SEQUOYAH NUCLEAR PLANT 1305 NRC SIMULATOR JPM A

SIM JPM A Page 2 of 9 RO/SRO JOB PERFORMANCE MEASURE Task: 0-SI-OPS-085-011.0 Reactivity Control Systems Moveable Control Assemblies Task #: 0010010201 Task Standard: The examinee will perform 0-SI-OPS-085-011.0 Reactivity Control Systems Moveable Control Assemblies starting with Control Bank Bank D. Following the uncontrolled rod movement, the examinee will trip the reactor using AOP-C.01, Rod Control System Malfunctions Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X K/A Reference/Ratings: 001.A2.11 (4.4/4.7)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 10 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM A Page 3 of 9 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 15, 96% power BOL.
3. If IC XX is not available perform the following:

Reset to IC 15, 96% power BOL.

Ensure Rod Control Mode Selector Switch in CB C position.

Run SCN file 1305 NRC JPM A

4. Display the following on ICS:

RPI for CB D Computer point T0499A Computer point T0496A

5. PLACE SIMULATOR IN RUN
6. An extra operator will be required to acknowledge alarms.
7. ACKNOWLEDGE ALARMS
8. FREEZE SIMULATOR.
9. Provide a copy of 0-SI-OPS-085-011.0 REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES.
10. Save as a temporary IC, if repeat runs of JPM will be desired.
11. PLACE SIMULATOR IN RUN
12. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
13. When the candidate begins inserting Control Bank D, insert Malfunction RD02 (uncontrolled insertion for Bank D group 2)

Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

REACTIVITY CONTROL SYSTEMS MOVEABLE

1. 0-SI-OPS-085-011.0 34 CONTROL ASSEMBLIES
2. AOP-C.01 ROD CONTROL SYSTEM MALFUNCTIONS 22

SIM JPM A Page 4 of 9 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1, 96% power, BOL.
2. 0-SI-OPS-085-011.0 REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES is in progress at section 6.1.8.

INITIATING CUES:

1. Perform 0-SI-OPS-085-011.0 REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES to verify rod operability for Control Bank D starting at section 6.1.8 step 1.
2. Inform the SRO when complete.

SIM JPM A Page 5 of 9 Start Time STEP 1  : SAT Obtain a copy of 0-SI-OPS-085-011.0, REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES. UNSAT Standard: Examinee obtains a copy of 0-SI-OPS-085-011.0, REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES.

Cue: Provide a marked up copy of 0-SI-OPS-085-011.0, REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES.

Comment STEP 2  : SAT UNSAT Standard: Examinee addresses the step as N/A.

Comment

SIM JPM A Page 6 of 9 STEP 3  : SAT UNSAT Standard: Examinee places HS-85-51110, Rod Control Mode Selector Switch to Critical Step Control Bank D.

Comment STEP 4  : SAT UNSAT Examinee places HS-85-51111, Rod Control to IN and obtains > a 10 Standard: step movement of Control Bank D Group 1 and Group 1 by 1-XI Critical Step 5105D1 and D2.

Comment

SIM JPM A Page 7 of 9 STEP 5  : SAT UNSAT Standard: The examinee verifies Control Bank D Step Counters and Individual Rod Position Indicators have moved > 10 steps.

Comment STEP 6  : SAT UNSAT Examinee places HS-85-51111, Rod Control to OUT and observes Standard:

Control Bank D Group 2 inserting continuously.

Examiner The examinee may elect to trip the Reactor. If the examinee trips the Note: reactor, go to JPM step 9.

Comment STEP 7  : SAT UNSAT Standard: The examinee transitions to AOP-C.01, ROD CONTROL SYSTEM MALFUNCTIONS section 2.1.

Comment

SIM JPM A Page 8 of 9 ALTERNATE PATH STEP 8  : SAT UNSAT The examinee places HS-85-51110, Rod Control Mode Selector Standard: Switch to MANUAL, checks Control Bank D is still inserting, and transitions to the RNO.

Comment STEP 9  : SAT UNSAT Standard: The examinee places 1-RT-1 or 1-RT-2 to TRIP. Critical Step Comment Terminating When the examinee trips the reactor provide the following cue, Cue: Another operator will complete the remaining steps of this STOP procedure..

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1, 96% power, BOL.
2. 0-SI-OPS-085-011.0 REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES is in progress at section 6.1.8.

INITIATING CUES:

1. Perform 0-SI-OPS-085-011.0 REACTIVITY CONTROL SYSTEMS MOVEABLE CONTROL ASSEMBLIES to verify rod operability for Control Bank D starting at section 6.1.8 step 1.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1305 NRC SIMULATOR JPM B

SIM JPM B Page 2 of 16 RO/SRO JOB PERFORMANCE MEASURE Task: Align ECCS Pumps to the Containment Sump Task #: 3010060601 Task Standard: The examinee will align CCP and SI pump flowpath for sump recirculation using ES-1.3 TRANSFER TO RHR CONTAINMENT.

Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X K/A Reference/Ratings: 006 A4.07 (4.4/4.4)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 15 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM B Page 3 of 16 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 302
3. If IC 302 is not available perform the following:

Reset to IC 24 IOR ZDIHS7421A f:0

{global95[5670]} DOR ZDIHS7421A

4. An extra operator will be required to acknowledge alarms.
5. ACKNOWLEDGE ALARMS
6. FREEZE SIMULATOR.
7. Save as a temporary IC, if repeat runs of JPM will be desired.
8. Provide a copy of ES-1.3 TRANSFER TO RHR CONTAINMENT SUMP.
9. PLACE SIMULATOR IN RUN
10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.

SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
2. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1. ES-1.3 TRANSFER TO RHR CONTAINMENT SUMP 19 2 1-AR-M6-E MISCELLANEOUS 23

SIM JPM B Page 4 of 16 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. A LOCA is in progress on Unit 1.
2. ECCS pumps are running taking a suction from the RWST.

INITIATING CUES:

1. When conditions permit, you are directed to perform ES-1.3, Transfer to Cold Leg Recirculation.
2. Inform the SRO when complete.

SIM JPM B Page 5 of 16 Start Time STEP 1  : SAT UNSAT Standard: Examinee acknowledges alarm and transitions to ES-1.3 TRANSFER TO RHR CONTAINMENT SUMP.

Comment STEP 2  : SAT Obtain a copy of ES-1.3 TRANSFER TO RHR CONTAINMENT SUMP UNSAT Standard: Examinee obtains a copy of ES-1.3 TRANSFER TO RHR CONTAINMENT SUMP.

Cue: Provide a copy of ES-1.3 TRANSFER TO RHR CONTAINMENT SUMP.

Comment

SIM JPM B Page 6 of 16 STEP 3  : SAT UNSAT Standard: Examinee addresses procedure step.

Cue If directed, acknowledge direction.

Comment STEP 4  : SAT UNSAT Standard: Examinee verifies both Containment Spray pumps running by observing red indicating lights above pump handswitches ON.

Comment

SIM JPM B Page 7 of 16 STEP 5  : SAT UNSAT Examinee places the A OR B Containment Spray 1-HS-72-27A or 1-Standard: HS-72-10A handswitch in PULL-TO-LOCK within 2 minutes of the Critical Step RWST Level Lo Alarm.

Comment Examiner Annotate the stop time for stopping the Containment Spray pump Note: here. ______

STEP 6  : SAT UNSAT Standard: Examinee verifies containment pressure by observing PDI-30-45, PDI-30-44, PDI-30-43, or PDI-30-42.

Comment

SIM JPM B Page 8 of 16 STEP 7  : SAT UNSAT RNO Standard: Examinee places both Containment Spray reset pushbuttons 1-HS-72 43 and 1-HS-72 42 to RESET.

Critical Step Comment STEP 8  : SAT UNSAT Examinee places the remaining running Containment Spray Pump Standard: handswitch to STOP, both Containment Spray Pump handswitches to A-AUTO, places Containment Spray discharge valve handswitches Critical Step FCV-72-39 and FCV-72-2 to close and proceeds to step 3.

Comment

SIM JPM B Page 9 of 16 STEP 9  : SAT UNSAT Standard: Examinee checks containment sump level greater than 11% by observing LI-63-176, LI-63-177, LI-63-178, or LI-63-179.

Comment STEP 10  : SAT UNSAT Standard: Examinee verifies FCV-63-73 and FCV-63-73 OPEN by observing the red lights above 1-HS-63-72A and 1-HS-63-73A ON.

Comment

SIM JPM B Page 10 of 16 STEP 11  : SAT UNSAT ALTERNATE PATH Examinee places containment sump valve 1-HS-74-21A to OPEN Standard: Critical Step Examinee checks RHR suction valves FCV-74-3 CLOSING by observing the red and green lights above 1-HS-74-3A ON (Not Critical).

Comment STEP 12  : SAT UNSAT Examinee monitors RWST LVL LO-LO alarm DARK on [M-6E, E4] by Standard: observing alarm window OFF and RWST level greater than 8% by observing LI-63-50, LI-63-51, LI-63-52, or LI-63-53.

Comment STEP 13  : SAT UNSAT Standard: Examinee monitors RHR pumps RUNNING by observing the red lights above 1-HS-74-10A and 1-HS-74-20A ON.

Comment

SIM JPM B Page 11 of 16 STEP 14  : SAT UNSAT Standard: Examinee directs another operator to perform step 6 and proceeds to step 7.

Cue Acknowledge direction from the examinee Comment Examiner The station standard practice is for the BOP operator to perform Note manipulations outside the At The Controls Area during this evolution.

STEP 15  : SAT UNSAT Examinee monitors containment sump valves FCV-63-72 and FCV Standard: 73 OPEN by observing the red indicating lights above 1-HS-63-72A and 1-HS-63-73A ON.

Comment

SIM JPM B Page 12 of 16 STEP 16  : SAT UNSAT Examinee ensures RWST to RHR suction valves FCV-74-3 and FCV-Standard: 74-21 CLOSED by observing the green indicating lights above 1-HS-74-3A and 1-HS-74-21A ON.

Comment STEP 17  : SAT UNSAT Standard: Examinee monitors RCS pressure less than 1500 psig by observing PI-68-62, PI-68-69 or other installed plant instrumentation.

Comment

SIM JPM B Page 13 of 16 STEP 18  : SAT UNSAT Standard: Examinee places 1-HS-63-3A AND 1-HS-63-4A AND 1-HS-63-175A Critical Step to CLOSE Comment STEP 19  : SAT UNSAT Standard: Examinee places 1-HS-74-33A AND 1-HS-74-35A to CLOSE Critical Step Comment

SIM JPM B Page 14 of 16 STEP 20  : SAT UNSAT Standard: Examinee places 1-HS-63-7A AND 1-HS-63-6A to OPEN Critical Step Comment STEP 21  : SAT UNSAT Standard: Examinee places 1-HS-63-8A to OPEN. Critical Step Comment

SIM JPM B Page 15 of 16 STEP 22  : SAT UNSAT Standard: Examinee places 1-HS-63-11A to OPEN. Critical Step Comment Terminating Provide the following cue Another operator will perform Cue: STOP the remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. A LOCA is in progress on Unit 1.
2. ECCS pumps are running taking a suction from the RWST.

INITIATING CUES:

1. When conditions permit, you are directed to perform ES-1.3, Transfer to Cold Leg Recirculation.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1305 NRC SIMULATOR JPM C

SIM JPM C Page 2 of 10 Rev. 15 RO/SRO JOB PERFORMANCE MEASURE Task: Terminate SI and Re-Establish Charging Flow Task #: 0001000501 Task Standard: Safety Injection is terminated using E-0 resulting in one of the CCPs in A-Auto and the alternate charging supply valve open due to the failure of the normal charging supply valve.

Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X K/A Reference/Ratings: EPE E02 EA1.1 (4.0/3.9)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 14 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM C Page 3 of 10 Rev. 15 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 309
3. If IC 309 is not available perform the following:

a) Reset to IC 16 b) Insert IMF RP04B ON [False Auto SIS, Hi Cntmt Press.]

c) Insert override ZDIHS6286A to CLOSE to override normal charging valve closed.

d) Perform E-0 (including ES-0.5) through step #14.

4. An extra operator will be required to acknowledge alarms.
5. ACKNOWLEDGE ALARMS
6. FREEZE SIMULATOR.
7. Provide a copy of E-0, REACTOR TRIP OR SAFETY INJECTION marked up through step 14.
8. Save as a temporary IC, if repeat runs of JPM will be desired.
9. PLACE SIMULATOR IN RUN
10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.

SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
2. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1. E-0 REACTOR TRIP OR SAFETY INJECTION 35 2.

SIM JPM C Page 4 of 10 Rev. 15 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3 following a spurious Safety Injection
2. The crew completed E-0, REACTOR TRIP OR SAFETY INJECTION through step 14.

INITIATING CUES:

1. The US has directed you to stop one charging pump, isolate the CCPIT and establish charging flow using E-0, REACTOR TRIP OR SAFETY INJECTION starting at step 15.
2. Inform the US when charging flow and seal injection flow have been established.

SIM JPM C Page 5 of 10 Rev. 15 Start Time Obtain a copy of E-0, REACTOR TRIP OR SAFETY INJECTION.

STEP 1  : SAT UNSAT Standard: Operator obtains a copy of E-0, REACTOR TRIP OR SAFETY INJECTION.

Cue Provide a copy of E-0, REACTOR TRIP OR SAFETY INJECTION.

Comment STEP 2  : SAT UNSAT Standard: Operator depresses SI Reset pushbuttons. Critical Step Comment STEP 3  : SAT UNSAT Standard: Operator addresses the procedure step.

Cue Provide the following cue, The CRO will monitor the shutdown boards.

Comment

SIM JPM C Page 6 of 10 Rev. 15 STEP 5  : SAT UNSAT Standard: Operator places ONE Charging Pump in STOP. Critical Step Comment STEP 6  : SAT UNSAT Standard: Operator verifies RCS pressure stable or rising by observing installed instrumentation.

Comment Examiner Note:

SIM JPM C Page 7 of 10 Rev. 15 STEP 7  : SAT UNSAT Operator places CCPIT inlet valves HS-63-39A AND HS-63-40A OR Standard: Critical Step Operator places CCPIT outlet valves HS 25A AND HS 26A To CLOSE.

Comment STEP 8  : SAT UNSAT Standard: Operator closes FCV-62-89 by adjusting controller FIC-62-89 CCW to Critical Step CLOSE (Maximum output.).

Comment

SIM JPM C Page 8 of 10 Rev. 15 STEP 9  : SAT UNSAT Standard: Operator places charging isolation valves HS-62-90A and HS-62-91A Critical Step to OPEN Comment STEP 12  : SAT UNSAT Operator places FCV-62-86 to OPEN. Operator observes when 1-HS -

Standard: 62-86A is turned to the right OPEN position, green light remains lit on HS and operator transitions to the RNO.

Comment STEP 13  : SAT RNO UNSAT Standard: Operator places 1-HS-62-85 Alternate Charging Isolation to OPEN. Critical Step Comment

SIM JPM C Page 9 of 10 Rev. 15 STEP 14  : SAT UNSAT Standard: Operator addresses the procedure step.

Comment Terminating Provide the following cue, Another operator will complete the Cue: STOP remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3 following a spurious Safety Injection
2. The crew completed E-0, REACTOR TRIP OR SAFETY INJECTION through step 14.

INITIATING CUES:

1. The US has directed you to stop one charging pump, isolate the CCPIT and establish charging flow using E-0, REACTOR TRIP OR SAFETY INJECTION starting at step 15.
2. Inform the US when charging flow and seal injection flow have been established.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1305 NRC SIMULATOR JPM D

SIM JPM D Page 2 of 16 RO/SRO JOB PERFORMANCE MEASURE Task: Respond to RCP High Stator temperature Alarm using AOP-R.04 REACTOR COOLANT PUMP MALFUNCTIONS.

Task #: 0030010101 Task Standard: The examinee manually stops the #2 Reactor Coolant Pump and closes RCS Loop 2 Pressurizer Spray Valve.

Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X K/A Reference/Ratings: APE 015/017 AA1.03 (3.7/3.8)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 15 mins Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM D Page 3 of 16 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 324.
3. If IC 324 is not available, perform the following:

Reset to IC 7 Open reactor Trip Breakers

4. Place MODE 3 sign on Panel M-4
5. Set NR-45 to display one SRM and one IRM
6. An extra operator will be required to acknowledge alarms.
7. ACKNOWLEDGE ALARMS
8. FREEZE SIMULATOR.
9. PLACE SIMULATOR IN RUN
10. Booth operator standby to insert the SCN File 1305 JPM D.scn (from exams folder) when the examinee assumes the shift.

SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
2. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

1-SO-68-2 Reactor Coolant Pumps AOP- R.04 Reactor Coolant Pump Malfunctions

References:

Reference Title Rev No.

1. 1-SO-68-2 Reactor Coolant Pumps 33
2. AOP- R.04 Reactor Coolant Pump Malfunctions 27 3 1-AR-M5-B CVCS Seal Water and RCP 39

SIM JPM D Page 4 of 16 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3 INITIATING CUES:
1. You are the OATC.
2. Respond to plant conditions.

SIM JPM D Page 5 of 16 STEP 1  : SAT UNSAT Standard: Examinee acknowledges alarm and observes rise in RCP motor stator temperatures.

Comment

SIM JPM D Page 6 of 16 STOP Loop 2 RCP STEP 2  : SAT UNSAT Standard: Examinee places 1-HS-68-31A #2 RCP handswitch to STOP. Critical Step Comment Examiner The following steps are from the Annunciator Response Procedure 1-Note AR-M5-B.

STEP 3  : SAT UNSAT Standard: Examinee determines the #2 RCP in alarm by observing the ICS display.

Comment

SIM JPM D Page 7 of 16 STEP 4  : SAT UNSAT Standard: Engineering is contacted to obtain engineering assistance in determining the validity of the alarm.

Cue If asked, provide the following cue, Time has been compressed, Engineering has been contacted and has validated the alarm.

Comment STEP 5  : SAT UNSAT Examinee monitors or directs monitoring parameters by observing Standard: indications on installed instrumentation and determines indications normal.

Cue If asked, provide the following cue, The AUO is monitoring RCP Vibration.

Comment

SIM JPM D Page 8 of 16 STEP 6  : SAT UNSAT Standard: Examinee verifies ERCW aligned to pump cooler by observing red light above 1-HS-67-102 on 0-M-27A ON.

Comment STEP 7  : SAT UNSAT Standard: Examinee verifies ERCW system temperature and pressure normal by observing indications 0-M-27A.

Comment STEP 8  : SAT UNSAT Standard: Examinee verifies lower compartment air temperature normal by observing indications on ICS and other installed plant instrumentation.

Comment

SIM JPM D Page 9 of 16 STEP 9  : SAT UNSAT Standard: Examinee refers to 1-SO-68-2 Appendix D for the operating limits.

Comment STOP Loop 2 RCP STEP 10  : SAT UNSAT Standard: Examinee places 1-HS-68-31A #2 RCP handswitch to STOP. Critical Step Comment STEP 11  : SAT UNSAT Standard: Examinee verifies pump amps normal by observing EI-68-8 less than 400 amps.

Comment

SIM JPM D Page 10 of 16 STEP 12  : SAT UNSAT Standard: Examinee observes the motor winding temperature is greater than 311°F using the ICS and goes to AOP-R.04.

Cue Respond as Engineering Alarm is valid.

Comment

SIM JPM D Page 11 of 16 STEP 13  : SAT UNSAT Standard: Examinee goes to AOP-R.04 section 2.6 Comment

SIM JPM D Page 12 of 16 STEP 14  : Alternate Path SAT UNSAT Examinee determines the motor winding temperature is greater than Standard: 311°F by observing the ICS and goes to the RNO column and ultimately to Section 2.1.

Comment

SIM JPM D Page 13 of 16 STEP 15  : SAT UNSAT Standard: Examinee determines the Unit is in MODE 3 and proceeds to RNO Comment STEP 16  : SAT UNSAT Standard: Examinee places handswitch 1-HS-68-31A #2 RCP to STOP. Critical Step Comment

SIM JPM D Page 14 of 16 STEP 17  : SAT UNSAT Standard: Examinee determines that seal leakoff within normal values and continues to step 4.

Comment STEP 18  : SAT UNSAT Standard: Examinee places XS-68-2D (T) and XS-68-2M (T-avg) in PULL TO Critical Step DEFEAT Comment

SIM JPM D Page 15 of 16 STEP 19  : SAT UNSAT Standard: Examinee identifies #2 RCP as effected pump and proceeds to RNO column.

Comment STEP 20  : SAT UNSAT Standard: Operator closes the Loop 2 Pressurizer Spray Valve by placing Critical Step controller 1-PIC-68-340B to CLOSE (minimum output).

Comment Terminating Provide the following cue Another operator will perform the Cue: STOP remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3 INITIATING CUES:
1. You are the OATC.
2. Respond to plant conditions.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1305 NRC SIMULATOR JPM E

SIM JPM E Page 2 of 12 RO/SRO JOB PERFORMANCE MEASURE Task: Operate the Motor Driven AFW pump.

Task #: 0610050101 Task Standard: The examinee will align Essential Raw Cooling Water (Service Water) to the motor driven Auxiliary Feed Pumps (AFW) suction using EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings: EPE E05 EA 1.1 (4.1/4.0)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 5 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM E Page 3 of 12 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 331
3. If IC 331 is not available perform the following:

Reset to IC 17 IMF ED01 f:1 IMF FW23C f:40 IMF CN05 f:100 IMF FW07C f:1 IOR ZDIHS3116AA f:0 IOR ZLOHS3116AA_GREEN1 f:1 IOR ZLOHS3116AA_GREEN2 f:1 IOR ZDIHS3126AA f:0 IOR ZLOHS3126AA_GREEN1 f:1 IOR ZLOHS3126AA_GREEN2 f:1

{global95[4811]} DOR ZDIHS3116AA

{global95[4811]} DOR ZLOHS3116AA_GREEN1

{global95[4811]} DOR ZLOHS3116AA_GREEN2

{global95[4822]} DOR ZDIHS3126AA

{global95[4822]} DOR ZLOHS3126AA_GREEN1

{global95[4822]} DOR ZLOHS3126AA_GREEN2

4. PLACE SIMULATOR IN RUN
5. An extra operator will be required to acknowledge alarms.
6. ACKNOWLEDGE ALARMS
7. FREEZE SIMULATOR.
8. Save as a temporary IC, if repeat runs of JPM will be desired.

SIM JPM E Page 4 of 12

9. Place pink tags on the following:

HS-3-148A AFP 1B-B LCV to S/G #3.

HS-3-172 S/G #3 Turbine AFP LCV.

10. PLACE SIMULATOR IN RUN Tools/Equipment/Procedures Needed:

EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW

References:

Reference Title Rev No.

1. EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW 2 2.

SIM JPM E Page 5 of 12 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3.
2. A Loss of offsite power is in progress.
3. #3 Steam Generator in faulted.
4. The Turbine Driven AFW pump has tripped.
5. Unit 1 Condensate Storage tank is 5% and lowering rapidly.

INITIATING CUES:

1. The SRO has directed you to align ERCW to the motor Driven AFW pumps using EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW.
2. Inform the SRO when complete.

SIM JPM E Page 6 of 12 Start Time STEP 1  : SAT Obtain a copy of EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW UNSAT Standard: Examinee obtains a copy of EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW Cue: Provide a copy of EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW.

Comment STEP 2  : SAT UNSAT Standard: Examinee selects Unit 1 as the affected unit.

When alarm 2C D6 CONDENSATE STORAGE TANK B LEVEL LO Cue: LO annunciates provide the following cue, Another operator will address 2C D6 CONDENSATE STORAGE TANK B LEVEL LO LO.

Comment

SIM JPM E Page 7 of 12 STEP 3  : SAT UNSAT Standard: The examinee addresses the step as N/A.

Comment STEP 4  : SAT UNSAT Standard: The examinee addresses the step as N/A.

Comment

SIM JPM E Page 8 of 12 STEP 5  : SAT UNSAT Standard: The examinee addresses the step as N/A.

Comment STEP 6  : SAT UNSAT Standard: The examinee addresses the step as N/A.

Comment

SIM JPM E Page 9 of 12 STEP 7  : SAT UNSAT Standard: The examinee selects section 4.10 as the applicable section.

Comment STEP 8  : SAT UNSAT Standard: The examinee places HS-3-116-A/A ERCW Header A AFW Supply to Critical Step OPEN.

Comment

SIM JPM E Page 10 of 12 STEP 9  : SAT UNSAT Standard: The examinee addresses the procedure step.

Cue Provide the following cue, AUO Acknowledges close ERCW tell tale drain valve 1-3-807.

Comment STEP 10  : SAT UNSAT Standard: The examinee places HS-3-126-A/A ERCW Header B AFW Supply to Critical Step OPEN.

Comment

SIM JPM E Page 11 of 12 STEP 9  : SAT UNSAT Standard: The examinee addresses the procedure step.

Cue Provide the following cue, AUO Acknowledges close ERCW tell tale drain valve 1-3-808.

Comment Terminating Provide the following cue, Another operator will complete the Cue: STOP remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3.
2. A Loss of offsite power is in progress.
3. #3 Steam Generator in faulted.
4. The Turbine Driven AFW pump has tripped.
5. Unit 1 Condensate Storage tank is 5% and lowering rapidly.

INITIATING CUES:

1. The SRO has directed you to align ERCW to the motor Driven AFW pumps using EA-3-10 ESTABLISHING MOTOR DRIVEN AFW FLOW.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1305 NRC SIMULATOR JPM F

SIM JPM F Page 2 of 12 RO/SRO JOB PERFORMANCE MEASURE Task: Start Up A-A Hydrogen Recombiner Task #: 0881010401 Task Standard: "A-A" Hydrogen Recombiner is placed in service using EA-268-1, Placing Hydrogen Recombiner in Service.

Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings: 028 A4.01 (4.0/4.0)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 5 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM F Page 3 of 12 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 312, (Post LOCA.)
3. If IC 312 is not available, perform the following:

a) Reset to IC 24.

b) ENSURE the controllers for both Hydrogen Recombiners are set to Zero (0) after simulator initialization.

c) Insert malfunctions to establish 5 psig on Containment Pressure Indicators:

IMF CH01A f:37.5 IMF CH01B f:37.5 IMF CH01C f:37.5 IMF CH01D f:37.5 d) Put Containment Hydrogen Analyzer Fans A and B in service by placing 1-HS- 43-200A and -210A in ANALYZE.

4. ENSURE white lights (1-XI-43-200 and 210 located on M-10) are NOT LIT indicating normal flow through the Hydrogen Analyzers.
5. Ensure Train A Recombiner Power Adjust potentiometer set at 100
6. The reference power value used in JPM step 9 (46.98 kw) must be verified correct prior to JPM performance.
7. An extra operator will be required to acknowledge alarms.
8. ACKNOWLEDGE ALARMS
9. FREEZE SIMULATOR.
10. Provide a copy of EA-268-1, Placing Hydrogen Recombiner in Service
11. Save as a temporary IC, if repeat runs of JPM will be desired.
12. PLACE SIMULATOR IN RUN
13. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, if a temporary IC has been deleted.

SIM JPM F Page 4 of 12 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
2. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

1. EA-268-1, Placing Hydrogen Recombiner in Service
2. Calculator

References:

Reference Title Rev No.

1. EA-268-1 Placing Hydrogen Recombiner in Service 4 2.

SIM JPM F Page 5 of 12 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 has had an event.
2. Containment pressure indicators1-PDI-30-45, 44, 43 and 42 are indicating 5 psig.
3. The Hydrogen Analyzers have been in service for > 30 minutes.
4. Containment Hydrogen concentration is 2.2%

INITIATING CUES:

1. The US has directed you to place "A-A" Hydrogen Recombiner in service using EA-268-1, Placing Hydrogen Recombiner in Service.
2. Inform the US when complete.

SIM JPM F Page 6 of 12 Start Time Obtain a copy of EA-268-1, Placing Hydrogen Recombiner in Service.

STEP 1  : SAT UNSAT Standard: Operator obtains EA-268-1, Placing Hydrogen Recombiner in Service.

Cue Provide a copy of EA-268-1, Placing Hydrogen Recombiner in Service.

Comment STEP 2  : SAT UNSAT Standard: Operator determines that section 4.2 is the appropriate section.

Comment

SIM JPM F Page 7 of 12 STEP 3  : SAT UNSAT Standard: Operator determines that Unit 1 is the appropriate unit.

Comment STEP 4  : SAT UNSAT Standard: Operator determines that the A Train Recombiner will be started from the initiating cue.

Comment STEP 5  : SAT UNSAT Standard: Operator records Containment press from at least one of the PAM instruments.

Comment

SIM JPM F Page 8 of 12 STEP 6  : SAT UNSAT Standard: Operator addresses the step as N/A Comment STEP 7  : SAT UNSAT Standard: Operator verifies "PWR AVAILABLE white light is ON for "A-A" Recombiner on M-10.

Comment STEP 8  : SAT UNSAT Operator places "A-A" Hydrogen power adjust potentiometer CCW to Standard: 000. Critical Step Operator addresses Train B as N/A (not critical).

Comment

SIM JPM F Page 9 of 12 STEP 9  : SAT UNSAT Standard: Operator places "A-A" Recombiner "PWR OUT SW" in UP (ON) Critical Step position.

Comment STEP 10  : SAT UNSAT Operator determines the correction factor (Pressure Factor) to be ~

Standard: 1.41 (1.4 - 1.45), by using the 5 psig Containment Pressure line and Critical Step intersection on curve.

Comment STEP 11  : SAT UNSAT Standard: Operator enters the reference power obtained from the Reference Power Data Plate or from Cue. (46.98 kW)

Cue Provide the following cue, Reference power is 46.98 kW.

Comment

SIM JPM F Page 10 of 12 STEP 12  : SAT UNSAT Operator calculates the hydrogen recombiner power setting by performing the following calculation:

Standard: Pressure Factor X Reference Power= Setting KW Critical Step 1.41 (1.4 to 1.45%) X 46.98 KW = 66.24 KW (Acceptable Range 65.77 to 68.12 KW)

Comment STEP 13  : SAT UNSAT Standard: Operator records power setting, 66.24KW (65.77 to 68.12) in the Train A 25 Minute Table, KW reading column, and checks the box.

Comment

SIM JPM F Page 11 of 12 STEP 14  : SAT UNSAT Standard: Operator places XS-83-5003 Power Adjust potentiometer CW until 5 +

0.5 KW is obtained.

Critical Step Comment Terminating Provide the following cue, Another operator will complete the Cue: STOP remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 has had an event.
2. Containment pressure indicators1-PDI-30-45, 44, 43 and 42 are indicating 5 psig.
3. The Hydrogen Analyzers have been in service for > 30 minutes.
4. Containment Hydrogen concentration is 2.2%

INITIATING CUES:

1. The US has directed you to place "A-A" Hydrogen Recombiner in service using EA-268-1, Placing Hydrogen Recombiner in Service.
2. Inform the US when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1305 NRC SIMULATOR JPM G

SIM JPM G Page 2 of 10 RO/SRO JOB PERFORMANCE MEASURE Task: Transfer 1A-A 6.9 KV SD Bd from Alternate to Normal Supply Task #: 0620520201 Task Standard: 1A-A 6.9 kv Shutdown Board is energized by manually starting the 1A-A EDG.

Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X K/A Reference/Ratings: EPE E02 EA1.1 (4.0/3.9)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 7 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM G Page 3 of 10 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 313.
3. If IC 313 is not available perform the following.

a) Reset to IC 14 b) Transfer 1A-A 6.9 Kv Shutdown Board to the alternate feeder.

c) Insert IMF EG08A - D/G 1A-A Fails to Auto Start.

d) Insert Override ZDIHS5744A - Trip 6.9 KV SD Bd 1A-A Alt. Fdr. Bkr. 1716.

4. An extra operator will be required to acknowledge alarms.
5. ACKNOWLEDGE ALARMS
6. FREEZE SIMULATOR.
7. Provide a copy of 0-SO-202-4, 6900V Shutdown Boards completed through 8.1.5 step 2.
8. PLACE SIMULATOR IN RUN SPECIAL INSTRUCTIONS TO EVALUATOR:
1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
2. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

0-SO-202-4, 6900V Shutdown Boards

References:

Reference Title Rev No.

1. 0-SO-202-4 6900V Shutdown Boards 35

SIM JPM G Page 4 of 10 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Units 1 and 2 are in MODE 1.
2. Relay testing has been completed on normal feeder to 1A-A 6.9 Kv Shutdown Board.
3. 1B-B, 2A-A, and 2B-B 6.9kV Shutdown Boards are aligned to Normal Power supply.

INITIATING CUES:

1. You have been directed to transfer 1A-A 6.9kV Shutdown Board to Normal Feeder at 1-M-1 using 0-SO-202-4, 6900V Shutdown Boards, Section 8.1.5, starting at step 3.
2. 0-SO-202-4, 6900V Shutdown Boards, Section 8.1.1 has been completed.
3. Another operator has been assigned and will provide concurrent verification.
4. Inform the SRO when complete.

SIM JPM G Page 5 of 10 Start Time Obtain a copy of 0-SO-202-4 6900V Shutdown Boards, Section 8.1.5 STEP 1  : SAT UNSAT Standard: Examinee obtains a copy of 0-SO-202-4 6900V Shutdown Boards, Section 8.1.5 Cue Provide a marked up copy of 0-SO-202-4 6900V Shutdown Boards, Section 8.1.5 completed through step 2 Comment Procedure Note:

STEP 2  : SAT UNSAT Standard: Examinee observes 1-XS-57-39 6.9kV Shutdown Board 1A-A voltmeter selector switch in the SDBD 1A position.

Comment

SIM JPM G Page 6 of 10 Examiner Note STEP 3  : SAT UNSAT Standard: Examinee places 1-HS-57-44A control switch for [1718] to CLOSE. Critical Step Comment Cue Respond to the examinee when asked to provide a concurrent verification, Operator concurs.

STEP 4  : SAT UNSAT Standard: Examinee places 1-HS-57-41A control switch for [1716] to TRIP. Critical Step Comment Cue Respond to the examinee when asked to provide a concurrent verification, Operator concurs.

SIM JPM G Page 7 of 10 NOTE:

STEP 5  : SAT UNSAT Standard: Examinee observes ACB 1718 fails to close resulting in a loss of 6.9 KV SD Bd. 1A-A.

Comment Examiner ACB 1718 fails to close resulting in a loss of 6.9 KV SD Bd. 1A-A Note followed by failure of D/Gs to auto start and re-energize SD Bd. 1A-A.

STEP 6  : SAT UNSAT Standard: Examinee observes no bus voltage indicated on 6.9 kv SD Bus 1A-A voltmeter 1-EI-57-39.

Comment STEP 7  : SAT UNSAT Standard: Examinee releases 1-HS-57-44A control switch for [1718] to MID position Comment

SIM JPM G Page 8 of 10 Examiner Note STEP 8  : SAT UNSAT Standard: Examinee observes diesel generators did not start, recognizes DG RUN green light ON. [M-1]

Comment Alternate Path STEP 9  : SAT UNSAT Examinee places 1-HS-82-15, D/G EMERG START 1A-A, 2A-A, 1B-B, 1B-B to EMERG START position Standard: OR Critical Step Examinee places 0-HS-82-16A, DG 1A-A Emergency Start, to EMERG START position.

Comment

SIM JPM G Page 9 of 10 STEP 10  : SAT UNSAT Examinee verifies DG emergency breaker 1912 closed, by observing red Standard: light above 1-HS-57-46A ON [M-26] or Breaker 1912 indicating light ON

[M-1]

Comment Cue Respond to the examinee when asked to provide a concurrent verification, Operator concurs.

Terminating Provide the following cue Another operator will perform the Cue: STOP remaining steps of this procedure.

Stop Time

SIM JPM G Page 10 of 10 JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Units 1 and 2 are in MODE 1.
2. Relay testing has been completed on normal feeder to 1A-A 6.9 Kv Shutdown Board.
3. 1B-B, 2A-A, and 2B-B 6.9kV Shutdown Boards are aligned to Normal Power supply.

INITIATING CUE:

1. You have been directed to transfer 1A-A 6.9kV Shutdown Board to Normal Feeder at 1-M-1 using 0-SO-202-4, 6900V Shutdown Boards, Section 8.1.5, starting at step 3.
2. 0-SO-202-4, 6900V Shutdown Boards, Section 8.1.1 has been completed.
3. Another operator has been assigned and will provide concurrent verification.
4. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1305 NRC SIMULATOR JPM H

SIM JPM H Page 2 of 10 RO/SRO JOB PERFORMANCE MEASURE Task: Shut down the Containment Purge System.

Task #: 0290030101 Task Standard: The examinee will shut down the Containment Purge System using 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION.

Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings: 029 A1.03 (3.0 / 3.3)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 5 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM H Page 3 of 10 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 329 If IC 329 is not available perform the following Reset to IC 182.

Ensure Lower Containment Purge A Train is in service using 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION.

3. Place MODE 5 sign on panel M-4
4. PLACE SIMULATOR IN RUN
5. An extra operator will be required to acknowledge alarms.
6. ACKNOWLEDGE ALARMS
7. FREEZE SIMULATOR.
8. Save as a temporary IC, if repeat runs of JPM will be desired.
9. PLACE SIMULATOR IN RUN
10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.

Tools/Equipment/Procedures Needed:

0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION.

References:

Reference Title Rev No.

1. 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION. 46 2.

SIM JPM H Page 4 of 10 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 5.
2. Lower Containment Purge A Train is in service.

INITIATING CUES:

1. You have been directed to shutdown the Lower Containment Purge System using 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION section 7.3.
2. Inform the SRO when complete.

SIM JPM H Page 5 of 10 Start Time STEP 1  : SAT Obtain a copy of 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION. UNSAT Standard: Examinee obtains a copy of 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION section 7.1.

Cue: Provide a marked up copy of 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION section 7.1..

Comment STEP 2  : SAT UNSAT Standard: Examinee addresses the step as N/A.

Comment

SIM JPM H Page 6 of 10 STEP 3  : SAT UNSAT Standard: Examinee places HS-30-2 Purge Air Supply Fan 1A Discharge Critical Step damper to CLOSE.

Comment STEP 4  : SAT UNSAT Standard: Examinee places HS-30-14, Lower Containment Purge Isolation Critical Step dampers FCV-30-14 and 56 to CLOSE.

Comment STEP 5  : SAT UNSAT Standard: Examinee places HS-30-15, Lower Containment Purge Isolation Critical Step dampers FCV-30-15 and 57 to CLOSE.

Comment

SIM JPM H Page 7 of 10 STEP 6  : SAT UNSAT Standard: Examinee addresses the procedure step.

Comment STEP 7  : SAT UNSAT Standard: Examinee addresses the procedure step.

Comment STEP 8  : SAT UNSAT Standard: Examinee places HS-30-61 Purge Air Exhaust Fan 1A Suction Critical Step Damper to CLOSE.

Comment

SIM JPM H Page 8 of 10 STEP 9  : SAT UNSAT Standard: Examinee places HS-30-1A Air Purge Supply and Exhaust fan 1A to CRITICAL STOP.

Comment STEP 10  : SAT UNSAT Standard: Examinee places HS-30-1A Air Purge Supply and Exhaust fan 1A in CRITICAL the PULL TO LOCK position.

Comment STEP 11  : SAT UNSAT Standard: Examinee verifies all dampers CLOSED by observing green lights ON for XI-30-1A, XI-30-1B, XI-30-294, and XI-30-295.

Comment

SIM JPM H Page 9 of 10 STEP 12  : SAT UNSAT Standard: Examinee places HS-30-213 Purge Air Exhaust Fan 1A Discharge CRITICAL Isolation to CLOSE.

Comment Terminating Provide the following cue, Another operator will complete the Cue: STOP remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 5.
2. Lower Containment Purge A Train is in service.

INITIATING CUES:

1. You have been directed to shutdown the Lower Containment Purge System using 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION section 7.3.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1305 NRC PLANT JPM I

PLANT JPM I Page 2 of 10 RO/SRO JOB PERFORMANCE MEASURE Task: Local Operation of 1A-A D/G (Idle Start & Stop)

Task #: 0640020104 Task Standard: D/G 1A-A is successfully started using local controls and cooling is established by local operation of the ERCW FCV using 0-SO-82-1 Diesel Generator 1A-A.

Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X K/A Reference/Ratings: 064A4.01 (4.0/4.3)

Method of Testing:

Simulated Performance: X Actual Performance:

Evaluation Method:

Simulator In-Plant X Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 12 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

PLANT JPM I Page 3 of 10 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. SM approval will be required to enter the Trip Hazard Zone in backup control room.
2. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
3. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

0-SO-82-1 section 8.2 and Appendices B and C.

References:

Reference Title Rev No.

0-SO-82-1 Diesel Generator 1A-A 37

PLANT JPM I Page 4 of 10 READ TO OPERATOR HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

DIRECTIONS TO EXAMINEE:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1.
2. 1A-A D/G has now been declared INOPERABLE for scheduled maintenance.
3. 0-SO-82-1 Diesel Generator 1A-A section 8.2 is in progress and has been completed through step 4.
4. Both of the Unit SROs have given approval to perform this procedure.
5. All prerequisites of 0-SO-82-1 Diesel Generator 1A-A are complete.

INITIATING CUES:

1. You have been directed to perform 0-SO-82-1 Diesel Generator 1A-A section 8.2 starting at step 5.
2. Inform the SRO when complete.

PLANT JPM I Page 5 of 10 Start Time Obtain a copy of 0-SO-82-1 Diesel Generator 1A-A section 8.2 and STEP 1  : SAT Appendices B and C.

UNSAT Standard: Examinee obtains a copy of 0-SO-82-1 Diesel Generator 1A-A section 8.2 and Appendices B and C.

Cue Provide a marked up copy of 0-SO-82-1 Diesel Generator 1A-A section 8.2 and Appendices B and C.

Comment STEP 2  : SAT UNSAT Standard: Examinee simulates depressing 0-HS-82-22 Critical Step Cue: Provide the following cue, 0-HS-82-22 went in and returned to out.

Comment

PLANT JPM I Page 6 of 10 STEP 3  : SAT UNSAT Standard: Examinee verifies LRX1A TRIPPED to local.

Provide the following cue, LRX1A relay switch is 45 degrees Cue: clockwise from 12 oclock position AND red flag above handswitch is present.

Comment STEP 4  : SAT UNSAT Standard: Examinee addresses the procedure step.

Examiner Note: The step was addressed in the initial conditions.

Comment

PLANT JPM I Page 7 of 10 STEP 5  : SAT UNSAT Standard: Examinee simulates placing HS-82-23 in the MAINTENANCE Critical Step (clockwise) position.

Cue: Provide the following cue, Red light above HS-82-23 is ON green light is OFF.

Comment STEP 6  : SAT UNSAT Standard: Examinee addresses the procedure step.

Cue: Provide the following cue, The UO will place out-of-service time in SI.

Comment STEP 7  : SAT UNSAT Standard: Examinee simulates depressing HS-82-23. Critical Step Cue: Provide the following cue, You hear a rumbling rotational sound from the diesel engines.

Comment

PLANT JPM I Page 8 of 10 STEP 8  : SAT UNSAT Standard: Examinee addresses the procedure step.

Cue: Provide the following cue, The UO will log the time.

Comment STEP 9  : SAT UNSAT Standard: Examinee addresses the procedure step.

Cue: Provide the following cue, Engine speed is ~ 400 rpm.

Comment

PLANT JPM I Page 9 of 10 STEP 10  : SAT UNSAT Examinee recognizes FCV-67-66 closed by use of position indicator Standard: on the valve motor OR recognizes no flow indicated on FI-67-69, &

277.

Cue: Provide the following cue, Both lights above HS-67-66 are OFF.

Provide the following cue, When Examinee looks at position Cue: indicator (or flow indicator), state valve indicates closed (or flow is 0 gpm).

Comment STEP 11  : SAT UNSAT Examinee simulates opening FCV-67-68 Emerg Dsl Htxs A1 & A2 Sup Standard: Vlv From Hdr B by placing HS-67-68 clockwise or manually operates Critical Step FCV-67-68 CCW.

Cue: Before FCV-67-68 operation provide the following cue, Green light above HS-67-68 is ON, red light is OFF.

Cue: After FCV-67-68 operation provide the following cue, Green light above HS-67-68 is OFF, red light is ON.

Comment Terminating Provide the following cue; Another operator will complete the Cue: STOP remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:

All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1.
2. 1A-A D/G has now been declared INOPERABLE for scheduled maintenance.
3. 0-SO-82-1 Diesel Generator 1A-A section 8.2 is in progress and has been completed through step 4.
4. Both of the Unit SROs have given approval to perform this procedure.
5. All prerequisites of 0-SO-82-1 Diesel Generator 1A-A are complete.

INITIATING CUES:

1. You have been directed to perform 0-SO-82-1 Diesel Generator 1A-A section 8.2 starting at step 5.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1305 NRC PLANT JPM J

PLANT JPM J Page 2 of 9 RO/SRO JOB PERFORMANCE MEASURE Task: Locally align U2 TDAFW LCV Back-up Air Supply Task #: 0000140504 Task Standard:

The examinee will align back-up air to the Unit 2 TDAFW LCV using EA-3-4 Local Alignment TD AFW LCV Back-Up Air Supply.

Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings:

Method of Testing:

Simulated Performance: X Actual Performance:

Evaluation Method:

Simulator In-Plant X Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 8 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

PLANT JPM J Page 3 of 9 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. SM approval will be required to enter the Trip Hazard Zone in backup control room.
2. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
3. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

1. EA-3-4 Local Alignment of TD AFW LCV Back-Up Air Supply

References:

Reference Title Rev No.

1 EA-3-4 Local Alignment of TD AFW LCV Back-Up Air 4 Supply

========================================================================

READ TO EXAMINEE HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

DIRECTIONS TO EXAMINEE:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 and Unit 2 have experienced a Loss of ERCW.
2. AOP-M.01 LOSS OF ESSENTIAL RAW COOLING WATER is in progress.

INITIATING CUES:

1. You have been directed to locally align the back-up air supply to the Unit 2 TDAFW LCVs using EA-3-4 Local Alignment of TD AFW LCV Back-Up Air Supply.
2. Inform the SRO when complete.

PLANT JPM J Page 4 of 9 Start Time STEP 1  : SAT Obtain a copy of EA-3-4 Local Alignment of TD AFW LCV Back-Up Air Supply. UNSAT Standard: Examinee obtains a copy of EA-3-4 Local Alignment of TD AFW LCV Back-Up Air Supply.

Cue Provide a copy of EA-3-4 Local Alignment of TD AFW LCV Back-Up Air Supply.

Comment STEP 2  : SAT UNSAT Standard: Examinee selects section 4.2 as the applicable section.

Comment

PLANT JPM J Page 5 of 9 STEP 3  : SAT UNSAT Standard: The examinee selects Unit 2 as the applicable Unit.

Comment STEP 4  : SAT UNSAT Standard: The examinee simulates obtaining hand held lighting and a radio.

Comment

PLANT JPM J Page 6 of 9 STEP 5  : SAT UNSAT Standard: The examinee addresses the step as N/A.

Comment STEP 6  : SAT UNSAT Standard: The examinee simulates turning the handwheel for U-2 ISV-32-1950E, Critical Step Isolation valve for Unit 2 LCV-3-172 in the counter clockwise direction.

After the examinee simulates opening ISV-32-1950E, provide the Cue: following cue, Handwheel turns several turns in the CCW direction and movement stops.

Comment

PLANT JPM J Page 7 of 9 STEP 7  : SAT UNSAT Standard: The examinee simulates turning the handwheel for U-2 ISV-32-1969E, Critical Step Isolation valve for Unit 2 LCV-3-173 in the counter clockwise direction.

After the examinee simulates opening ISV-32-1969E, provide the Cue: following cue, Handwheel turns several turns in the CCW direction and movement stops.

Comment STEP 8  : SAT UNSAT Standard: The examinee simulates turning the handwheel for U-2 ISV-32-1866E, Critical Step Isolation valve for Unit 2 LCV-3-175 in the counter clockwise direction.

After the examinee simulates opening ISV-32-1866E, provide the Cue: following cue, Handwheel turns several turns in the CCW direction and movement stops.

Comment

PLANT JPM J Page 8 of 9 STEP 9  : SAT UNSAT Standard: The examinee simulates turning the handwheel for U-2 ISV-32-1974E, Critical Step Isolation valve for Unit 2 LCV-3-174 in the counter clockwise direction.

After the examinee simulates opening ISV-32-1974E, provide the Cue: following cue, Handwheel turns several turns in the CCW direction and movement stops.

Comment Terminating Provide the following cue, another Operator will complete the Cue: STOP remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:

All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 and Unit 2 have experienced a Loss of ERCW.
2. AOP-M.01 LOSS OF ESSENTIAL RAW COOLING WATER is in progress.

INITIATING CUES:

1. You have been directed to locally align the back-up air supply to the Unit 2 TDAFW LCVs using EA-3-4 Local Alignment of TD AFW LCV Back-Up Air Supply.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1305 NRC PLANT JPM K

PLANT JPM K Page 2 of 12 RO/SRO JOB PERFORMANCE MEASURE Task: Respond to Loss of Control Air System Task #: 0000900501 Task Standard: The examinee will reset and start Control & Service Air Compressor(s). using EA-32-2, Establishing Control and Service Air.

Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings: APE 065 AA1.04 (3.5/3.4)

Method of Testing:

Simulated Performance: X Actual Performance:

Evaluation Method:

Simulator In-Plant X Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 10 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

PLANT JPM K Page 3 of 12 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. SM approval will be required to enter the Trip Hazard Zone in backup control room.
2. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
3. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

1. EA-32-2, Establishing Control and Service Air

References:

Reference Title Rev No.

EA-32-2 Establishing Control and Service Air 3

PLANT JPM K Page 4 of 12 READ TO OPERATOR HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

DIRECTIONS TO EXAMINEE:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Units 1 and 2 are in MODE 3 following a Loss of Offsite Power.
2. The Aux. Air Compressors are not in service.
3. EA-32-2, Establishing Control and Service Air is in progress, completed through section 4.2 step 3.

INITIATING CUES:

1. You have been directed to start and manually load the Station Air Compressors using EA-32-2, Establishing Control and Service Air section 4.2 starting at step 4.
2. Inform the SRO when complete.

PLANT JPM K Page 5 of 12 Start Time Obtain a copy of EA-32-2, Establishing Control and Service Air.

STEP 1  : SAT UNSAT Standard: Examinee obtains a copy of EA-32-2, Establishing Control and Service Air.

Cue Provide a marked up copy of EA-32-2, Establishing Control and Service Air, completed through section 4.2 step 3.

Comment STEP 2  : SAT UNSAT Standard: Examinee simulates depressing 0-HS-32-25B to reset air comp trip Critical Step signals.

Cue Following simulated operation provide the following cue, 0-HS-32 25B went in and returned to out..

Comment

PLANT JPM K Page 6 of 12 STEP 3  : SAT UNSAT Standard: Examinee observes Compressor A Trip lights DARK.

Cue When asked provide the following cue, All Compressor A trip lights are DARK.

Comment STEP 4  : SAT UNSAT Standard: Examinee observes Compressor A Trip lights DARK.

Cue When asked provide the following cue, All Compressor B trip lights are DARK.

Comment

PLANT JPM K Page 7 of 12 STEP 5  : SAT UNSAT Standard: Examinee simulates placing 0-HS-32-25D to HAND. Critical Step Cue When asked provide the following cue, 0-HS-32-25D is positioned counter-clockwise to HAND.

Comment STEP 6  : SAT UNSAT Standard: Examinee simulates placing 0-HS-32-26A to HAND. Critical Step Cue When asked provide the following cue, 0-HS-32-26A is positioned counter-clockwise to HAND.

Comment

PLANT JPM K Page 8 of 12 STEP 7  : SAT UNSAT Standard: Examinee simulates placing HS-32-25A in Position 1.

Cue When asked provide the following cue, HS-32-25A is positioned counter-clockwise to Position 1.

Comment STEP 8  : SAT UNSAT Standard: Examinee simulates placing 0-HS-32-25F for comp A in PULL TO Critical Step START position.

Cue When asked provide the following cue, HS-32-25F is in maintained in the pull out position.

Comment

PLANT JPM K Page 9 of 12 STEP 9  : SAT UNSAT Standard: Examinee simulates depressing 0-HS-32-25E. Critical Step Cue When asked provide the following cue, You hear a mechanical rotational noise from Compressor A.

Comment STEP 10  : SAT UNSAT Standard: Examinee simulates placing 0-HS-32-43A and 0-HS-32-43B in ON Critical Step (clockwise) position to fully load comp A.

Cue When asked provide the following cue, You hear the rotational sound lowering then recovering from Compressor A.

Comment

PLANT JPM K Page 10 of 12 STEP 11  : SAT UNSAT Standard: Examinee simulates placing 0-HS-32-26D for comp A in PULL TO Critical Step START position.

Cue When asked provide the following cue, HS-32-26D is maintained in the pull out position.

Comment STEP 12  : SAT UNSAT Standard: Examinee simulates depressing 0-HS-32-26B. Critical Step Cue When asked provide the following cue, You hear a mechanical rotational noise from Compressor B.

Comment

PLANT JPM K Page 11 of 12 STEP 13  : SAT UNSAT Standard: Examinee simulates placing 0-HS-32-38A and 0-HS-32-38B in ON Critical Step (clockwise) position to fully load Air Compressor B.

Cue When asked provide the following cue, You hear the rotational sound lowering then recovering from Compressor B.

Comment Terminating Provide the following cue, Another operator will perform the Cue: STOP remaining ste4ps of this procedure.

Stop Time

JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:

All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Units 1 and 2 are in MODE 3 following a Loss of Offsite Power.
2. The Aux. Air Compressors are not in service.
3. EA-32-2, Establishing Control and Service Air is in progress, completed through section 4.2 step 3.

INITIATING CUES:

1. You have been directed to start and manually load the Station Air Compressors using EA-32-2, Establishing Control and Service Air section 4.2 starting at step 4.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.