f:0

{global95[5670]} DOR ZDIHS7421A

4. An extra operator will be required to acknowledge alarms.
5. ACKNOWLEDGE ALARMS
6. FREEZE SIMULATOR.
7. Save as a temporary IC, if repeat runs of JPM will be desired.
8. Provide a copy of ES-1.3 TRANSFER TO RHR CONTAINMENT SUMP.
9. PLACE SIMULATOR IN RUN
10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.

SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
2. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1. ES-1.3 TRANSFER TO RHR CONTAINMENT SUMP 19 2 1-AR-M6-E MISCELLANEOUS 23

SIM JPM B Page 4 of 16 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. A LOCA is in progress on Unit 1.
2. ECCS pumps are running taking a suction from the RWST.

INITIATING CUES:

1. When conditions permit, you are directed to perform ES-1.3, Transfer to Cold Leg Recirculation.
2. Inform the SRO when complete.

SIM JPM B Page 5 of 16 Start Time STEP 1  : SAT UNSAT Standard: Examinee acknowledges alarm and transitions to ES-1.3 TRANSFER TO RHR CONTAINMENT SUMP.

Comment STEP 2  : SAT Obtain a copy of ES-1.3 TRANSFER TO RHR CONTAINMENT SUMP UNSAT Standard: Examinee obtains a copy of ES-1.3 TRANSFER TO RHR CONTAINMENT SUMP.

Cue: Provide a copy of ES-1.3 TRANSFER TO RHR CONTAINMENT SUMP.

Comment

SIM JPM B Page 6 of 16 STEP 3  : SAT UNSAT Standard: Examinee addresses procedure step.

Cue If directed, acknowledge direction.

Comment STEP 4  : SAT UNSAT Standard: Examinee verifies both Containment Spray pumps running by observing red indicating lights above pump handswitches ON.

Comment

SIM JPM B Page 7 of 16 STEP 5  : SAT UNSAT Examinee places the A OR B Containment Spray 1-HS-72-27A or 1-Standard: HS-72-10A handswitch in PULL-TO-LOCK within 2 minutes of the Critical Step RWST Level Lo Alarm.

Comment Examiner Annotate the stop time for stopping the Containment Spray pump Note: here. ______

STEP 6  : SAT UNSAT Standard: Examinee verifies containment pressure by observing PDI-30-45, PDI-30-44, PDI-30-43, or PDI-30-42.

Comment

SIM JPM B Page 8 of 16 STEP 7  : SAT UNSAT RNO Standard: Examinee places both Containment Spray reset pushbuttons 1-HS-72 43 and 1-HS-72 42 to RESET.

Critical Step Comment STEP 8  : SAT UNSAT Examinee places the remaining running Containment Spray Pump Standard: handswitch to STOP, both Containment Spray Pump handswitches to A-AUTO, places Containment Spray discharge valve handswitches Critical Step FCV-72-39 and FCV-72-2 to close and proceeds to step 3.

Comment

SIM JPM B Page 9 of 16 STEP 9  : SAT UNSAT Standard: Examinee checks containment sump level greater than 11% by observing LI-63-176, LI-63-177, LI-63-178, or LI-63-179.

Comment STEP 10  : SAT UNSAT Standard: Examinee verifies FCV-63-73 and FCV-63-73 OPEN by observing the red lights above 1-HS-63-72A and 1-HS-63-73A ON.

Comment

SIM JPM B Page 10 of 16 STEP 11  : SAT UNSAT ALTERNATE PATH Examinee places containment sump valve 1-HS-74-21A to OPEN Standard: Critical Step Examinee checks RHR suction valves FCV-74-3 CLOSING by observing the red and green lights above 1-HS-74-3A ON (Not Critical).

Comment STEP 12  : SAT UNSAT Examinee monitors RWST LVL LO-LO alarm DARK on [M-6E, E4] by Standard: observing alarm window OFF and RWST level greater than 8% by observing LI-63-50, LI-63-51, LI-63-52, or LI-63-53.

Comment STEP 13  : SAT UNSAT Standard: Examinee monitors RHR pumps RUNNING by observing the red lights above 1-HS-74-10A and 1-HS-74-20A ON.

Comment

SIM JPM B Page 11 of 16 STEP 14  : SAT UNSAT Standard: Examinee directs another operator to perform step 6 and proceeds to step 7.

Cue Acknowledge direction from the examinee Comment Examiner The station standard practice is for the BOP operator to perform Note manipulations outside the At The Controls Area during this evolution.

STEP 15  : SAT UNSAT Examinee monitors containment sump valves FCV-63-72 and FCV Standard: 73 OPEN by observing the red indicating lights above 1-HS-63-72A and 1-HS-63-73A ON.

Comment

SIM JPM B Page 12 of 16 STEP 16  : SAT UNSAT Examinee ensures RWST to RHR suction valves FCV-74-3 and FCV-Standard: 74-21 CLOSED by observing the green indicating lights above 1-HS-74-3A and 1-HS-74-21A ON.

Comment STEP 17  : SAT UNSAT Standard: Examinee monitors RCS pressure less than 1500 psig by observing PI-68-62, PI-68-69 or other installed plant instrumentation.

Comment

SIM JPM B Page 13 of 16 STEP 18  : SAT UNSAT Standard: Examinee places 1-HS-63-3A AND 1-HS-63-4A AND 1-HS-63-175A Critical Step to CLOSE Comment STEP 19  : SAT UNSAT Standard: Examinee places 1-HS-74-33A AND 1-HS-74-35A to CLOSE Critical Step Comment

SIM JPM B Page 14 of 16 STEP 20  : SAT UNSAT Standard: Examinee places 1-HS-63-7A AND 1-HS-63-6A to OPEN Critical Step Comment STEP 21  : SAT UNSAT Standard: Examinee places 1-HS-63-8A to OPEN. Critical Step Comment

SIM JPM B Page 15 of 16 STEP 22  : SAT UNSAT Standard: Examinee places 1-HS-63-11A to OPEN. Critical Step Comment Terminating Provide the following cue Another operator will perform Cue: STOP the remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. A LOCA is in progress on Unit 1.
2. ECCS pumps are running taking a suction from the RWST.

INITIATING CUES:

1. When conditions permit, you are directed to perform ES-1.3, Transfer to Cold Leg Recirculation.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1305 NRC SIMULATOR JPM C

SIM JPM C Page 2 of 10 Rev. 15 RO/SRO JOB PERFORMANCE MEASURE Task: Terminate SI and Re-Establish Charging Flow Task #: 0001000501 Task Standard: Safety Injection is terminated using E-0 resulting in one of the CCPs in A-Auto and the alternate charging supply valve open due to the failure of the normal charging supply valve.

Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X K/A Reference/Ratings: EPE E02 EA1.1 (4.0/3.9)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 14 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM C Page 3 of 10 Rev. 15 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 309
3. If IC 309 is not available perform the following:

a) Reset to IC 16 b) Insert IMF RP04B ON [False Auto SIS, Hi Cntmt Press.]

c) Insert override ZDIHS6286A to CLOSE to override normal charging valve closed.

d) Perform E-0 (including ES-0.5) through step #14.

4. An extra operator will be required to acknowledge alarms.
5. ACKNOWLEDGE ALARMS
6. FREEZE SIMULATOR.
7. Provide a copy of E-0, REACTOR TRIP OR SAFETY INJECTION marked up through step 14.
8. Save as a temporary IC, if repeat runs of JPM will be desired.
9. PLACE SIMULATOR IN RUN
10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.

SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
2. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1. E-0 REACTOR TRIP OR SAFETY INJECTION 35 2.

SIM JPM C Page 4 of 10 Rev. 15 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3 following a spurious Safety Injection
2. The crew completed E-0, REACTOR TRIP OR SAFETY INJECTION through step 14.

INITIATING CUES:

1. The US has directed you to stop one charging pump, isolate the CCPIT and establish charging flow using E-0, REACTOR TRIP OR SAFETY INJECTION starting at step 15.
2. Inform the US when charging flow and seal injection flow have been established.

SIM JPM C Page 5 of 10 Rev. 15 Start Time Obtain a copy of E-0, REACTOR TRIP OR SAFETY INJECTION.

STEP 1  : SAT UNSAT Standard: Operator obtains a copy of E-0, REACTOR TRIP OR SAFETY INJECTION.

Cue Provide a copy of E-0, REACTOR TRIP OR SAFETY INJECTION.

Comment STEP 2  : SAT UNSAT Standard: Operator depresses SI Reset pushbuttons. Critical Step Comment STEP 3  : SAT UNSAT Standard: Operator addresses the procedure step.

Cue Provide the following cue, The CRO will monitor the shutdown boards.

Comment

SIM JPM C Page 6 of 10 Rev. 15 STEP 5  : SAT UNSAT Standard: Operator places ONE Charging Pump in STOP. Critical Step Comment STEP 6  : SAT UNSAT Standard: Operator verifies RCS pressure stable or rising by observing installed instrumentation.

Comment Examiner Note:

SIM JPM C Page 7 of 10 Rev. 15 STEP 7  : SAT UNSAT Operator places CCPIT inlet valves HS-63-39A AND HS-63-40A OR Standard: Critical Step Operator places CCPIT outlet valves HS 25A AND HS 26A To CLOSE.

Comment STEP 8  : SAT UNSAT Standard: Operator closes FCV-62-89 by adjusting controller FIC-62-89 CCW to Critical Step CLOSE (Maximum output.).

Comment

SIM JPM C Page 8 of 10 Rev. 15 STEP 9  : SAT UNSAT Standard: Operator places charging isolation valves HS-62-90A and HS-62-91A Critical Step to OPEN Comment STEP 12  : SAT UNSAT Operator places FCV-62-86 to OPEN. Operator observes when 1-HS -

Standard: 62-86A is turned to the right OPEN position, green light remains lit on HS and operator transitions to the RNO.

Comment STEP 13  : SAT RNO UNSAT Standard: Operator places 1-HS-62-85 Alternate Charging Isolation to OPEN. Critical Step Comment

SIM JPM C Page 9 of 10 Rev. 15 STEP 14  : SAT UNSAT Standard: Operator addresses the procedure step.

Comment Terminating Provide the following cue, Another operator will complete the Cue: STOP remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3 following a spurious Safety Injection
2. The crew completed E-0, REACTOR TRIP OR SAFETY INJECTION through step 14.

INITIATING CUES:

1. The US has directed you to stop one charging pump, isolate the CCPIT and establish charging flow using E-0, REACTOR TRIP OR SAFETY INJECTION starting at step 15.
2. Inform the US when charging flow and seal injection flow have been established.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1305 NRC SIMULATOR JPM D

SIM JPM D Page 2 of 16 RO/SRO JOB PERFORMANCE MEASURE Task: Respond to RCP High Stator temperature Alarm using AOP-R.04 REACTOR COOLANT PUMP MALFUNCTIONS.

Task #: 0030010101 Task Standard: The examinee manually stops the #2 Reactor Coolant Pump and closes RCS Loop 2 Pressurizer Spray Valve.

Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X K/A Reference/Ratings: APE 015/017 AA1.03 (3.7/3.8)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 15 mins Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM D Page 3 of 16 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 324.
3. If IC 324 is not available, perform the following:

Reset to IC 7 Open reactor Trip Breakers

4. Place MODE 3 sign on Panel M-4
5. Set NR-45 to display one SRM and one IRM
6. An extra operator will be required to acknowledge alarms.
7. ACKNOWLEDGE ALARMS
8. FREEZE SIMULATOR.
9. PLACE SIMULATOR IN RUN
10. Booth operator standby to insert the SCN File 1305 JPM D.scn (from exams folder) when the examinee assumes the shift.

SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
2. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

1-SO-68-2 Reactor Coolant Pumps AOP- R.04 Reactor Coolant Pump Malfunctions

References:

Reference Title Rev No.

1. 1-SO-68-2 Reactor Coolant Pumps 33
2. AOP- R.04 Reactor Coolant Pump Malfunctions 27 3 1-AR-M5-B CVCS Seal Water and RCP 39

SIM JPM D Page 4 of 16 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3 INITIATING CUES:
1. You are the OATC.
2. Respond to plant conditions.

SIM JPM D Page 5 of 16 STEP 1  : SAT UNSAT Standard: Examinee acknowledges alarm and observes rise in RCP motor stator temperatures.

Comment

SIM JPM D Page 6 of 16 STOP Loop 2 RCP STEP 2  : SAT UNSAT Standard: Examinee places 1-HS-68-31A #2 RCP handswitch to STOP. Critical Step Comment Examiner The following steps are from the Annunciator Response Procedure 1-Note AR-M5-B.

STEP 3  : SAT UNSAT Standard: Examinee determines the #2 RCP in alarm by observing the ICS display.

Comment

SIM JPM D Page 7 of 16 STEP 4  : SAT UNSAT Standard: Engineering is contacted to obtain engineering assistance in determining the validity of the alarm.

Cue If asked, provide the following cue, Time has been compressed, Engineering has been contacted and has validated the alarm.

Comment STEP 5  : SAT UNSAT Examinee monitors or directs monitoring parameters by observing Standard: indications on installed instrumentation and determines indications normal.

Cue If asked, provide the following cue, The AUO is monitoring RCP Vibration.

Comment

SIM JPM D Page 8 of 16 STEP 6  : SAT UNSAT Standard: Examinee verifies ERCW aligned to pump cooler by observing red light above 1-HS-67-102 on 0-M-27A ON.

Comment STEP 7  : SAT UNSAT Standard: Examinee verifies ERCW system temperature and pressure normal by observing indications 0-M-27A.

Comment STEP 8  : SAT UNSAT Standard: Examinee verifies lower compartment air temperature normal by observing indications on ICS and other installed plant instrumentation.

Comment

SIM JPM D Page 9 of 16 STEP 9  : SAT UNSAT Standard: Examinee refers to 1-SO-68-2 Appendix D for the operating limits.

Comment STOP Loop 2 RCP STEP 10  : SAT UNSAT Standard: Examinee places 1-HS-68-31A #2 RCP handswitch to STOP. Critical Step Comment STEP 11  : SAT UNSAT Standard: Examinee verifies pump amps normal by observing EI-68-8 less than 400 amps.

Comment

SIM JPM D Page 10 of 16 STEP 12  : SAT UNSAT Standard: Examinee observes the motor winding temperature is greater than 311°F using the ICS and goes to AOP-R.04.

Cue Respond as Engineering Alarm is valid.

Comment

SIM JPM D Page 11 of 16 STEP 13  : SAT UNSAT Standard: Examinee goes to AOP-R.04 section 2.6 Comment

SIM JPM D Page 12 of 16 STEP 14  : Alternate Path SAT UNSAT Examinee determines the motor winding temperature is greater than Standard: 311°F by observing the ICS and goes to the RNO column and ultimately to Section 2.1.

Comment

SIM JPM D Page 13 of 16 STEP 15  : SAT UNSAT Standard: Examinee determines the Unit is in MODE 3 and proceeds to RNO Comment STEP 16  : SAT UNSAT Standard: Examinee places handswitch 1-HS-68-31A #2 RCP to STOP. Critical Step Comment

SIM JPM D Page 14 of 16 STEP 17  : SAT UNSAT Standard: Examinee determines that seal leakoff within normal values and continues to step 4.

Comment STEP 18  : SAT UNSAT Standard: Examinee places XS-68-2D (T) and XS-68-2M (T-avg) in PULL TO Critical Step DEFEAT Comment

SIM JPM D Page 15 of 16 STEP 19  : SAT UNSAT Standard: Examinee identifies #2 RCP as effected pump and proceeds to RNO column.

Comment STEP 20  : SAT UNSAT Standard: Operator closes the Loop 2 Pressurizer Spray Valve by placing Critical Step controller 1-PIC-68-340B to CLOSE (minimum output).

Comment Terminating Provide the following cue Another operator will perform the Cue: STOP remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3 INITIATING CUES:
1. You are the OATC.
2. Respond to plant conditions.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1305 NRC SIMULATOR JPM E

SIM JPM E Page 2 of 12 RO/SRO JOB PERFORMANCE MEASURE Task: Operate the Motor Driven AFW pump.

Task #: 0610050101 Task Standard: The examinee will align Essential Raw Cooling Water (Service Water) to the motor driven Auxiliary Feed Pumps (AFW) suction using EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings: EPE E05 EA 1.1 (4.1/4.0)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 5 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM E Page 3 of 12 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 331
3. If IC 331 is not available perform the following:

Reset to IC 17 IMF ED01 f:1 IMF FW23C f:40 IMF CN05 f:100 IMF FW07C f:1 IOR ZDIHS3116AA f:0 IOR ZLOHS3116AA_GREEN1 f:1 IOR ZLOHS3116AA_GREEN2 f:1 IOR ZDIHS3126AA f:0 IOR ZLOHS3126AA_GREEN1 f:1 IOR ZLOHS3126AA_GREEN2 f:1

{global95[4811]} DOR ZDIHS3116AA

{global95[4811]} DOR ZLOHS3116AA_GREEN1

{global95[4811]} DOR ZLOHS3116AA_GREEN2

{global95[4822]} DOR ZDIHS3126AA

{global95[4822]} DOR ZLOHS3126AA_GREEN1

{global95[4822]} DOR ZLOHS3126AA_GREEN2

4. PLACE SIMULATOR IN RUN
5. An extra operator will be required to acknowledge alarms.
6. ACKNOWLEDGE ALARMS
7. FREEZE SIMULATOR.
8. Save as a temporary IC, if repeat runs of JPM will be desired.

SIM JPM E Page 4 of 12

9. Place pink tags on the following:

HS-3-148A AFP 1B-B LCV to S/G #3.

HS-3-172 S/G #3 Turbine AFP LCV.

10. PLACE SIMULATOR IN RUN Tools/Equipment/Procedures Needed:

EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW

References:

Reference Title Rev No.

1. EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW 2 2.

SIM JPM E Page 5 of 12 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3.
2. A Loss of offsite power is in progress.
3. #3 Steam Generator in faulted.
4. The Turbine Driven AFW pump has tripped.
5. Unit 1 Condensate Storage tank is 5% and lowering rapidly.

INITIATING CUES:

1. The SRO has directed you to align ERCW to the motor Driven AFW pumps using EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW.
2. Inform the SRO when complete.

SIM JPM E Page 6 of 12 Start Time STEP 1  : SAT Obtain a copy of EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW UNSAT Standard: Examinee obtains a copy of EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW Cue: Provide a copy of EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW.

Comment STEP 2  : SAT UNSAT Standard: Examinee selects Unit 1 as the affected unit.

When alarm 2C D6 CONDENSATE STORAGE TANK B LEVEL LO Cue: LO annunciates provide the following cue, Another operator will address 2C D6 CONDENSATE STORAGE TANK B LEVEL LO LO.

Comment

SIM JPM E Page 7 of 12 STEP 3  : SAT UNSAT Standard: The examinee addresses the step as N/A.

Comment STEP 4  : SAT UNSAT Standard: The examinee addresses the step as N/A.

Comment

SIM JPM E Page 8 of 12 STEP 5  : SAT UNSAT Standard: The examinee addresses the step as N/A.

Comment STEP 6  : SAT UNSAT Standard: The examinee addresses the step as N/A.

Comment

SIM JPM E Page 9 of 12 STEP 7  : SAT UNSAT Standard: The examinee selects section 4.10 as the applicable section.

Comment STEP 8  : SAT UNSAT Standard: The examinee places HS-3-116-A/A ERCW Header A AFW Supply to Critical Step OPEN.

Comment

SIM JPM E Page 10 of 12 STEP 9  : SAT UNSAT Standard: The examinee addresses the procedure step.

Cue Provide the following cue, AUO Acknowledges close ERCW tell tale drain valve 1-3-807.

Comment STEP 10  : SAT UNSAT Standard: The examinee places HS-3-126-A/A ERCW Header B AFW Supply to Critical Step OPEN.

Comment

SIM JPM E Page 11 of 12 STEP 9  : SAT UNSAT Standard: The examinee addresses the procedure step.

Cue Provide the following cue, AUO Acknowledges close ERCW tell tale drain valve 1-3-808.

Comment Terminating Provide the following cue, Another operator will complete the Cue: STOP remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3.
2. A Loss of offsite power is in progress.
3. #3 Steam Generator in faulted.
4. The Turbine Driven AFW pump has tripped.
5. Unit 1 Condensate Storage tank is 5% and lowering rapidly.

INITIATING CUES:

1. The SRO has directed you to align ERCW to the motor Driven AFW pumps using EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1305 NRC SIMULATOR JPM F

SIM JPM F Page 2 of 12 RO/SRO JOB PERFORMANCE MEASURE Task: Start Up A-A Hydrogen Recombiner Task #: 0881010401 Task Standard: "A-A" Hydrogen Recombiner is placed in service using EA-268-1, Placing Hydrogen Recombiner in Service.

Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings: 028 A4.01 (4.0/4.0)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 5 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM F Page 3 of 12 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 312, (Post LOCA.)
3. If IC 312 is not available, perform the following:

a) Reset to IC 24.

b) ENSURE the controllers for both Hydrogen Recombiners are set to Zero (0) after simulator initialization.

c) Insert malfunctions to establish 5 psig on Containment Pressure Indicators:

IMF CH01A f:37.5 IMF CH01B f:37.5 IMF CH01C f:37.5 IMF CH01D f:37.5 d) Put Containment Hydrogen Analyzer Fans A and B in service by placing 1-HS- 43-200A and -210A in ANALYZE.

4. ENSURE white lights (1-XI-43-200 and 210 located on M-10) are NOT LIT indicating normal flow through the Hydrogen Analyzers.
5. Ensure Train A Recombiner Power Adjust potentiometer set at 100
6. The reference power value used in JPM step 9 (46.98 kw) must be verified correct prior to JPM performance.
7. An extra operator will be required to acknowledge alarms.
8. ACKNOWLEDGE ALARMS
9. FREEZE SIMULATOR.
10. Provide a copy of EA-268-1, Placing Hydrogen Recombiner in Service
11. Save as a temporary IC, if repeat runs of JPM will be desired.
12. PLACE SIMULATOR IN RUN
13. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, if a temporary IC has been deleted.

SIM JPM F Page 4 of 12 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
2. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

1. EA-268-1, Placing Hydrogen Recombiner in Service
2. Calculator

References:

Reference Title Rev No.

1. EA-268-1 Placing Hydrogen Recombiner in Service 4 2.

SIM JPM F Page 5 of 12 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 has had an event.
2. Containment pressure indicators1-PDI-30-45, 44, 43 and 42 are indicating 5 psig.
3. The Hydrogen Analyzers have been in service for > 30 minutes.
4. Containment Hydrogen concentration is 2.2%

INITIATING CUES:

1. The US has directed you to place "A-A" Hydrogen Recombiner in service using EA-268-1, Placing Hydrogen Recombiner in Service.
2. Inform the US when complete.

SIM JPM F Page 6 of 12 Start Time Obtain a copy of EA-268-1, Placing Hydrogen Recombiner in Service.

STEP 1  : SAT UNSAT Standard: Operator obtains EA-268-1, Placing Hydrogen Recombiner in Service.

Cue Provide a copy of EA-268-1, Placing Hydrogen Recombiner in Service.

Comment STEP 2  : SAT UNSAT Standard: Operator determines that section 4.2 is the appropriate section.

Comment

SIM JPM F Page 7 of 12 STEP 3  : SAT UNSAT Standard: Operator determines that Unit 1 is the appropriate unit.

Comment STEP 4  : SAT UNSAT Standard: Operator determines that the A Train Recombiner will be started from the initiating cue.

Comment STEP 5  : SAT UNSAT Standard: Operator records Containment press from at least one of the PAM instruments.

Comment

SIM JPM F Page 8 of 12 STEP 6  : SAT UNSAT Standard: Operator addresses the step as N/A Comment STEP 7  : SAT UNSAT Standard: Operator verifies "PWR AVAILABLE white light is ON for "A-A" Recombiner on M-10.

Comment STEP 8  : SAT UNSAT Operator places "A-A" Hydrogen power adjust potentiometer CCW to Standard: 000. Critical Step Operator addresses Train B as N/A (not critical).

Comment

SIM JPM F Page 9 of 12 STEP 9  : SAT UNSAT Standard: Operator places "A-A" Recombiner "PWR OUT SW" in UP (ON) Critical Step position.

Comment STEP 10  : SAT UNSAT Operator determines the correction factor (Pressure Factor) to be ~

Standard: 1.41 (1.4 - 1.45), by using the 5 psig Containment Pressure line and Critical Step intersection on curve.

Comment STEP 11  : SAT UNSAT Standard: Operator enters the reference power obtained from the Reference Power Data Plate or from Cue. (46.98 kW)

Cue Provide the following cue, Reference power is 46.98 kW.

Comment

SIM JPM F Page 10 of 12 STEP 12  : SAT UNSAT Operator calculates the hydrogen recombiner power setting by performing the following calculation:

Standard: Pressure Factor X Reference Power= Setting KW Critical Step 1.41 (1.4 to 1.45%) X 46.98 KW = 66.24 KW (Acceptable Range 65.77 to 68.12 KW)

Comment STEP 13  : SAT UNSAT Standard: Operator records power setting, 66.24KW (65.77 to 68.12) in the Train A 25 Minute Table, KW reading column, and checks the box.

Comment

SIM JPM F Page 11 of 12 STEP 14  : SAT UNSAT Standard: Operator places XS-83-5003 Power Adjust potentiometer CW until 5 +

0.5 KW is obtained.

Critical Step Comment Terminating Provide the following cue, Another operator will complete the Cue: STOP remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 has had an event.
2. Containment pressure indicators1-PDI-30-45, 44, 43 and 42 are indicating 5 psig.
3. The Hydrogen Analyzers have been in service for > 30 minutes.
4. Containment Hydrogen concentration is 2.2%

INITIATING CUES:

1. The US has directed you to place "A-A" Hydrogen Recombiner in service using EA-268-1, Placing Hydrogen Recombiner in Service.
2. Inform the US when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1305 NRC SIMULATOR JPM G

SIM JPM G Page 2 of 10 RO/SRO JOB PERFORMANCE MEASURE Task: Transfer 1A-A 6.9 KV SD Bd from Alternate to Normal Supply Task #: 0620520201 Task Standard: 1A-A 6.9 kv Shutdown Board is energized by manually starting the 1A-A EDG.

Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X K/A Reference/Ratings: EPE E02 EA1.1 (4.0/3.9)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 7 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM G Page 3 of 10 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 313.
3. If IC 313 is not available perform the following.

a) Reset to IC 14 b) Transfer 1A-A 6.9 Kv Shutdown Board to the alternate feeder.

c) Insert IMF EG08A - D/G 1A-A Fails to Auto Start.

d) Insert Override ZDIHS5744A - Trip 6.9 KV SD Bd 1A-A Alt. Fdr. Bkr. 1716.

4. An extra operator will be required to acknowledge alarms.
5. ACKNOWLEDGE ALARMS
6. FREEZE SIMULATOR.
7. Provide a copy of 0-SO-202-4, 6900V Shutdown Boards completed through 8.1.5 step 2.
8. PLACE SIMULATOR IN RUN SPECIAL INSTRUCTIONS TO EVALUATOR:
1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
2. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

0-SO-202-4, 6900V Shutdown Boards

References:

Reference Title Rev No.

1. 0-SO-202-4 6900V Shutdown Boards 35

SIM JPM G Page 4 of 10 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Units 1 and 2 are in MODE 1.
2. Relay testing has been completed on normal feeder to 1A-A 6.9 Kv Shutdown Board.
3. 1B-B, 2A-A, and 2B-B 6.9kV Shutdown Boards are aligned to Normal Power supply.

INITIATING CUES:

1. You have been directed to transfer 1A-A 6.9kV Shutdown Board to Normal Feeder at 1-M-1 using 0-SO-202-4, 6900V Shutdown Boards, Section 8.1.5, starting at step 3.
2. 0-SO-202-4, 6900V Shutdown Boards, Section 8.1.1 has been completed.
3. Another operator has been assigned and will provide concurrent verification.
4. Inform the SRO when complete.

SIM JPM G Page 5 of 10 Start Time Obtain a copy of 0-SO-202-4 6900V Shutdown Boards, Section 8.1.5 STEP 1  : SAT UNSAT Standard: Examinee obtains a copy of 0-SO-202-4 6900V Shutdown Boards, Section 8.1.5 Cue Provide a marked up copy of 0-SO-202-4 6900V Shutdown Boards, Section 8.1.5 completed through step 2 Comment Procedure Note:

STEP 2  : SAT UNSAT Standard: Examinee observes 1-XS-57-39 6.9kV Shutdown Board 1A-A voltmeter selector switch in the SDBD 1A position.

Comment

SIM JPM G Page 6 of 10 Examiner Note STEP 3  : SAT UNSAT Standard: Examinee places 1-HS-57-44A control switch for [1718] to CLOSE. Critical Step Comment Cue Respond to the examinee when asked to provide a concurrent verification, Operator concurs.

STEP 4  : SAT UNSAT Standard: Examinee places 1-HS-57-41A control switch for [1716] to TRIP. Critical Step Comment Cue Respond to the examinee when asked to provide a concurrent verification, Operator concurs.

SIM JPM G Page 7 of 10 NOTE:

STEP 5  : SAT UNSAT Standard: Examinee observes ACB 1718 fails to close resulting in a loss of 6.9 KV SD Bd. 1A-A.

Comment Examiner ACB 1718 fails to close resulting in a loss of 6.9 KV SD Bd. 1A-A Note followed by failure of D/Gs to auto start and re-energize SD Bd. 1A-A.

STEP 6  : SAT UNSAT Standard: Examinee observes no bus voltage indicated on 6.9 kv SD Bus 1A-A voltmeter 1-EI-57-39.

Comment STEP 7  : SAT UNSAT Standard: Examinee releases 1-HS-57-44A control switch for [1718] to MID position Comment

SIM JPM G Page 8 of 10 Examiner Note STEP 8  : SAT UNSAT Standard: Examinee observes diesel generators did not start, recognizes DG RUN green light ON. [M-1]

Comment Alternate Path STEP 9  : SAT UNSAT Examinee places 1-HS-82-15, D/G EMERG START 1A-A, 2A-A, 1B-B, 1B-B to EMERG START position Standard: OR Critical Step Examinee places 0-HS-82-16A, DG 1A-A Emergency Start, to EMERG START position.

Comment

SIM JPM G Page 9 of 10 STEP 10  : SAT UNSAT Examinee verifies DG emergency breaker 1912 closed, by observing red Standard: light above 1-HS-57-46A ON [M-26] or Breaker 1912 indicating light ON

[M-1]

Comment Cue Respond to the examinee when asked to provide a concurrent verification, Operator concurs.

Terminating Provide the following cue Another operator will perform the Cue: STOP remaining steps of this procedure.

Stop Time

SIM JPM G Page 10 of 10 JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Units 1 and 2 are in MODE 1.
2. Relay testing has been completed on normal feeder to 1A-A 6.9 Kv Shutdown Board.
3. 1B-B, 2A-A, and 2B-B 6.9kV Shutdown Boards are aligned to Normal Power supply.

INITIATING CUE:

1. You have been directed to transfer 1A-A 6.9kV Shutdown Board to Normal Feeder at 1-M-1 using 0-SO-202-4, 6900V Shutdown Boards, Section 8.1.5, starting at step 3.
2. 0-SO-202-4, 6900V Shutdown Boards, Section 8.1.1 has been completed.
3. Another operator has been assigned and will provide concurrent verification.
4. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1305 NRC SIMULATOR JPM H

SIM JPM H Page 2 of 10 RO/SRO JOB PERFORMANCE MEASURE Task: Shut down the Containment Purge System.

Task #: 0290030101 Task Standard: The examinee will shut down the Containment Purge System using 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION.

Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings: 029 A1.03 (3.0 / 3.3)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 5 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM H Page 3 of 10 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 329 If IC 329 is not available perform the following Reset to IC 182.

Ensure Lower Containment Purge A Train is in service using 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION.

3. Place MODE 5 sign on panel M-4
4. PLACE SIMULATOR IN RUN
5. An extra operator will be required to acknowledge alarms.
6. ACKNOWLEDGE ALARMS
7. FREEZE SIMULATOR.
8. Save as a temporary IC, if repeat runs of JPM will be desired.
9. PLACE SIMULATOR IN RUN
10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.

Tools/Equipment/Procedures Needed:

0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION.

References:

Reference Title Rev No.

1. 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION. 46 2.

SIM JPM H Page 4 of 10 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 5.
2. Lower Containment Purge A Train is in service.

INITIATING CUES:

1. You have been directed to shutdown the Lower Containment Purge System using 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION section 7.3.
2. Inform the SRO when complete.

SIM JPM H Page 5 of 10 Start Time STEP 1  : SAT Obtain a copy of 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION. UNSAT Standard: Examinee obtains a copy of 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION section 7.1.

Cue: Provide a marked up copy of 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION section 7.1..

Comment STEP 2  : SAT UNSAT Standard: Examinee addresses the step as N/A.

Comment

SIM JPM H Page 6 of 10 STEP 3  : SAT UNSAT Standard: Examinee places HS-30-2 Purge Air Supply Fan 1A Discharge Critical Step damper to CLOSE.

Comment STEP 4  : SAT UNSAT Standard: Examinee places HS-30-14, Lower Containment Purge Isolation Critical Step dampers FCV-30-14 and 56 to CLOSE.

Comment STEP 5  : SAT UNSAT Standard: Examinee places HS-30-15, Lower Containment Purge Isolation Critical Step dampers FCV-30-15 and 57 to CLOSE.

Comment

SIM JPM H Page 7 of 10 STEP 6  : SAT UNSAT Standard: Examinee addresses the procedure step.

Comment STEP 7  : SAT UNSAT Standard: Examinee addresses the procedure step.

Comment STEP 8  : SAT UNSAT Standard: Examinee places HS-30-61 Purge Air Exhaust Fan 1A Suction Critical Step Damper to CLOSE.

Comment

SIM JPM H Page 8 of 10 STEP 9  : SAT UNSAT Standard: Examinee places HS-30-1A Air Purge Supply and Exhaust fan 1A to CRITICAL STOP.

Comment STEP 10  : SAT UNSAT Standard: Examinee places HS-30-1A Air Purge Supply and Exhaust fan 1A in CRITICAL the PULL TO LOCK position.

Comment STEP 11  : SAT UNSAT Standard: Examinee verifies all dampers CLOSED by observing green lights ON for XI-30-1A, XI-30-1B, XI-30-294, and XI-30-295.

Comment

SIM JPM H Page 9 of 10 STEP 12  : SAT UNSAT Standard: Examinee places HS-30-213 Purge Air Exhaust Fan 1A Discharge CRITICAL Isolation to CLOSE.

Comment Terminating Provide the following cue, Another operator will complete the Cue: STOP remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 5.
2. Lower Containment Purge A Train is in service.

INITIATING CUES:

1. You have been directed to shutdown the Lower Containment Purge System using 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION section 7.3.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1305 NRC PLANT JPM I

PLANT JPM I Page 2 of 10 RO/SRO JOB PERFORMANCE MEASURE Task: Local Operation of 1A-A D/G (Idle Start & Stop)

Task #: 0640020104 Task Standard: D/G 1A-A is successfully started using local controls and cooling is established by local operation of the ERCW FCV using 0-SO-82-1 Diesel Generator 1A-A.

Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X K/A Reference/Ratings: 064A4.01 (4.0/4.3)

Method of Testing:

Simulated Performance: X Actual Performance:

Evaluation Method:

Simulator In-Plant X Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 12 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

PLANT JPM I Page 3 of 10 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. SM approval will be required to enter the Trip Hazard Zone in backup control room.
2. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
3. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

0-SO-82-1 section 8.2 and Appendices B and C.

References:

Reference Title Rev No.

0-SO-82-1 Diesel Generator 1A-A 37

PLANT JPM I Page 4 of 10 READ TO OPERATOR HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

DIRECTIONS TO EXAMINEE:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1.
2. 1A-A D/G has now been declared INOPERABLE for scheduled maintenance.
3. 0-SO-82-1 Diesel Generator 1A-A section 8.2 is in progress and has been completed through step 4.
4. Both of the Unit SROs have given approval to perform this procedure.
5. All prerequisites of 0-SO-82-1 Diesel Generator 1A-A are complete.

INITIATING CUES:

1. You have been directed to perform 0-SO-82-1 Diesel Generator 1A-A section 8.2 starting at step 5.
2. Inform the SRO when complete.

PLANT JPM I Page 5 of 10 Start Time Obtain a copy of 0-SO-82-1 Diesel Generator 1A-A section 8.2 and STEP 1  : SAT Appendices B and C.

UNSAT Standard: Examinee obtains a copy of 0-SO-82-1 Diesel Generator 1A-A section 8.2 and Appendices B and C.

Cue Provide a marked up copy of 0-SO-82-1 Diesel Generator 1A-A section 8.2 and Appendices B and C.

Comment STEP 2  : SAT UNSAT Standard: Examinee simulates depressing 0-HS-82-22 Critical Step Cue: Provide the following cue, 0-HS-82-22 went in and returned to out.

Comment

PLANT JPM I Page 6 of 10 STEP 3  : SAT UNSAT Standard: Examinee verifies LRX1A TRIPPED to local.

Provide the following cue, LRX1A relay switch is 45 degrees Cue: clockwise from 12 oclock position AND red flag above handswitch is present.

Comment STEP 4  : SAT UNSAT Standard: Examinee addresses the procedure step.

Examiner Note: The step was addressed in the initial conditions.

Comment

PLANT JPM I Page 7 of 10 STEP 5  : SAT UNSAT Standard: Examinee simulates placing HS-82-23 in the MAINTENANCE Critical Step (clockwise) position.

Cue: Provide the following cue, Red light above HS-82-23 is ON green light is OFF.

Comment STEP 6  : SAT UNSAT Standard: Examinee addresses the procedure step.

Cue: Provide the following cue, The UO will place out-of-service time in SI.

Comment STEP 7  : SAT UNSAT Standard: Examinee simulates depressing HS-82-23. Critical Step Cue: Provide the following cue, You hear a rumbling rotational sound from the diesel engines.

Comment

PLANT JPM I Page 8 of 10 STEP 8  : SAT UNSAT Standard: Examinee addresses the procedure step.

Cue: Provide the following cue, The UO will log the time.

Comment STEP 9  : SAT UNSAT Standard: Examinee addresses the procedure step.

Cue: Provide the following cue, Engine speed is ~ 400 rpm.

Comment

PLANT JPM I Page 9 of 10 STEP 10  : SAT UNSAT Examinee recognizes FCV-67-66 closed by use of position indicator Standard: on the valve motor OR recognizes no flow indicated on FI-67-69, &

277.

Cue: Provide the following cue, Both lights above HS-67-66 are OFF.

Provide the following cue, When Examinee looks at position Cue: indicator (or flow indicator), state valve indicates closed (or flow is 0 gpm).

Comment STEP 11  : SAT UNSAT Examinee simulates opening FCV-67-68 Emerg Dsl Htxs A1 & A2 Sup Standard: Vlv From Hdr B by placing HS-67-68 clockwise or manually operates Critical Step FCV-67-68 CCW.

Cue: Before FCV-67-68 operation provide the following cue, Green light above HS-67-68 is ON, red light is OFF.

Cue: After FCV-67-68 operation provide the following cue, Green light above HS-67-68 is OFF, red light is ON.

Comment Terminating Provide the following cue; Another operator will complete the Cue: STOP remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:

All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1.
2. 1A-A D/G has now been declared INOPERABLE for scheduled maintenance.
3. 0-SO-82-1 Diesel Generator 1A-A section 8.2 is in progress and has been completed through step 4.
4. Both of the Unit SROs have given approval to perform this procedure.
5. All prerequisites of 0-SO-82-1 Diesel Generator 1A-A are complete.

INITIATING CUES:

1. You have been directed to perform 0-SO-82-1 Diesel Generator 1A-A section 8.2 starting at step 5.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1305 NRC PLANT JPM J

PLANT JPM J Page 2 of 9 RO/SRO JOB PERFORMANCE MEASURE Task: Locally align U2 TDAFW LCV Back-up Air Supply Task #: 0000140504 Task Standard:

The examinee will align back-up air to the Unit 2 TDAFW LCV using EA-3-4 Local Alignment TD AFW LCV Back-Up Air Supply.

Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings:

Method of Testing:

Simulated Performance: X Actual Performance:

Evaluation Method:

Simulator In-Plant X Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 8 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

PLANT JPM J Page 3 of 9 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. SM approval will be required to enter the Trip Hazard Zone in backup control room.
2. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
3. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

1. EA-3-4 Local Alignment of TD AFW LCV Back-Up Air Supply

References:

Reference Title Rev No.

1 EA-3-4 Local Alignment of TD AFW LCV Back-Up Air 4 Supply

========================================================================

READ TO EXAMINEE HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

DIRECTIONS TO EXAMINEE:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 and Unit 2 have experienced a Loss of ERCW.
2. AOP-M.01 LOSS OF ESSENTIAL RAW COOLING WATER is in progress.

INITIATING CUES:

1. You have been directed to locally align the back-up air supply to the Unit 2 TDAFW LCVs using EA-3-4 Local Alignment of TD AFW LCV Back-Up Air Supply.
2. Inform the SRO when complete.

PLANT JPM J Page 4 of 9 Start Time STEP 1  : SAT Obtain a copy of EA-3-4 Local Alignment of TD AFW LCV Back-Up Air Supply. UNSAT Standard: Examinee obtains a copy of EA-3-4 Local Alignment of TD AFW LCV Back-Up Air Supply.

Cue Provide a copy of EA-3-4 Local Alignment of TD AFW LCV Back-Up Air Supply.

Comment STEP 2  : SAT UNSAT Standard: Examinee selects section 4.2 as the applicable section.

Comment

PLANT JPM J Page 5 of 9 STEP 3  : SAT UNSAT Standard: The examinee selects Unit 2 as the applicable Unit.

Comment STEP 4  : SAT UNSAT Standard: The examinee simulates obtaining hand held lighting and a radio.

Comment

PLANT JPM J Page 6 of 9 STEP 5  : SAT UNSAT Standard: The examinee addresses the step as N/A.

Comment STEP 6  : SAT UNSAT Standard: The examinee simulates turning the handwheel for U-2 ISV-32-1950E, Critical Step Isolation valve for Unit 2 LCV-3-172 in the counter clockwise direction.

After the examinee simulates opening ISV-32-1950E, provide the Cue: following cue, Handwheel turns several turns in the CCW direction and movement stops.

Comment

PLANT JPM J Page 7 of 9 STEP 7  : SAT UNSAT Standard: The examinee simulates turning the handwheel for U-2 ISV-32-1969E, Critical Step Isolation valve for Unit 2 LCV-3-173 in the counter clockwise direction.

After the examinee simulates opening ISV-32-1969E, provide the Cue: following cue, Handwheel turns several turns in the CCW direction and movement stops.

Comment STEP 8  : SAT UNSAT Standard: The examinee simulates turning the handwheel for U-2 ISV-32-1866E, Critical Step Isolation valve for Unit 2 LCV-3-175 in the counter clockwise direction.

After the examinee simulates opening ISV-32-1866E, provide the Cue: following cue, Handwheel turns several turns in the CCW direction and movement stops.

Comment

PLANT JPM J Page 8 of 9 STEP 9  : SAT UNSAT Standard: The examinee simulates turning the handwheel for U-2 ISV-32-1974E, Critical Step Isolation valve for Unit 2 LCV-3-174 in the counter clockwise direction.

After the examinee simulates opening ISV-32-1974E, provide the Cue: following cue, Handwheel turns several turns in the CCW direction and movement stops.

Comment Terminating Provide the following cue, another Operator will complete the Cue: STOP remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:

All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 and Unit 2 have experienced a Loss of ERCW.
2. AOP-M.01 LOSS OF ESSENTIAL RAW COOLING WATER is in progress.

INITIATING CUES:

1. You have been directed to locally align the back-up air supply to the Unit 2 TDAFW LCVs using EA-3-4 Local Alignment of TD AFW LCV Back-Up Air Supply.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1305 NRC PLANT JPM K

PLANT JPM K Page 2 of 12 RO/SRO JOB PERFORMANCE MEASURE Task: Respond to Loss of Control Air System Task #: 0000900501 Task Standard: The examinee will reset and start Control & Service Air Compressor(s). using EA-32-2, Establishing Control and Service Air.

Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings: APE 065 AA1.04 (3.5/3.4)

Method of Testing:

Simulated Performance: X Actual Performance:

Evaluation Method:

Simulator In-Plant X Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 10 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

PLANT JPM K Page 3 of 12 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. SM approval will be required to enter the Trip Hazard Zone in backup control room.
2. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
3. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

1. EA-32-2, Establishing Control and Service Air

References:

Reference Title Rev No.

EA-32-2 Establishing Control and Service Air 3

PLANT JPM K Page 4 of 12 READ TO OPERATOR HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

DIRECTIONS TO EXAMINEE:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Units 1 and 2 are in MODE 3 following a Loss of Offsite Power.
2. The Aux. Air Compressors are not in service.
3. EA-32-2, Establishing Control and Service Air is in progress, completed through section 4.2 step 3.

INITIATING CUES:

1. You have been directed to start and manually load the Station Air Compressors using EA-32-2, Establishing Control and Service Air section 4.2 starting at step 4.
2. Inform the SRO when complete.

PLANT JPM K Page 5 of 12 Start Time Obtain a copy of EA-32-2, Establishing Control and Service Air.

STEP 1  : SAT UNSAT Standard: Examinee obtains a copy of EA-32-2, Establishing Control and Service Air.

Cue Provide a marked up copy of EA-32-2, Establishing Control and Service Air, completed through section 4.2 step 3.

Comment STEP 2  : SAT UNSAT Standard: Examinee simulates depressing 0-HS-32-25B to reset air comp trip Critical Step signals.

Cue Following simulated operation provide the following cue, 0-HS-32 25B went in and returned to out..

Comment

PLANT JPM K Page 6 of 12 STEP 3  : SAT UNSAT Standard: Examinee observes Compressor A Trip lights DARK.

Cue When asked provide the following cue, All Compressor A trip lights are DARK.

Comment STEP 4  : SAT UNSAT Standard: Examinee observes Compressor A Trip lights DARK.

Cue When asked provide the following cue, All Compressor B trip lights are DARK.

Comment

PLANT JPM K Page 7 of 12 STEP 5  : SAT UNSAT Standard: Examinee simulates placing 0-HS-32-25D to HAND. Critical Step Cue When asked provide the following cue, 0-HS-32-25D is positioned counter-clockwise to HAND.

Comment STEP 6  : SAT UNSAT Standard: Examinee simulates placing 0-HS-32-26A to HAND. Critical Step Cue When asked provide the following cue, 0-HS-32-26A is positioned counter-clockwise to HAND.

Comment

PLANT JPM K Page 8 of 12 STEP 7  : SAT UNSAT Standard: Examinee simulates placing HS-32-25A in Position 1.

Cue When asked provide the following cue, HS-32-25A is positioned counter-clockwise to Position 1.

Comment STEP 8  : SAT UNSAT Standard: Examinee simulates placing 0-HS-32-25F for comp A in PULL TO Critical Step START position.

Cue When asked provide the following cue, HS-32-25F is in maintained in the pull out position.

Comment

PLANT JPM K Page 9 of 12 STEP 9  : SAT UNSAT Standard: Examinee simulates depressing 0-HS-32-25E. Critical Step Cue When asked provide the following cue, You hear a mechanical rotational noise from Compressor A.

Comment STEP 10  : SAT UNSAT Standard: Examinee simulates placing 0-HS-32-43A and 0-HS-32-43B in ON Critical Step (clockwise) position to fully load comp A.

Cue When asked provide the following cue, You hear the rotational sound lowering then recovering from Compressor A.

Comment

PLANT JPM K Page 10 of 12 STEP 11  : SAT UNSAT Standard: Examinee simulates placing 0-HS-32-26D for comp A in PULL TO Critical Step START position.

Cue When asked provide the following cue, HS-32-26D is maintained in the pull out position.

Comment STEP 12  : SAT UNSAT Standard: Examinee simulates depressing 0-HS-32-26B. Critical Step Cue When asked provide the following cue, You hear a mechanical rotational noise from Compressor B.

Comment

PLANT JPM K Page 11 of 12 STEP 13  : SAT UNSAT Standard: Examinee simulates placing 0-HS-32-38A and 0-HS-32-38B in ON Critical Step (clockwise) position to fully load Air Compressor B.

Cue When asked provide the following cue, You hear the rotational sound lowering then recovering from Compressor B.

Comment Terminating Provide the following cue, Another operator will perform the Cue: STOP remaining ste4ps of this procedure.

Stop Time

JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:

All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Units 1 and 2 are in MODE 3 following a Loss of Offsite Power.
2. The Aux. Air Compressors are not in service.
3. EA-32-2, Establishing Control and Service Air is in progress, completed through section 4.2 step 3.

INITIATING CUES:

1. You have been directed to start and manually load the Station Air Compressors using EA-32-2, Establishing Control and Service Air section 4.2 starting at step 4.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.