ML15309A129: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ENT000726   Submitted: November 5, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Entergy ("ENT") TRACK 2 Hearing Exhibits Entergy Exhibit #
{{#Wiki_filter:ENT000726 Submitted: November 5, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENTR16001 All Entergy Hearing Exhibit List ("ENT Exhibit List") 10/29/2015[Revised] ENT00015A-B All Indian Point Energy Center License Renewal Application (April 2007) 3/28/2012 X ENTR00031           NYS-26B/RK-TC-1B, NYS-
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Entergy (ENT) TRACK 2 Hearing Exhibits Track 2 Exhibit        Admitted Contentions Entergy Exhibit #                                              Exhibit Name                         Submission       During Addressed by                                                                                        Track 1 Date Exhibit                                                                                        Hearing?
ENTR16001         All           Entergy Hearing Exhibit List (ENT Exhibit List)                     10/29/2015
[Revised]
ENT00015A-B       All           Indian Point Energy Center License Renewal Application (April 2007)   3/28/2012 X
NYS-26B/RK-    Curriculum Vitae of Alan B. Cox                                        8/10/2015 TC-1B, NYS-38/RK-TC-5, ENTR00031 NYS-25                                                                                              [Revised]
NYS-26B/RK-   Curriculum Vitae of Nelson F. Azevedo                                  3/28/2012 TC-1B, NYS-ENT000032 38/RK-TC-5,                                                                                            X NYS-25 NYS-38/RK-    NRC, Audit Report for Plant Aging Management Programs and Reviews      3/28/2012 ENT000041                        (Jan. 13, 2009)
TC-5                                                                                                    X


38/RK-TC-5, NYS-25  Curriculum Vitae of Alan B. Cox 8/10/2015[Revised] ENT000032            NYS-26B/RK-TC-1B, NYS-38/RK-TC-5, NYS-25  Curriculum Vitae of Nelson F. Azevedo 3/28/2012 X ENT000041 NYS-38/RK-TC-5 NRC, Audit Report for Plant Aging Management Programs and Reviews (Jan. 13, 2009) 3/28/2012 X 2 Entergy Exhibit #
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                             Exhibit Name                           Submission   During Addressed by                                                                                      Track 1 Date Exhibit                                                                                      Hearing?
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000089            NYS-26B/RK-TC-1B Declaration of Dr. Joram Hopenfeld in Support of New England Coalition's Motion for Reconsideration (Dec. 15, 2008) 3/28/2012 X ENT000098            NYS-25 NEI 95-10, Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule, Rev. 6 (June 2005) 3/28/2012 X ENT000182            NYS-26B/RK-TC-1B Entergy Statement of Position Regarding Contention NYS-26/RK-TC-1B (Metal Fatigue) 3/29/2012 X ENT000183            NYS-26B/RK-TC-1B Testimony of Entergy Witnesses Nelson F.
NYS-26B/RK- Declaration of Dr. Joram Hopenfeld in Support of New England             3/28/2012 ENT000089                      Coalitions Motion for Reconsideration (Dec. 15, 2008)
Azevedo, Alan B. Cox, Jack R. Strosnider, Robert E. Nickell, and Mark A. Gray Regarding Contention  
TC-1B                                                                                              X NYS-25       NEI 95-10, Industry Guideline for Implementing the Requirements of 10     3/28/2012 ENT000098 CFR Part 54 - The License Renewal Rule, Rev. 6 (June 2005)                             X NYS-26B/RK- Entergy Statement of Position Regarding Contention NYS-26/RK-TC-1B       3/29/2012 ENT000182                      (Metal Fatigue)
TC-1B                                                                                              X NYS-26B/RK- Testimony of Entergy Witnesses Nelson F. Azevedo, Alan B. Cox, Jack R. 3/29/2012 ENT000183        TC-1B        Strosnider, Robert E. Nickell, and Mark A. Gray Regarding Contention                   X NYS-26/RK-TC-1B (Metal Fatigue)
NYS-26B/RK-  Curriculum Vitae of Jack R. Strosnider                                    8/10/2015 TC-1B, NYS-ENTR00184 38/RK-TC-5,                                                                                      [Revised]
NYS-25 NYS-26B/RK-  Curriculum Vitae of Robert E. Nickell                                    8/20/2012 ENTR00185        TC-1B, NYS-
[Revised]
38/RK-TC-5 NYS-26B/RK-  Curriculum Vitae of Mark A. Gray                                          8/10/2015 TC-1B, NYS-ENTR00186 38/RK-TC-5,                                                                                      [Revised]
NYS-25 NYS-26B/RK-  ASTM Vol. 03.01, Metals - Mechanical Testing; Elevated and Low            3/29/2012 ENT000187 TC-1B        Temperature Tests; Metallography (2005) (excerpted)                                    X 2


NYS-26/RK-TC-1B (Metal Fatigue) 3/29/2012 X ENTR00184            NYS-26B/RK-TC-1B, NYS-38/RK-TC-5, NYS-25 Curriculum Vitae of Jack R. Strosnider 8/10/2015[Revised] ENTR00185            NYS-26B/RK-TC-1B, NYS-
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                            Exhibit Name                              Submission    During Addressed by                                                                                        Track 1 Date Exhibit                                                                                        Hearing?
NYS-26B/RK- ASME, Criteria of the ASME Boiler and Pressure Vessel Code for Design      3/29/2012 ENT000188 TC-1B       by Analysis in Sections III and VIII, Division 2 (1969)                                  X NYS-26B/RK-  SAND94-0187, Evaluation of Conservatisms and Environmental Effects in      3/29/2012 ENT000189 TC-1B        ASME Code, Section III, Class 1 Fatigue Analysis (Aug. 1994)                             X NYS-26B/RK-  Memorandum from Ashok C. Thadani to William D. Travers, Closeout of        3/29/2012 ENT000190        TC-1B, NYS-  Generic Safety Issue 190, Fatigue Evaluation of Metal Components for 60-X 38/RK-TC-5  year Plant Life (Dec. 26, 1999)
NYS-26B/RK- K. R. Rao, Companion Guide to the ASME Boiler & Pressure Vessel Code        3/29/2012 ENT000191 TC-1B        (3rd ed. 2009) (excerpted)                                                              X NYS-26B/RK-  NRC Regulatory Issue Summary 2011-05, Information on Revision 2 to          3/29/2012 TC-1B, NYS- the Generic Aging Lessons Learned Report for License Renewal of ENT000192 38/RK-TC-5, Nuclear Power Plants (July 1, 2011)                                                      X NYS-25 NYS-26B/RK-  NL-08-092, Letter from Fred R. Dacimo, Entergy, to NRC, Amendment 5        3/29/2012 ENT000193        TC-1B, NYS-  to License Renewal Application (June 11, 2008)
X 25 NYS-26B/RK- NL-08-084, Letter from Fred R. Dacimo, Entergy, to NRC, Reply to            3/29/2012 ENT000194        TC-1B       Request for Additional Information Regarding License Renewal X
Application - Time-Limited Aging Analyses and Boraflex (May 16, 2008)
NYS-26B/RK-  NUREG-2101, Safety Evaluation Report Related to the License Renewal        8/10/2015 ENTR00195 TC-1B        of Salem Nuclear Generating Station § 4.3 (Jun. 2011) (exceprt)                      [Revised]
3


38/RK-TC-5 Curriculum Vitae of Robert E. Nickell 8/20/2012[Revised] ENTR00186            NYS-26B/RK-TC-1B, NYS-38/RK-TC-5, NYS-25 Curriculum Vitae of Mark A. Gray 8/10/2015[Revised] ENT000187            NYS-26B/RK-TC-1B ASTM Vol. 03.01, Metals - Mechanical Testing; Elevated and Low Temperature Tests; Metallography (2005) (excerpted) 3/29/2012 X 3  Entergy Exhibit #
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                            Exhibit Name                             Submission   During Addressed by                                                                                      Track 1 Date Exhibit                                                                                        Hearing?
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000188            NYS-26B/RK-TC-1B ASME, Criteria of the ASME Boiler and Pressure Vessel Code for Design by Analysis in Sections III and VIII, Division 2 (1969)  3/29/2012 X ENT000189            NYS-26B/RK-TC-1B SAND94-0187, Evaluation of Conservatisms and Environmental Effects in ASME Code, Section III, Class 1 Fatigue Analysis (Aug. 1994)  3/29/2012 X ENT000190            NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Memorandum from Ashok C. Thadani to William D. Travers, Closeout of Generic Safety Issue 190, Fatigue Evaluation of Metal Components for 60-year Plant Life (Dec. 26, 1999)  3/29/2012 X ENT000191            NYS-26B/RK-TC-1B K. R. Rao, Companion Guide to the ASME Boiler & Pressure Vessel Code (3rd ed. 2009) (excerpted)  3/29/2012 X ENT000192            NYS-26B/RK-TC-1B, NYS-38/RK-TC-5, NYS-25 NRC Regulatory Issue Summary 2011-05, Information on Revision 2 to the Generic Aging Lessons Learned Report for License Renewal of Nuclear Power Plants (July 1, 2011) 3/29/2012 X ENT000193            NYS-26B/RK-TC-1B, NYS-25 NL-08-092, Letter from Fred R. Dacimo, Entergy, to NRC, Amendment 5 to License Renewal Application (June 11, 2008)  3/29/2012 X ENT000194            NYS-26B/RK-TC-1B NL-08-084, Letter from Fred R. Dacimo, Entergy, to NRC, Reply to Request for Additional Information Regarding License Renewal Application - Time-Limited Aging Analyses and Boraflex (May 16, 2008)  3/29/2012 X ENTR00195            NYS-26B/RK-TC-1B NUREG-2101, Safety Evaluation Repor t Related to the License Renewal of Salem Nuclear Generating Station § 4.3 (Jun. 2011) (exceprt) 8/10/2015[Revised]
NYS-26B/RK- Westinghouse Level 2 Policy/Procedure NSNP 3.2.6, Design Analysis          3/29/2012 ENT000196        TC-1B, NYS-  (Mar. 2011) [PROPRIETARY]
4  Entergy Exhibit #
X 38/RK-TC-5 NYS-26B/RK- Letter from P. Davison, PSEG Nuclear, LLC, to NRC, Close-out of the         3/29/2012 TC-1B, NYS-  NRC Audit Associated with Use of WESTEMS' Related to the Salem ENT000197 38/RK-TC-5  Nuclear Generating Station, Units 1 and 2 License Renewal Application                   X (Feb. 24, 2011)
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000196            NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse Level 2 Policy/Procedure NSNP 3.2.6, Design Analysis (Mar. 2011) [PROPRIETARY] 3/29/2012 X ENT000197            NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Letter from P. Davison, PSEG Nuclear, LLC, to NRC, Close-out of the NRC Audit Associated with Use of WESTEMSŽ Related to the Salem Nuclear Generating Station, Units 1 and 2 License Renewal Application (Feb. 24, 2011) 3/29/2012 X ENT000198            NYS-26B/RK-TC-1B Letter from Paul Bessette, Entergy, to Janice Dean, NYS, Twenty-Second Update to Disclosures Pursuant to 10 C.F.R. § 2.336; Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), Docket Nos. 50-247- LR and 50-286-LR (Dec. 1, 2010) 3/29/2012 X ENT000199 NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-09-100, Rev. 0, Indian Point Unit 2 Insurge/Outsurge and Environmental Fatigue Evaluations, (Jun. 10, 2010) [PROPRIETARY] 3/29/2012 X ENT000200            NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-09-63, Rev. 0, Indian Point Unit 2 Pressurizer Insurge/Outsurge Transient Development (June 18, 2010) ") [PROPRIETARY] 3/29/2012 X ENT000201            NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-08-109, Rev. 0, Indian Point Units 2 and 3 Transfer Function Database Development for Hot Leg Surge Nozzle (June 18, 2010) [PROPRIETARY] 3/29/2012 X ENT000202            NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-08-78, Rev. 0, Indian Point Unit 2 and Unit 3: Transfer Function Database Development for Hot Leg Charging Nozzle (June 18, 2010) [PROPRIETARY] 3/29/2012 X 5  Entergy Exhibit #
NYS-26B/RK- Letter from Paul Bessette, Entergy, to Janice Dean, NYS, Twenty-Second     3/29/2012 TC-1B        Update to Disclosures Pursuant to 10 C.F.R. § 2.336; Entergy Nuclear ENT000198 Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), Docket                 X Nos. 50-247- LR and 50-286-LR (Dec. 1, 2010)
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000203            NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-08-116, Rev. 0, Indian Point Unit 2 BIT Nozzle Transfer Function Database Development (June 18, 2010) [PROPRIETARY] 3/29/2012 X ENT000204            NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-08-103, Rev. 0, Indian Point Units 2 and 3 Transfer Function Database Development for Accumulator Nozzles (June 17, 2010) [PROPRIETARY] 3/29/2012 X ENT000205            NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-09-105, Rev. 0, Indian Point Unit 3 Insurge/Outsurge and Environmental Fatigue Evaluations (June 22, 2010) [PROPRIETARY] 3/29/2012 X ENT000206            NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-09-74, Rev. 0, Indian Point Unit 3 Boron Injection Tank Nozzle Environmental Fatigue Evaluations (Jun. 14, 2010) [PROPRIETARY] 3/29/2012 X ENT000207            NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-09-13, Rev. 0, Indian Point Unit 3 BIT Nozzle Transfer Function Database Development (June 18, 2010) [PROPRIETARY] 3/29/2012 X ENT000208            NYS-26B/RK-TC-1B F. Kreith, Principles of Heat Transfer (3rd ed. 1973) (excerpted) 3/29/2012 X ENT000209            NYS-26B/RK-TC-1B J. P. Holman, Heat Transfer (4th ed. 1976) (excerpted)  3/29/2012 X ENT000210            NYS-26B/RK-TC-1B Westinghouse, Systems Standard Design Criteria 1.3.F, Rev. 0, Reactor Coolant System Design Transients for Standard Plants with Model F Steam Generators (July 1978) [PROPRIETARY] 3/29/2012 X ENT000211            NYS-26B/RK-TC-1B Westinghouse Memorandum LTR-SSO-03-43, Rev. 1, from NS Systems & Safety Analysis, Design Transient Revisions for Indian Point 2 4.7% Uprate - Revised Figures (Apr. 25, 2003) [PROPRIETARY] 3/29/2012 X 6  Entergy Exhibit #
NYS-26B/RK- Westinghouse Calculation Note Number CN-PAFM-09-100, Rev. 0, Indian         3/29/2012 ENT000199        TC-1B        Point Unit 2 Insurge/Outsurge and Environmental Fatigue Evaluations,                     X (Jun. 10, 2010) [PROPRIETARY]
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000212            NYS-26B/RK-TC-1B Westinghouse Memorandum LTR-SCS-03-53, Rev. 0, from NS Systems & Safety Analysis, Design Transient Revisions for Indian Point 3 Stretch Power Uprate Project - Revised Figures (Aug. 21, 2003)
NYS-26B/RK- Westinghouse Calculation Note Number CN-PAFM-09-63, Rev. 0, Indian         3/29/2012 ENT000200        TC-1B        Point Unit 2 Pressurizer Insurge/Outsurge Transient Development (June                   X 18, 2010) ) [PROPRIETARY]
[PROPRIETARY] 3/29/2012 X ENT000213            NYS-26B/RK-TC-1B Westinghouse, Systems Standard Design Criteria 1.3.X, Rev. 0, Nuclear Steam Supply System Auxiliary Equipment Design Transients for All Standard Plants (Sept. 1978)  [PROPRIETARY] 3/29/2012 X ENT000214            NYS-26B/RK-TC-1B EPRI, Materials Reliability Program: Evaluation of Fatigue Data Including Reactor Water Environmental Effects (Dec. 2001) 3/29/2012 X ENT000215            NYS-26B/RK-TC-1B W. E. Cooper, The Initial Scope and Intent of the Section III Fatigue Design Procedures, in Pressure Vessel Research Council, Technical Information from Workshop on Cyclic Events in Nuclear Applications, Clearwater Beach, Florida, Vol. 1, (Jan. 20, 1992)  3/29/2012 X ENT000216            NYS-26B/RK-TC-1B NUREG-1929, Safety Evaluation Repor t Related to the License Renewal of Beaver Valley Power Station, Units 1 and 2 (Oct. 2009) (excerpted) 3/29/2012 X ENT000217            NYS-26B/RK-TC-1B Westinghouse, WCAP-9693, Investigation of Feedwater Line Cracking in Pressurized Water Reactor Plants (June 1980) [PROPRIETARY]
NYS-26B/RK- Westinghouse Calculation Note Number CN-PAFM-08-109, Rev. 0, Indian         3/29/2012 ENT000201        TC-1B       Point Units 2 and 3 Transfer Function Database Development for Hot Leg                   X Surge Nozzle (June 18, 2010) [PROPRIETARY]
(excerpted) 3/29/2012 X ENT000218            NYS-26B/RK-TC-1B Westinghouse Owners Group, WCAP-12639, Pressurizer Surge Line Thermal Stratification Generic Detailed Analysis Program MUHP-1091 Summary Report (June 1990) [PROPRIETARY] 3/29/2012 X ENT000219            NYS-26B/RK-TC-1B Westinghouse, WCAP-12937, Structural Evaluation of Indian Point Units 2 and 3 Pressurizer Surge Lines, Considering the Effects of Thermal Stratification  (May 1991) [PROPRIETARY] 3/29/2012 X 7  Entergy Exhibit #
NYS-26B/RK- Westinghouse Calculation Note Number CN-PAFM-08-78, Rev. 0, Indian         3/29/2012 ENT000202        TC-1B       Point Unit 2 and Unit 3: Transfer Function Database Development for Hot                  X Leg Charging Nozzle (June 18, 2010) [PROPRIETARY]
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000220            NYS-26B/RK-TC-1B J. D. Burr et al., PVP2011-57700, Simulation and Evaluation of Thermal Stratification in a Sloped Surge Nozzle Correlated with Plant Measurements (July 2011) 3/29/2012 X ENT000221            NYS-26B/RK-TC-1B M. E. Nitzel et al., Comparison of ASME Code NB-3200 and NB-3600: Results for Fatigue Analysis of B31.1 Branch Nozzles (Apr. 1996) 3/29/2012 X ENT000222            NYS-26B/RK-TC-1B Letter from Ekaterina Lenning, NRC, to James A Gresham, Westinghouse, "Westinghouse Electric Company Quality Management System, Revision 6" (Feb. 24, 2011)  3/29/2012 X ENT000223    NYS-26B/RK-TC-1B NUREG-1916, Safety Evaluation Repor t Related to the License Renewal of Shearon Harris Nuclear Power Plant, Unit 1, Vol. 2 (Nov. 2008) (excerpted)  3/29/2012 X ENT000224    NYS-26B/RK-TC-1B SECY-95-245, Completion of the Fatigue Action Plan (Sept. 25, 1995)  3/29/2012 X ENT000225    NYS-26B/RK-TC-1B NUREG/CR-6815, Review of the Margins for ASME Code Fatigue Design Curve - Effects of Surface Roughness and Material Variability (Sept. 2003)  3/29/2012 X ENT000226    NYS-26B/RK-TC-1B Entergy, 0-CY-2310, Rev. 16, Reactor Coolant System Specification and Frequencies (Oct. 2011)  3/29/2012 X ENT000227 NYS-26B/RK-TC-1B Westinghouse, WCAP-13588, Operating Strategies for Mitigating Pressurizer Insurge and Outsurge Transients (Mar. 1993)
4
[PROPRIETARY] (excerpted) 3/29/2012 X ENT000228 NYS-26B/RK-TC-1B Calculation Note RCDA-03-75, Indian Point Unit 3 Stretch Power Uprate Reactor Vessel Structural Evaluation (May 2005) [PROPRIETARY]  3/29/2012 X 8  Entergy Exhibit #
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000229 NYS-26B/RK-TC-1B Calculation Note RCDA-03-64, Indian Point Unit 2 Stretch Power Uprate Reactor Vessel Evaluation (Feb. 2005)  [PROPRIETARY] 3/29/2012 X ENT000230 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5, NYS-25 Letter from R. Nelson, NRC, to N. Wilmshurst, EPRI, Revision 1 to the Safety Evaluation of Electric Power Research Institute (EPRI) Report, Materials Reliability Prog[ra]m (MRP) Report 1016596 (MRP-227),
Revision 0, Pressurized Water Reactor (PWR) Internals Inspection and Evaluation Guidelines (Dec. 16, 2011)  3/29/2012 X ENT000231 NYS-26B/RK-TC-1B, NYS-25 NL-08-143, Letter from F. Dacimo, Entergy, to NRC, Additional Information (Regarding License Renewal Application - Reactor Vessel Fluence Clarification (Sept. 24, 2008) 3/29/2012 X ENT000251  NYS-38/RK-TC-5 NRC Inspection Manual Chapter 71003, Post-Approval Site Inspection for License Renewal (Oct. 31, 2008) 3/29/2012 X ENT000252 NYS-38/RK-TC-5 NRC Inspection Manual, Temporary Instruction 2516/001 (Mar. 30, 2011)  3/29/2012 X ENT000369 NYS-26B/RK-TC-1B Entergy Nuclear Vt. Yankee (Vt. Yankee Nuclear Power Station), Docket No. 50-271-LR, Hearing Transcript (Jul. 21, 2008) (excerpted) 3/29/2012 X ENT000520 NYS-38/RK-TC-5 Entergy Statement of Position Regarding Contention NYS-38/RK-TC-5 (Safety Commitments) 8/20/2012 X ENT000521 NYS-38/RK-TC-5 Direct Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. Dolansky, Alan B. Cox, Jack R. Strosnid er, Robert E. Nickell, and Mark A. Gray Regarding Contention NYS-38/RK-TC-5 (Safety Commitments) 8/20/2012 X ENT000522 NYS-38/RK-TC-5, NYS-25 Curriculum Vitae of Robert J. Dolansky 8/20/2012 X
9  Entergy Exhibit #
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000523 NYS-38/RK-TC-5 EPRI, Report No. 1020988, "Steam Generator Management Program: Phase II Divider Plate Cracking Engineering Study" (Nov. 2010)
[PROPRIETARY]  8/20/2012 X ENT000524 NYS-38/RK-TC-5 EPRI, Report 1025133, Steam Generator Management Program:
Assessment of Channel Head Susceptibility to Primary Water Stress Corrosion Cracking (June 2012) [PROPRIETARY]  8/20/2012 X ENT000525 NYS-38/RK-TC-5 NRC Inspection Manual Chapter 2516 (Feb. 18, 2005)  8/20/2012 X ENT000526 NYS-38/RK-TC-5 F. D'Annucci and E. Lecour, ICONE18-29457, Inspection of the Steam Generator Divider Plate (May 2010)  8/20/2012 X ENT000527 NYS-38/RK-TC-5 NRC Information Notice 2005-09, Indications in Thermally Treated Alloy 600 Steam Generator Tubes and Tube-to Tubesheet Welds (Apr. 7, 2005)  8/20/2012 X ENT000528 NYS-38/RK-TC-5 NUREG-1950, Disposition of Public Comments and Technical Bases for Changes in the License Renewal Guidance Documents NUREG-1801 and NUREG-1800 (Apr. 2011) (excerpted)  8/20/2012 X ENTR00529 NYS-38/RK-TC-5 Westinghouse Technical Manual No. TMMC 1440-C350, Vertical Steam Generator Instruction for New York Power Authority - Indian Point Nuclear Plant No. 3 (Dec. 1989) [PROPRIETARY] (excerpted) 8/10/2015[Revised] ENT000530 NYS-38/RK-TC-5 EPRI, Report 1014982, Divider Plate Cracking in Steam Generators -Results of Phase 1: Analysis of Primary Water Stress Corrosion Cracking and Mechanical Fatigue in the Alloy 600 Stub Runner to Divider Plate Weld Material (June 2007) [PROPRIETARY] 8/20/2012 X ENT000531 NYS-38/RK-TC-5 ASME Code, Sec. XI, Art. IWA-2000 (2001) 8/20/2012 X ENT000532 NYS-38/RK-TC-5 ASME Code, Sec. V, Art. 14 (2001) 8/20/2012 X
10  Entergy Exhibit #
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000533 NYS-38/RK-TC-5 Memorandum from C. Hunt, NRC to G. Kulesa, NRC, "Summary of the February 16, 2012, Category 2 Public Meeting with the Electric Power Research Institute (EPRI) and Industry to Discuss Steam Generator Issues" (Mar. 15, 2012) 8/20/2012 X ENT000534 NYS-38/RK-TC-5 NEI 99-04, Guidelines for Managing NRC Commitment Changes (July 1999) 8/20/2012 X ENT000535 NYS-38/RK-TC-5 NRR Office Instruction, LIC-105, Rev. 3, Managing Regulatory Commitments Made by Licensees to the NRC (Mar. 2009)  8/20/2012 X ENT000536 NYS-38/RK-TC-5 NUREG-2101, Safety Evaluation Repor t Related to the License Renewal of Salem Nuclear Generating Station (June 2011) (excerpted) 8/20/2012 X ENT000537 NYS-38/RK-TC-5 NUREG-1961, Safety Evaluation Repor t Related to the License Renewal of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Apr. 2011) (excerpted) 8/20/2012 X ENT000538 NYS-38/RK-TC-5 SECY 2000-45, Acceptance of NEI 99-04, "Guidelines for Managing NRC Commitments" (Feb. 22, 2000) 8/20/2012 X ENT000539 NYS-38/RK-TC-5 NRC Enforcement Manual, Rev. 7 (Oct. 1, 2010) (excerpted) 8/20/2012 X ENT000540 NYS-38/RK-TC-5 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station) Docket No. 50-293, Renewed Facility Operating License (May 9, 2012)
(excerpted) 8/20/2012 X ENT000541 NYS-38/RK-TC-5 EN-LI-110, Commitment Management Program (Jan. 2012)  8/20/2012 X ENT000542 NYS-38/RK-TC-5 NRC Regulatory Issue Summary 2000-17, Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff  (Sept. 21, 2000) 8/20/2012 X 11  Entergy Exhibit #
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000543 NYS-38/RK-TC-5 Inspection Procedure 71002, License Renewal Inspection (Nov. 2011)  8/20/2012 X ENT000544 NYS-38/RK-TC-5 Letter from A. Macfarlane, Chairman, NRC, to E. Markey, U.S. Congressman, "Regulatory Commitments" (July 12, 2012)  8/20/2012 X ENT000545 NYS-38/RK-TC-5 Memorandum from S. Dingbaum, Assist ant Inspector Gen. for Audits, NRC, to R. W. Borchardt, Exec. Dir. for Operations, NRC, "Status of Recommendations: Audit of NRC's Management of Licensee Commitments (OIG-11-A-17)" (Apr. 16, 2012)  8/20/2012 X ENT000546 NYS-38/RK-TC-5 NUREG-1958, Safety Evaluation Repor t Related to the License Renewal of Kewaunee Power Station (Jan. 2011) (excerpted) 8/20/2012 X ENT000547 NYS-38/RK-TC-5 EA-12-051, Order Modifying Licenses With Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) (Mar. 12, 2012)  8/20/2012 X ENT000548 NYS-38/RK-TC-5 Letter from R. Braun, Senior Vice President, PSEG Nuclear LLC, to NRC Document Control Desk, "PSEG Nuclear LLC's Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation" (Mar. 29, 2012) 8/20/2012 X ENT000549 NYS-38/RK-TC-5 Letter from R. Conte, NRC, to J. Ventosa, Entergy, "Indian Point Nuclear Generating Unit 2 - NRC Inspection Report 05000247/2012008" (Apr. 19, 2012) 8/20/2012 X ENT000550 NYS-38/RK-TC-5, NYS-


26B/RK-TC-
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                            Exhibit Name                            Submission    During Addressed by                                                                                      Track 1 Date Exhibit                                                                                        Hearing?
NYS-26B/RK-  Westinghouse Calculation Note Number CN-PAFM-08-116, Rev. 0, Indian        3/29/2012 ENT000203        TC-1B        Point Unit 2 BIT Nozzle Transfer Function Database Development (June                    X 18, 2010) [PROPRIETARY]
NYS-26B/RK-  Westinghouse Calculation Note Number CN-PAFM-08-103, Rev. 0, Indian        3/29/2012 ENT000204        TC-1B        Point Units 2 and 3 Transfer Function Database Development for                          X Accumulator Nozzles (June 17, 2010) [PROPRIETARY]
NYS-26B/RK-  Westinghouse Calculation Note Number CN-PAFM-09-105, Rev. 0, Indian        3/29/2012 ENT000205        TC-1B        Point Unit 3 Insurge/Outsurge and Environmental Fatigue Evaluations                    X (June 22, 2010) [PROPRIETARY]
NYS-26B/RK- Westinghouse Calculation Note Number CN-PAFM-09-74, Rev. 0, Indian        3/29/2012 ENT000206        TC-1B        Point Unit 3 Boron Injection Tank Nozzle Environmental Fatigue                          X Evaluations (Jun. 14, 2010) [PROPRIETARY]
NYS-26B/RK-  Westinghouse Calculation Note Number CN-PAFM-09-13, Rev. 0, Indian        3/29/2012 ENT000207        TC-1B        Point Unit 3 BIT Nozzle Transfer Function Database Development (June                    X 18, 2010) [PROPRIETARY]
NYS-26B/RK-  F. Kreith, Principles of Heat Transfer (3rd ed. 1973) (excerpted)          3/29/2012 ENT000208 TC-1B                                                                                                X NYS-26B/RK-  J. P. Holman, Heat Transfer (4th ed. 1976) (excerpted)                    3/29/2012 ENT000209 TC-1B                                                                                                X NYS-26B/RK-  Westinghouse, Systems Standard Design Criteria 1.3.F, Rev. 0, Reactor      3/29/2012 ENT000210        TC-1B        Coolant System Design Transients for Standard Plants with Model F Steam                X Generators (July 1978) [PROPRIETARY]
NYS-26B/RK-  Westinghouse Memorandum LTR-SSO-03-43, Rev. 1, from NS Systems &          3/29/2012 ENT000211        TC-1B        Safety Analysis, Design Transient Revisions for Indian Point 2 4.7%                    X Uprate - Revised Figures (Apr. 25, 2003) [PROPRIETARY]
5


1B Letter from A. Cunanan, NRC Project Manager, to S.K. Gambhir, Vice President, Energy Northwest, "Request for Additional Information for the Review of the Columbia Generating Station License Renewal Application for Metal Fatigue" (Feb. 3, 20118/20/2012 X ENT000551 NYS-38/RK-TC-5 Letter from B. Harris, NRC Project Manager, to B. Allen, FENOC, "Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Batch 3" (May 2, 2011) (excerpted) 8/20/2012 X 12  Entergy Exhibit #
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                            Exhibit Name                                Submission    During Addressed by                                                                                        Track 1 Date Exhibit                                                                                          Hearing?
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000552 NYS-38/RK-TC-5 Letter from P. Bessette, Morgan Lewis, to Administrative Judges (May 15, 2012)  8/20/2012 X ENT000553 NYS-38/RK-TC-5 Entergy, Condition Report LO-LAR-2011-00174, Corrective Actions (Aug. 2011) (excerpted) 8/20/2012 X ENT000554 NYS-38/RK-TC-5, NYS-
NYS-26B/RK-  Westinghouse Memorandum LTR-SCS-03-53, Rev. 0, from NS Systems &            3/29/2012 ENT000212        TC-1B       Safety Analysis, Design Transient Revisions for Indian Point 3 Stretch Power Uprate Project - Revised Figures (Aug. 21, 2003)                                    X
[PROPRIETARY]
NYS-26B/RK-  Westinghouse, Systems Standard Design Criteria 1.3.X, Rev. 0, Nuclear        3/29/2012 ENT000213        TC-1B        Steam Supply System Auxiliary Equipment Design Transients for All                        X Standard Plants (Sept. 1978) [PROPRIETARY]
NYS-26B/RK- EPRI, Materials Reliability Program: Evaluation of Fatigue Data Including    3/29/2012 ENT000214                      Reactor Water Environmental Effects (Dec. 2001)
TC-1B                                                                                                  X NYS-26B/RK- W. E. Cooper, The Initial Scope and Intent of the Section III Fatigue        3/29/2012 ENT000215        TC-1B        Design Procedures, in Pressure Vessel Research Council, Technical Information from Workshop on Cyclic Events in Nuclear Applications,                      X Clearwater Beach, Florida, Vol. 1, (Jan. 20, 1992)
NYS-26B/RK-  NUREG-1929, Safety Evaluation Report Related to the License Renewal          3/29/2012 ENT000216                      of Beaver Valley Power Station, Units 1 and 2 (Oct. 2009) (excerpted)
TC-1B                                                                                                  X NYS-26B/RK- Westinghouse, WCAP-9693, Investigation of Feedwater Line Cracking in        3/29/2012 ENT000217        TC-1B        Pressurized Water Reactor Plants (June 1980) [PROPRIETARY]                                X (excerpted)
NYS-26B/RK- Westinghouse Owners Group, WCAP-12639, Pressurizer Surge Line                3/29/2012 ENT000218        TC-1B        Thermal Stratification Generic Detailed Analysis Program MUHP-1091                        X Summary Report (June 1990) [PROPRIETARY]
NYS-26B/RK- Westinghouse, WCAP-12937, Structural Evaluation of Indian Point Units        3/29/2012 ENT000219        TC-1B        2 and 3 Pressurizer Surge Lines, Considering the Effects of Thermal                      X Stratification (May 1991) [PROPRIETARY]
6


26B/RK-TC-
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                            Exhibit Name                            Submission    During Addressed by                                                                                    Track 1 Date Exhibit                                                                                      Hearing?
NYS-26B/RK-  J. D. Burr et al., PVP2011-57700, Simulation and Evaluation of Thermal    3/29/2012 ENT000220        TC-1B        Stratification in a Sloped Surge Nozzle Correlated with Plant                          X Measurements (July 2011)
NYS-26B/RK- M. E. Nitzel et al., Comparison of ASME Code NB-3200 and NB-3600:        3/29/2012 ENT000221                      Results for Fatigue Analysis of B31.1 Branch Nozzles (Apr. 1996)
TC-1B                                                                                              X NYS-26B/RK-  Letter from Ekaterina Lenning, NRC, to James A Gresham, Westinghouse,    3/29/2012 ENT000222        TC-1B        Westinghouse Electric Company Quality Management System, Revision                    X 6 (Feb. 24, 2011)
NYS-26B/RK-  NUREG-1916, Safety Evaluation Report Related to the License Renewal      3/29/2012 ENT000223        TC-1B        of Shearon Harris Nuclear Power Plant, Unit 1, Vol. 2 (Nov. 2008)                      X (excerpted)
NYS-26B/RK-  SECY-95-245, Completion of the Fatigue Action Plan (Sept. 25, 1995)      3/29/2012 ENT000224 TC-1B                                                                                              X NYS-26B/RK-  NUREG/CR-6815, Review of the Margins for ASME Code Fatigue Design        3/29/2012 ENT000225        TC-1B        Curve - Effects of Surface Roughness and Material Variability (Sept.                  X 2003)
NYS-26B/RK-  Entergy, 0-CY-2310, Rev. 16, Reactor Coolant System Specification and    3/29/2012 ENT000226                      Frequencies (Oct. 2011)
TC-1B                                                                                              X NYS-26B/RK-  Westinghouse, WCAP-13588, Operating Strategies for Mitigating            3/29/2012 ENT000227        TC-1B        Pressurizer Insurge and Outsurge Transients (Mar. 1993)                                X
[PROPRIETARY] (excerpted)
NYS-26B/RK-  Calculation Note RCDA-03-75, Indian Point Unit 3 Stretch Power Uprate    3/29/2012 ENT000228                      Reactor Vessel Structural Evaluation (May 2005) [PROPRIETARY]
TC-1B                                                                                              X 7


1B NL-12-089, Letter from F. Dacimo, Entergy, to NRC, "Reply to Request for Additional Information Regardi ng the License Renewal Application Indian Point Nuclear Generating Unit Nos. 2 & 3" (June 14, 20118/20/2012 X ENT000555 NYS-38/RK-TC-5 B. Gordon, Minimum Chromium Content In Nickel-Alloy Weld Overlays to Mitigate PWSCC (Jan. 18, 2005) 8/20/2012 X ENT000556 NYS-38/RK-TC-5 F. Delabrouille et al., Effect of the Chromium Content and Strain on the Corrosion of Nickel Based Alloys in Primary Water of Pressurized Water
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                            Exhibit Name                              Submission    During Addressed by                                                                                        Track 1 Date Exhibit                                                                                          Hearing?
NYS-26B/RK-  Calculation Note RCDA-03-64, Indian Point Unit 2 Stretch Power Uprate        3/29/2012 ENT000229                      Reactor Vessel Evaluation (Feb. 2005) [PROPRIETARY]
TC-1B                                                                                                  X NYS-26B/RK-  Letter from R. Nelson, NRC, to N. Wilmshurst, EPRI, Revision 1 to the        3/29/2012 TC-1B, NYS-  Safety Evaluation of Electric Power Research Institute (EPRI) Report, ENT000230                      Materials Reliability Prog[ra]m (MRP) Report 1016596 (MRP-227),
38/RK-TC-5,                                                                                            X Revision 0, Pressurized Water Reactor (PWR) Internals Inspection and NYS-25 Evaluation Guidelines (Dec. 16, 2011)
NYS-26B/RK-  NL-08-143, Letter from F. Dacimo, Entergy, to NRC, Additional               3/29/2012 ENT000231        TC-1B, NYS-  Information (Regarding License Renewal Application - Reactor Vessel Fluence Clarification (Sept. 24, 2008)                                                   X 25 NYS-38/RK- NRC Inspection Manual Chapter 71003, Post-Approval Site Inspection for      3/29/2012 ENT000251                      License Renewal (Oct. 31, 2008)
TC-5                                                                                                  X NYS-38/RK-   NRC Inspection Manual, Temporary Instruction 2516/001 (Mar. 30, 2011)        3/29/2012 ENT000252 TC-5                                                                                                   X NYS-26B/RK-  Entergy Nuclear Vt. Yankee (Vt. Yankee Nuclear Power Station), Docket        3/29/2012 ENT000369 TC-1B        No. 50-271-LR, Hearing Transcript (Jul. 21, 2008) (excerpted)                             X NYS-38/RK-  Entergy Statement of Position Regarding Contention NYS-38/RK-TC-5            8/20/2012 ENT000520        TC-5        (Safety Commitments)                                                                      X NYS-38/RK-   Direct Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J.          8/20/2012 ENT000521        TC-5         Dolansky, Alan B. Cox, Jack R. Strosnider, Robert E. Nickell, and Mark A.                X Gray Regarding Contention NYS-38/RK-TC-5 (Safety Commitments)
NYS-38/RK-  Curriculum Vitae of Robert J. Dolansky                                      8/20/2012 ENT000522                                                                                                                X TC-5, NYS-25 8


Reactors (2005)  8/20/2012 X ENT000557 NYS-38/RK-TC-5 EPRI, Report 1014986, Pressurized Water Reactor Primary Water Chemistry Guidelines, Rev. 6 (Dec. 2007) [PROPRIETARY] (excerpted) 8/20/2012 X ENT000558 NYS-38/RK-TC-5 Letter from J. Daily, Project Manager, NRC, to D. Heacock, President, Dominion Energy Kewaunee, "Request for Additional Information for the Review of the Kewaunee Power Sta tion License Renewal Application" (Mar. 11, 2010) 8/20/2012 X ENT000559 NYS-38/RK-TC-5 Letter from B. Brady, Project Manager, NRC, to T. Joyce, President, PSEG Nuclear, "Request for Additional Information for Salem Nuclear Generating Stations Units 1 and 2 Li cense Renewal Application" (June 10, 2010) 8/20/2012 X ENT000560 NYS-38/RK-TC-5 Letter from R. Plasse, Project Manager, NRC, to P. Freeman, Site Vice President, NextEra Energy Seabrook, "Request for Additional Information Related to the Review of the Seabrook Station, License Renewal Application" (Dec. 14, 2010) 8/20/2012 X 13  Entergy Exhibit #
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                            Exhibit Name                              Submission    During Addressed by                                                                                      Track 1 Date Exhibit                                                                                        Hearing?
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000561 NYS-38/RK-TC-5 Kewaunee Tr., Advisory Comm. on Reactor Safeguards, Plant License Renewal Subcomm. (Aug. 18, 2010) (excerpted) 8/20/2012 X ENT000562 NYS-38/RK-TC-5 Letter from J. Daily, NRC, to D. Heacock, President, Dominion Energy Kewaunee, Inc., "Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application (TAC No.
NYS-38/RK-   EPRI, Report No. 1020988, Steam Generator Management Program:            8/20/2012 ENT000523        TC-5         Phase II Divider Plate Cracking Engineering Study (Nov. 2010)                         X
MD9408)" (Sept. 10, 2010)  8/20/2012 X ENT000563 NYS-38/RK-TC-5 Letter from Said Abdel-Khalik, ACRS Chairman, to Jaczko, NRC Chairman, "Report on the Safety Aspects of the License Renewal Application for the Kewaunee Power Station" (Jan. 7, 2011)  8/20/2012 X ENT000564 NYS-38/RK-TC-5 Final License Renewal Interim Staff Guidance, LR-ISG-2011-05, "Ongoing Review of Operating Experience" (Mar. 9, 2012) 8/20/2012 X ENT000565 NYS-38/RK-TC-5 Letter from L. Hartz, Vice President, Dominion Energy Kewaunee., to, NRC, "Response to Request for Additi onal Information for the Review of the Kewaunee Power Station License Re newal Application" (Sept. 23, 2010) 8/20/2012 X ENT000566 NYS-38/RK-TC-5 Letter from P. Freeman, Site Vice President, NextEra Energy Seabrook, to NRC, "Response to Request for additi onal Information - Set 10" (Mar. 22, 2011) 8/20/2012 X ENT000567 NYS-38/RK-TC-5 NL-00-043, Letter from J. Baumstark, Consol. Edison Co. of N.Y., to NRC, "Root Cause Evaluation For Steam Generator Tube Rupture Event of February 15, 2000" (Apr. 14, 2000)  8/20/2012 X ENT000568 NYS-38/RK-TC-5 EPRI, Report 1019044, Steam Generator Management Program: Improvement Factors for Pressurized Water Reactor Steam Generator Tube Materials (Dec. 2009) [PROPRIETARY] (excerpted) 8/20/2012 X ENT000569 NYS-38/RK-TC-5 Letter from E. Shields, Westinghouse, to W. Wittich, Entergy, "Steam Generator Operational Assessment" (June 29, 2010) [PROPRIETARY]  8/20/2012 X 14  Entergy Exhibit #
[PROPRIETARY]
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000570 NYS-38/RK-TC-5 WCAP-17091-NP, Rev. 0, H*, Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model 44F) (June 2009) (excerpted) 8/20/2012 X ENT000571 NYS-38/RK-TC-5 Safety Evaluation Related to Amendment No. 308 for Oconee Nuclear Station Units 1, 2 and 3 (Dec. 3, 1999) 8/20/2012 X ENT000572 NYS-38/RK-TC-5 Letter from A. Cunanan, NRC, to M. Reddemann, Energy Northwest, "Issuance of Renewed Facility Operating License No. NPF-21 for Columbia Generating Station" (May 22, 2012) (ENT000540) (excerpted) 8/20/2012 X ENT000602 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 EN-LI-100, Rev. 12, Process Applicability Determination (Nov. 6, 2012) 1/11/2013 X ENT000603 NYS-25, NYS-26B/RK-TC-1B, NYS-
NYS-38/RK-   EPRI, Report 1025133, Steam Generator Management Program:                  8/20/2012 ENT000524        TC-5         Assessment of Channel Head Susceptibility to Primary Water Stress                      X Corrosion Cracking (June 2012) [PROPRIETARY]
NYS-38/RK-   NRC Inspection Manual Chapter 2516 (Feb. 18, 2005)                         8/20/2012 ENT000525                                                                                                              X TC-5 NYS-38/RK-   F. DAnnucci and E. Lecour, ICONE18-29457, Inspection of the Steam        8/20/2012 ENT000526        TC-5        Generator Divider Plate (May 2010)                                                      X NYS-38/RK-   NRC Information Notice 2005-09, Indications in Thermally Treated Alloy    8/20/2012 ENT000527        TC-5         600 Steam Generator Tubes and Tube-to Tubesheet Welds (Apr. 7, 2005)                   X NYS-38/RK-   NUREG-1950, Disposition of Public Comments and Technical Bases for         8/20/2012 ENT000528        TC-5         Changes in the License Renewal Guidance Documents NUREG-1801 and                        X NUREG-1800 (Apr. 2011) (excerpted)
NYS-38/RK-   Westinghouse Technical Manual No. TMMC 1440-C350, Vertical Steam           8/10/2015 ENTR00529        TC-5         Generator Instruction for New York Power Authority - Indian Point                    [Revised]
Nuclear Plant No. 3 (Dec. 1989) [PROPRIETARY] (excerpted)
NYS-38/RK-   EPRI, Report 1014982, Divider Plate Cracking in Steam Generators -        8/20/2012 TC-5         Results of Phase 1: Analysis of Primary Water Stress Corrosion Cracking ENT000530                      and Mechanical Fatigue in the Alloy 600 Stub Runner to Divider Plate                    X Weld Material (June 2007) [PROPRIETARY]
NYS-38/RK-   ASME Code, Sec. XI, Art. IWA-2000 (2001)                                   8/20/2012 ENT000531                                                                                                              X TC-5 NYS-38/RK-   ASME Code, Sec. V, Art. 14 (2001)                                         8/20/2012 ENT000532                                                                                                              X TC-5 9


38/RK-TC-5 EN-LI-101, Rev. 9, 10 CFR 50.59 Evaluations (Feb. 16, 2012) 1/11/2013 X ENT000604 NYS-25, NYS-26B/RK-TC-1B, NYS-
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                            Exhibit Name                                Submission    During Addressed by                                                                                        Track 1 Date Exhibit                                                                                          Hearing?
NYS-38/RK-  Memorandum from C. Hunt, NRC to G. Kulesa, NRC, Summary of the              8/20/2012 TC-5        February 16, 2012, Category 2 Public Meeting with the Electric Power ENT000533                      Research Institute (EPRI) and Industry to Discuss Steam Generator Issues                X (Mar. 15, 2012)
NYS-38/RK-   NEI 99-04, Guidelines for Managing NRC Commitment Changes (July              8/20/2012 ENT000534        TC-5         1999)                                                                                    X NYS-38/RK-   NRR Office Instruction, LIC-105, Rev. 3, Managing Regulatory                8/20/2012 ENT000535        TC-5        Commitments Made by Licensees to the NRC (Mar. 2009)                                      X NYS-38/RK-  NUREG-2101, Safety Evaluation Report Related to the License Renewal          8/20/2012 ENT000536        TC-5        of Salem Nuclear Generating Station (June 2011) (excerpted)                              X NYS-38/RK-  NUREG-1961, Safety Evaluation Report Related to the License Renewal          8/20/2012 ENT000537        TC-5        of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Apr. 2011)                  X (excerpted)
NYS-38/RK-  SECY 2000-45, Acceptance of NEI 99-04, Guidelines for Managing NRC          8/20/2012 ENT000538        TC-5        Commitments (Feb. 22, 2000)                                                             X NYS-38/RK-  NRC Enforcement Manual, Rev. 7 (Oct. 1, 2010) (excerpted)                    8/20/2012 ENT000539                                                                                                                X TC-5 NYS-38/RK-  Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station) Docket        8/20/2012 ENT000540        TC-5        No. 50-293, Renewed Facility Operating License (May 9, 2012)                              X (excerpted)
NYS-38/RK-   EN-LI-110, Commitment Management Program (Jan. 2012)                        8/20/2012 ENT000541                                                                                                                X TC-5 NYS-38/RK-  NRC Regulatory Issue Summary 2000-17, Managing Regulatory                    8/20/2012 ENT000542        TC-5        Commitments Made by Power Reactor Licensees to the NRC Staff (Sept.                      X 21, 2000) 10


38/RK-TC-5 Indian Point Nuclear Generating Units  2 and 3, NRC Evaluation of Changes, Tests or Experiments and Permanent Plant Modifications Team Inspection Report (Jan. 13, 2012) 1/11/2013 X ENT000615 NYS-25 Entergy's Statement of Position Regarding Contention NYS-25 (Embrittlement) (Aug. 10, 2015) 8/10/2015 15  Entergy Exhibit #
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                            Exhibit Name                              Submission    During Addressed by                                                                                      Track 1 Date Exhibit                                                                                        Hearing?
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000616 NYS-25, NYS-26B/RK-TC-1B, NYS-
NYS-38/RK-   Inspection Procedure 71002, License Renewal Inspection (Nov. 2011)          8/20/2012 ENT000543                                                                                                              X TC-5 NYS-38/RK-  Letter from A. Macfarlane, Chairman, NRC, to E. Markey, U.S.                8/20/2012 ENT000544        TC-5        Congressman, Regulatory Commitments (July 12, 2012)                                   X NYS-38/RK-  Memorandum from S. Dingbaum, Assistant Inspector Gen. for Audits,          8/20/2012 TC-5        NRC, to R. W. Borchardt, Exec. Dir. for Operations, NRC, Status of ENT000545                      Recommendations: Audit of NRCs Management of Licensee                                  X Commitments (OIG-11-A-17) (Apr. 16, 2012)
NYS-38/RK-  NUREG-1958, Safety Evaluation Report Related to the License Renewal        8/20/2012 ENT000546        TC-5        of Kewaunee Power Station (Jan. 2011) (excerpted)                                        X NYS-38/RK-  EA-12-051, Order Modifying Licenses With Regard to Reliable Spent Fuel      8/20/2012 ENT000547        TC-5        Pool Instrumentation (Effective Immediately) (Mar. 12, 2012)                             X NYS-38/RK-  Letter from R. Braun, Senior Vice President, PSEG Nuclear LLC, to NRC      8/20/2012 TC-5        Document Control Desk, PSEG Nuclear LLCs Response to March 12, ENT000548                      2012 Commission Order Modifying License with Regard to Reliable Spent                    X Fuel Pool Instrumentation (Mar. 29, 2012)
NYS-38/RK-  Letter from R. Conte, NRC, to J. Ventosa, Entergy, Indian Point Nuclear    8/20/2012 ENT000549        TC-5        Generating Unit 2 - NRC Inspection Report 05000247/2012008 (Apr. 19,                    X 2012)
NYS-38/RK-  Letter from A. Cunanan, NRC Project Manager, to S.K. Gambhir, Vice          8/20/2012 TC-5, NYS-   President, Energy Northwest, Request for Additional Information for the ENT000550        26B/RK-TC-   Review of the Columbia Generating Station License Renewal Application                    X 1B           for Metal Fatigue (Feb. 3, 2011)
NYS-38/RK-  Letter from B. Harris, NRC Project Manager, to B. Allen, FENOC,            8/20/2012 ENT000551        TC-5        Request for Additional Information for the Review of the Davis-Besse                    X Nuclear Power Station - Batch 3 (May 2, 2011) (excerpted) 11


38/RK-TC-5 Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. Dolansky, Alan B. Cox, Jack R. Strosnider, Timothy J. Griesbach, Randy G. Lott, and Mark A. Gray Regarding Contention NYS-25 (Embrittlement) (Aug. 10, 2015) 8/10/2015 ENT000617 NYS-25, NYS-38/RK-
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                              Exhibit Name                            Submission    During Addressed by                                                                                      Track 1 Date Exhibit                                                                                        Hearing?
NYS-38/RK-   Letter from P. Bessette, Morgan Lewis, to Administrative Judges (May 15,    8/20/2012 ENT000552        TC-5         2012)                                                                                    X NYS-38/RK-  Entergy, Condition Report LO-LAR-2011-00174, Corrective Actions            8/20/2012 ENT000553        TC-5        (Aug. 2011) (excerpted)                                                                  X NYS-38/RK-  NL-12-089, Letter from F. Dacimo, Entergy, to NRC, Reply to Request        8/20/2012 TC-5, NYS-  for Additional Information Regarding the License Renewal Application ENT000554                                                                                                              X 26B/RK-TC-  Indian Point Nuclear Generating Unit Nos. 2 & 3 (June 14, 2011) 1B NYS-38/RK-  B. Gordon, Minimum Chromium Content In Nickel-Alloy Weld Overlays          8/20/2012 ENT000555        TC-5        to Mitigate PWSCC (Jan. 18, 2005)                                                        X NYS-38/RK-  F. Delabrouille et al., Effect of the Chromium Content and Strain on the    8/20/2012 ENT000556        TC-5        Corrosion of Nickel Based Alloys in Primary Water of Pressurized Water                  X Reactors (2005)
NYS-38/RK-  EPRI, Report 1014986, Pressurized Water Reactor Primary Water              8/20/2012 ENT000557        TC-5        Chemistry Guidelines, Rev. 6 (Dec. 2007) [PROPRIETARY] (excerpted)                      X NYS-38/RK-  Letter from J. Daily, Project Manager, NRC, to D. Heacock, President,      8/20/2012 TC-5        Dominion Energy Kewaunee, Request for Additional Information for the ENT000558                      Review of the Kewaunee Power Station License Renewal Application                        X (Mar. 11, 2010)
NYS-38/RK-  Letter from B. Brady, Project Manager, NRC, to T. Joyce, President, PSEG    8/20/2012 TC-5        Nuclear, Request for Additional Information for Salem Nuclear ENT000559                      Generating Stations Units 1 and 2 License Renewal Application (June 10,                X 2010)
NYS-38/RK-   Letter from R. Plasse, Project Manager, NRC, to P. Freeman, Site Vice      8/20/2012 TC-5        President, NextEra Energy Seabrook, Request for Additional Information ENT000560                      Related to the Review of the Seabrook Station, License Renewal                          X Application (Dec. 14, 2010) 12


TC-5 Curriculum Vitae of Timothy J. Griesbach 8/10/2015 ENT000618 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Curriculum Vitae of Randy G. Lott 8/10/2015 ENT000619 NYS-25 NL-08-127, Letter from F. Dacimo, Entergy, to NRC Document Control Desk, "Additional Information Regarding License Renewal Application - Structural OE Clarifications, Clarifications for Electrical RAIs and Audit
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                            Exhibit Name                                Submission    During Addressed by                                                                                        Track 1 Date Exhibit                                                                                          Hearing?
NYS-38/RK-  Kewaunee Tr., Advisory Comm. on Reactor Safeguards, Plant License            8/20/2012 ENT000561        TC-5         Renewal Subcomm. (Aug. 18, 2010) (excerpted)                                              X NYS-38/RK-  Letter from J. Daily, NRC, to D. Heacock, President, Dominion Energy        8/20/2012 TC-5        Kewaunee, Inc., Request for Additional Information for the Review of the ENT000562                      Kewaunee Power Station License Renewal Application (TAC No.                              X MD9408) (Sept. 10, 2010)
NYS-38/RK-  Letter from Said Abdel-Khalik, ACRS Chairman, to Jaczko, NRC                8/20/2012 ENT000563        TC-5        Chairman, Report on the Safety Aspects of the License Renewal                            X Application for the Kewaunee Power Station (Jan. 7, 2011)
NYS-38/RK-   Final License Renewal Interim Staff Guidance, LR-ISG-2011-05,                8/20/2012 ENT000564        TC-5        Ongoing Review of Operating Experience (Mar. 9, 2012)                                  X NYS-38/RK-   Letter from L. Hartz, Vice President, Dominion Energy Kewaunee., to,        8/20/2012 TC-5         NRC, Response to Request for Additional Information for the Review of ENT000565                      the Kewaunee Power Station License Renewal Application (Sept. 23,                        X 2010)
NYS-38/RK-  Letter from P. Freeman, Site Vice President, NextEra Energy Seabrook, to    8/20/2012 ENT000566        TC-5        NRC, Response to Request for additional Information - Set 10 (Mar. 22,                  X 2011)
NYS-38/RK-   NL-00-043, Letter from J. Baumstark, Consol. Edison Co. of N.Y., to         8/20/2012 ENT000567        TC-5        NRC, Root Cause Evaluation For Steam Generator Tube Rupture Event of                    X February 15, 2000 (Apr. 14, 2000)
NYS-38/RK-   EPRI, Report 1019044, Steam Generator Management Program:                    8/20/2012 ENT000568        TC-5        Improvement Factors for Pressurized Water Reactor Steam Generator Tube                    X Materials (Dec. 2009) [PROPRIETARY] (excerpted)
NYS-38/RK-  Letter from E. Shields, Westinghouse, to W. Wittich, Entergy, Steam        8/20/2012 ENT000569        TC-5        Generator Operational Assessment (June 29, 2010) [PROPRIETARY]                          X 13


Questions, License Renewal Application Amendment" (Aug. 14, 2008) 8/10/2015 ENT000620 NYS-25, NYS-38/RK-
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                            Exhibit Name                            Submission    During Addressed by                                                                                    Track 1 Date Exhibit                                                                                      Hearing?
NYS-38/RK-  WCAP-17091-NP, Rev. 0, H*, Alternate Repair Criteria for the Tubesheet    8/20/2012 ENT000570        TC-5        Expansion Region in Steam Generators with Hydraulically Expanded                      X Tubes (Model 44F) (June 2009) (excerpted)
NYS-38/RK-  Safety Evaluation Related to Amendment No. 308 for Oconee Nuclear        8/20/2012 ENT000571        TC-5        Station Units 1, 2 and 3 (Dec. 3, 1999)                                               X NYS-38/RK-  Letter from A. Cunanan, NRC, to M. Reddemann, Energy Northwest,          8/20/2012 ENT000572        TC-5        Issuance of Renewed Facility Operating License No. NPF-21 for                        X Columbia Generating Station (May 22, 2012) (ENT000540) (excerpted)
NYS-25,      EN-LI-100, Rev. 12, Process Applicability Determination (Nov. 6, 2012)    1/11/2013 NYS-26B/RK-ENT000602        TC-1B, NYS-                                                                                        X 38/RK-TC-5 NYS-25,      EN-LI-101, Rev. 9, 10 CFR 50.59 Evaluations (Feb. 16, 2012)              1/11/2013 NYS-26B/RK-ENT000603        TC-1B, NYS-                                                                                        X 38/RK-TC-5 NYS-25,      Indian Point Nuclear Generating Units 2 and 3, NRC Evaluation of          1/11/2013 NYS-26B/RK-  Changes, Tests or Experiments and Permanent Plant Modifications Team ENT000604        TC-1B, NYS- Inspection Report (Jan. 13, 2012)                                                      X 38/RK-TC-5 ENT000615        NYS-25      Entergy's Statement of Position Regarding Contention NYS-25              8/10/2015 (Embrittlement) (Aug. 10, 2015) 14


TC-5 PWROG Presentation, "Material Orientation Toughness Assessment (MOTA) for the Purpose of Mitigating Branch Technical Position (BTP) 5-3 Uncertainties" (Feb. 19, 2015) 8/10/2015 ENT000621 NYS-25, NYS-38/RK-TC-5 Westinghouse, WCAP-17894-NP, Rev. 0, Component Inspection Details Supporting Aging Management of Reactor Internals at Indian Point Unit 2 (Sept. 2014) 8/10/2015 ENT000622 NYS-25, NYS-38/RK-TC-5 Westinghouse, WCAP-17901-NP, Rev. 1, Component Inspection Details Supporting Aging Management of Reactor Internals at Indian Point Unit 3 (Sept. 2014) 8/10/2015 16  Entergy Exhibit #
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                            Exhibit Name                                Submission    During Addressed by                                                                                        Track 1 Date Exhibit                                                                                          Hearing?
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000623 NYS-25, NYS-38/RK-
ENT000616        NYS-25,      Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. Dolansky,        8/10/2015 NYS-26B/RK-  Alan B. Cox, Jack R. Strosnider, Timothy J. Griesbach, Randy G. Lott, and TC-1B, NYS-  Mark A. Gray Regarding Contention NYS-25 (Embrittlement) (Aug. 10, 38/RK-TC-5   2015)
ENT000617        NYS-25,      Curriculum Vitae of Timothy J. Griesbach                                      8/10/2015 NYS-38/RK-TC-5 ENT000618        NYS-25,      Curriculum Vitae of Randy G. Lott                                            8/10/2015 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 ENT000619        NYS-25      NL-08-127, Letter from F. Dacimo, Entergy, to NRC Document Control            8/10/2015 Desk, Additional Information Regarding License Renewal Application -
Structural OE Clarifications, Clarifications for Electrical RAIs and Audit Questions, License Renewal Application Amendment (Aug. 14, 2008)
ENT000620        NYS-25,      PWROG Presentation, Material Orientation Toughness Assessment               8/10/2015 NYS-38/RK-  (MOTA) for the Purpose of Mitigating Branch Technical Position (BTP) 5-TC-5        3 Uncertainties (Feb. 19, 2015)
ENT000621         NYS-25,     Westinghouse, WCAP-17894-NP, Rev. 0, Component Inspection Details             8/10/2015 NYS-38/RK-  Supporting Aging Management of Reactor Internals at Indian Point Unit 2 TC-5        (Sept. 2014)
ENT000622         NYS-25,     Westinghouse, WCAP-17901-NP, Rev. 1, Component Inspection Details             8/10/2015 NYS-38/RK-  Supporting Aging Management of Reactor Internals at Indian Point Unit 3 TC-5        (Sept. 2014) 15


TC-5 Cases of ASME Boiler and Pressure Vessel Code, Case N-729-1, "Alternative Examination Requirements for PWR Reactor Vessel Upper Heads With Nozzles Having Pressure-Retaining Partial-Penetration Welds," (Section XI, Division 1) (Mar. 28, 2006) [Full-Text Copyright] 8/10/2015 ENT000624 NYS-25, NYS-38/RK-
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                            Exhibit Name                                Submission    During Addressed by                                                                                        Track 1 Date Exhibit                                                                                          Hearing?
ENT000623        NYS-25,      Cases of ASME Boiler and Pressure Vessel Code, Case N-729-1,                 8/10/2015 NYS-38/RK-  Alternative Examination Requirements for PWR Reactor Vessel Upper TC-5        Heads With Nozzles Having Pressure-Retaining Partial-Penetration Welds, (Section XI, Division 1) (Mar. 28, 2006) [Full-Text Copyright]
ENT000624        NYS-25,      Letter from N. Salgado to Vice President, Operations, Entergy Nuclear        8/10/2015 NYS-38/RK-  Operations, Inc., Indian Point Nuclear Generating Unit No. 2 - Relief TC-5        from the Examination Area for Reactor Vessel Head Penetration Nozzles (TAC No. ME1658) (Mar. 1, 2010)
ENT000625        NYS-25,      Letter from N. Salgado to Vice President, Operations, Entergy Nuclear        8/10/2015 NYS-38/RK-  Operations, Inc., Indian Point Nuclear Generating Unit No. 3 - Relief TC-5        Requests RR-3-45 and RR-3-46 for Reactor Vessel Head Penetrations Examination (TAC Nos. ME0411 and ME0412) (July 8, 2009)
ENT000626        NYS-25,      Letter from P. Milano, NRC, to M. Kansler, Entergy, Bulletin 2002-01,        8/10/2015 NYS-38/RK-  Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure TC-5        Boundary Integrity, 15-Day Response for Indian Pont Nuclear Generating Unit Nos. 2 & 3 (TAC Nos. MB4550 and MB4551) (Nov. 12, 2002)
(ENT-25-0026)
ENT000627        NYS-25,      G. Was, Fundamentals of Radiation Materials Science: Metals and Alloys;      8/10/2015 NYS-26B/RK-  Part III: Mechanical Effects of Radiation Damage (2007) [Full-Text TC-1B, NYS-  Copyright] [excerpt]
38/RK-TC-5 ENT000628        NYS-25,     I. Tylek and K. Kuchta, Mechanical Properties of Structural Stainless        8/10/2015 NYS-38/RK-   Steels, 4-B Technical Transactions, Civil Engineering 59 (2014) [Full-Text TC-5        Copyright]
16


TC-5 Letter from N. Salgado to Vice President, Operations, Entergy Nuclear Operations, Inc., "Indian Point Nuclear Generating Unit No. 2 - Relief from the Examination Area for Reactor Vessel Head Penetration Nozzles (TAC No. ME1658)" (Mar. 1, 2010) 8/10/2015 ENT000625 NYS-25, NYS-38/RK-TC-5 Letter from N. Salgado to Vice President, Operations, Entergy Nuclear Operations, Inc., "Indian Point Nuclear Generating Unit No. 3 - Relief Requests RR-3-45 and RR-3-46 for Reactor Vessel Head Penetrations Examination (TAC Nos. ME0411 and ME0412)" (July 8, 2009) 8/10/2015 ENT000626 NYS-25, NYS-38/RK-
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                            Exhibit Name                              Submission    During Addressed by                                                                                      Track 1 Date Exhibit                                                                                        Hearing?
ENT000629        NYS-25,      Letter from C. Grimes, NRC, to D. Walters, NEI, License Renewal Issue    8/10/2015 NYS-38/RK-  No. 98-0030, Thermal Aging Embrittlement of Cast Austenitic Stainless TC-5        Steel Components (May 19, 2000)
ENT000630        NYS-25,      W.J. Mills, Effect of Temperature on the Fracture Toughness Behavior of    8/10/2015 NYS-38/RK-  Inconel X-750, in ASTM STP 733: Fractography and Materials Science 98 TC-5        (L.N. Gilbertson and R.D. Zipp, eds., 1981) [Full-Text Copyright]
ENT000631        NYS-25,      EPRI, MRP-175, Materials Reliability Program: PWR Internals Material      8/10/2015 NYS-26B/RK-  Aging Degradation Mechanism Screening and Threshold Values (Dec.
TC-1B, NYS-  2005) [Full-Text Copyright]
38/RK-TC-5 ENT000632        NYS-25,     ASME Boiler & Pressure Vessel Code, Section III, Article NB-2000,          8/10/2015 NYS-38/RK-   Material (1998) [Full-Text Copyright]
TC-5 ENT000633        NYS-25,      Letter from P. Anderson, Entergy, to NRC Document Control Desk,           8/10/2015 NYS-38/RK-   Documentation for Pressurized Thermal Shock Evaluation Meeting (June TC-5        2, 2010)
ENT000634        NYS-25,      Entergy, IP2, FSAR Update, Revision 25 (2014) [excerpts]                  8/10/2015 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 ENT000635        NYS-25,     Westinghouse, WCAP-17096-NP, Rev. 2, Reactor Internals Acceptance          8/10/2015 NYS-38/RK-   Criteria Methodology and Data Requirements (Dec. 2009)
TC-5 17


TC-5 Letter from P. Milano, NRC, to M. Kansler, Entergy, "Bulletin 2002-01, 'Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity,' 15-Day Response for Indian Pont Nuclear Generating Unit Nos. 2 & 3 (TAC Nos. MB4550 and MB4551)" (Nov. 12, 2002) (ENT-25-0026)  8/10/2015 ENT000627 NYS-25, NYS-26B/RK-TC-1B, NYS-
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                          Exhibit Name                              Submission    During Addressed by                                                                                      Track 1 Date Exhibit                                                                                        Hearing?
ENT000636        NYS-25,      P. Shahinian et al., NRL Report 7446, Effect of Neutron Irradiation on    8/10/2015 NYS-26B/RK-  Fatigue Crack Propagation in Types 304 and 316 Stainless Steels at High TC-1B, NYS-  Temperature (July 21, 1972) 38/RK-TC-5 ENT000637        NYS-25,     NUREG-1874, Recommended Screening Limits for Pressurized Thermal          8/10/2015 NYS-38/RK-  Shock (PTS) (March 2010)
TC-5 ENT00638A-C      NYS-25,     NUREG-1806, Vol. 1, Technical Basis for Revision of the Pressurized        8/10/2015 NYS-38/RK-  Thermal Shock (PTS) Screening Limit in the PTS Rule (10 CFR 50.61)
TC-5        (Aug. 2007)
ENT00639A-F      NYS-25,      Westinghouse, WCAP-16156, Indian Point Nuclear Generating Unit No. 2,      8/10/2015 NYS-26B/RK-  Stretch Power Uprate NSSS Engineering Report (Mar. 2004)
TC-1B, NYS-  [PROPRIETARY]
38/RK-TC-5 ENT00640A-I      NYS-25,      Westinghouse, WCAP-16211, Power Uprate Project, Indian Point Unit 3        8/10/2015 NYS-26B/RK-  Power Plant, NSSS Engineering Report (June 2004) [PROPRIETARY]
TC-1B, NYS-38/RK-TC-5 ENT000641        NYS-25,     Final License Renewal Interim Staff Guidance LR-ISG-2011-04, Updated      8/10/2015 NYS-38/RK-   Aging Management Criteria for Reactor Vessel Internal Components for TC-5        Pressurized Water Reactors (May 28, 2013)
ENT00642A-C      NYS-25,      EPRI, MRP-232, Materials Reliability Program: Aging Management            8/10/2015 NYS-38/RK-  Strategies for Westinghouse and Combustion Engineering PWR Internals TC-5        (Dec. 2008) [Full-Text Copyright]
18


38/RK-TC-5 G. Was, Fundamentals of Radiation Materials Science: Metals and Alloys; Part III: Mechanical Effects of Radiation Damage (2007) [Full-Text Copyright] [excerpt] 8/10/2015 ENT000628 NYS-25, NYS-38/RK-
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                            Exhibit Name                                Submission    During Addressed by                                                                                        Track 1 Date Exhibit                                                                                          Hearing?
ENT000643        NYS-25,      EPRI, MRP-232, Revision 1, Materials Reliability Program: Aging              8/10/2015 NYS-38/RK-   Management Strategies for Westinghouse and Combustion Engineering TC-5         PWR Internals (Dec. 2008) [Full-Text Copyright]
ENT000644        NYS-25,      EPRI, MRP-230, Materials Reliability Program: Functionality Analysis        8/10/2015 NYS-38/RK-  for Westinghouse and Combustion Engineering Representative PWR TC-5        Internals (Oct. 2009) [Full-Text Copyright]
ENT000645        NYS-25,      EPRI, MRP-228, Rev. 1, Materials Reliability Program: Inspection            8/10/2015 NYS-38/RK-  Standard for PWR Internals - 2012 Update (Dec. 2012) [Full-Text TC-5        Copyright]
ENT000646        NYS-25,      EPRI, MRP-210, Materials Reliability Program: Fracture Toughness            8/10/2015 NYS-26B/RK-  Evaluation of Highly Irradiated PWR Stainless Steel Internal Components TC-1B, NYS-  (Dec. 2007) [Full-Text Copyright]
38/RK-TC-5 ENT000647        NYS-25,      EPRI, MRP-134, Materials Reliability Program: Framework and                  8/10/2015 NYS-38/RK-  Strategies for Managing Aging Effects in PWR Internals (June 2005) [Full-TC-5        Text Copyright]
ENT000648        NYS-25,      M. Mitchell, Chief, Vessels and Internals Integrity Branch, Response to      8/10/2015 NYS-38/RK-  Non-Concurrence Regarding Safety Evaluation for Topical Report MRP-TC-5        227, Pressurized Water Reactor Internals Inspection and Evaluation Guidelines (undated)
ENT000649        NYS-25,     Letter from D. Pelton, NRC, to E. McCartney, NextEra Energy Point            8/10/2015 NYS-38/RK-   Beach, Point Beach Nuclear Plant, Units 1 and 2 - Staff Assessment of TC-5        Reactor Vessel Internals Inspection Plan Based on MRP-227-A (TAC Nos.
ME8235 and ME8236) (Mar. 30, 2015) 19


TC-5 I. Tylek and K. Kuchta, Mechanical Properties of Structural Stainless Steels, 4-B Technical Transactions, Civil Engineering 59 (2014) [Full-Text Copyright] 8/10/2015 17  Entergy Exhibit #
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                            Exhibit Name                                Submission    During Addressed by                                                                                        Track 1 Date Exhibit                                                                                          Hearing?
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000629 NYS-25, NYS-38/RK-
ENT000650        NYS-25,      G. Gardner, Chair, EPRI Reactor Internals Working Group, Recent              8/10/2015 NYS-38/RK-  Materials Inspections of PWR Reactor Internals (Mar. 2015)
TC-5 ENT000651        NYS-25,      T. Griesbach and B. Gordon, Materials Aging Management Programs at            8/10/2015 NYS-38/RK-   Nuclear Power Plants in the United States (Oct. 2007) [Full-Text TC-5        Copyright]
ENT000652        NYS-25,      Letter from P. Milano, NRR, to M. Kansler, Entergy, Indian Point Nuclear    8/10/2015 NYS-38/RK-  Generating Unit No. 2 - Issuance of Amendment Re: 3.26 Percent Power TC-5        Uprate (TAC No. MC1865) (Oct. 27, 2004)
ENT000653        NYS-25,      Letter from P. Milano, NRR, to M. Kansler, Entergy, Indian Point Nuclear    8/10/2015 NYS-38/RK-  Generating Unit No. 3 - Issuance of Amendment Re: 4.85 Percent Stretch TC-5        Power Uprate and Relocation of Cycle-Specific Parameters (TAC No.
MC3552) (Mar. 24, 2005)
ENT000654        NYS-25,      Westinghouse, WCAP-15270, Determination of Acceptable Baffle-Barrel-          8/10/2015 NYS-38/RK-  Bolting for Four-Loop Westinghouse Downflow and Converted Upflow TC-5        Domestic Plants (Nov. 2001) [PROPRIETARY]
ENT000655        NYS-25,      Westinghouse, WCAP-15030-NP-A, Westinghouse Methodology for                  8/10/2015 NYS-38/RK-  Evaluating the Acceptability of Baffle-Former-Barrel Bolting Distributions TC-5        under Faulted Load Conditions (Mar. 2, 1999)
ENT000656        NYS-25,     Westinghouse, Technical Bulletin TB-14-5, Reactor Internals Lower            8/10/2015 NYS-38/RK-   Radial Support Clevis Insert Cap Screw Degradation (Aug. 25, 2014)
TC-5 20


TC-5 Letter from C. Grimes, NRC, to D. Walters, NEI, "License Renewal Issue No. 98-0030, 'Thermal Aging Embrittlement of Cast Austenitic Stainless Steel Components'" (May 19, 2000) 8/10/2015 ENT000630 NYS-25, NYS-38/RK-
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                            Exhibit Name                            Submission    During Addressed by                                                                                    Track 1 Date Exhibit                                                                                      Hearing?
ENT000657        NYS-25,      NRC Inspection Manual, Manual Chapter 2516, Policy and Guidance for      8/10/2015 NYS-38/RK-  the License Renewal Inspection Program (LRIP) (Aug. 13, 2013)
TC-5 ENT000658        NYS-25,      J. Smith, Irradiated Materials Testing, Inside MRP (Winter 2012)          8/10/2015 NYS-38/RK-TC-5 ENT000659        NYS-25,      Letter from R. Kuntz, NRC, to Vice President, Operations, Entergy,        8/10/2015 NYS-26B/RK-  Request for Additional Information for the Review of the Indian Point TC-1B, NYS-  Nuclear Generating Unit Nos. 2 and 3, License Renewal Application 38/RK-TC-5  (May 15, 2012)
ENT000660        NYS-25,      Letter from J. Daly, NRC, to Vice President, Operations, Entergy,        8/10/2015 NYS-38/RK-  Request for Additional Information for the Review of the Indian Point TC-5        Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2013-01 (TAC Nos. MD5407 and MD5408) (Feb. 6, 2013)
ENT000661        NYS-25,      Letter from K. Green, NRC, to Vice President, Operations, Entergy,        8/10/2015 NYS-38/RK-  Request for Additional Information for the Review of the Indian Point TC-5        Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2013-04 (TAC Nos. MD5407 and MD5408) (July 26, 2013)
ENT000662        NYS-25,     Letter from K. Green, NRC, to Vice President, Operations, Entergy,        8/10/2015 NYS-38/RK-   Request for Additional Information for the Review of the Indian Point TC-5        Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2014-02 (TAC Nos. MD5407 and MD5408) (Apr. 9, 2014) 21


TC-5 W.J. Mills, Effect of Temperature on the Fracture Toughness Behavior of Inconel X-750, in ASTM STP 733: Fractography and Materials Science 98 (L.N. Gilbertson and R.D. Zipp, eds., 1981) [Full-Text Copyright] 8/10/2015 ENT000631 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 EPRI, MRP-175, Materials Reliability Program:  PWR Internals Material Aging Degradation Mechanism Screening and Threshold Values (Dec.
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                            Exhibit Name                              Submission    During Addressed by                                                                                      Track 1 Date Exhibit                                                                                        Hearing?
2005) [Full-Text Copyright] 8/10/2015 ENT000632 NYS-25, NYS-38/RK-TC-5 ASME Boiler & Pressure Vessel Code, Section III, Article NB-2000, "Material" (1998) [Full-Text Copyright] 8/10/2015 ENT000633 NYS-25, NYS-38/RK-
ENT000663        NYS-25,      Letter from A. McGehee & T. Hanley, EPRI, to NRC Document Control          8/10/2015 NYS-38/RK-  Desk, BWRVIP 2015-025, Project No. 704 - Summary of Industry TC-5        Position on Screening Criteria for Thermal and Irradiation Embrittlement for PWR and BWR Reactor Internals Fabricated of Cast Austenitic Stainless Steel (Mar. 9, 2015)
ENT000664        NYS-25,     Email from J. Holonich, NRC, to K. Amberge, EPRI, et al., Summary          8/10/2015 NYS-38/RK-  Tables for CASS Position (Mar. 12, 2014, 1:23 PM)
TC-5 ENT000665        NYS-25,     ASME Boiler & Pressure Vessel Code, Section XI, Subsection IWB,            8/10/2015 NYS-26B/RK- Requirements for Class 1 Components of Light-Water Cooled Plants TC-1B, NYS- (2010) [Full-Text Copyright]
38/RK-TC-5 ENT00666A-I      NYS-25,     NUREG/CR-6943, A Study of Remote Visual Methods to Detect Cracking          8/10/2015 NYS-38/RK-  in Reactor Components (Oct. 2007)
TC-5 ENT000667        NYS-25,      PWROG-14048-P, Rev. 0-A, PWROG, Functionality Analysis: Lower              8/10/2015 NYS-38/RK-   Support Columns (Oct. 2014) [PROPRIETARY]
TC-5 ENT000668        NYS-25,     EPRI, MRP-219, Rev. 10, Materials Reliability Program: Inspection Data      8/10/2015 NYS-38/RK-   Survey Report (Nov. 2014) [Full-Text Copyright]
TC-5 22


TC-5 Letter from P. Anderson, Entergy, to NRC Document Control Desk, "Documentation for Pressurized Therma l Shock Evaluation Meeting" (June 2, 2010) 8/10/2015 ENT000634 NYS-25, NYS-26B/RK-TC-1B, NYS-
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                            Exhibit Name                              Submission    During Addressed by                                                                                        Track 1 Date Exhibit                                                                                          Hearing?
ENT000669        NYS-25,      Regulatory Guide 1.99, Radiation Embrittlement of Reactor Vessel            8/10/2015 NYS-26B/RK-  Materials, Revision 2 (May 1988)
TC-1B, NYS-38/RK-TC-5 ENT000670        NYS-25      NL-13-106, Letter from J. Ventosa, Entergy, to NRC Document Control         8/10/2015 Desk, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule Per 10 CFR 50 Appendix H (Aug. 12, 2013)
ENT000671        NYS-25      NL-14-129, Letter from J. Ventosa, Entergy, to NRC Document Control          8/10/2015 Desk, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule Per 10 CFR 50 Appendix H (Nov. 5, 2014)
ENT000672        NYS-25       Letter from B. Beasley, NRC, to Vice President, Operations, Indian Point    8/10/2015 Nuclear Generating Unit No. 2 - Safety Evaluation re: Revision to the Reactor Vessel Surveillance Capsule Withdrawal Schedule per 10 CFR 50 Appendix H (TAC No. MF2558) (Jan. 14, 2014)
ENT000673        NYS-25      Letter from B. Beasley, NRC, to Vice President, Operations, Indian Point    8/10/2015 Nuclear Generating Unit No. 3 - Safety Evaluation re: Revision to the Reactor Vessel Surveillance Capsule Withdrawal Schedule per 10 CFR 50 Appendix H (TAC No. MF5148) (Mar. 4, 2015)
ENT000674        NYS-25      NL-08-014, Letter from Fred R. Dacimo, Entergy, to NRC Document              8/10/2015 Control Desk, Clarifications to Reactor Vessel Surveillance Program and Neutron Embrittlement Time-Limited Aging Analyses and Audit Item
                              #105; and Revision to License Renewal Regulatory Commitment List (Jan. 17, 2008) 23


38/RK-TC-5 Entergy, IP2, FSAR Update, Revision 25 (2014) [excerpts] 8/10/2015 ENT000635 NYS-25, NYS-38/RK-TC-5 Westinghouse, WCAP-17096-NP, Rev. 2, Reactor Internals Acceptance Criteria Methodology and Data Requirements (Dec. 2009)  8/10/2015 18  Entergy Exhibit #
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                            Exhibit Name                            Submission    During Addressed by                                                                                    Track 1 Date Exhibit                                                                                      Hearing?
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000636 NYS-25, NYS-26B/RK-TC-1B, NYS-
ENT000675        NYS-25      Letter from M. Hodges, NRC, to W. Rasin, Nuclear Management and          8/10/2015 Resources Council, Safety Assessment of Report WCAP-13587, Revision 1, Reactor Vessel Upper Shelf Energy Bounding Evaluation for Westinghouse Pressurized Water Reactors, September 1993 (Apr. 21, 1994)
ENT000676        NYS-25      NUREG-1785, Safety Evaluation Report Related to the License Renewal      8/10/2015 of H.B. Robinson Steam Electric Plant, Unit 2 (Mar. 2004)
ENT000677        NYS-25       NL-07-140, Letter from F. Dacimo, Entergy, to NRC Document Control        8/10/2015 Desk, Reply to Request for Additional Information Regarding License Renewal Application (Nov. 28, 2007)
ENT000678        NYS-26B/RK-  Entergy's Revised Statement of Position Regarding Contention NYS-        8/10/2015 TC-1B        26B/RK-TC-1B (Metal Fatigue) (Aug. 10, 2015)
ENT000679        NYS-25,      Revised Testimony of Entergy Witnesses Nelson F. Azevedo, Alan B. Cox,   8/10/2015 NYS-26B/RK- Jack R. Strosnider, Randy G. Lott, Mark A. Gray, and Barry M. Gordon TC-1B, NYS-  Regarding Contention NYS-26B/RK-TC-1B (Metal Fatigue) (Aug. 10, 38/RK-TC-5  2015)
ENT000680        NYS-26B/RK- Curriculum Vitae of Barry M. Gordon                                      8/10/2015 TC-1B, NYS-38/RK-TC-5 ENT000681        NYS-25,     Westinghouse, WCAP-17199-P, Rev. 1, Environmental Fatigue Evaluation      8/10/2015 NYS-26B/RK- for Indian Point Unit 2, (Dec. 2014) [PROPRIETARY]
TC-1B, NYS-38/RK-TC-5 24


38/RK-TC-5 P. Shahinian et al., NRL Report 7446, Effect of Neutron Irradiation on Fatigue Crack Propagation in Types 304 and 316 Stainless Steels at High Temperature (July 21, 1972) 8/10/2015 ENT000637 NYS-25, NYS-38/RK-
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                              Exhibit Name                          Submission    During Addressed by                                                                                    Track 1 Date Exhibit                                                                                      Hearing?
ENT000682        NYS-25,      Westinghouse, WCAP-17200-P, Rev. 1, Environmental Fatigue Evaluation    8/10/2015 NYS-26B/RK-  for Indian Point Unit 3, (Dec. 2014) [PROPRIETARY]
TC-1B, NYS-38/RK-TC-5 ENT000683        NYS-25,      Westinghouse, Calculation Note CN-PAFM-13-32, Rev. 3 Indian Point      8/10/2015 NYS-26B/RK-  Unit 2 (IP2) and Unit 3 (IP3) Refined EAF Analyses and EAF Screening TC-1B, NYS-  Evaluations (June 25, 2015) [PROPRIETARY]
38/RK-TC-5 ENT000684        NYS-25,      Cases of ASME Boiler and Pressure Vessel, Code Case N-779,              8/10/2015 NYS-26B/RK-  Alternative Rules for Simplified Elastic-Plastic Analysis, Class 1 TC-1B, NYS-  (Section III, Division 1) (Jan. 26, 2009) [Full-Text Copyright]
38/RK-TC-5 ENT00686A-C      NYS-25,      Westinghouse, WESTEMS' User Manual, Volume 2: Design Analysis,          8/10/2015 NYS-26B/RK-  Rev. 6 (Mar. 2015) [PROPRIETARY]
TC-1B, NYS-38/RK-TC-5 ENT000687        NYS-25,     NRC, Safety Evaluation Report, Topical Report on ASME Section III      8/10/2015 NYS-26B/RK-  Piping and Component Fatigue Analysis Utilizing the WESTEMSTM TC-1B, NYS-  Computer Code (WCAP-17577, Revision 2) (undated) 38/RK-TC-5 ENT000688        NYS-25,      Westinghouse, Calculation Note CN-PAFM-13-40, Rev. 1, Indian Point      8/10/2015 NYS-26B/RK-  Unit 2 and Unit 3 Pressurizer Spray Nozzle Transfer Function Database TC-1B, NYS- Development and Environmental Fatigue Evaluations (Jan. 15, 2015) 38/RK-TC-5  [PROPRIETARY]
25


TC-5 NUREG-1874, Recommended Screening Limits for Pressurized Thermal Shock (PTS) (March 2010) 8/10/2015 ENT00638A-C NYS-25, NYS-38/RK-TC-5 NUREG-1806, Vol. 1, Technical Basis for Revision of the Pressurized Thermal Shock (PTS) Screening Limit in the PTS Rule (10 CFR 50.61) (Aug. 2007) 8/10/2015 ENT00639A-F NYS-25, NYS-26B/RK-TC-1B, NYS-
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                            Exhibit Name                              Submission    During Addressed by                                                                                      Track 1 Date Exhibit                                                                                        Hearing?
ENT000689        NYS-25,      Westinghouse, WCAP-12191, Rev. 4, Transient and Fatigue Cycle              8/10/2015 NYS-26B/RK-  Monitoring Program Transient History Evaluation Report for Indian Point TC-1B, NYS-  Unit 2 (Dec. 2014) [PROPRIETARY]
38/RK-TC-5 ENT000690        NYS-25,      Westinghouse, WCAP-16898-P, Rev. 1, Indian Point Unit 3 Transient and      8/10/2015 NYS-26B/RK-  Fatigue Cycle Monitoring Program Transient History Evaluation (May TC-1B, NYS-  2015) [PROPRIETARY]
38/RK-TC-5 ENT000691        NYS-25,      EPRI, BWRVIP-187, BWR Vessel and Internals Project: Controlling            8/10/2015 NYS-26B/RK-  Intergranular Stress Corrosion Cracking During a BWR Startup-Addition TC-1B, NYS- of Hydrazine or Carbohydrazide (Mar. 2008) [PROPRIETARY]
38/RK-TC-5 ENT000692        NYS-25,      Entergy, 0-CY-2310, Rev. 24, Reactor Coolant System Specification and      8/10/2015 NYS-26B/RK-  Frequencies (Jan. 16, 2015)
TC-1B, NYS-38/RK-TC-5 ENT000693        NYS-25,      IPEC, Unit 3 Chemistry Data (Mar. 21-22, 2015)                             8/10/2015 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 ENT000694        NYS-25,     Z. Szklarska-Smialowska et al., Mechanism of Crack Growth in Alloy 600    8/10/2015 NYS-26B/RK- in High-Temperature Deaerated Water, 50 Corrosion 676 (Sept. 1994)
TC-1B, NYS- [Full-Text Copyright]
38/RK-TC-5 26


38/RK-TC-5 Westinghouse, WCAP-16156, Indian Point Nuclear Generating Unit No. 2, Stretch Power Uprate NSSS Engineering Report (Mar. 2004) [PROPRIETARY] 8/10/2015 ENT00640A-I NYS-25, NYS-26B/RK-TC-1B, NYS-
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                            Exhibit Name                              Submission    During Addressed by                                                                                      Track 1 Date Exhibit                                                                                        Hearing?
ENT000695        NYS-25,      Letter from J. Trapp, NRC, to J. Ventosa, Entergy, Indian Point Nuclear    8/10/2015 NYS-26B/RK-  Generating Unit 2 - NRC License Renewal Team Inspection Report TC-1B, NYS-  05000247/2013010 (Sept. 19, 2013) 38/RK-TC-5 ENT000696        NYS-25,      Westinghouse, Calculation Note CN-SGDA-02-214, 4.7% Uprate                8/10/2015 NYS-26B/RK-  Structural Evaluation of Primary and Secondary side Components for TC-1B, NYS-  Indian Point Unit 2 (44F), 10% Plugging (June 12, 2003) 38/RK-TC-5  [PROPRIETARY]
ENT000697        NYS-25,      Entergy, Visual Examination of Reactor Vessel and Internals (VT-3),        8/10/2015 NYS-26B/RK-  Summary No. 206913-RVVINT for IP2 (Mar. 10, 2014), and Summary TC-1B, NYS- No. 1-1200-VESS. INT. for IP3 (Mar. 13, 2015) 38/RK-TC-5 ENT000698        NYS-38/RK-  Entergy's Revised Statement of Position Regarding Contention NYS-          8/10/2015 TC-5        38/RK-TC-5 (Safety Commitments) (Aug. 10, 2015)
ENT000699        NYS-25,     Revised Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J.        8/10/2015 NYS-26B/RK- Dolansky, Alan B. Cox, Jack R. Strosnider, Timothy J. Griesbach, Barry TC-1B, NYS- M. Gordon, Randy G. Lott, and Mark A. Gray Regarding Contention NYS-38/RK-TC-5  38/RK-TC-5 (Safety Commitments) (Aug. 10, 2015)
ENT000700        NYS-38/RK-  State of New York, Riverkeeper, Inc., Nuclear Regulatory Commission        8/10/2015 TC-5        Staff, and Entergy Nuclear Operations, Inc., Joint Stipulation Regarding State of New York Pre-Filed Testimony for Contention NYS-38/RK-TC-5 (Safety Commitments) (June 23, 2015) 27


38/RK-TC-5 Westinghouse, WCAP-16211, Power Uprate Project, Indian Point Unit 3 Power Plant, NSSS Engineering Report (June 2004) [PROPRIETARY] 8/10/2015 ENT000641 NYS-25, NYS-38/RK-TC-5 Final License Renewal Interim Staff Guidance LR-ISG-2011-04, Updated Aging Management Criteria for Reactor Vessel Internal Components for Pressurized Water Reactors (May 28, 2013) 8/10/2015 ENT00642A-C NYS-25, NYS-38/RK-TC-5 EPRI, MRP-232, Materials Reliability Program: Aging Management Strategies for Westinghouse and Combustion Engineering PWR Internals (Dec. 2008) [Full-Text Copyright] 8/10/2015 19 Entergy Exhibit #
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                            Exhibit Name                            Submission    During Addressed by                                                                                    Track 1 Date Exhibit                                                                                      Hearing?
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000643 NYS-25, NYS-38/RK-
ENT000701        NYS-38/RK-   Letter from A. Burritt, NRC, to L. Coyle, Entergy, Annual Assessment    8/10/2015 TC-5         Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001) (Mar. 4, 2015)
ENT000703        NYS-38/RK-  NRC Inspection Manual, Inspection Procedure 71003, Post-Approval Site    8/10/2015 TC-5        Inspection for License Renewal (Feb. 25, 2013)
ENT000704        NYS-38/RK-   NRC Inspection Manual, Inspection Procedure 71013, Site Inspection for    8/10/2015 TC-5         Plants with a Timely Renewal Application (Sept. 25, 2013)
ENT000705        NYS-38/RK-   NRR Office Instruction, LIC-105, Revision 5, Managing Regulatory          8/10/2015 TC-5        Commitments Made by Licensees to the NRC (Sept. 16, 2013)
ENT000706        NYS-38/RK-   NRC Enforcement Manual, Rev. 9 (Sept. 9, 2013)                           8/10/2015 TC-5 ENT000707        NYS-38/RK-   Memorandum from S. Dingbaum, Assistant Inspector Gen. for Audits,        8/10/2015 TC-5         NRC, to M. Satorius, Exec. Dir. for Operations, NRC, Status of Recommendations: Audit of NRCs Management of Licensee Commitments (OIG-11-A-17) (Nov. 25, 2013)
ENT000708        NYS-25,      Entergy, Commitment Closure Verification Form, LRC # 43 (Aug. 27,        8/10/2015 NYS-26B/RK- 2013)
TC-1B, NYS-38/RK-TC-5 ENT000709        NYS-25,      Entergy, Commitment Closure Verification Form, LRC # 49 (Aug. 27,        8/10/2015 NYS-26B/RK-  2013)
TC-1B, NYS-38/RK-TC-5 28


TC-5 EPRI, MRP-232, Revision 1, Materials Reliability Program:  Aging Management Strategies for Westinghouse and Combustion Engineering PWR Internals (Dec. 2008) [Full-Text Copyright] 8/10/2015 ENT000644 NYS-25, NYS-38/RK-
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                            Exhibit Name                              Submission    During Addressed by                                                                                      Track 1 Date Exhibit                                                                                        Hearing?
ENT000710        NYS-25,      Entergy, Commitment Closure Verification Form, LRC # 44 (June 19,          8/10/2015 NYS-26B/RK-  2013)
TC-1B, NYS-38/RK-TC-5 ENT000711        NYS-38/RK-  H. Kawamura et al., Paper No. 141, The Effect of Zinc Addition to          8/10/2015 TC-5        Simulated PWR Primary Water on the PWSCC Resistance, Crack Growth Rate and Surface Oxide Film Characteristics of Prefilmed Alloy 600 (Corrosion 98, 1998) [Full-Text Copyright]
ENT000712        NYS-38/RK-   P.L. Andresen et al., Effects of Hydrogen on Stress Corrosion Crack        8/10/2015 TC-5        Growth Rate of Nickel Alloys in High-Temperature Water, 64 Corrosion 707 (Sept. 2008) [Full-Text Copyright]
ENT000713        NYS-38/RK-  B. Gordon, Corrosion and Corrosion Control in Light Water Reactors, 65      8/10/2015 TC-5        Journal of Metals 1043 (Aug. 2013) [Full-Text Copyright]
ENT00714A-B      NYS-38/RK-  H. Cothron et al., EPRI, Slides: NRC/Industry Meeting Regarding Tube-to-    8/10/2015 TC-5        Tubesheet Weld and Divider Plate Cracking Report (July 30, 2015)
ENT000715        NYS-38/RK-  NRC, Notice of Meeting with Industry on Divider Plate and Tube-to-          8/10/2015 TC-5        Tubesheet Weld (July 1, 2015)
ENT000716        NYS-38/RK-  EPRI, Final Report No. 3002000473, Steam Generator Channel Head            8/10/2015 TC-5        Degradation Failure Modes and Effects Analysis (Apr. 2013) [Full-Text Copyright]
ENT000717        NYS-38/RK-   Entergy Procedure SEP-SG-IP3-001, IP3 Steam Generator Program,              8/10/2015 TC-5        Revision 1 (May 21, 2014) 29


TC-5 EPRI, MRP-230, Materials Reliability Program: Functionality Analysis for Westinghouse and Combustion Engineering Representative PWR Internals (Oct. 2009) [Full-Text Copyright] 8/10/2015 ENT000645 NYS-25, NYS-38/RK-
Track 2 Exhibit    Admitted Contentions Entergy Exhibit #                                            Exhibit Name                              Submission    During Addressed by                                                                                      Track 1 Date Exhibit                                                                                        Hearing?
ENT000718        NYS-38/RK-  Westinghouse, Technical Manual No. TM 1440-C348, Vertical Steam            8/10/2015 TC-5        Generator Instructions for Consolidated Edison Company of New York, Indian Point Station - Unit 2 (2001) [PROPRIETARY] (excerpt)
ENT000719        NYS-38/RK-  T. Couvant et al., Paper Reference No. A004T04, PWSCC of Steam              8/10/2015 TC-5         Generator Divider Plates in Alloy 600: Coupling Field Characterizations with R&D Studies (Fontevraud 7, Sept. 26-30, 2010) [Full-Text Copyright]
ENT000720        NYS-38/RK-  M. Boccanfuso, et al., Paper Reference No. A165-T06, Steam Generator        8/10/2015 TC-5        Mechanical Plug Failure: A Tribologic Problem (Fontevraud 7, Sept. 26-30, 2010) [Full-Text Copyright]
ENT000721        NYS-38/RK-  EPRI, MRP-55, Rev. 1, Materials Reliability Program: Crack Growth          8/10/2015 TC-5        Rates for Evaluating Primary Water Stress Corrosion Cracking (PWSCC) of Thick-Wall Alloy 600 Materials (Nov. 2002) [Full-Text Copyright]
ENT000722        NYS-25,      Supplemental Testimony of Entergy Witnesses Nelson F. Azevedo,            10/29/2015 NYS-26B/RK-  Timothy J. Griesbach, and Randy G. Lott Regarding Contention NYS-25 TC-1B, NYS-  (Reactor Vessel Internals AMP), NYS-26B/RK-TC-1B (Metal Fatigue),
38/RK-TC-5  and NYS-38/RK-TC-5 (Safety Commitments) (Oct. 29, 2015)
ENT000723        NYS-25,      D.J. Gavenda et al., NUREG/CR-6428, Effects of Thermal Aging on          10/29/2015 NYS-26B/RK-  Fracture Toughness and Charpy-Impact Strengths of Stainless Steel Pipe TC-1B, NYS-  Welds (May 1996) 38/RK-TC-5 ENT000724        NYS-25,     Westinghouse, Calculation Note CN-RIDA-13-48, Rev. 0 Indian Point        10/29/2015 NYS-26B/RK-  Units 2 and 3 Reactor Internals Lower Support Column Bodies Thermal TC-1B, NYS-  Embrittlement and Irradiation Embrittlement Screening Assessment (Oct.
38/RK-TC-5  15, 2013) [PROPRIETARY]
30


TC-5 EPRI, MRP-228, Rev. 1,  Materials Reliability Program: Inspection Standard for PWR Internals - 2012 Update (Dec. 2012) [Full-Text Copyright] 8/10/2015 ENT000646 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 EPRI, MRP-210, Materials Reliability Program:  Fracture Toughness Evaluation of Highly Irradiated PWR Stainless Steel Internal Components (Dec. 2007) [Full-Text Copyright] 8/10/2015 ENT000647 NYS-25, NYS-38/RK-
Track 2 Exhibit   Admitted Contentions Entergy Exhibit #                                         Exhibit Name                     Submission   During Addressed by                                                                           Track 1 Date Exhibit                                                                             Hearing?
 
ENT000725        NYS-25,     Westinghouse, WCAP-14574-A, License Renewal Evaluation: Aging 10/29/2015 NYS-26B/RK-  Management Evaluation for Pressurizers (Dec. 2000)
TC-5 EPRI, MRP-134, Materials Reliability Program:  Framework and Strategies for Managing Aging Effects in PWR Internals (June 2005) [Full-Text Copyright] 8/10/2015 ENT000648 NYS-25, NYS-38/RK-
TC-1B, NYS-38/RK-TC-5 ENT000726        NYS-25,     Entergy Track 2 Hearing Exhibit List                            11/4/2015 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 DB1/ 85187843 31}}
 
TC-5 M. Mitchell, Chief, Vessels and Internals Integrity Branch, Response to Non-Concurrence Regarding Safety Evaluation for Topical Report MRP-227, "Pressurized Water Reactor Internals Inspection and Evaluation Guidelines" (undated) 8/10/2015 ENT000649 NYS-25, NYS-38/RK-TC-5 Letter from D. Pelton, NRC, to E. McCartney, NextEra Energy Point Beach, "Point Beach Nuclear Plant, Units 1 and 2 - Staff Assessment of Reactor Vessel Internals Inspection Plan Based on MRP-227-A (TAC Nos. ME8235 and ME8236)" (Mar. 30, 2015) 8/10/2015 20  Entergy Exhibit #
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000650 NYS-25, NYS-38/RK-
 
TC-5 G. Gardner, Chair, EPRI Reactor Internals Working Group, Recent Materials Inspections of PWR Reactor Internals (Mar. 2015) 8/10/2015 ENT000651 NYS-25, NYS-38/RK-
 
TC-5 T. Griesbach and B. Gordon, Materials Aging Management Programs at Nuclear Power Plants in the United States  (Oct. 2007) [Full-Text Copyright] 8/10/2015 ENT000652 NYS-25, NYS-38/RK-
 
TC-5 Letter from P. Milano, NRR, to M. Kansler, Entergy, "Indian Point Nuclear Generating Unit No. 2 - Issuance of Amendment Re:  3.26 Percent Power Uprate (TAC No. MC1865)" (Oct. 27, 2004) 8/10/2015 ENT000653 NYS-25, NYS-38/RK-TC-5 Letter from P. Milano, NRR, to M. Kansler, Entergy, "Indian Point Nuclear Generating Unit No. 3 - Issuance of Amendment Re:  4.85 Percent Stretch Power Uprate and Relocation of Cycle-Specific Parameters (TAC No. MC3552)" (Mar. 24, 2005) 8/10/2015 ENT000654 NYS-25, NYS-38/RK-
 
TC-5 Westinghouse, WCAP-15270, Determination of Acceptable Baffle-Barrel-Bolting for Four-Loop Westinghouse Downflow and Converted Upflow Domestic Plants (Nov. 2001) [PROPRIETARY] 8/10/2015 ENT000655 NYS-25, NYS-38/RK-
 
TC-5 Westinghouse, WCAP-15030-NP-A, Westinghouse Methodology for Evaluating the Acceptability of Baffle-Former-Barrel Bolting Distributions under Faulted Load Conditions (Mar. 2, 1999) 8/10/2015 ENT000656 NYS-25, NYS-38/RK-
 
TC-5 Westinghouse, Technical Bulletin TB-14-5, Reactor Internals Lower Radial Support Clevis Insert Cap Screw Degradation  (Aug. 25, 2014) 8/10/2015 21  Entergy Exhibit #
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000657 NYS-25, NYS-38/RK-
 
TC-5 NRC Inspection Manual, Manual Chapter 2516, Policy and Guidance for the License Renewal Inspection Program ("LRIP") (Aug. 13, 2013) 8/10/2015 ENT000658 NYS-25, NYS-38/RK-
 
TC-5 J. Smith, Irradiated Materials Testing, Inside MRP (Winter 2012) 8/10/2015 ENT000659 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Letter from R. Kuntz, NRC, to Vice President, Operations, Entergy, "Request for Additional Information for the Review of the Indian Point
 
Nuclear Generating Unit Nos. 2 and 3, License Renewal Application" (May 15, 2012) 8/10/2015 ENT000660 NYS-25, NYS-38/RK-TC-5 Letter from J. Daly, NRC, to Vice President, Operations, Entergy, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2013-01 (TAC Nos. MD5407 and MD5408)" (Feb. 6, 2013) 8/10/2015 ENT000661 NYS-25, NYS-38/RK-
 
TC-5 Letter from K. Green, NRC, to Vice President, Operations, Entergy, "Request for Additional Information for the Review of the Indian Point
 
Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2013-04 (TAC Nos. MD5407 and MD5408)" (July 26, 2013) 8/10/2015 ENT000662 NYS-25, NYS-38/RK-TC-5 Letter from K. Green, NRC, to Vice President, Operations, Entergy, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2014-02 (TAC Nos. MD5407 and MD5408)" (Apr. 9, 2014) 8/10/2015 22  Entergy Exhibit #
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000663 NYS-25, NYS-38/RK-
 
TC-5 Letter from A. McGehee & T. Hanley, EPRI, to NRC Document Control Desk, BWRVIP 2015-025, "Project No. 704 - Summary of Industry Position on Screening Criteria for Thermal and Irradiation Embrittlement for PWR and BWR Reactor Internals Fabricated of Cast Austenitic Stainless Steel" (Mar. 9, 2015) 8/10/2015 ENT000664 NYS-25, NYS-38/RK-TC-5 Email from J. Holonich, NRC, to K. Amberge, EPRI, et al., "Summary Tables for CASS Position" (Mar. 12, 2014, 1:23 PM) 8/10/2015 ENT000665 NYS-25, NYS-26B/RK-TC-1B, NYS-
 
38/RK-TC-5 ASME Boiler & Pressure Vessel Code, Section XI, Subsection IWB, "Requirements for Class 1 Components of Light-Water Cooled Plants" (2010) [Full-Text Copyright] 8/10/2015 ENT00666A-I NYS-25, NYS-38/RK-
 
TC-5 NUREG/CR-6943, A Study of Remote Visual Methods to Detect Cracking in Reactor Components (Oct. 2007) 8/10/2015 ENT000667 NYS-25, NYS-38/RK-
 
TC-5 PWROG-14048-P, Rev. 0-A, PWROG, Functionality Analysis: Lower Support Columns (Oct. 2014) [PROPRIETARY] 8/10/2015 ENT000668 NYS-25, NYS-38/RK-TC-5 EPRI, MRP-219, Rev. 10, Materials Reliability Program: Inspection Data Survey Report (Nov. 2014) [Full-Text Copyright] 8/10/2015 23  Entergy Exhibit #
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000669 NYS-25, NYS-26B/RK-TC-1B, NYS-
 
38/RK-TC-5 Regulatory Guide 1.99, Radiation Embrittlement of Reactor Vessel Materials, Revision 2 (May 1988) 8/10/2015 ENT000670 NYS-25 NL-13-106, Letter from J. Ventosa, Entergy, to NRC Document Control Desk, "Proposed Revision to React or Vessel Surveillance Capsule Withdrawal Schedule Per 10 CFR 50 Appendix H" (Aug. 12, 2013) 8/10/2015 ENT000671 NYS-25 NL-14-129, Letter from J. Ventosa, Entergy, to NRC Document Control Desk, "Proposed Revision to React or Vessel Surveillance Capsule Withdrawal Schedule Per 10 CFR 50 Appendix H" (Nov. 5, 2014) 8/10/2015 ENT000672 NYS-25 Letter from B. Beasley, NRC, to Vice President, Operations, "Indian Point Nuclear Generating Unit No. 2 - Safety Evaluation re: Revision to the Reactor Vessel Surveillance Capsule Withdrawal Schedule per 10 CFR 50 Appendix H (TAC No. MF2558)" (Jan. 14, 2014) 8/10/2015 ENT000673 NYS-25 Letter from B. Beasley, NRC, to Vice President, Operations, "Indian Point Nuclear Generating Unit No. 3 - Safety Evaluation re: Revision to the Reactor Vessel Surveillance Capsule Withdrawal Schedule per 10 CFR 50 Appendix H (TAC No. MF5148)" (Mar. 4, 2015) 8/10/2015 ENT000674 NYS-25 NL-08-014, Letter from Fred R. Dacimo, Entergy, to NRC Document Control Desk, "Clarifications to Reactor Vessel Surveillance Program and Neutron Embrittlement Time-Limited Aging Analyses and Audit Item #105; and Revision to License Renewal Regulatory Commitment List" (Jan. 17, 2008) 8/10/2015 24  Entergy Exhibit #
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000675 NYS-25 Letter from M. Hodges, NRC, to W. Rasin, Nuclear Management and Resources Council, "Safety Assessment of Report WCAP-13587, Revision 1, 'Reactor Vessel Upper Shelf Energy Bounding Evaluation for Westinghouse Pressurized Water Reactors,' September 1993" (Apr. 21, 1994) 8/10/2015 ENT000676 NYS-25 NUREG-1785, Safety Evaluation Report Related to the License Renewal of H.B. Robinson Steam Electric Plant, Unit 2 (Mar. 2004) 8/10/2015 ENT000677 NYS-25 NL-07-140, Letter from F. Dacimo, Entergy, to NRC Document Control Desk, "Reply to Request for Additional Information Regarding License Renewal Application" (Nov. 28, 2007) 8/10/2015 ENT000678 NYS-26B/RK-TC-1B Entergy's Revised Statement of Position Regarding Contention NYS-26B/RK-TC-1B (Metal Fatigue) (Aug. 10, 2015) 8/10/2015 ENT000679 NYS-25, NYS-26B/RK-TC-1B, NYS-
 
38/RK-TC-5 Revised Testimony of Entergy Witnesses Nelson F. Azevedo, Alan B. Cox, Jack R. Strosnider, Randy G. Lott, Mark A. Gray, and Barry M. Gordon Regarding Contention NYS-26B/RK-TC-1B (Metal Fatigue) (Aug. 10, 2015)  8/10/2015 ENT000680 NYS-26B/RK-TC-1B, NYS-
 
38/RK-TC-5 Curriculum Vitae of Barry M. Gordon 8/10/2015 ENT000681 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, WCAP-17199-P, Rev. 1, Environmental Fatigue Evaluation for Indian Point Unit 2, (Dec. 2014) [PROPRIETARY] 8/10/2015 25  Entergy Exhibit #
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000682 NYS-25, NYS-26B/RK-TC-1B, NYS-
 
38/RK-TC-5 Westinghouse, WCAP-17200-P, Rev. 1, Environmental Fatigue Evaluation for Indian Point Unit 3, (Dec. 2014) [PROPRIETARY] 8/10/2015 ENT000683 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, Calculation Note CN-PAFM-13-32, Rev. 3 "Indian Point Unit 2 (IP2) and Unit 3 (IP3) Refined EAF Analyses and EAF Screening Evaluations" (June 25, 2015) [PROPRIETARY] 8/10/2015 ENT000684 NYS-25, NYS-26B/RK-TC-1B, NYS-
 
38/RK-TC-5 Cases of ASME Boiler and Pressure Vessel, Code Case N-779, "Alternative Rules for Simplified Elastic-Plastic Analysis, Class 1" (Section III, Division 1) (Jan. 26, 2009) [Full-Text Copyright] 8/10/2015 ENT00686A-C NYS-25, NYS-26B/RK-TC-1B, NYS-
 
38/RK-TC-5 Westinghouse, WESTEMSŽ User Manual, Volume 2Design Analysis, Rev. 6 (Mar. 2015) [PROPRIETARY] 8/10/2015 ENT000687 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 NRC, Safety Evaluation Report, "Topical Report on ASME Section III Piping and Component Fatigue Analysis Utilizing the WESTEMS TM Computer Code" (WCAP-17577, Revision 2) (undated) 8/10/2015 ENT000688 NYS-25, NYS-26B/RK-TC-1B, NYS-
 
38/RK-TC-5 Westinghouse, Calculation Note CN-PAFM-13-40, Rev. 1, "Indian Point Unit 2 and Unit 3 Pressurizer Spray Nozzle Transfer Function Database Development and Environmental Fatigue Evaluations" (Jan. 15, 2015)
[PROPRIETARY] 8/10/2015 26 Entergy Exhibit #
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000689 NYS-25, NYS-26B/RK-TC-1B, NYS-
 
38/RK-TC-5 Westinghouse, WCAP-12191, Rev. 4, Transient and Fatigue Cycle Monitoring Program Transient History Evaluation Report for Indian Point Unit 2 (Dec. 2014) [PROPRIETARY] 8/10/2015 ENT000690 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, WCAP-16898-P, Rev. 1, Indian Point Unit 3 Transient and Fatigue Cycle Monitoring Program Transient History Evaluation (May 2015) [PROPRIETARY] 8/10/2015 ENT000691 NYS-25, NYS-26B/RK-TC-1B, NYS-
 
38/RK-TC-5 EPRI, BWRVIP-187, BWR Vessel and Internals Project: Controlling Intergranular Stress Corrosion Cracking During a BWR Startup-Addition of Hydrazine or Carbohydrazide (Mar. 2008) [PROPRIETARY] 8/10/2015 ENT000692 NYS-25, NYS-26B/RK-TC-1B, NYS-
 
38/RK-TC-5 Entergy, 0-CY-2310, Rev. 24, Reactor Coolant System Specification and Frequencies (Jan. 16, 2015) 8/10/2015 ENT000693 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 IPEC, Unit 3 Chemistry Data (Mar. 21-22, 2015) 8/10/2015 ENT000694 NYS-25, NYS-26B/RK-TC-1B, NYS-
 
38/RK-TC-5 Z. Szklarska-Smialowska et al., Mechanism of Crack Growth in Alloy 600 in High-Temperature Deaerated Water, 50 Corrosion 676 (Sept. 1994)
[Full-Text Copyright] 8/10/2015 27  Entergy Exhibit #
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000695 NYS-25, NYS-26B/RK-TC-1B, NYS-
 
38/RK-TC-5 Letter from J. Trapp, NRC, to J. Ventosa, Entergy, "Indian Point Nuclear Generating Unit 2 - NRC License Renewal Team Inspection Report 05000247/2013010" (Sept. 19, 2013) 8/10/2015 ENT000696 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, Calculation Note CN-SGDA-02-214, "4.7% Uprate Structural Evaluation of Primary and Secondary side Components for Indian Point Unit 2 (44F), 10% Plugging" (June 12, 2003) [PROPRIETARY] 8/10/2015 ENT000697 NYS-25, NYS-26B/RK-TC-1B, NYS-
 
38/RK-TC-5 Entergy, Visual Examination of Reactor Vessel and Internals (VT-3), Summary No. 206913-RVVINT for IP2 (Mar. 10, 2014), and Summary No. 1-1200-VESS. INT. for IP3 (Mar. 13, 2015) 8/10/2015 ENT000698 NYS-38/RK-TC-5 Entergy's Revised Statement of Position Regarding Contention NYS-38/RK-TC-5 (Safety Commitments) (Aug. 10, 2015) 8/10/2015 ENT000699 NYS-25, NYS-26B/RK-TC-1B, NYS-
 
38/RK-TC-5 Revised Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. Dolansky, Alan B. Cox, Jack R. Strosnider, Timothy J. Griesbach, Barry M. Gordon, Randy G. Lott, and Mark A. Gray Regarding Contention NYS-38/RK-TC-5 (Safety Commitments) (Aug. 10, 2015)  8/10/2015 ENT000700 NYS-38/RK-TC-5 State of New York, Riverkeeper, Inc., Nuclear Regulatory Commission Staff, and Entergy Nuclear Operations, Inc., Joint Stipulation Regarding State of New York Pre-Filed Testimony for Contention NYS-38/RK-TC-5 (Safety Commitments) (June 23, 2015)  8/10/2015 28  Entergy Exhibit #
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000701 NYS-38/RK-TC-5 Letter from A. Burritt, NRC, to L. Coyle, Entergy, "Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001)" (Mar. 4, 2015)  8/10/2015 ENT000703 NYS-38/RK-TC-5 NRC Inspection Manual, Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal (Feb. 25, 2013) 8/10/2015 ENT000704 NYS-38/RK-TC-5 NRC Inspection Manual, Inspection Procedure 71013, Site Inspection for Plants with a Timely Renewal Application (Sept. 25, 2013)  8/10/2015 ENT000705 NYS-38/RK-TC-5 NRR Office Instruction, LIC-105, Revision 5, Managing Regulatory Commitments Made by Licensees to the NRC (Sept. 16, 2013)  8/10/2015 ENT000706 NYS-38/RK-TC-5 NRC Enforcement Manual, Rev. 9 (Sept. 9, 2013) 8/10/2015 ENT000707 NYS-38/RK-TC-5 Memorandum from S. Dingbaum, Assist ant Inspector Gen. for Audits, NRC, to M. Satorius, Exec. Dir. for Operations, NRC, "Status of Recommendations:  Audit of NRC's Management of Licensee Commitments (OIG-11-A-17)" (Nov. 25, 2013)  8/10/2015 ENT000708 NYS-25, NYS-26B/RK-TC-1B, NYS-
 
38/RK-TC-5 Entergy, Commitment Closure Verification Form, LRC # 43 (Aug. 27, 2013)  8/10/2015 ENT000709 NYS-25, NYS-26B/RK-TC-1B, NYS-
 
38/RK-TC-5 Entergy, Commitment Closure Verification Form, LRC # 49 (Aug. 27, 2013)  8/10/2015 29  Entergy Exhibit #
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000710 NYS-25, NYS-26B/RK-TC-1B, NYS-
 
38/RK-TC-5 Entergy, Commitment Closure Verification Form, LRC # 44 (June 19, 2013)  8/10/2015 ENT000711 NYS-38/RK-TC-5 H. Kawamura et al., Paper No. 141, The Effect of Zinc Addition to Simulated PWR Primary Water on the PWSCC Resistance, Crack Growth Rate and Surface Oxide Film Characteristics of Prefilmed Alloy 600 (Corrosion 98, 1998) [Full-Text Copyright] 8/10/2015 ENT000712 NYS-38/RK-TC-5 P.L. Andresen et al., Effects of Hydrogen on Stress Corrosion Crack Growth Rate of Nickel Alloys in High-Temperature Water, 64 Corrosion 707 (Sept. 2008) [Full-Text Copyright] 8/10/2015 ENT000713 NYS-38/RK-TC-5 B. Gordon, Corrosion and Corrosion Control in Light Water Reactors, 65 Journal of Metals 1043 (Aug. 2013) [Full-Text Copyright] 8/10/2015 ENT00714A-B NYS-38/RK-TC-5 H. Cothron et al., EPRI, Slides: NRC/Industry Meeting Regarding Tube-to-Tubesheet Weld and Divider Plate Cracking Report (July 30, 2015) 8/10/2015 ENT000715 NYS-38/RK-TC-5 NRC, Notice of Meeting with Industry on Divider Plate and Tube-to-Tubesheet Weld (July 1, 2015)  8/10/2015 ENT000716 NYS-38/RK-TC-5 EPRI, Final Report No. 3002000473, Steam Generator Channel Head Degradation Failure Modes and Effects Analysis (Apr. 2013) [Full-Text Copyright] 8/10/2015 ENT000717 NYS-38/RK-TC-5 Entergy Procedure SEP-SG-IP3-001, IP3 Steam Generator Program, Revision 1 (May 21, 2014) 8/10/2015 30  Entergy Exhibit #
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000718 NYS-38/RK-TC-5 Westinghouse, Technical Manual No. TM 1440-C348, Vertical Steam Generator Instructions for Consolidated Edison Company of New York, Indian Point Station - Unit 2 (2001) [PROPRIETARY] (excerpt) 8/10/2015 ENT000719 NYS-38/RK-TC-5 T. Couvant et al., Paper Reference No. A004T04, PWSCC of Steam Generator Divider Plates in Alloy 600: Coupling Field Characterizations with R&D Studies (Fontevraud 7, Sept. 26-30, 2010) [Full-Text Copyright] 8/10/2015 ENT000720 NYS-38/RK-TC-5 M. Boccanfuso, et al., Paper Reference No. A165-T06, Steam Generator Mechanical Plug Failure: A Tribologic Problem (Fontevraud 7, Sept. 26-30, 2010) [Full-Text Copyright] 8/10/2015 ENT000721 NYS-38/RK-TC-5 EPRI, MRP-55, Rev. 1, Materials Reliability Program: Crack Growth Rates for Evaluating Primary Water Stress Corrosion Cracking (PWSCC) of Thick-Wall Alloy 600 Materials (Nov. 2002) [Full-Text Copyright] 8/10/2015 ENT000722 NYS-25, NYS-26B/RK-TC-1B, NYS-
 
38/RK-TC-5 Supplemental Testimony of Entergy Witnesses Nelson F. Azevedo, Timothy J. Griesbach, and Randy G. Lott Regarding Contention NYS-25 (Reactor Vessel Internals AMP), NYS-26B/RK-TC-1B (Metal Fatigue),
and NYS-38/RK-TC-5 (Safety Commitments) (Oct. 29, 2015) 10/29/2015 ENT000723 NYS-25, NYS-26B/RK-TC-1B, NYS-
 
38/RK-TC-5 D.J. Gavenda et al., NUREG/CR-6428, "Effects of Thermal Aging on Fracture Toughness and Charpy-Impact Strengths of Stainless Steel Pipe Welds"  (May 1996)  10/29/2015 ENT000724 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, Calculation Note CN-RIDA-13-48, Rev. 0 "Indian Point Units 2 and 3 Reactor Internals Lower Support Column Bodies Thermal Embrittlement and Irradiation Embrittlement Screening Assessment" (Oct. 15, 2013) [PROPRIETARY] 10/29/2015
 
31  DB1/ 85187843 Entergy Exhibit #
Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000725 NYS-25, NYS-26B/RK-TC-1B, NYS-
 
38/RK-TC-5 Westinghouse, WCAP-14574-A, License Renewal Evaluation: Aging Management Evaluation for Pressurizers (Dec. 2000) 10/29/2015 ENT000726 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Entergy Track 2 Hearing Exhibit List  11/4/2015}}

Latest revision as of 05:55, 31 October 2019

ENT000726 - Entergy Track 2 Hearing Exhibit List
ML15309A129
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 11/05/2015
From:
Entergy Nuclear Operations
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 28471, ASLBP 07-858-03-LR-BD01, 50-247-LR, 50-286-LR
Download: ML15309A129 (31)


Text

ENT000726 Submitted: November 5, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Entergy (ENT) TRACK 2 Hearing Exhibits Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

ENTR16001 All Entergy Hearing Exhibit List (ENT Exhibit List) 10/29/2015

[Revised]

ENT00015A-B All Indian Point Energy Center License Renewal Application (April 2007) 3/28/2012 X

NYS-26B/RK- Curriculum Vitae of Alan B. Cox 8/10/2015 TC-1B, NYS-38/RK-TC-5, ENTR00031 NYS-25 [Revised]

NYS-26B/RK- Curriculum Vitae of Nelson F. Azevedo 3/28/2012 TC-1B, NYS-ENT000032 38/RK-TC-5, X NYS-25 NYS-38/RK- NRC, Audit Report for Plant Aging Management Programs and Reviews 3/28/2012 ENT000041 (Jan. 13, 2009)

TC-5 X

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

NYS-26B/RK- Declaration of Dr. Joram Hopenfeld in Support of New England 3/28/2012 ENT000089 Coalitions Motion for Reconsideration (Dec. 15, 2008)

TC-1B X NYS-25 NEI 95-10, Industry Guideline for Implementing the Requirements of 10 3/28/2012 ENT000098 CFR Part 54 - The License Renewal Rule, Rev. 6 (June 2005) X NYS-26B/RK- Entergy Statement of Position Regarding Contention NYS-26/RK-TC-1B 3/29/2012 ENT000182 (Metal Fatigue)

TC-1B X NYS-26B/RK- Testimony of Entergy Witnesses Nelson F. Azevedo, Alan B. Cox, Jack R. 3/29/2012 ENT000183 TC-1B Strosnider, Robert E. Nickell, and Mark A. Gray Regarding Contention X NYS-26/RK-TC-1B (Metal Fatigue)

NYS-26B/RK- Curriculum Vitae of Jack R. Strosnider 8/10/2015 TC-1B, NYS-ENTR00184 38/RK-TC-5, [Revised]

NYS-25 NYS-26B/RK- Curriculum Vitae of Robert E. Nickell 8/20/2012 ENTR00185 TC-1B, NYS-

[Revised]

38/RK-TC-5 NYS-26B/RK- Curriculum Vitae of Mark A. Gray 8/10/2015 TC-1B, NYS-ENTR00186 38/RK-TC-5, [Revised]

NYS-25 NYS-26B/RK- ASTM Vol. 03.01, Metals - Mechanical Testing; Elevated and Low 3/29/2012 ENT000187 TC-1B Temperature Tests; Metallography (2005) (excerpted) X 2

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

NYS-26B/RK- ASME, Criteria of the ASME Boiler and Pressure Vessel Code for Design 3/29/2012 ENT000188 TC-1B by Analysis in Sections III and VIII, Division 2 (1969) X NYS-26B/RK- SAND94-0187, Evaluation of Conservatisms and Environmental Effects in 3/29/2012 ENT000189 TC-1B ASME Code,Section III, Class 1 Fatigue Analysis (Aug. 1994) X NYS-26B/RK- Memorandum from Ashok C. Thadani to William D. Travers, Closeout of 3/29/2012 ENT000190 TC-1B, NYS- Generic Safety Issue 190, Fatigue Evaluation of Metal Components for 60-X 38/RK-TC-5 year Plant Life (Dec. 26, 1999)

NYS-26B/RK- K. R. Rao, Companion Guide to the ASME Boiler & Pressure Vessel Code 3/29/2012 ENT000191 TC-1B (3rd ed. 2009) (excerpted) X NYS-26B/RK- NRC Regulatory Issue Summary 2011-05, Information on Revision 2 to 3/29/2012 TC-1B, NYS- the Generic Aging Lessons Learned Report for License Renewal of ENT000192 38/RK-TC-5, Nuclear Power Plants (July 1, 2011) X NYS-25 NYS-26B/RK- NL-08-092, Letter from Fred R. Dacimo, Entergy, to NRC, Amendment 5 3/29/2012 ENT000193 TC-1B, NYS- to License Renewal Application (June 11, 2008)

X 25 NYS-26B/RK- NL-08-084, Letter from Fred R. Dacimo, Entergy, to NRC, Reply to 3/29/2012 ENT000194 TC-1B Request for Additional Information Regarding License Renewal X

Application - Time-Limited Aging Analyses and Boraflex (May 16, 2008)

NYS-26B/RK- NUREG-2101, Safety Evaluation Report Related to the License Renewal 8/10/2015 ENTR00195 TC-1B of Salem Nuclear Generating Station § 4.3 (Jun. 2011) (exceprt) [Revised]

3

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

NYS-26B/RK- Westinghouse Level 2 Policy/Procedure NSNP 3.2.6, Design Analysis 3/29/2012 ENT000196 TC-1B, NYS- (Mar. 2011) [PROPRIETARY]

X 38/RK-TC-5 NYS-26B/RK- Letter from P. Davison, PSEG Nuclear, LLC, to NRC, Close-out of the 3/29/2012 TC-1B, NYS- NRC Audit Associated with Use of WESTEMS' Related to the Salem ENT000197 38/RK-TC-5 Nuclear Generating Station, Units 1 and 2 License Renewal Application X (Feb. 24, 2011)

NYS-26B/RK- Letter from Paul Bessette, Entergy, to Janice Dean, NYS, Twenty-Second 3/29/2012 TC-1B Update to Disclosures Pursuant to 10 C.F.R. § 2.336; Entergy Nuclear ENT000198 Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), Docket X Nos. 50-247- LR and 50-286-LR (Dec. 1, 2010)

NYS-26B/RK- Westinghouse Calculation Note Number CN-PAFM-09-100, Rev. 0, Indian 3/29/2012 ENT000199 TC-1B Point Unit 2 Insurge/Outsurge and Environmental Fatigue Evaluations, X (Jun. 10, 2010) [PROPRIETARY]

NYS-26B/RK- Westinghouse Calculation Note Number CN-PAFM-09-63, Rev. 0, Indian 3/29/2012 ENT000200 TC-1B Point Unit 2 Pressurizer Insurge/Outsurge Transient Development (June X 18, 2010) ) [PROPRIETARY]

NYS-26B/RK- Westinghouse Calculation Note Number CN-PAFM-08-109, Rev. 0, Indian 3/29/2012 ENT000201 TC-1B Point Units 2 and 3 Transfer Function Database Development for Hot Leg X Surge Nozzle (June 18, 2010) [PROPRIETARY]

NYS-26B/RK- Westinghouse Calculation Note Number CN-PAFM-08-78, Rev. 0, Indian 3/29/2012 ENT000202 TC-1B Point Unit 2 and Unit 3: Transfer Function Database Development for Hot X Leg Charging Nozzle (June 18, 2010) [PROPRIETARY]

4

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

NYS-26B/RK- Westinghouse Calculation Note Number CN-PAFM-08-116, Rev. 0, Indian 3/29/2012 ENT000203 TC-1B Point Unit 2 BIT Nozzle Transfer Function Database Development (June X 18, 2010) [PROPRIETARY]

NYS-26B/RK- Westinghouse Calculation Note Number CN-PAFM-08-103, Rev. 0, Indian 3/29/2012 ENT000204 TC-1B Point Units 2 and 3 Transfer Function Database Development for X Accumulator Nozzles (June 17, 2010) [PROPRIETARY]

NYS-26B/RK- Westinghouse Calculation Note Number CN-PAFM-09-105, Rev. 0, Indian 3/29/2012 ENT000205 TC-1B Point Unit 3 Insurge/Outsurge and Environmental Fatigue Evaluations X (June 22, 2010) [PROPRIETARY]

NYS-26B/RK- Westinghouse Calculation Note Number CN-PAFM-09-74, Rev. 0, Indian 3/29/2012 ENT000206 TC-1B Point Unit 3 Boron Injection Tank Nozzle Environmental Fatigue X Evaluations (Jun. 14, 2010) [PROPRIETARY]

NYS-26B/RK- Westinghouse Calculation Note Number CN-PAFM-09-13, Rev. 0, Indian 3/29/2012 ENT000207 TC-1B Point Unit 3 BIT Nozzle Transfer Function Database Development (June X 18, 2010) [PROPRIETARY]

NYS-26B/RK- F. Kreith, Principles of Heat Transfer (3rd ed. 1973) (excerpted) 3/29/2012 ENT000208 TC-1B X NYS-26B/RK- J. P. Holman, Heat Transfer (4th ed. 1976) (excerpted) 3/29/2012 ENT000209 TC-1B X NYS-26B/RK- Westinghouse, Systems Standard Design Criteria 1.3.F, Rev. 0, Reactor 3/29/2012 ENT000210 TC-1B Coolant System Design Transients for Standard Plants with Model F Steam X Generators (July 1978) [PROPRIETARY]

NYS-26B/RK- Westinghouse Memorandum LTR-SSO-03-43, Rev. 1, from NS Systems & 3/29/2012 ENT000211 TC-1B Safety Analysis, Design Transient Revisions for Indian Point 2 4.7% X Uprate - Revised Figures (Apr. 25, 2003) [PROPRIETARY]

5

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

NYS-26B/RK- Westinghouse Memorandum LTR-SCS-03-53, Rev. 0, from NS Systems & 3/29/2012 ENT000212 TC-1B Safety Analysis, Design Transient Revisions for Indian Point 3 Stretch Power Uprate Project - Revised Figures (Aug. 21, 2003) X

[PROPRIETARY]

NYS-26B/RK- Westinghouse, Systems Standard Design Criteria 1.3.X, Rev. 0, Nuclear 3/29/2012 ENT000213 TC-1B Steam Supply System Auxiliary Equipment Design Transients for All X Standard Plants (Sept. 1978) [PROPRIETARY]

NYS-26B/RK- EPRI, Materials Reliability Program: Evaluation of Fatigue Data Including 3/29/2012 ENT000214 Reactor Water Environmental Effects (Dec. 2001)

TC-1B X NYS-26B/RK- W. E. Cooper, The Initial Scope and Intent of the Section III Fatigue 3/29/2012 ENT000215 TC-1B Design Procedures, in Pressure Vessel Research Council, Technical Information from Workshop on Cyclic Events in Nuclear Applications, X Clearwater Beach, Florida, Vol. 1, (Jan. 20, 1992)

NYS-26B/RK- NUREG-1929, Safety Evaluation Report Related to the License Renewal 3/29/2012 ENT000216 of Beaver Valley Power Station, Units 1 and 2 (Oct. 2009) (excerpted)

TC-1B X NYS-26B/RK- Westinghouse, WCAP-9693, Investigation of Feedwater Line Cracking in 3/29/2012 ENT000217 TC-1B Pressurized Water Reactor Plants (June 1980) [PROPRIETARY] X (excerpted)

NYS-26B/RK- Westinghouse Owners Group, WCAP-12639, Pressurizer Surge Line 3/29/2012 ENT000218 TC-1B Thermal Stratification Generic Detailed Analysis Program MUHP-1091 X Summary Report (June 1990) [PROPRIETARY]

NYS-26B/RK- Westinghouse, WCAP-12937, Structural Evaluation of Indian Point Units 3/29/2012 ENT000219 TC-1B 2 and 3 Pressurizer Surge Lines, Considering the Effects of Thermal X Stratification (May 1991) [PROPRIETARY]

6

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

NYS-26B/RK- J. D. Burr et al., PVP2011-57700, Simulation and Evaluation of Thermal 3/29/2012 ENT000220 TC-1B Stratification in a Sloped Surge Nozzle Correlated with Plant X Measurements (July 2011)

NYS-26B/RK- M. E. Nitzel et al., Comparison of ASME Code NB-3200 and NB-3600: 3/29/2012 ENT000221 Results for Fatigue Analysis of B31.1 Branch Nozzles (Apr. 1996)

TC-1B X NYS-26B/RK- Letter from Ekaterina Lenning, NRC, to James A Gresham, Westinghouse, 3/29/2012 ENT000222 TC-1B Westinghouse Electric Company Quality Management System, Revision X 6 (Feb. 24, 2011)

NYS-26B/RK- NUREG-1916, Safety Evaluation Report Related to the License Renewal 3/29/2012 ENT000223 TC-1B of Shearon Harris Nuclear Power Plant, Unit 1, Vol. 2 (Nov. 2008) X (excerpted)

NYS-26B/RK- SECY-95-245, Completion of the Fatigue Action Plan (Sept. 25, 1995) 3/29/2012 ENT000224 TC-1B X NYS-26B/RK- NUREG/CR-6815, Review of the Margins for ASME Code Fatigue Design 3/29/2012 ENT000225 TC-1B Curve - Effects of Surface Roughness and Material Variability (Sept. X 2003)

NYS-26B/RK- Entergy, 0-CY-2310, Rev. 16, Reactor Coolant System Specification and 3/29/2012 ENT000226 Frequencies (Oct. 2011)

TC-1B X NYS-26B/RK- Westinghouse, WCAP-13588, Operating Strategies for Mitigating 3/29/2012 ENT000227 TC-1B Pressurizer Insurge and Outsurge Transients (Mar. 1993) X

[PROPRIETARY] (excerpted)

NYS-26B/RK- Calculation Note RCDA-03-75, Indian Point Unit 3 Stretch Power Uprate 3/29/2012 ENT000228 Reactor Vessel Structural Evaluation (May 2005) [PROPRIETARY]

TC-1B X 7

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

NYS-26B/RK- Calculation Note RCDA-03-64, Indian Point Unit 2 Stretch Power Uprate 3/29/2012 ENT000229 Reactor Vessel Evaluation (Feb. 2005) [PROPRIETARY]

TC-1B X NYS-26B/RK- Letter from R. Nelson, NRC, to N. Wilmshurst, EPRI, Revision 1 to the 3/29/2012 TC-1B, NYS- Safety Evaluation of Electric Power Research Institute (EPRI) Report, ENT000230 Materials Reliability Prog[ra]m (MRP) Report 1016596 (MRP-227),

38/RK-TC-5, X Revision 0, Pressurized Water Reactor (PWR) Internals Inspection and NYS-25 Evaluation Guidelines (Dec. 16, 2011)

NYS-26B/RK- NL-08-143, Letter from F. Dacimo, Entergy, to NRC, Additional 3/29/2012 ENT000231 TC-1B, NYS- Information (Regarding License Renewal Application - Reactor Vessel Fluence Clarification (Sept. 24, 2008) X 25 NYS-38/RK- NRC Inspection Manual Chapter 71003, Post-Approval Site Inspection for 3/29/2012 ENT000251 License Renewal (Oct. 31, 2008)

TC-5 X NYS-38/RK- NRC Inspection Manual, Temporary Instruction 2516/001 (Mar. 30, 2011) 3/29/2012 ENT000252 TC-5 X NYS-26B/RK- Entergy Nuclear Vt. Yankee (Vt. Yankee Nuclear Power Station), Docket 3/29/2012 ENT000369 TC-1B No. 50-271-LR, Hearing Transcript (Jul. 21, 2008) (excerpted) X NYS-38/RK- Entergy Statement of Position Regarding Contention NYS-38/RK-TC-5 8/20/2012 ENT000520 TC-5 (Safety Commitments) X NYS-38/RK- Direct Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. 8/20/2012 ENT000521 TC-5 Dolansky, Alan B. Cox, Jack R. Strosnider, Robert E. Nickell, and Mark A. X Gray Regarding Contention NYS-38/RK-TC-5 (Safety Commitments)

NYS-38/RK- Curriculum Vitae of Robert J. Dolansky 8/20/2012 ENT000522 X TC-5, NYS-25 8

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

NYS-38/RK- EPRI, Report No. 1020988, Steam Generator Management Program: 8/20/2012 ENT000523 TC-5 Phase II Divider Plate Cracking Engineering Study (Nov. 2010) X

[PROPRIETARY]

NYS-38/RK- EPRI, Report 1025133, Steam Generator Management Program: 8/20/2012 ENT000524 TC-5 Assessment of Channel Head Susceptibility to Primary Water Stress X Corrosion Cracking (June 2012) [PROPRIETARY]

NYS-38/RK- NRC Inspection Manual Chapter 2516 (Feb. 18, 2005) 8/20/2012 ENT000525 X TC-5 NYS-38/RK- F. DAnnucci and E. Lecour, ICONE18-29457, Inspection of the Steam 8/20/2012 ENT000526 TC-5 Generator Divider Plate (May 2010) X NYS-38/RK- NRC Information Notice 2005-09, Indications in Thermally Treated Alloy 8/20/2012 ENT000527 TC-5 600 Steam Generator Tubes and Tube-to Tubesheet Welds (Apr. 7, 2005) X NYS-38/RK- NUREG-1950, Disposition of Public Comments and Technical Bases for 8/20/2012 ENT000528 TC-5 Changes in the License Renewal Guidance Documents NUREG-1801 and X NUREG-1800 (Apr. 2011) (excerpted)

NYS-38/RK- Westinghouse Technical Manual No. TMMC 1440-C350, Vertical Steam 8/10/2015 ENTR00529 TC-5 Generator Instruction for New York Power Authority - Indian Point [Revised]

Nuclear Plant No. 3 (Dec. 1989) [PROPRIETARY] (excerpted)

NYS-38/RK- EPRI, Report 1014982, Divider Plate Cracking in Steam Generators - 8/20/2012 TC-5 Results of Phase 1: Analysis of Primary Water Stress Corrosion Cracking ENT000530 and Mechanical Fatigue in the Alloy 600 Stub Runner to Divider Plate X Weld Material (June 2007) [PROPRIETARY]

NYS-38/RK- ASME Code, Sec. XI, Art. IWA-2000 (2001) 8/20/2012 ENT000531 X TC-5 NYS-38/RK- ASME Code, Sec. V, Art. 14 (2001) 8/20/2012 ENT000532 X TC-5 9

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

NYS-38/RK- Memorandum from C. Hunt, NRC to G. Kulesa, NRC, Summary of the 8/20/2012 TC-5 February 16, 2012, Category 2 Public Meeting with the Electric Power ENT000533 Research Institute (EPRI) and Industry to Discuss Steam Generator Issues X (Mar. 15, 2012)

NYS-38/RK- NEI 99-04, Guidelines for Managing NRC Commitment Changes (July 8/20/2012 ENT000534 TC-5 1999) X NYS-38/RK- NRR Office Instruction, LIC-105, Rev. 3, Managing Regulatory 8/20/2012 ENT000535 TC-5 Commitments Made by Licensees to the NRC (Mar. 2009) X NYS-38/RK- NUREG-2101, Safety Evaluation Report Related to the License Renewal 8/20/2012 ENT000536 TC-5 of Salem Nuclear Generating Station (June 2011) (excerpted) X NYS-38/RK- NUREG-1961, Safety Evaluation Report Related to the License Renewal 8/20/2012 ENT000537 TC-5 of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Apr. 2011) X (excerpted)

NYS-38/RK- SECY 2000-45, Acceptance of NEI 99-04, Guidelines for Managing NRC 8/20/2012 ENT000538 TC-5 Commitments (Feb. 22, 2000) X NYS-38/RK- NRC Enforcement Manual, Rev. 7 (Oct. 1, 2010) (excerpted) 8/20/2012 ENT000539 X TC-5 NYS-38/RK- Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station) Docket 8/20/2012 ENT000540 TC-5 No. 50-293, Renewed Facility Operating License (May 9, 2012) X (excerpted)

NYS-38/RK- EN-LI-110, Commitment Management Program (Jan. 2012) 8/20/2012 ENT000541 X TC-5 NYS-38/RK- NRC Regulatory Issue Summary 2000-17, Managing Regulatory 8/20/2012 ENT000542 TC-5 Commitments Made by Power Reactor Licensees to the NRC Staff (Sept. X 21, 2000) 10

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

NYS-38/RK- Inspection Procedure 71002, License Renewal Inspection (Nov. 2011) 8/20/2012 ENT000543 X TC-5 NYS-38/RK- Letter from A. Macfarlane, Chairman, NRC, to E. Markey, U.S. 8/20/2012 ENT000544 TC-5 Congressman, Regulatory Commitments (July 12, 2012) X NYS-38/RK- Memorandum from S. Dingbaum, Assistant Inspector Gen. for Audits, 8/20/2012 TC-5 NRC, to R. W. Borchardt, Exec. Dir. for Operations, NRC, Status of ENT000545 Recommendations: Audit of NRCs Management of Licensee X Commitments (OIG-11-A-17) (Apr. 16, 2012)

NYS-38/RK- NUREG-1958, Safety Evaluation Report Related to the License Renewal 8/20/2012 ENT000546 TC-5 of Kewaunee Power Station (Jan. 2011) (excerpted) X NYS-38/RK- EA-12-051, Order Modifying Licenses With Regard to Reliable Spent Fuel 8/20/2012 ENT000547 TC-5 Pool Instrumentation (Effective Immediately) (Mar. 12, 2012) X NYS-38/RK- Letter from R. Braun, Senior Vice President, PSEG Nuclear LLC, to NRC 8/20/2012 TC-5 Document Control Desk, PSEG Nuclear LLCs Response to March 12, ENT000548 2012 Commission Order Modifying License with Regard to Reliable Spent X Fuel Pool Instrumentation (Mar. 29, 2012)

NYS-38/RK- Letter from R. Conte, NRC, to J. Ventosa, Entergy, Indian Point Nuclear 8/20/2012 ENT000549 TC-5 Generating Unit 2 - NRC Inspection Report 05000247/2012008 (Apr. 19, X 2012)

NYS-38/RK- Letter from A. Cunanan, NRC Project Manager, to S.K. Gambhir, Vice 8/20/2012 TC-5, NYS- President, Energy Northwest, Request for Additional Information for the ENT000550 26B/RK-TC- Review of the Columbia Generating Station License Renewal Application X 1B for Metal Fatigue (Feb. 3, 2011)

NYS-38/RK- Letter from B. Harris, NRC Project Manager, to B. Allen, FENOC, 8/20/2012 ENT000551 TC-5 Request for Additional Information for the Review of the Davis-Besse X Nuclear Power Station - Batch 3 (May 2, 2011) (excerpted) 11

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

NYS-38/RK- Letter from P. Bessette, Morgan Lewis, to Administrative Judges (May 15, 8/20/2012 ENT000552 TC-5 2012) X NYS-38/RK- Entergy, Condition Report LO-LAR-2011-00174, Corrective Actions 8/20/2012 ENT000553 TC-5 (Aug. 2011) (excerpted) X NYS-38/RK- NL-12-089, Letter from F. Dacimo, Entergy, to NRC, Reply to Request 8/20/2012 TC-5, NYS- for Additional Information Regarding the License Renewal Application ENT000554 X 26B/RK-TC- Indian Point Nuclear Generating Unit Nos. 2 & 3 (June 14, 2011) 1B NYS-38/RK- B. Gordon, Minimum Chromium Content In Nickel-Alloy Weld Overlays 8/20/2012 ENT000555 TC-5 to Mitigate PWSCC (Jan. 18, 2005) X NYS-38/RK- F. Delabrouille et al., Effect of the Chromium Content and Strain on the 8/20/2012 ENT000556 TC-5 Corrosion of Nickel Based Alloys in Primary Water of Pressurized Water X Reactors (2005)

NYS-38/RK- EPRI, Report 1014986, Pressurized Water Reactor Primary Water 8/20/2012 ENT000557 TC-5 Chemistry Guidelines, Rev. 6 (Dec. 2007) [PROPRIETARY] (excerpted) X NYS-38/RK- Letter from J. Daily, Project Manager, NRC, to D. Heacock, President, 8/20/2012 TC-5 Dominion Energy Kewaunee, Request for Additional Information for the ENT000558 Review of the Kewaunee Power Station License Renewal Application X (Mar. 11, 2010)

NYS-38/RK- Letter from B. Brady, Project Manager, NRC, to T. Joyce, President, PSEG 8/20/2012 TC-5 Nuclear, Request for Additional Information for Salem Nuclear ENT000559 Generating Stations Units 1 and 2 License Renewal Application (June 10, X 2010)

NYS-38/RK- Letter from R. Plasse, Project Manager, NRC, to P. Freeman, Site Vice 8/20/2012 TC-5 President, NextEra Energy Seabrook, Request for Additional Information ENT000560 Related to the Review of the Seabrook Station, License Renewal X Application (Dec. 14, 2010) 12

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

NYS-38/RK- Kewaunee Tr., Advisory Comm. on Reactor Safeguards, Plant License 8/20/2012 ENT000561 TC-5 Renewal Subcomm. (Aug. 18, 2010) (excerpted) X NYS-38/RK- Letter from J. Daily, NRC, to D. Heacock, President, Dominion Energy 8/20/2012 TC-5 Kewaunee, Inc., Request for Additional Information for the Review of the ENT000562 Kewaunee Power Station License Renewal Application (TAC No. X MD9408) (Sept. 10, 2010)

NYS-38/RK- Letter from Said Abdel-Khalik, ACRS Chairman, to Jaczko, NRC 8/20/2012 ENT000563 TC-5 Chairman, Report on the Safety Aspects of the License Renewal X Application for the Kewaunee Power Station (Jan. 7, 2011)

NYS-38/RK- Final License Renewal Interim Staff Guidance, LR-ISG-2011-05, 8/20/2012 ENT000564 TC-5 Ongoing Review of Operating Experience (Mar. 9, 2012) X NYS-38/RK- Letter from L. Hartz, Vice President, Dominion Energy Kewaunee., to, 8/20/2012 TC-5 NRC, Response to Request for Additional Information for the Review of ENT000565 the Kewaunee Power Station License Renewal Application (Sept. 23, X 2010)

NYS-38/RK- Letter from P. Freeman, Site Vice President, NextEra Energy Seabrook, to 8/20/2012 ENT000566 TC-5 NRC, Response to Request for additional Information - Set 10 (Mar. 22, X 2011)

NYS-38/RK- NL-00-043, Letter from J. Baumstark, Consol. Edison Co. of N.Y., to 8/20/2012 ENT000567 TC-5 NRC, Root Cause Evaluation For Steam Generator Tube Rupture Event of X February 15, 2000 (Apr. 14, 2000)

NYS-38/RK- EPRI, Report 1019044, Steam Generator Management Program: 8/20/2012 ENT000568 TC-5 Improvement Factors for Pressurized Water Reactor Steam Generator Tube X Materials (Dec. 2009) [PROPRIETARY] (excerpted)

NYS-38/RK- Letter from E. Shields, Westinghouse, to W. Wittich, Entergy, Steam 8/20/2012 ENT000569 TC-5 Generator Operational Assessment (June 29, 2010) [PROPRIETARY] X 13

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

NYS-38/RK- WCAP-17091-NP, Rev. 0, H*, Alternate Repair Criteria for the Tubesheet 8/20/2012 ENT000570 TC-5 Expansion Region in Steam Generators with Hydraulically Expanded X Tubes (Model 44F) (June 2009) (excerpted)

NYS-38/RK- Safety Evaluation Related to Amendment No. 308 for Oconee Nuclear 8/20/2012 ENT000571 TC-5 Station Units 1, 2 and 3 (Dec. 3, 1999) X NYS-38/RK- Letter from A. Cunanan, NRC, to M. Reddemann, Energy Northwest, 8/20/2012 ENT000572 TC-5 Issuance of Renewed Facility Operating License No. NPF-21 for X Columbia Generating Station (May 22, 2012) (ENT000540) (excerpted)

NYS-25, EN-LI-100, Rev. 12, Process Applicability Determination (Nov. 6, 2012) 1/11/2013 NYS-26B/RK-ENT000602 TC-1B, NYS- X 38/RK-TC-5 NYS-25, EN-LI-101, Rev. 9, 10 CFR 50.59 Evaluations (Feb. 16, 2012) 1/11/2013 NYS-26B/RK-ENT000603 TC-1B, NYS- X 38/RK-TC-5 NYS-25, Indian Point Nuclear Generating Units 2 and 3, NRC Evaluation of 1/11/2013 NYS-26B/RK- Changes, Tests or Experiments and Permanent Plant Modifications Team ENT000604 TC-1B, NYS- Inspection Report (Jan. 13, 2012) X 38/RK-TC-5 ENT000615 NYS-25 Entergy's Statement of Position Regarding Contention NYS-25 8/10/2015 (Embrittlement) (Aug. 10, 2015) 14

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

ENT000616 NYS-25, Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. Dolansky, 8/10/2015 NYS-26B/RK- Alan B. Cox, Jack R. Strosnider, Timothy J. Griesbach, Randy G. Lott, and TC-1B, NYS- Mark A. Gray Regarding Contention NYS-25 (Embrittlement) (Aug. 10, 38/RK-TC-5 2015)

ENT000617 NYS-25, Curriculum Vitae of Timothy J. Griesbach 8/10/2015 NYS-38/RK-TC-5 ENT000618 NYS-25, Curriculum Vitae of Randy G. Lott 8/10/2015 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 ENT000619 NYS-25 NL-08-127, Letter from F. Dacimo, Entergy, to NRC Document Control 8/10/2015 Desk, Additional Information Regarding License Renewal Application -

Structural OE Clarifications, Clarifications for Electrical RAIs and Audit Questions, License Renewal Application Amendment (Aug. 14, 2008)

ENT000620 NYS-25, PWROG Presentation, Material Orientation Toughness Assessment 8/10/2015 NYS-38/RK- (MOTA) for the Purpose of Mitigating Branch Technical Position (BTP) 5-TC-5 3 Uncertainties (Feb. 19, 2015)

ENT000621 NYS-25, Westinghouse, WCAP-17894-NP, Rev. 0, Component Inspection Details 8/10/2015 NYS-38/RK- Supporting Aging Management of Reactor Internals at Indian Point Unit 2 TC-5 (Sept. 2014)

ENT000622 NYS-25, Westinghouse, WCAP-17901-NP, Rev. 1, Component Inspection Details 8/10/2015 NYS-38/RK- Supporting Aging Management of Reactor Internals at Indian Point Unit 3 TC-5 (Sept. 2014) 15

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

ENT000623 NYS-25, Cases of ASME Boiler and Pressure Vessel Code, Case N-729-1, 8/10/2015 NYS-38/RK- Alternative Examination Requirements for PWR Reactor Vessel Upper TC-5 Heads With Nozzles Having Pressure-Retaining Partial-Penetration Welds, (Section XI, Division 1) (Mar. 28, 2006) [Full-Text Copyright]

ENT000624 NYS-25, Letter from N. Salgado to Vice President, Operations, Entergy Nuclear 8/10/2015 NYS-38/RK- Operations, Inc., Indian Point Nuclear Generating Unit No. 2 - Relief TC-5 from the Examination Area for Reactor Vessel Head Penetration Nozzles (TAC No. ME1658) (Mar. 1, 2010)

ENT000625 NYS-25, Letter from N. Salgado to Vice President, Operations, Entergy Nuclear 8/10/2015 NYS-38/RK- Operations, Inc., Indian Point Nuclear Generating Unit No. 3 - Relief TC-5 Requests RR-3-45 and RR-3-46 for Reactor Vessel Head Penetrations Examination (TAC Nos. ME0411 and ME0412) (July 8, 2009)

ENT000626 NYS-25, Letter from P. Milano, NRC, to M. Kansler, Entergy, Bulletin 2002-01, 8/10/2015 NYS-38/RK- Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure TC-5 Boundary Integrity, 15-Day Response for Indian Pont Nuclear Generating Unit Nos. 2 & 3 (TAC Nos. MB4550 and MB4551) (Nov. 12, 2002)

(ENT-25-0026)

ENT000627 NYS-25, G. Was, Fundamentals of Radiation Materials Science: Metals and Alloys; 8/10/2015 NYS-26B/RK- Part III: Mechanical Effects of Radiation Damage (2007) [Full-Text TC-1B, NYS- Copyright] [excerpt]

38/RK-TC-5 ENT000628 NYS-25, I. Tylek and K. Kuchta, Mechanical Properties of Structural Stainless 8/10/2015 NYS-38/RK- Steels, 4-B Technical Transactions, Civil Engineering 59 (2014) [Full-Text TC-5 Copyright]

16

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

ENT000629 NYS-25, Letter from C. Grimes, NRC, to D. Walters, NEI, License Renewal Issue 8/10/2015 NYS-38/RK- No. 98-0030, Thermal Aging Embrittlement of Cast Austenitic Stainless TC-5 Steel Components (May 19, 2000)

ENT000630 NYS-25, W.J. Mills, Effect of Temperature on the Fracture Toughness Behavior of 8/10/2015 NYS-38/RK- Inconel X-750, in ASTM STP 733: Fractography and Materials Science 98 TC-5 (L.N. Gilbertson and R.D. Zipp, eds., 1981) [Full-Text Copyright]

ENT000631 NYS-25, EPRI, MRP-175, Materials Reliability Program: PWR Internals Material 8/10/2015 NYS-26B/RK- Aging Degradation Mechanism Screening and Threshold Values (Dec.

TC-1B, NYS- 2005) [Full-Text Copyright]

38/RK-TC-5 ENT000632 NYS-25, ASME Boiler & Pressure Vessel Code,Section III, Article NB-2000, 8/10/2015 NYS-38/RK- Material (1998) [Full-Text Copyright]

TC-5 ENT000633 NYS-25, Letter from P. Anderson, Entergy, to NRC Document Control Desk, 8/10/2015 NYS-38/RK- Documentation for Pressurized Thermal Shock Evaluation Meeting (June TC-5 2, 2010)

ENT000634 NYS-25, Entergy, IP2, FSAR Update, Revision 25 (2014) [excerpts] 8/10/2015 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 ENT000635 NYS-25, Westinghouse, WCAP-17096-NP, Rev. 2, Reactor Internals Acceptance 8/10/2015 NYS-38/RK- Criteria Methodology and Data Requirements (Dec. 2009)

TC-5 17

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

ENT000636 NYS-25, P. Shahinian et al., NRL Report 7446, Effect of Neutron Irradiation on 8/10/2015 NYS-26B/RK- Fatigue Crack Propagation in Types 304 and 316 Stainless Steels at High TC-1B, NYS- Temperature (July 21, 1972) 38/RK-TC-5 ENT000637 NYS-25, NUREG-1874, Recommended Screening Limits for Pressurized Thermal 8/10/2015 NYS-38/RK- Shock (PTS) (March 2010)

TC-5 ENT00638A-C NYS-25, NUREG-1806, Vol. 1, Technical Basis for Revision of the Pressurized 8/10/2015 NYS-38/RK- Thermal Shock (PTS) Screening Limit in the PTS Rule (10 CFR 50.61)

TC-5 (Aug. 2007)

ENT00639A-F NYS-25, Westinghouse, WCAP-16156, Indian Point Nuclear Generating Unit No. 2, 8/10/2015 NYS-26B/RK- Stretch Power Uprate NSSS Engineering Report (Mar. 2004)

TC-1B, NYS- [PROPRIETARY]

38/RK-TC-5 ENT00640A-I NYS-25, Westinghouse, WCAP-16211, Power Uprate Project, Indian Point Unit 3 8/10/2015 NYS-26B/RK- Power Plant, NSSS Engineering Report (June 2004) [PROPRIETARY]

TC-1B, NYS-38/RK-TC-5 ENT000641 NYS-25, Final License Renewal Interim Staff Guidance LR-ISG-2011-04, Updated 8/10/2015 NYS-38/RK- Aging Management Criteria for Reactor Vessel Internal Components for TC-5 Pressurized Water Reactors (May 28, 2013)

ENT00642A-C NYS-25, EPRI, MRP-232, Materials Reliability Program: Aging Management 8/10/2015 NYS-38/RK- Strategies for Westinghouse and Combustion Engineering PWR Internals TC-5 (Dec. 2008) [Full-Text Copyright]

18

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

ENT000643 NYS-25, EPRI, MRP-232, Revision 1, Materials Reliability Program: Aging 8/10/2015 NYS-38/RK- Management Strategies for Westinghouse and Combustion Engineering TC-5 PWR Internals (Dec. 2008) [Full-Text Copyright]

ENT000644 NYS-25, EPRI, MRP-230, Materials Reliability Program: Functionality Analysis 8/10/2015 NYS-38/RK- for Westinghouse and Combustion Engineering Representative PWR TC-5 Internals (Oct. 2009) [Full-Text Copyright]

ENT000645 NYS-25, EPRI, MRP-228, Rev. 1, Materials Reliability Program: Inspection 8/10/2015 NYS-38/RK- Standard for PWR Internals - 2012 Update (Dec. 2012) [Full-Text TC-5 Copyright]

ENT000646 NYS-25, EPRI, MRP-210, Materials Reliability Program: Fracture Toughness 8/10/2015 NYS-26B/RK- Evaluation of Highly Irradiated PWR Stainless Steel Internal Components TC-1B, NYS- (Dec. 2007) [Full-Text Copyright]

38/RK-TC-5 ENT000647 NYS-25, EPRI, MRP-134, Materials Reliability Program: Framework and 8/10/2015 NYS-38/RK- Strategies for Managing Aging Effects in PWR Internals (June 2005) [Full-TC-5 Text Copyright]

ENT000648 NYS-25, M. Mitchell, Chief, Vessels and Internals Integrity Branch, Response to 8/10/2015 NYS-38/RK- Non-Concurrence Regarding Safety Evaluation for Topical Report MRP-TC-5 227, Pressurized Water Reactor Internals Inspection and Evaluation Guidelines (undated)

ENT000649 NYS-25, Letter from D. Pelton, NRC, to E. McCartney, NextEra Energy Point 8/10/2015 NYS-38/RK- Beach, Point Beach Nuclear Plant, Units 1 and 2 - Staff Assessment of TC-5 Reactor Vessel Internals Inspection Plan Based on MRP-227-A (TAC Nos.

ME8235 and ME8236) (Mar. 30, 2015) 19

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

ENT000650 NYS-25, G. Gardner, Chair, EPRI Reactor Internals Working Group, Recent 8/10/2015 NYS-38/RK- Materials Inspections of PWR Reactor Internals (Mar. 2015)

TC-5 ENT000651 NYS-25, T. Griesbach and B. Gordon, Materials Aging Management Programs at 8/10/2015 NYS-38/RK- Nuclear Power Plants in the United States (Oct. 2007) [Full-Text TC-5 Copyright]

ENT000652 NYS-25, Letter from P. Milano, NRR, to M. Kansler, Entergy, Indian Point Nuclear 8/10/2015 NYS-38/RK- Generating Unit No. 2 - Issuance of Amendment Re: 3.26 Percent Power TC-5 Uprate (TAC No. MC1865) (Oct. 27, 2004)

ENT000653 NYS-25, Letter from P. Milano, NRR, to M. Kansler, Entergy, Indian Point Nuclear 8/10/2015 NYS-38/RK- Generating Unit No. 3 - Issuance of Amendment Re: 4.85 Percent Stretch TC-5 Power Uprate and Relocation of Cycle-Specific Parameters (TAC No.

MC3552) (Mar. 24, 2005)

ENT000654 NYS-25, Westinghouse, WCAP-15270, Determination of Acceptable Baffle-Barrel- 8/10/2015 NYS-38/RK- Bolting for Four-Loop Westinghouse Downflow and Converted Upflow TC-5 Domestic Plants (Nov. 2001) [PROPRIETARY]

ENT000655 NYS-25, Westinghouse, WCAP-15030-NP-A, Westinghouse Methodology for 8/10/2015 NYS-38/RK- Evaluating the Acceptability of Baffle-Former-Barrel Bolting Distributions TC-5 under Faulted Load Conditions (Mar. 2, 1999)

ENT000656 NYS-25, Westinghouse, Technical Bulletin TB-14-5, Reactor Internals Lower 8/10/2015 NYS-38/RK- Radial Support Clevis Insert Cap Screw Degradation (Aug. 25, 2014)

TC-5 20

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

ENT000657 NYS-25, NRC Inspection Manual, Manual Chapter 2516, Policy and Guidance for 8/10/2015 NYS-38/RK- the License Renewal Inspection Program (LRIP) (Aug. 13, 2013)

TC-5 ENT000658 NYS-25, J. Smith, Irradiated Materials Testing, Inside MRP (Winter 2012) 8/10/2015 NYS-38/RK-TC-5 ENT000659 NYS-25, Letter from R. Kuntz, NRC, to Vice President, Operations, Entergy, 8/10/2015 NYS-26B/RK- Request for Additional Information for the Review of the Indian Point TC-1B, NYS- Nuclear Generating Unit Nos. 2 and 3, License Renewal Application 38/RK-TC-5 (May 15, 2012)

ENT000660 NYS-25, Letter from J. Daly, NRC, to Vice President, Operations, Entergy, 8/10/2015 NYS-38/RK- Request for Additional Information for the Review of the Indian Point TC-5 Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2013-01 (TAC Nos. MD5407 and MD5408) (Feb. 6, 2013)

ENT000661 NYS-25, Letter from K. Green, NRC, to Vice President, Operations, Entergy, 8/10/2015 NYS-38/RK- Request for Additional Information for the Review of the Indian Point TC-5 Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2013-04 (TAC Nos. MD5407 and MD5408) (July 26, 2013)

ENT000662 NYS-25, Letter from K. Green, NRC, to Vice President, Operations, Entergy, 8/10/2015 NYS-38/RK- Request for Additional Information for the Review of the Indian Point TC-5 Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2014-02 (TAC Nos. MD5407 and MD5408) (Apr. 9, 2014) 21

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

ENT000663 NYS-25, Letter from A. McGehee & T. Hanley, EPRI, to NRC Document Control 8/10/2015 NYS-38/RK- Desk, BWRVIP 2015-025, Project No. 704 - Summary of Industry TC-5 Position on Screening Criteria for Thermal and Irradiation Embrittlement for PWR and BWR Reactor Internals Fabricated of Cast Austenitic Stainless Steel (Mar. 9, 2015)

ENT000664 NYS-25, Email from J. Holonich, NRC, to K. Amberge, EPRI, et al., Summary 8/10/2015 NYS-38/RK- Tables for CASS Position (Mar. 12, 2014, 1:23 PM)

TC-5 ENT000665 NYS-25, ASME Boiler & Pressure Vessel Code,Section XI, Subsection IWB, 8/10/2015 NYS-26B/RK- Requirements for Class 1 Components of Light-Water Cooled Plants TC-1B, NYS- (2010) [Full-Text Copyright]

38/RK-TC-5 ENT00666A-I NYS-25, NUREG/CR-6943, A Study of Remote Visual Methods to Detect Cracking 8/10/2015 NYS-38/RK- in Reactor Components (Oct. 2007)

TC-5 ENT000667 NYS-25, PWROG-14048-P, Rev. 0-A, PWROG, Functionality Analysis: Lower 8/10/2015 NYS-38/RK- Support Columns (Oct. 2014) [PROPRIETARY]

TC-5 ENT000668 NYS-25, EPRI, MRP-219, Rev. 10, Materials Reliability Program: Inspection Data 8/10/2015 NYS-38/RK- Survey Report (Nov. 2014) [Full-Text Copyright]

TC-5 22

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

ENT000669 NYS-25, Regulatory Guide 1.99, Radiation Embrittlement of Reactor Vessel 8/10/2015 NYS-26B/RK- Materials, Revision 2 (May 1988)

TC-1B, NYS-38/RK-TC-5 ENT000670 NYS-25 NL-13-106, Letter from J. Ventosa, Entergy, to NRC Document Control 8/10/2015 Desk, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule Per 10 CFR 50 Appendix H (Aug. 12, 2013)

ENT000671 NYS-25 NL-14-129, Letter from J. Ventosa, Entergy, to NRC Document Control 8/10/2015 Desk, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule Per 10 CFR 50 Appendix H (Nov. 5, 2014)

ENT000672 NYS-25 Letter from B. Beasley, NRC, to Vice President, Operations, Indian Point 8/10/2015 Nuclear Generating Unit No. 2 - Safety Evaluation re: Revision to the Reactor Vessel Surveillance Capsule Withdrawal Schedule per 10 CFR 50 Appendix H (TAC No. MF2558) (Jan. 14, 2014)

ENT000673 NYS-25 Letter from B. Beasley, NRC, to Vice President, Operations, Indian Point 8/10/2015 Nuclear Generating Unit No. 3 - Safety Evaluation re: Revision to the Reactor Vessel Surveillance Capsule Withdrawal Schedule per 10 CFR 50 Appendix H (TAC No. MF5148) (Mar. 4, 2015)

ENT000674 NYS-25 NL-08-014, Letter from Fred R. Dacimo, Entergy, to NRC Document 8/10/2015 Control Desk, Clarifications to Reactor Vessel Surveillance Program and Neutron Embrittlement Time-Limited Aging Analyses and Audit Item

  1. 105; and Revision to License Renewal Regulatory Commitment List (Jan. 17, 2008) 23

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

ENT000675 NYS-25 Letter from M. Hodges, NRC, to W. Rasin, Nuclear Management and 8/10/2015 Resources Council, Safety Assessment of Report WCAP-13587, Revision 1, Reactor Vessel Upper Shelf Energy Bounding Evaluation for Westinghouse Pressurized Water Reactors, September 1993 (Apr. 21, 1994)

ENT000676 NYS-25 NUREG-1785, Safety Evaluation Report Related to the License Renewal 8/10/2015 of H.B. Robinson Steam Electric Plant, Unit 2 (Mar. 2004)

ENT000677 NYS-25 NL-07-140, Letter from F. Dacimo, Entergy, to NRC Document Control 8/10/2015 Desk, Reply to Request for Additional Information Regarding License Renewal Application (Nov. 28, 2007)

ENT000678 NYS-26B/RK- Entergy's Revised Statement of Position Regarding Contention NYS- 8/10/2015 TC-1B 26B/RK-TC-1B (Metal Fatigue) (Aug. 10, 2015)

ENT000679 NYS-25, Revised Testimony of Entergy Witnesses Nelson F. Azevedo, Alan B. Cox, 8/10/2015 NYS-26B/RK- Jack R. Strosnider, Randy G. Lott, Mark A. Gray, and Barry M. Gordon TC-1B, NYS- Regarding Contention NYS-26B/RK-TC-1B (Metal Fatigue) (Aug. 10, 38/RK-TC-5 2015)

ENT000680 NYS-26B/RK- Curriculum Vitae of Barry M. Gordon 8/10/2015 TC-1B, NYS-38/RK-TC-5 ENT000681 NYS-25, Westinghouse, WCAP-17199-P, Rev. 1, Environmental Fatigue Evaluation 8/10/2015 NYS-26B/RK- for Indian Point Unit 2, (Dec. 2014) [PROPRIETARY]

TC-1B, NYS-38/RK-TC-5 24

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

ENT000682 NYS-25, Westinghouse, WCAP-17200-P, Rev. 1, Environmental Fatigue Evaluation 8/10/2015 NYS-26B/RK- for Indian Point Unit 3, (Dec. 2014) [PROPRIETARY]

TC-1B, NYS-38/RK-TC-5 ENT000683 NYS-25, Westinghouse, Calculation Note CN-PAFM-13-32, Rev. 3 Indian Point 8/10/2015 NYS-26B/RK- Unit 2 (IP2) and Unit 3 (IP3) Refined EAF Analyses and EAF Screening TC-1B, NYS- Evaluations (June 25, 2015) [PROPRIETARY]

38/RK-TC-5 ENT000684 NYS-25, Cases of ASME Boiler and Pressure Vessel, Code Case N-779, 8/10/2015 NYS-26B/RK- Alternative Rules for Simplified Elastic-Plastic Analysis, Class 1 TC-1B, NYS- (Section III, Division 1) (Jan. 26, 2009) [Full-Text Copyright]

38/RK-TC-5 ENT00686A-C NYS-25, Westinghouse, WESTEMS' User Manual, Volume 2: Design Analysis, 8/10/2015 NYS-26B/RK- Rev. 6 (Mar. 2015) [PROPRIETARY]

TC-1B, NYS-38/RK-TC-5 ENT000687 NYS-25, NRC, Safety Evaluation Report, Topical Report on ASME Section III 8/10/2015 NYS-26B/RK- Piping and Component Fatigue Analysis Utilizing the WESTEMSTM TC-1B, NYS- Computer Code (WCAP-17577, Revision 2) (undated) 38/RK-TC-5 ENT000688 NYS-25, Westinghouse, Calculation Note CN-PAFM-13-40, Rev. 1, Indian Point 8/10/2015 NYS-26B/RK- Unit 2 and Unit 3 Pressurizer Spray Nozzle Transfer Function Database TC-1B, NYS- Development and Environmental Fatigue Evaluations (Jan. 15, 2015) 38/RK-TC-5 [PROPRIETARY]

25

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

ENT000689 NYS-25, Westinghouse, WCAP-12191, Rev. 4, Transient and Fatigue Cycle 8/10/2015 NYS-26B/RK- Monitoring Program Transient History Evaluation Report for Indian Point TC-1B, NYS- Unit 2 (Dec. 2014) [PROPRIETARY]

38/RK-TC-5 ENT000690 NYS-25, Westinghouse, WCAP-16898-P, Rev. 1, Indian Point Unit 3 Transient and 8/10/2015 NYS-26B/RK- Fatigue Cycle Monitoring Program Transient History Evaluation (May TC-1B, NYS- 2015) [PROPRIETARY]

38/RK-TC-5 ENT000691 NYS-25, EPRI, BWRVIP-187, BWR Vessel and Internals Project: Controlling 8/10/2015 NYS-26B/RK- Intergranular Stress Corrosion Cracking During a BWR Startup-Addition TC-1B, NYS- of Hydrazine or Carbohydrazide (Mar. 2008) [PROPRIETARY]

38/RK-TC-5 ENT000692 NYS-25, Entergy, 0-CY-2310, Rev. 24, Reactor Coolant System Specification and 8/10/2015 NYS-26B/RK- Frequencies (Jan. 16, 2015)

TC-1B, NYS-38/RK-TC-5 ENT000693 NYS-25, IPEC, Unit 3 Chemistry Data (Mar. 21-22, 2015) 8/10/2015 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 ENT000694 NYS-25, Z. Szklarska-Smialowska et al., Mechanism of Crack Growth in Alloy 600 8/10/2015 NYS-26B/RK- in High-Temperature Deaerated Water, 50 Corrosion 676 (Sept. 1994)

TC-1B, NYS- [Full-Text Copyright]

38/RK-TC-5 26

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

ENT000695 NYS-25, Letter from J. Trapp, NRC, to J. Ventosa, Entergy, Indian Point Nuclear 8/10/2015 NYS-26B/RK- Generating Unit 2 - NRC License Renewal Team Inspection Report TC-1B, NYS- 05000247/2013010 (Sept. 19, 2013) 38/RK-TC-5 ENT000696 NYS-25, Westinghouse, Calculation Note CN-SGDA-02-214, 4.7% Uprate 8/10/2015 NYS-26B/RK- Structural Evaluation of Primary and Secondary side Components for TC-1B, NYS- Indian Point Unit 2 (44F), 10% Plugging (June 12, 2003) 38/RK-TC-5 [PROPRIETARY]

ENT000697 NYS-25, Entergy, Visual Examination of Reactor Vessel and Internals (VT-3), 8/10/2015 NYS-26B/RK- Summary No. 206913-RVVINT for IP2 (Mar. 10, 2014), and Summary TC-1B, NYS- No. 1-1200-VESS. INT. for IP3 (Mar. 13, 2015) 38/RK-TC-5 ENT000698 NYS-38/RK- Entergy's Revised Statement of Position Regarding Contention NYS- 8/10/2015 TC-5 38/RK-TC-5 (Safety Commitments) (Aug. 10, 2015)

ENT000699 NYS-25, Revised Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. 8/10/2015 NYS-26B/RK- Dolansky, Alan B. Cox, Jack R. Strosnider, Timothy J. Griesbach, Barry TC-1B, NYS- M. Gordon, Randy G. Lott, and Mark A. Gray Regarding Contention NYS-38/RK-TC-5 38/RK-TC-5 (Safety Commitments) (Aug. 10, 2015)

ENT000700 NYS-38/RK- State of New York, Riverkeeper, Inc., Nuclear Regulatory Commission 8/10/2015 TC-5 Staff, and Entergy Nuclear Operations, Inc., Joint Stipulation Regarding State of New York Pre-Filed Testimony for Contention NYS-38/RK-TC-5 (Safety Commitments) (June 23, 2015) 27

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

ENT000701 NYS-38/RK- Letter from A. Burritt, NRC, to L. Coyle, Entergy, Annual Assessment 8/10/2015 TC-5 Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001) (Mar. 4, 2015)

ENT000703 NYS-38/RK- NRC Inspection Manual, Inspection Procedure 71003, Post-Approval Site 8/10/2015 TC-5 Inspection for License Renewal (Feb. 25, 2013)

ENT000704 NYS-38/RK- NRC Inspection Manual, Inspection Procedure 71013, Site Inspection for 8/10/2015 TC-5 Plants with a Timely Renewal Application (Sept. 25, 2013)

ENT000705 NYS-38/RK- NRR Office Instruction, LIC-105, Revision 5, Managing Regulatory 8/10/2015 TC-5 Commitments Made by Licensees to the NRC (Sept. 16, 2013)

ENT000706 NYS-38/RK- NRC Enforcement Manual, Rev. 9 (Sept. 9, 2013) 8/10/2015 TC-5 ENT000707 NYS-38/RK- Memorandum from S. Dingbaum, Assistant Inspector Gen. for Audits, 8/10/2015 TC-5 NRC, to M. Satorius, Exec. Dir. for Operations, NRC, Status of Recommendations: Audit of NRCs Management of Licensee Commitments (OIG-11-A-17) (Nov. 25, 2013)

ENT000708 NYS-25, Entergy, Commitment Closure Verification Form, LRC # 43 (Aug. 27, 8/10/2015 NYS-26B/RK- 2013)

TC-1B, NYS-38/RK-TC-5 ENT000709 NYS-25, Entergy, Commitment Closure Verification Form, LRC # 49 (Aug. 27, 8/10/2015 NYS-26B/RK- 2013)

TC-1B, NYS-38/RK-TC-5 28

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

ENT000710 NYS-25, Entergy, Commitment Closure Verification Form, LRC # 44 (June 19, 8/10/2015 NYS-26B/RK- 2013)

TC-1B, NYS-38/RK-TC-5 ENT000711 NYS-38/RK- H. Kawamura et al., Paper No. 141, The Effect of Zinc Addition to 8/10/2015 TC-5 Simulated PWR Primary Water on the PWSCC Resistance, Crack Growth Rate and Surface Oxide Film Characteristics of Prefilmed Alloy 600 (Corrosion 98, 1998) [Full-Text Copyright]

ENT000712 NYS-38/RK- P.L. Andresen et al., Effects of Hydrogen on Stress Corrosion Crack 8/10/2015 TC-5 Growth Rate of Nickel Alloys in High-Temperature Water, 64 Corrosion 707 (Sept. 2008) [Full-Text Copyright]

ENT000713 NYS-38/RK- B. Gordon, Corrosion and Corrosion Control in Light Water Reactors, 65 8/10/2015 TC-5 Journal of Metals 1043 (Aug. 2013) [Full-Text Copyright]

ENT00714A-B NYS-38/RK- H. Cothron et al., EPRI, Slides: NRC/Industry Meeting Regarding Tube-to- 8/10/2015 TC-5 Tubesheet Weld and Divider Plate Cracking Report (July 30, 2015)

ENT000715 NYS-38/RK- NRC, Notice of Meeting with Industry on Divider Plate and Tube-to- 8/10/2015 TC-5 Tubesheet Weld (July 1, 2015)

ENT000716 NYS-38/RK- EPRI, Final Report No. 3002000473, Steam Generator Channel Head 8/10/2015 TC-5 Degradation Failure Modes and Effects Analysis (Apr. 2013) [Full-Text Copyright]

ENT000717 NYS-38/RK- Entergy Procedure SEP-SG-IP3-001, IP3 Steam Generator Program, 8/10/2015 TC-5 Revision 1 (May 21, 2014) 29

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

ENT000718 NYS-38/RK- Westinghouse, Technical Manual No. TM 1440-C348, Vertical Steam 8/10/2015 TC-5 Generator Instructions for Consolidated Edison Company of New York, Indian Point Station - Unit 2 (2001) [PROPRIETARY] (excerpt)

ENT000719 NYS-38/RK- T. Couvant et al., Paper Reference No. A004T04, PWSCC of Steam 8/10/2015 TC-5 Generator Divider Plates in Alloy 600: Coupling Field Characterizations with R&D Studies (Fontevraud 7, Sept. 26-30, 2010) [Full-Text Copyright]

ENT000720 NYS-38/RK- M. Boccanfuso, et al., Paper Reference No. A165-T06, Steam Generator 8/10/2015 TC-5 Mechanical Plug Failure: A Tribologic Problem (Fontevraud 7, Sept. 26-30, 2010) [Full-Text Copyright]

ENT000721 NYS-38/RK- EPRI, MRP-55, Rev. 1, Materials Reliability Program: Crack Growth 8/10/2015 TC-5 Rates for Evaluating Primary Water Stress Corrosion Cracking (PWSCC) of Thick-Wall Alloy 600 Materials (Nov. 2002) [Full-Text Copyright]

ENT000722 NYS-25, Supplemental Testimony of Entergy Witnesses Nelson F. Azevedo, 10/29/2015 NYS-26B/RK- Timothy J. Griesbach, and Randy G. Lott Regarding Contention NYS-25 TC-1B, NYS- (Reactor Vessel Internals AMP), NYS-26B/RK-TC-1B (Metal Fatigue),

38/RK-TC-5 and NYS-38/RK-TC-5 (Safety Commitments) (Oct. 29, 2015)

ENT000723 NYS-25, D.J. Gavenda et al., NUREG/CR-6428, Effects of Thermal Aging on 10/29/2015 NYS-26B/RK- Fracture Toughness and Charpy-Impact Strengths of Stainless Steel Pipe TC-1B, NYS- Welds (May 1996) 38/RK-TC-5 ENT000724 NYS-25, Westinghouse, Calculation Note CN-RIDA-13-48, Rev. 0 Indian Point 10/29/2015 NYS-26B/RK- Units 2 and 3 Reactor Internals Lower Support Column Bodies Thermal TC-1B, NYS- Embrittlement and Irradiation Embrittlement Screening Assessment (Oct.

38/RK-TC-5 15, 2013) [PROPRIETARY]

30

Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?

ENT000725 NYS-25, Westinghouse, WCAP-14574-A, License Renewal Evaluation: Aging 10/29/2015 NYS-26B/RK- Management Evaluation for Pressurizers (Dec. 2000)

TC-1B, NYS-38/RK-TC-5 ENT000726 NYS-25, Entergy Track 2 Hearing Exhibit List 11/4/2015 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 DB1/ 85187843 31