| RAI-3 The licensee used a crack growth rate with an improvement factor of 100 over Alloy 600 for Alloy 690 materials in its fracture mechanics analyses. | | RAI-3 The licensee used a crack growth rate with an improvement factor of 100 over Alloy 600 for Alloy 690 materials in its fracture mechanics analyses. |
| The May 24, 2012, submittal states that NUREG/CR-7103, Volume 2, "Pacific Northwest National Laboratory Investigation of Stress Corrosion Cracking [SCC] in Nickel-Base Alloys," indicated similar crack growth results except for high levels of cold work. However, the NUREG states,"Representative | | The May 24, 2012, submittal states that NUREG/CR-7103, Volume 2, "Pacific Northwest National Laboratory Investigation of Stress Corrosion Cracking [SCC] in Nickel-Base Alloys," indicated similar crack growth results except for high levels of cold work. However, the NUREG states,"Representative |
| [Alloy] 690 CRDM plant materials were studied to investigate the SCCcrack-growth response in the as-received TT [thermally treated] and several modifiedconditions."
| | [Alloy] 690 CRDM plant materials were studied to investigate the SCCcrack-growth response in the as-received TT [thermally treated] and several modifiedconditions." |
| To ensure that the plant-specific Alloy 690 material for the CRDMs did not receive significant cold work which is "representative" according to the NUREG, please provide your estimate of the cold work for the Ginna CRDM penetrations based on the fabrication and installation record of the Ginna CRDM penetrations to support that the Ginna CRDM penetrations did not receive significant cold work. | | To ensure that the plant-specific Alloy 690 material for the CRDMs did not receive significant cold work which is "representative" according to the NUREG, please provide your estimate of the cold work for the Ginna CRDM penetrations based on the fabrication and installation record of the Ginna CRDM penetrations to support that the Ginna CRDM penetrations did not receive significant cold work. |
| RAI-4 Since the May 24, 2012, submittal did not specify the examination frequency, the staff assumed that the examination frequency of ASME Code Case N-729-1 will be followed.Please provide EFPYs operated so far for the Ginna CRDM penetration nozzles and specify the time for the next examination based on (1) whether prior examinations have identified flaws and (2) whether the amount of cold work requested in RAI-3 allows you to consider the plant-specific Alloy 690 material as PWSCC resistant. | | RAI-4 Since the May 24, 2012, submittal did not specify the examination frequency, the staff assumed that the examination frequency of ASME Code Case N-729-1 will be followed.Please provide EFPYs operated so far for the Ginna CRDM penetration nozzles and specify the time for the next examination based on (1) whether prior examinations have identified flaws and (2) whether the amount of cold work requested in RAI-3 allows you to consider the plant-specific Alloy 690 material as PWSCC resistant. |
Letter Sequence Other |
---|
|
|
MONTHYEARML12178A1922012-06-25025 June 2012 Gina_ TAC Nos. ME8000 and ME8001-Relief Ginna Relief Request Project stage: Other ML12284A1972012-11-21021 November 2012 Pennsylvania State University - Request for Additional Information Re Reactor Bay Ventilation System License Amendment Request Project stage: RAI ML12346A3492012-12-0303 December 2012 Pennsylvania State University - Email to Extend RAI Response Time for Facility Operating License No. R-2 Breazeale Reactor Project stage: RAI ML13024A4112013-01-0707 January 2013 Response to Request for Additional Information - License Amendment Request R-2 Project stage: Response to RAI ML14036A3192014-04-0101 April 2014 Pennsylvania State University - Request for Additional Information for License Amendment Request the Reactor Bay Ventilation System Upgrade for the Penn State Breazeale Reactor Project stage: RAI ML16188A3932016-07-27027 July 2016 Pennsylvania State University - NRC Request for Additional Information for License Amendment Request Regarding the Reactor Bay Ventilation System Upgrade for the Penn State Breazeale Reactor Project stage: RAI ML18201A1982018-06-25025 June 2018 Pennsylvania State Univ., Request to Withdraw License Amendment Request for Reactor Bay Exhaust System Project stage: Request 2013-01-07
[Table View] |
Similar Documents at Ginna |
---|
Category:E-Mail
MONTHYEARML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24073A3602024-03-13013 March 2024 Request for Additional Information (RAI) Alternative Request PR-03 Sixth Interval Inservice Testing Program ML24045A2892024-02-14014 February 2024 R. E. Ginna Nuclear Power Plant Acceptance Review: IST Relief Request for B Auxiliary Feedwater Pump ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23312A1302023-11-0707 November 2023 Final Rci/Rai - Constellation – R. E. Ginna Nuclear Power Plant - Exemption from Security Rule (EPID L-2023-LLE-0029) (Email) ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22325A0052022-11-18018 November 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-273-A, Revision 2 ML22339A0032022-09-28028 September 2022 R. E. Ginna Nuclear Power Plant - Ginna: Acceptance Review: to Revise Technical Specifications (TS) TS 5.6.5, Core Operating Limits Report ML22269A4522022-09-22022 September 2022 R. E. Ginna Nuclear Power Plant - Acceptance Review: to Revise Technical Specifications (TS) TS 5.6.5, Core Operating Limits Report (COLR) ML22255A0132022-09-0909 September 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, Calvert Cliffs, Ginna - License Amendment Request to Adopt TSTF-577 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22138A1672022-05-16016 May 2022 R. E. Ginna Nuclear Power Plant - Acceptance Review TS to Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes (EPID-L-2022-LLA-0057) ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22116A0242022-04-25025 April 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, and Ginna Request to Adopt TSTF-246 ML22088A1562022-03-0202 March 2022 NRR E-mail Capture - Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5.b, the Core Operating Limits Report (COLR) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML21308A5592021-11-0404 November 2021 NRR E-mail Capture - NRC Request for Additional Information for Ginna Biennial EP Exercise Exemption Request ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21293A2342021-10-19019 October 2021 R. E. Ginna Nuclear Power Plant - Acceptance of Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR 50, Appendix E, Section IV.F.2.C ML21293A1332021-10-19019 October 2021 R. E. Ginna Nuclear Power Plant - Acceptance of Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR 50, Appendix E, Section IV.F.2.C ML21279A1122021-10-0606 October 2021 R. E. Ginna Nuclear Power Plant - Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR 50, Appendix E, Section IV.F.2.c ML21273A1092021-09-30030 September 2021 R. E. Ginna Nuclear Power Plant - Acceptance Review - Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (EPID L-2021-LLR-0074 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21189A1602021-07-0808 July 2021 NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs ML21172A2702021-06-22022 June 2021 E-Mail Acceptance of Application - Risk Informed Completion Times in Accordance with TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, ML21172A2692021-06-22022 June 2021 E Mail Acceptance of Application to Adopt 10 CFR 50.69, _Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors (Epid_ L-2021-LLA-0092) ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21123A2442021-05-0303 May 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood/Byron/Ginna - Application to Address the Issues Identified in Westinghouse Documents NSAL-09-5 and NSAL-15-1 (L-2021-LLA-0066) ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21076A5152021-03-17017 March 2021 R. E. Ginna Nuclear Power Plant - RAI Steam Generator LAR to Revise Technical Specifications for Steam Generator Tube Inspection Frequency (EPID L-2020-LLA-0207) (e-mail) ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 ML21029A3302021-01-29029 January 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative Request to Use ASME Code Case N-885 ML20357A2232020-12-17017 December 2020 Update on Ginna POV - 3504A and 4562 (Email Request for Inspection Information) ML20350B5582020-12-14014 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC -Alternative Request for Documentation of Replacement of Pressure Retaining Bolting ML20335A5692020-11-30030 November 2020 R. E. Ginna Nuclear Power Plant - Acceptance Review: Alternative to ASME Code, Section XI ML20325A1002020-11-20020 November 2020 Acceptance Review: Force-on-Force Temporary Exemption Request ML20294A4942020-10-20020 October 2020 R. E. Ginna Nuclear Power Plant - Acceptance Review: to Revise Technical Specifications for Steam Generator Tube Inspection Frequency ML20276A1032020-10-0202 October 2020 R. E. Ginna Nuclear Power Plant - Acceptance Review - Exemptions from 10 CFR 2.109(b), Effect of Timely Renewal Application 2024-09-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24073A3602024-03-13013 March 2024 Request for Additional Information (RAI) Alternative Request PR-03 Sixth Interval Inservice Testing Program ML23312A1302023-11-0707 November 2023 Final Rci/Rai - Constellation – R. E. Ginna Nuclear Power Plant - Exemption from Security Rule (EPID L-2023-LLE-0029) (Email) ML22160A3962022-06-0909 June 2022 R. E. Ginna Nuclear Power Plant, LLC - Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2022010 ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML21308A5592021-11-0404 November 2021 NRR E-mail Capture - NRC Request for Additional Information for Ginna Biennial EP Exercise Exemption Request ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21189A1602021-07-0808 July 2021 NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21119A1082021-04-27027 April 2021 Ti 2515/194 Inspection Documentation Request ML21076A5152021-03-17017 March 2021 R. E. Ginna Nuclear Power Plant - RAI Steam Generator LAR to Revise Technical Specifications for Steam Generator Tube Inspection Frequency (EPID L-2020-LLA-0207) (e-mail) ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21029A3302021-01-29029 January 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative Request to Use ASME Code Case N-885 ML20357A2232020-12-17017 December 2020 Update on Ginna POV - 3504A and 4562 (Email Request for Inspection Information) ML20218A6422020-08-0505 August 2020 R. E. Ginna Nuclear Power Plant - Request for Additional Information (RAI) for LAR to Implement WCAP, TSTF-411, and TSTF-418 ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML19120A3862019-04-30030 April 2019 Request for Additional Information to Revise Emergency Plan Response Organization Staffing and Augmentation ML18228A5242018-08-15015 August 2018 R. E. Ginna Nuclear Power Plant - TSTF 547 Adoption, Request for Additional Information (RAI) EPID L-2018-LLA-0179 ML18102A2372018-04-12012 April 2018 NRR E-mail Capture - Calvert Cliffs, Ginna, and Nine Mile Point - Request for Additional Information Regarding License Amendment Request to Revise Emergency Action Level Schemes (EPID-L-2017-LLA-0237) ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML17331B1342017-12-12012 December 2017 2, and R.E. Ginna Nuclear Power Plant - Request for Additional Information - Regarding ML17277A2052017-10-0202 October 2017 Email - Ginna: Request for Additional Information (RAI) for NFPA-805 LAR RS-17-026, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal2017-03-10010 March 2017 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal ML17062A4912017-03-0303 March 2017 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative to RPV Threads in Flange Examination (CAC Nos. MF8712-MF8729) ML16278A0772016-11-0707 November 2016 Request for Additional Information Regarding: Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specifications ML16075A1192016-03-17017 March 2016 Request for Additional Information Regarding: Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specifications ML16077A1082016-03-17017 March 2016 NRR E-mail Capture - (External_Sender) Email Clarification and Supplementation to AMP RAI ML15349B0252016-01-0707 January 2016 Request for Additional Information Regarding Reactor Vessels Internals Program ML15344A3532016-01-0707 January 2016 Request for Additional Information Regarding Risk-Informed Technical Specifications Initiative 5B CAC No. MF6358) ML15100A2112015-04-28028 April 2015 RAI Regarding License Amendment Request to Adopt Technical Specification Task Force Traveler-523 ML14093A6772014-05-0101 May 2014 SONGS - Request for Additional Information Concerning Pre-Emption Authority ML13337A6252013-12-0505 December 2013 Constellation Energy Nuclear Group, R.E. Ginna Nuclear Power Plant, Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instru ML13337A3902013-12-0505 December 2013 Request for Additional Information Regarding Order Approving Direct Transfer of Renewed Facility Operating License and Conforming Amendments ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13261A0612013-09-24024 September 2013 R. E. Ginna Nuclear Power Plant - Request for Additional Information Regarding Amendment to Revise Technical Specification 3.6.5. Containment Air Temperature. ML13261A1142013-09-12012 September 2013 R. E. Ginna Nuclear Power Plant, E-mail Re. NFPA 805 License Amendment Request, Audit RAIs ML13226A3822013-08-29029 August 2013 Request for Additional Information Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) ML13108A0682013-04-23023 April 2013 (Security Related) Request for Additional Information for Review of Security Plan Changes in Revision 5 ML12264A6192012-09-20020 September 2012 RAI for the CRDM Nozzle Examination Relief Request ML12234A5172012-08-21021 August 2012 Physical Security Plan Change Per 10 CFR 50.54(p)(2) ML12228A6182012-08-15015 August 2012 Re_ Ginna-BMI Flaw Evaluation(ME8247) ML12178A1922012-06-25025 June 2012 Gina_ TAC Nos. ME8000 and ME8001-Relief Ginna Relief Request ML12056A0482012-03-12012 March 2012 Enclosure 2 - Recommendation 2.1: Flooding ML12056A0502012-03-12012 March 2012 Enclosure 4 - Recommendation 2.3: Flooding ML12056A0472012-03-12012 March 2012 Enclosure 1 - Recommendation 2.1: Seismic ML12056A0492012-03-12012 March 2012 Enclosure 3 - Recommendation 2.3: Seismic ML12056A0512012-03-12012 March 2012 Enclosure 5 - Recommendation 9.3: Emergency Preparedness 2024-07-12
[Table view] |
Text
From:Thadani, Mohan To:Harding Jr, Thomas Cc:Alley, David; Sheng, Simon
Subject:
Gina: TAC NOS. ME8000 and ME8001-Relief Requests ISI-07 and ISI-08-Regarding BMI Date:Monday, June 25, 2012 10:56:00 AM Attachments:
image001.png Tom:
The NRC staff is reviewing the requests ISI-07 and ISI-08 for relief pursuant to 10 CFR 50.55a, regarding reactor pressure vessel closure head penetration nozzle examinations for R.E. Ginna, during its fifth Inservice Inspection interval.
The NRC staff has identified a need for following additional information required to facilitate the continuation of review of the relief requests.
Please provide your response to the following request promptly to facilitate the completion of the NRC staff's review in time to support your requested schedule for NRC response.
REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR RELIEF FROM REQUIREMENTS FOR EXAMINATION OF REACTOR VESSEL HEAD PENETRATION NOZZLES R. E. GINNA NUCLEAR POWER PLANT, LLC R. E. GINNA NUCLEAR POWER PLANT DOCKET NO. 50-244
RAI-1 The May 24, 2012, submittal did not provide information on axial stresses for the control rod drive mechanism (CRDM) penetration nozzles on the basis that the hoop stresses arelimiting.
As indicated in Pacific Northwest National Laboratory (PNNL) Report 17763,"Final Report - Inspection Limit Confirmation for Upper Head Penetration Nozzle Cracking,"
dated August of 2008, this basis is not always true. Case 12 of Figure 9, Case 61 of Figure 11, and Cases 87, 88, 89 of Figure 13 of the PNNL report all indicated that the axial stresses are more limiting than the hoop stresses.
When you study the above quoted figures in the PNNL report, please note that, for axial stresses, the longer distance from the triple point to where the stress drops to 20 ski means that a longer portion of the penetration nozzle is at stresses greater than 20 ski.
Please provide additional plant-specific information on axial stresses to substantiate your claim that the hoop stresses are limiting.
RAI-2 The licensee used a deterministic fracture mechanics analysis to justify the alternative examination coverage for penetration nozzle number 35. However, the proposed coverage of 0.2 inch is not sufficient to tolerate the uncertainties in the calculated residual stresses and the determination of the assumed crack length. The staff also has a concern with the proposed crack growth rate for Alloy 690 CRDM material (discussed in RAI-3). Hence, the NRC staff requests the licensee provide the basis for not performing a surface examination of the lower portion of each penetration nozzle necessary to meet the inspection requirements of 10 CFR 50.55a(g)(6)(ii)(D) and consider changing the regulatory basis of the relief request from 10 CFR 50.55a(a)(3)(i) to10 CFR 50.55a(a)(3)(ii).
Up to date, all similar relief requests were granted under 10 CFR 50.55a(a)(3)(ii), because the NRC staff finds insufficient basis to grant relief under 10 CFR 50.55a(a)(3)(i), considering that surface examinations could be performed on each penetration nozzle to meet the current inspection requirements.
RAI-3 The licensee used a crack growth rate with an improvement factor of 100 over Alloy 600 for Alloy 690 materials in its fracture mechanics analyses.
The May 24, 2012, submittal states that NUREG/CR-7103, Volume 2, "Pacific Northwest National Laboratory Investigation of Stress Corrosion Cracking [SCC] in Nickel-Base Alloys," indicated similar crack growth results except for high levels of cold work. However, the NUREG states,"Representative
[Alloy] 690 CRDM plant materials were studied to investigate the SCCcrack-growth response in the as-received TT [thermally treated] and several modifiedconditions."
To ensure that the plant-specific Alloy 690 material for the CRDMs did not receive significant cold work which is "representative" according to the NUREG, please provide your estimate of the cold work for the Ginna CRDM penetrations based on the fabrication and installation record of the Ginna CRDM penetrations to support that the Ginna CRDM penetrations did not receive significant cold work.
RAI-4 Since the May 24, 2012, submittal did not specify the examination frequency, the staff assumed that the examination frequency of ASME Code Case N-729-1 will be followed.Please provide EFPYs operated so far for the Ginna CRDM penetration nozzles and specify the time for the next examination based on (1) whether prior examinations have identified flaws and (2) whether the amount of cold work requested in RAI-3 allows you to consider the plant-specific Alloy 690 material as PWSCC resistant.
Please note that if insignificant cold work cannot be demonstrated for the Ginna CRDM penetration nozzles, the nozzles' classification of Item No. B4.40 of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Code Case N-729-1, "Alternative Examination Requirements for PWR [pressurized water reactor] Reactor Vessel Upper Heads With Nozzles Having Pressure-Retaining Partial-Penetration Welds," may not be justified.
If there are any questions, please contact me. Mohan C ThadaniSenior Project ManagerPlant Licensing Branch IVDivision of Operating Reactor Licensing Office of Nuclear Reactor Regulation(301) 415-1476 Mohan.Thadani@nrc.gov