Line 2: |
Line 2: |
| | number = ML14105A366 | | | number = ML14105A366 |
| | issue date = 04/14/2014 | | | issue date = 04/14/2014 |
| | title = Required Response 2 to March 12, 2012, Request for Information (Rfi), Enclosure 2, Recommendation 2.1, Flood Hazard Evaluation Report | | | title = Required Response 2 to March 12, 2012, Request for Information (Rfi), Enclosure 2, Recommendation 2.1, Flood Hazard Evaluation Report |
| | author name = Browning J G | | | author name = Browning J G |
| | author affiliation = Entergy Operations, Inc | | | author affiliation = Entergy Operations, Inc |
Letter Sequence Request |
---|
|
|
MONTHYEAR0CAN091302, Assistance in Obtaining Information on Dams2013-09-30030 September 2013 Assistance in Obtaining Information on Dams Project stage: Request L-PI-14-024, Extension Request Regarding the Flooding Hazard Reevaluation Report Required by NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(0 Regarding Recommendation 2.1, Flooding, of the Near-Term Task For2014-03-10010 March 2014 Extension Request Regarding the Flooding Hazard Reevaluation Report Required by NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(0 Regarding Recommendation 2.1, Flooding, of the Near-Term Task Force Project stage: Request L-14-113, Extension Request Regarding the Flood Hazard Reevaluation Report Required by NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights.2014-03-11011 March 2014 Extension Request Regarding the Flood Hazard Reevaluation Report Required by NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights. Project stage: Request 0CAN031401, Required Response 2 to March 12, 2012, Request for Information (Rfi), Enclosure 2, Recommendation 2.1, Flood Hazard Evaluation Report Arkansas Nuclear One - Units 1 and 22014-03-12012 March 2014 Required Response 2 to March 12, 2012, Request for Information (Rfi), Enclosure 2, Recommendation 2.1, Flood Hazard Evaluation Report Arkansas Nuclear One - Units 1 and 2 Project stage: Request 0CAN041402, Required Response 2 to March 12, 2012, Request for Information (Rfi), Enclosure 2, Recommendation 2.1, Flood Hazard Evaluation Report2014-04-14014 April 2014 Required Response 2 to March 12, 2012, Request for Information (Rfi), Enclosure 2, Recommendation 2.1, Flood Hazard Evaluation Report Project stage: Request ML14162A3712014-06-26026 June 2014 5/22/2014 Summary of Meeting with Entergy Operations, Inc. to Discuss Flooding Hazard Reevaluation Extension Request for Arkansas Nuclear One, Units 1 and 2; Near-Term Task Force Recommendation 2.1 Project stage: Meeting ML14171A5292014-07-17017 July 2014 Relaxation of Response Due Date Regarding Flooding Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of the Insights from the Fukushima Dai-Ichi Accident Project stage: Approval ML14171A1662014-07-29029 July 2014 Relaxation of Response Due Date Regarding Flooding Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of the Insights from the Fukushima Dai-Ichi Accident Project stage: Approval 2014-03-12
[Table View] |
|
---|
Category:Letter
MONTHYEARML24295A1202024-10-21021 October 2024 Relief Request ANO2-RR-24-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 71 IR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000313/20240112024-09-0505 September 2024 Comprehensive Engineering Team Inspection Report 05000313/2024011 and 05000368/2024011 IR 05000313/20244042024-08-29029 August 2024 Cybersecurity Inspection Report 05000313/2024404 and 05000368/2024404 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24198A0722024-08-21021 August 2024 Correction to Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000313/20240052024-08-21021 August 2024 Updated Inspection Plan for Arkansas Nuclear One – Units 1 and 2 (Report 05000313/2024005, 05000368/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 IR 05000313/20240022024-08-0606 August 2024 Integrated Inspection Report 05000313/2024002 and 05000368/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24101A1792024-06-25025 June 2024 Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24143A0632024-05-22022 May 2024 Notification of Inspection (NRC Inspection Report 05000368/2024003) and Request for Information IR 05000313/20240012024-05-0808 May 2024 Integrated Inspection Report 05000313/2024001 and 05000368/2024001 ML24128A2472024-05-0808 May 2024 Project Manager Assignment ML24017A2982024-04-18018 April 2024 Summary of Regulatory Audit Regarding the License Amendment Request to Revise Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML24107A0282024-04-17017 April 2024 Notification of Comprehensive Engineering Team Inspection (05000313/2024011 and 05000368/2024011) and Request for Information IR 05000313/20243012024-04-16016 April 2024 NRC Examination Report 05000313/2024301 ML24086A5412024-04-10010 April 2024 Authorization of Request for Alternative ANO1-ISI-037 Regarding Extension of Reactor Vessel Inservice Inspection Interval IR 05000313/20244022024-04-0808 April 2024 Security Baseline Inspection Report 05000313/2024402 and 05000368/2024402 (Full Report) ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24031A6442024-03-14014 March 2024 Issuance of Amendment No. 282 to Modify Technical Specification 3.3.1, Reactor Pressure System (RPS) Instrumentation, Turbine Trip Function on Low Control Oil Pressure ML24102A1342024-03-12012 March 2024 AN1-2024-03 Post Exam Submittal IR 05000313/20230062024-02-28028 February 2024 Annual Assessment Letter for Arkansas Nuclear One- Units 1 and 2 Report 05000313/2023006 and 05000368/2023006 IR 05000313/20230042024-02-0808 February 2024 Integrated Inspection Report 05000313/2023004 and 05000368/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023002 ML24012A0502024-02-0202 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0054 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000313/20234052023-12-12012 December 2023 – Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 – Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000313/20230112023-10-10010 October 2023 Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 IR 05000313/20230052023-08-21021 August 2023 Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2023005 and 05000368/2023005) - Mid Cycle 2024-09-09
[Table view] |
Text
0CAN041402
April 14, 2014
U.S. Nuclear Regulatory Commission
ATTN: Document Control Desk
11555 Rockville Pike
Rockville, MD 20852
SUBJECT:
Required Response 2 to March 12, 2012, Request for Information (RFI), Enclosure 2, Recommendation 2.1, Flood Hazard Evaluation Report
Arkansas Nuclear One - Units 1 and 2
Docket Nos. 50-313 and 50-368
License Nos. DPR-51 and NPF-6
REFERENCES:
- 1. NRC letter to Entergy, RFI Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dai-ichi Accident , dated March 12, 2012 (0CNA031208) (ML12053A340) 2. Entergy letter to NRC, Entergy's Response to NRC RFI Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.1 and 2.3 of the NTTF Review of Insights from the Fukushima Dai-ichi
Accident , dated June 8, 2012 (0CAN061202) (ML12164A567) 3. Entergy letter to NRC, Assistance in Obtaining Information on Dams , dated September 30, 2013 (0CAN091302) (ML13275A067) 4. NRC letter to Entergy, Supplemental Information Related to RFI Pursuant toTitle 10 of the Code of Federal Regulations 50.54(f) Regarding Flooding Hazard Reevaluations for Recommendation 2.1 of the NTTF Review of Insights fron the Fukushima Dai-ichi Accident , dated March 1, 2013 (0CAN031302) (ML13044A561) 5. Entergy letter to NRC, Required Response 2 to March 12, 2012, Request for Information (RFI), Enclosure 2, Recommendation 2.1, Flood Hazard
Evaluation Report , dated March 12, 2014 (0CAN031401) (ML14071A459) 6. NRC email to Entergy, Request for Additional Information - Proposed Extension Request Regarding Response 2 to March 12, 2012, Request for Information, Enclosure 2, Recommendation 2.1, Flood Hazard
Reevaluation Report , dated March 24, 2014 (0CNA031412) (ML14083A683)
Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802
Tel 479-858-3110 Jeremy G. Browning Site Vice President A rkansas Nuclear One
0CAN041402 Page 2 of 3
Dear Sir or Madam:
On March 12, 2012, the NRC issued Reference 1 requesting information pursuant to Title 10 of
the Code of Federal Regulations 50.54(f). Enclosure 2 of that letter contained specific
requested Information associated with NTTF Recommendation 2.1 for flooding. By Reference 2
Entergy Operations, Inc. (Entergy) committed to submit the flood hazard evaluation for
Arkansas Nuclear One (ANO), Units 1 and 2 as a Category 2 site by March 12, 2014.
In September 2013 (Reference 3), Entergy requested the assistance of the NRC to obtain
information from three Districts of the United States Army Corps of Engineers (USACE) to
support the flood hazard reevaluation at ANO. Pursuant to the guidance in Reference 4, Entergy requested a revision to its commitment for submittal of the flood hazard reevaluation
report to six months after USACE data is received (Reference 5).
By email dated March 24, 2014 (Reference 6), an NRC request for additional information (RAI)
was forwarded to Entergy associated with the revised commitment of Reference 5 as follows:
The NRC staff requests that Entergy provide a more detailed breakdown of the activities and analyses that remain to be conducted, as well as the associated schedule for those activities and analyses. The NRC staff suggests that a Gantt chart or similar format would be an effective means of communicating the schedule information.
The NRC and ANO personnel discussed this request in phone conversation on March 25, 2014.
The NRC suggested ANO review similar information provided to the NRC by the Cooper and
Ft. Calhoun nuclear facilities. Following review, the ANO version of a Gantt chart did not
contain the level of detail provided by the aforementioned facilities. Therefore, remaining
activities were loaded as inputs into a work scheduling database to produce detail similar to that
previously provided to the NRC by other facilities.
The attachment to this letter provides a chart containing the information that Entergy believes provides the necessary response to the RAI.
This letter contains no new regulatory commitment. Should you have any questions concerning
the content of this letter, please contact Stephenie Pyle at 479.858.4704.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on April 14, 2014.
Sincerely,
ORIGINAL SIGNED BY JEREMY G. BROWING
JGB/dbb
Attachment:
Detailed Breakdown of Remaining Activities - Flood Hazard Reevaluation
0CAN041402 Page 3 of 3
cc: Mr. Marc L. Dapas Regional Administrator
U. S. Nuclear Regulatory Commission
Region IV
1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector
Arkansas Nuclear One
P. O. Box 310
London, AR 72847 U. S. Nuclear Regulatory Commission
Attn: Mr. Peter Bamford
MS O-8B3 One White Flint North
11555 Rockville Pike
Rockville, MD 20852
Attachment to 0CAN041402 Detailed Breakdown of Remaining Activities - Flood Hazard Reevaluation
ANO RAI A N ANO RAI ANO Schedule for RAI response ANO RAI.01 ANO RAI.01 ANO Flood Hazard Evaluation Project
ANO RAI.02 ANO RAI.02 ANO Prob Max Flood on Arkansas River
,"
"
"3 "4
4 4
ANO RAI.03 ANO RAI.03 Dams Analysis
,4!
"
4
, ",
,
ANO RAI.04 ANO RAI.04 ANO Combined Events
!"
"
ANO RAI.05 ANO RAI.05 Reevaluation Report
!
"
3
4
!