ML18179A164: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 33: | Line 33: | ||
* Manual Name: TRM2 -Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date: 06/15/2018 Procedure Name TEX'l! . WES | * Manual Name: TRM2 -Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date: 06/15/2018 Procedure Name TEX'l! . WES | ||
* Rev *97 Title: LIST OF EFFECTIVE S~CTIONS TEXT-TOC 25 Title: TABLE OF CONTENTS TEXT 1.1 0 Issue Date .06/15/2018 05/i0/2016 11/19/2002 Title: USE AND APPLICATION DEFINITIONS TEXT 2.1 Change ID Change Number .:.' TEXT 2.2 ., Title: PLANT PROGRAMS AND | * Rev *97 Title: LIST OF EFFECTIVE S~CTIONS TEXT-TOC 25 Title: TABLE OF CONTENTS TEXT 1.1 0 Issue Date .06/15/2018 05/i0/2016 11/19/2002 Title: USE AND APPLICATION DEFINITIONS TEXT 2.1 Change ID Change Number .:.' TEXT 2.2 ., Title: PLANT PROGRAMS AND | ||
* TEXT 3.0 TEXT 3 .1.2 TEXT 3 .1.3 5 12/18/2017 Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3 .1.4 0 11/19/2002 Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 13 03/26/2017 Title: CORE OPERATING LIMITS REPORT (COLR) Page 1 of 15 Report Date: 06/15/18 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 -* TEXT 3.3.1 0 11/19/2002 Title: INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT3.3.2 | * TEXT 3.0 TEXT 3 .1.2 TEXT 3 .1.3 5 12/18/2017 Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3 .1.4 0 11/19/2002 Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 13 03/26/2017 Title: CORE OPERATING LIMITS REPORT (COLR) Page 1 of 15 Report Date: 06/15/18 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 -* TEXT 3.3.1 0 11/19/2002 Title: INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT3.3.2 | ||
: 3. 03/31/2011 Title: INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007 Title: INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 11 07/21/2017 Title: INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0 11/19/2002 Title: INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 4 04/29/2014 | : 3. 03/31/2011 Title: INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007 Title: INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 11 07/21/2017 Title: INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0 11/19/2002 Title: INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 4 04/29/2014 | ||
* Title: INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 2 11/10/2015 Title: INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003 Title: INTENTIONALLY LEFT BLANK TEXT 3.3.9 3 05/14/2009 Title: INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1 12/14/2004 Title: INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003 fr*--.. Title: INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 1 03/05/2015 Title: WATER MONITORING INSTRUMENTATION | * Title: INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 2 11/10/2015 Title: INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003 Title: INTENTIONALLY LEFT BLANK TEXT 3.3.9 3 05/14/2009 Title: INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1 12/14/2004 Title: INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003 fr*--.. Title: INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 1 03/05/2015 Title: WATER MONITORING INSTRUMENTATION | ||
Line 58: | Line 58: | ||
* Page! of 15 Report Date: 06/15/18 SSES MANUAL | * Page! of 15 Report Date: 06/15/18 SSES MANUAL | ||
* Manual Name: TRM2 ... * ... Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 * | * Manual Name: TRM2 ... * ... Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 * | ||
* TEXT B3.0 6 03/05/2015 Title: APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.l.1 2 04/29/2014 Title: REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRAl~SIENT WITHOUT SCRAM ALTERNATE . . ROD-INJESTION | * TEXT B3.0 6 03/05/2015 Title: APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.l.1 2 04/29/2014 Title: REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRAl~SIENT WITHOUT SCRAM ALTERNATE . . ROD-INJESTION | ||
(~TWS-ARI).INSTRUMENTATION TEXT B3 .1.2 0 11/19/2002 Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3 .1.3 4 12/18/2017 Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.l.4 0 11/19/2002 Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0 11/19/2002 Title: CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR) TEXT B3.3.1 1 01/31/2014 Title: INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2 03/31/2011 Title: INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 2 11/09/2007 Title: INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 7 07/21/2017 Title: INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2 11/09/2007 Title: INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK TEXT B3.3.6 5 01/31/2014 Title: INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION Page 2 of 15 Report Date: 06/15/18 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 | (~TWS-ARI).INSTRUMENTATION TEXT B3 .1.2 0 11/19/2002 Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3 .1.3 4 12/18/2017 Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.l.4 0 11/19/2002 Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0 11/19/2002 Title: CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR) TEXT B3.3.1 1 01/31/2014 Title: INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2 03/31/2011 Title: INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 2 11/09/2007 Title: INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 7 07/21/2017 Title: INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2 11/09/2007 Title: INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK TEXT B3.3.6 5 01/31/2014 Title: INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION Page 2 of 15 Report Date: 06/15/18 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 | ||
* TEXT B3.3.7 2 11/10/2015 Title: INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TE;XT B3.3.8 1 10/22/2003 Title: INTENTIONALLY BLANK TEXT B3.3.9 3 05/14/2009 Title: INSTRUMENTATION BASES LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10 3 02/22/2012 Title: INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.ll 1 10/22/2003 Title: INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0 04/16/2009 | * TEXT B3.3.7 2 11/10/2015 Title: INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TE;XT B3.3.8 1 10/22/2003 Title: INTENTIONALLY BLANK TEXT B3.3.9 3 05/14/2009 Title: INSTRUMENTATION BASES LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10 3 02/22/2012 Title: INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.ll 1 10/22/2003 Title: INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0 04/16/2009 |
Revision as of 06:18, 25 April 2019
ML18179A164 | |
Person / Time | |
---|---|
Site: | Susquehanna |
Issue date: | 06/18/2018 |
From: | Susquehanna |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
2018-11483 | |
Download: ML18179A164 (28) | |
Text
- MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2018-11483 USER INFORMATION:
GERLACH*ROSEY M Address: NUCSA2 Phone#: 542-3194 EMPL#:028401 CA#: 0363 TRANSMITTAL INFORMATION:
TO: GERLACH*ROSEY M 06/18/2018 LOCATION:
USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
Page 1 THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF *RORS. TENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no C will be issued with the updated material.
TRM2 -TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 05/23/2018 ADD MANUAL TABLE OF CONTENTS DATE: 06/15/2018 CATEGORY:
DOCUMENTS TYPE: TRM2 ID: TEXT 3.0 ADD: REV: 7 REMOVE: REV:6
- of 2
- CATEGORY:
DOCUMENTS TYPE: TRM2 ID: TEXT LOES ADD: REV: 97 REMOVE: REV:96 Page 2 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3107 OR X3171 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX . *
- of 2
'I SSES MANUAL *t *.
- Manual Name: TRM2 -Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date: 06/15/2018 Procedure Name TEX'l! . WES
- Rev *97 Title: LIST OF EFFECTIVE S~CTIONS TEXT-TOC 25 Title: TABLE OF CONTENTS TEXT 1.1 0 Issue Date .06/15/2018 05/i0/2016 11/19/2002 Title: USE AND APPLICATION DEFINITIONS TEXT 2.1 Change ID Change Number .:.' TEXT 2.2 ., Title: PLANT PROGRAMS AND
- TEXT 3.0 TEXT 3 .1.2 TEXT 3 .1.3 5 12/18/2017 Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3 .1.4 0 11/19/2002 Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 13 03/26/2017 Title: CORE OPERATING LIMITS REPORT (COLR) Page 1 of 15 Report Date: 06/15/18 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 -* TEXT 3.3.1 0 11/19/2002 Title: INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT3.3.2
- 3. 03/31/2011 Title: INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007 Title: INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 11 07/21/2017 Title: INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0 11/19/2002 Title: INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 4 04/29/2014
- Title: INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 2 11/10/2015 Title: INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003 Title: INTENTIONALLY LEFT BLANK TEXT 3.3.9 3 05/14/2009 Title: INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1 12/14/2004 Title: INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003 fr*--.. Title: INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 1 03/05/2015 Title: WATER MONITORING INSTRUMENTATION
- Page~ of 15 Report Date: 06/15/18 SSES MANUAL
- Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 Manual Name: TRM2 TEXT 3.4.1 1 04/26/2006 Title: REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY T,EXT 3.4.2 l 04/16/2009 Title: INTENTIONALLY LEFT BLANK TEXT 3.4.3 1 11/09/2007 Title: REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS) TEXT 3.4.4 2 05/14/2009 Title: REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 04/26/2006 Title: REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS
- =* TEXT 3.4.6 1 04/25/2013 Title: REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1 1 02/04/2005 Title: ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1 11/09/2007 Title: ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/19/2002 Title: ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/19/2002 Title: CONTAINMENT VENTING OR PURGING TEXT 3.6.2 2 04/29/2014 Title: SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/19/2002
- . ..:-:**.--'
Title: CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Pagel of 15 Report Date: 06/15/18 SSES MANUAL J Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2
- TEXT 3.6.4 0 11/19/2002 Title: CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/19/2002 Title: PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0 11/19/2002 Title: PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 5 02/16/2017 Title: PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3 04/16/2009 Title: PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 4 05/16/2016
- Title: PLANT SYSTEMS CO2 SYSTEMS TEXT 3.7.3.4 2 04/16/2009 Title: PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2 04/16/2009 Title: PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2 04/16/2009 Title: PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1 04/26/2006 Title: PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 14 12/18/2017 Title: PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1 04/26/2006 Title: PLANT SYSTEMS SOLID RADWASTE SYSTEM
- Page .! of 15 Report Date: 06/15/18
- *
- SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.1 1 03/05/2015 Title: PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/19/2002 Title: PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 04/26/2006 Title: PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 3 06/04/2012 Title: PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008 Title: PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 9 03/05/2015 Title: PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1 08/28/2006 Title: PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 2 04/29/2014 Title: PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS) TEXT 3.7.11 1 10/02/2009 Title: PLANT SYSTEMS TEXT 3.8.1 3 06/20/2012 Title: ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2 11/09/2007 Title: ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION
-CONTINUOUS TEXT 3.8.2.2 2 12/14/2004 Title: ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION
-AUTOMATIC Page~ of 15 Report Date: 06/15/18 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2
- TEXT 3.8.3 2 06/20/2012 Title: ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 1 02/04/2005 Title: ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8.5 1 11/14/2013 Title: ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 2 12/14/2006 Title: ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 2 10/22/2009 Title: BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0 11/19/2002
- Title: REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/19/2002 Title: REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/19/2002 Title: REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006 Title: MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1 04/09/2007 Title: MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2 06/15/2010 Title: MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI) TEXT 3 . 11. 1. 1 1 04/26/2006 Title: RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION
- Page .§. of 15 . Report Date: 06/15/18 j
' SSES MANUAL ** Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3 .11.1.2 1 04/26/2006 Title: RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3 . 11 . 1. 3 1 04/26/2006 Title: RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3 .11.1.4 2 10/09/2012 Title: RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3 . 11 . 1. 5 3 03/05/2015 Title: RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3 . 11. 2 . 1 3 04/26/2006 Title: RADIOACTIVE EFFLUENTS DOSE RATE *. TEXT 3.11.2.2 1 04/26/2006 Title: RADIOACTIVE EFFLUENTS DOSE -NOBLE GASES TEXT 3. 11. 2. 3 1 04/26/2006 Title: RADIOACTIVE EFFLUENTS DOSE -IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3 . 11. 2. 4 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3 .11. 2. 5 4 07/03/2013 Title: RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3 . 11. 2 . 6 8 07/21/2017 Title: RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1 04/26/2006 Title: RADIOACTIVE EFFLUENTS TOTAL DOSE TEXT 3 . 11. 4 . 1 4 03/05/2015
- Title: RADIOACTIVE EFFLUENTS MONITORING PROGRAM Page]_ of 15 Report Date: 06/15/18 SSES MANUAL ' Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2
- TEXT 3.11.4.2 2 04/26/2006 Title: RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3 .11. 4. 3 1 04/26/2006 . ... . Title: RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0 11/19/2002 Title: LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 4 04/17/2008 Title: LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002 Title: LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT 4.1 0 09/27/2003
- Title: ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0 09/27/2003 Title: ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 0 09/27/2003 Title: ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1 12/18/2008 Title: ADMINISTRATIVE CONTROLS PROCEDURES
& PROGRAMS TEXT 4.5 0 09/27/2003 Title: ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0 09/27/2003 Title: ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM TEXT 4.7 0 09/27/2003 Title: ADMINISTRATIVE CONTROLS TRAINING
- Page! of 15 Report Date: 06/15/18 SSES MANUAL
- Manual Name: TRM2 ... * ... Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 *
- TEXT B3.0 6 03/05/2015 Title: APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.l.1 2 04/29/2014 Title: REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRAl~SIENT WITHOUT SCRAM ALTERNATE . . ROD-INJESTION
(~TWS-ARI).INSTRUMENTATION TEXT B3 .1.2 0 11/19/2002 Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3 .1.3 4 12/18/2017 Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.l.4 0 11/19/2002 Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0 11/19/2002 Title: CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR) TEXT B3.3.1 1 01/31/2014 Title: INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2 03/31/2011 Title: INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 2 11/09/2007 Title: INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 7 07/21/2017 Title: INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2 11/09/2007 Title: INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK TEXT B3.3.6 5 01/31/2014 Title: INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION Page 2 of 15 Report Date: 06/15/18 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2
- TEXT B3.3.7 2 11/10/2015 Title: INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TE;XT B3.3.8 1 10/22/2003 Title: INTENTIONALLY BLANK TEXT B3.3.9 3 05/14/2009 Title: INSTRUMENTATION BASES LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10 3 02/22/2012 Title: INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.ll 1 10/22/2003 Title: INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0 04/16/2009
- Title: WATER MONITORING INSTRUMENTATION TEXT B3.4.l 0 11/19/2002 Title: REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1 04/16/2009 Title: REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1 11/09/2007 Title: REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002 Title: REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0 11/19/2002 Title: REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3.4.6 1 04/25/2013 Title: REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION
- Page 10 of 15 Report Date: 06/15/18
- SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.1 0 11/19/2002 Title: ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1 11/09/2007 Title: ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1 11/09/2007 Title: ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.l 0 11/19/2002 Title: CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002 Title: CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION
- TEXT B3.6.3 1 04/19/2007 Title: CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1 12/14/2004 Title: CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.l 0 11/19/2002 Title: PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0 11/19/2002 Title: PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 4 02/16/2017 Title: PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2 04/26/2006 Title: PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS TEXT B3.7.3.3 0 11/19/2002
- -Title: PLANT SYSTEMS BASES CO2 SYSTEMS Page 11 of 15 Report Date: 06/15/18
... SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.4 2 04/29/2014 Title: PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1 04/26/2006 Title: PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1 04/26/2006 Title: PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002 Title: PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 3 09/27/2012 Title: PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0 11/19/2002 Title: PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.l 0 11/19/2002 Title: PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2002 Title: PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002 Title: PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 4 06/04/2013 Title: PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2 01/31/2008 Title: PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 4 01/31/2014 Title: PLANT SYSTEMS BASES SNUBBERS Page 12 of 15 Report Date: 06/15/18 * * *
- SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.9 2 12/08/2011 Title: PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004 Title: PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 2 04/14/2010 Title: STRUCTURAL INTEGRITY TEXT B3.8.1 2 03/10/2010 Title: ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002 Title: ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION
-CONTINUOUS TEXT B3.8.2.2 1 09/17/2004 Title: ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION
-AUTOMATIC TEXT B3.8.3 0 11/19/2002 Title: ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0 11/19/2002 Title: ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 1 11/14/2013 Title: ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 3 06/20/2012 Title: ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 2 06/04/2013 Title: BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0 11/19/2002 Title: REFUELING OPERATIONS BASES DECAY TIME Page 13 of 15 Report Date: 06/15/18 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2
- TEXT B3.9.2 0 11/19/2002 Title: REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0 11/19/2002 Title: REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.l 0 11/19/2002 Title: MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1 04/10/2007 Title: MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002 Title: MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI) !J=:t:=*=.
TEXT B3.ll.l.l 1 05/10/2016
- Title: RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3 .11.1. 2 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3 . 11. 1. 3 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3. 11. 1. 4 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3. 11. 1. 5 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3 .11.2 .1 1 12/14/2004 Title: RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3 .11. 2. 2 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES DOSE -NOBLE GASES
- Page 14 of 15 Report Date: 06/15/18 J
.. 1 * *= ., SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B 3 . 11. 2 . 3 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES DOSE -IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.ll.2.4 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3 .11.2. 5 5 07/03/2013 Title: RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3 .11. 2. 6 2 09/08/2016 Title: RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3 . 11. 3 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3 .11. 4 .1 5 03/05/2015 Title: RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3. 11. 4. 2 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3 .11. 4. 3 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.l 1 10/04/2007 Title: LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1 12/03/2010 Title: LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0 11/19/2002 Title: LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Page 15 of 15 Report Date: 06/15/18 SUSQUEHANNA STEAM ELECTRIC STATION Rev.97 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) ~*-* *-Section Title Effective Date TOC TABLE OF CONTENTS 04/28/2016 1.0 USE AND APPLICATION
1.1 Definitions
10/04/2002
2.0 PLANT
PROGRAMS 2.1 Plant Programs 06/25/2002
2.2 Instrument
Trip Setpoint Table 01/21/2014
3.0 APPLICABILITY
3.0 Technical
Requirement for Operation (TRO) Applicability 06/07/2018
3.1 REACTIVITY
CONTROL SYSTEMS 3.1.1 Anticipated Transient Without Scram Alternate Rod Injection 10/31/2007 (ATWS-ARI)
Instrumentation
3.1.2 Control
Rod Drive (CRD) Housing Support 08/31/1998
3.1.3 Control
Rod Block Instrumentation 12/15/2017
3.1.4 Control
Rod Scram Accumulators Instrumentation and Check Valve 02/18/1999 3.2 CORE OPERATING LIMITS REPORT . -:t_:_:* 3.2.1 Core Operating Limits Report 03/16/2017
3.3 INSTRUMENTATION
3.3.1 Radiation
Monitoring Instrumentation 07/16/1999
3.3.2 Seismic
Monitoring Instrumentation 03/10/2011
3.3.3 Meteorological
Monitoring Instrumentation 10/31/2007 3.3.4 TRM Post-Accident Monitoring Instrumentation 07/20/2017
3.3.5 Section
Not Used 10/31/2007 3.3.6 TRM Isolation Actuation Instrumentation 04/11/2014 3.3.7 Main Turbine Overspeed Protection System 11/04/2015
3.3.8 Section
Not Used 10/22/2003 3.3.9 OPRM Instrumentation Configuration 03/27/2007 3.3.10 Reactor Recirculation Pump MG Set Stops 12/03/2004 3.3.11 MVP Isolation Instrumentation 10/22/2003 3.3.12 Water Monitoring Instrumentation 02/19/2015
3.4 REACTOR
COOLANT SYSTEM 3.4.1 Reactor Coolant System Chemistry 03/31/2006
3.4.2 Section
Not Used 04/02/2009 3.4.3 High/Low Pressure Interface Leakage Monitors 10/31/2007
3.4.4 Reactor
Recirculation Flow and Rod Line Limit 04/17/2009
3.4.5 Reactor
Vessel Materials 03/31/2006
3.4.6 Reactor
Recirculation Single Loop Operation (SLO) Flow Rate Restriction 04/24/2013 SUSQUEHANNA
-UNIT 2 TRM / LOES-1 SUSQUEHANNA STEAM ELECTRIC STATION Rev. 97 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) Section Title Effective Date 3.5 EMERGENCY CORE COOLING AND RCIC 3.5.1 ADS Manual Inhibit 01/28/2005 3.5.2 ECCS and RCIC System Monitoring Instrumentation 10/31/2007 3.5.3 Long Term Nitrogen Supply to ADS 08/31/1998
3.6 CONTAINMENT
3.6.1 Venting
or Purging 08/31/1998
3.6.2 Suppression
Chamber-to-Drywell Vacuum Breaker Position Indication 04/16/2014
3.6.3 Suppression
Pool Alarm Instrumentation 01/07/2002
3.6.4 Primary
Containment Closed System Boundaries 12/31/2002
3.7 PLANT
SYSTEMS 3.7.1 Emergency Service Water System (ESW) Shutdown 07/29/1999
3.7.2 Ultimate
Heat Sink (UHS) and Ground Water Level 08/31/1998 3.7.3.1 Fire Suppression Water Supply System 01/26/2017 3.7.3.2 Spray and Sprinkler Systems 04/07/2009 3.7.3.3 CO2 Systems 05/09/2016 3.7.3.4 Halon Systems 08/02/1999 3.7.3.5 Fire Hose Station 08/02/1999 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses 08/02/1999 3.7.3.7 Fire Rated Assemblies 03/31/2006 3.7.3.8 Fire Detection Instrumentation 12/15/2017
3.7.4 Solid
Radwaste System 03/31/2006 3.7.5.1 Main Condenser Offgas Hydrogen Monitor 02/19/2015 3.7.5.2 Main Condenser Offgas Explosive Gas Mixture 08/31/1998 3.7.5.3 Liquid Holdup Tanks 03/31/2006 3.7.6 ESSW Pumphouse Ventilation 05/24/2012 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation 09/04/2008
3.7.8 Snubbers
02/19/2015
3.7.9 Control
Structure HVAC 08/16/2006 3.7.10 Spent Fuel Storage Pools (SFSPs) 12/03/2004 3.7.11 Structural Integrity 09/25/2009 SUSQUEHANNA
-UNIT 2 TRM / LOES-2 SUSQUEHANNA STEAM ELECTRIC STATION Rev. 97 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) Section Title Effective Date 3.8 ELECTRICAL POWER 3.8.1 Primary Containment Penetration Conductor Overcurrent 06/'12/2012 Protective Devices 3.8.2.1 Motor Operated Valves (MOV) Thermal Overload Protection
-Continuous 10/31/2007 3.8.2.2 Motor Operated Valves (MOV) Thermal Overload Protection
-Automatic 12/03/2004
3.8.3 Diesel
Generator (DG) Maintenance Activities 06/12/2012 3.8.4 24 voe Electrical Power Subsystem 01/28/2005
3.8.5 Degraded
Voltage Protection 11/07/2013
3.8.6 Emergency
Switchgear Room Cooling 06/11/2012
3.8.7 Battery
Monitoring and Maintenance Program 10/20/2009
3.9 REFUELING
OPERATIONS
3.9.1 Decay
Time 08/31/1998
3.9.2 Communications
08/31/1998
3.9.3 Refueling
Platform 08/31/1998 3.10 MISCELLANEOUS 3.10.1 Sealed Source Contamination 03/31/2006 3.10.2 Shutdown Margin Test RPS Instrumentation 03/27/2007 3.10.3 Independent Spent Fuel Storage Installation (ISFSI) 06/10/2010 3.11 RADIOACTIVE EFFLUENTS 3.11.1.1 Liquid Effluents Concentration 03/31/2006 3.11.1.2 Liquid Effluents Dose 03/31/2006 3.11.1.3 Liquid Waste Treatment System 03/31/2006 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation 10/09/2012 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation 02/19/2015 3.11.2.1 Radioactive Effluents Dose Rate 03/21/2006 3.11.2.2 Dose -Noble Gases 03/31/2006 3.11.2.3 Dose -Iodine, Tritium, and Radionuclides in Particulate Form 03/31/2006 3.11.2.4 Gaseous Radwaste Treatment System 04/02/2002 3.11.2.5 Ventilation Exhaust Treatment System 06/18/2013 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation 07/20/2017 3.11.3 Total Dose 03/31/2006 3.11.4.1 Monitoring Program 02/19/2015 3.11.4.2 Land Use Census 03/31/2006 3.11.4.3 lnterlaboratory Comparison Program 03/31/2006 SUSQUEHANNA
-UNIT 2 TRM / LOES-3 r*<:-:-<*:
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 97 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) Section 3.12 3.12.1 3.12.2 3.12.3 4.0 4.1 4.2 4.3 4.4 4.5 4.5.1 4.5.2 4.5.3 4.6 4.7 LOADS CONTROL PROGRAM Crane Travel -Spent Fuel Storage Pool Heavy Loads Requirements Light Loads Requirements ADMINISTRATIVE CONTROLS Organization Controls Organization Reportable Event Action Safety Limit Violation Procedures and Programs Reporting Requirements Startup Reports Annual Reports Special Reports Radiation Protection Program Training SUSQUEHANNA
-UNIT 2 TRM / LOES-4 Effective Date 02/05/1999 03/14/2008 02/05/1999 08/31 /'I 998 08/31/1998 08/31/1997 12/11/2008 08/31/1998 08/31/1998 08/31/1998 08/31/1998 08/31/1998 08/31/1998 SUSQUEHANNA STEAM ELECTRIC STATION Rev. 97 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) Section Title Effective Date B 3.0 APPLICABILITY BASES B 3.0 Technical Requirement Surveillance (TRS) 02/09/2015 B3.1 REACTIVITY CONTROL SYSTEMS BASES B 3.1.1 Anticipated Transient Without Scram Alternate Rod Injection (ATWS-ARI)
Instrumentation 04/16/2014 B 3.1.2 Control Rod Drive (CRD) Housing Support 08/31/1998 B 3.1.3 Control Rod Block Instrumentation 12/15/2017 B 3:1.4 Control Rod Scram Accumulators Instrumentation and Check Valve 02/18/1999 B3.2 CORE OPERATING LIMITS BASES B 3.2.1 Core Operating Limits Report (COLR) 08/31/1999 B 3.3 INSTRUMENT BASES B 3.3.1 Radiation Monitoring Instrumentation 01/21/2014 B 3.3.2 Seismic Monitoring Instrumentation 03/10/2011 B 3.3.3 Meteorological Monitoring Instrumentation 10/31/2007 B 3.3.4 TRM Post-Accident Monitoring Instrumentation 07/20/2017 B 3.3.5 Section Not Used 10/31/2007 B 3.3.6 TRM Isolation Actuation Instrumentation 02/21/2014 B 3.3.7 Turbine Overspeed Protection System 11/04/2015
-~-*::_ B 3.3.8 Section Not Used 10/22/2003 B 3.3.9 OPRM Instrumentation 04/17/2009 B 3.3.10 Reactor Recirculation Pump MG Set Stops 02/16/2012 B 3.3.11 MVP Isolation Instrumentation 10/22/2003 B 3.3.12 Water Monitoring Instrumentation 04/07/2009 B 3.4 REACTOR COOLANT SYSTEM BASES B 3.4.1 Reactor Coolant System Chemistry 08/31/1998 B 3.4.2 Section Not Used 04/01/2009 B 3.4.3 High/Low Pressure Interface Leakage Monitor 10/31/2007 B 3.4.4 Reactor Recirculation Flow and Rod Line Limit 10/15/1999 B 3.4.5 Reactor Vessel Materials 08/31/1999 B 3.4.6 Reactor Recirculation Single Loop Operation (SLO) Flow Rate Restriction 04/25/2013 B 3.5 ECCS AND RCIC BASES B 3.5.1 ADS Manual Inhibit 08/31/1998 B 3.5.2 ECCS and RCIC System Monitoring Instrumentation 10/31/2007 B 3.5.3 Long Term Nitrogen Supply to ADS 10/31/2007 SUSQUEHANNA
-UNIT 2 TRM / LOES-5 SUSQUEHANNA STEAM ELECTRIC STATION Rev.97 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) Section Title Effective Date B 3.6 CONTAINMENT BASES B 3.6.1 Venting or Purging 07/26/2011 B 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position indication 08/31/1998 B 3.6.3 Suppression Pool Alarm Instrumentation 04/04/2007 B 3.6.4 Primary Containment Closed System Boundaries 12/03/2004 B 3.7 PLANT SYSTEMS BASES B 3.7.1 Emergency Service Water System (Shutdown) 08/31/1998 B 3.7.2 Ultimate Heat Sink (UHS) Ground Water Level 08/31/1998 B 3.7.3.1 Fire Suppression Water Supply System 01/26/2017 B 3.7.3.2 Spray and Sprinkler Systems 03/31/2006 B 3.7.3.3 CO2 Systems 08/02/1999 B 3.7.3.4 Halon Systems 04/11/2014 B 3.7.3.5 Fire Hose Stations 03/31/2006 B 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses 08/02/1999 B 3.7.3.7 Fire Rated Assemblies 09/25/2012 B 3.7.3.8 Fire Detection Instrumentation 09/25/2012 B 3.7.4 Solid Radwaste System 02/01/1999 B 3.7.5.1 Main Condenser Offgas Hydrogen Monitor 08/31/1998 B 3.7.5.2 Main Condenser Offgas Explosive Gas Mixture 08/31/1998 B 3.7.5.3 Liquid Holdup Tanks 08/31/1998 B 3.7.6 ESSW Pumphouse Ventilation 05/29/2013 B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation 01/30/2008 B 3.7.8 Snubbers 01/21/2014 B 3.7.9 Control Structure HVAC 11/30/2011 B 3.7.10 Spent Fuel Storage Pools 12/03/2004 B 3.7.11 Structural Integrity 04/08/2010 B 3.8 ELECTRICAL POWER BASES B 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices 03/10/2010 B 3.8.2.1 Motor Operated Valves (MOV) Thermal Overload Protection
-Continuous 04/02/2002 B 3.8.2.2 Motor Operated Valves (MOV) Thermal Overload Protection
-Automatic 09/03/2004 B 3.8.3 Diesel Generator (DG) Maintenance Activities 08/31/1998 B 3.8.4 24 VDC Electrical Power Subsystem 04/02/2002 B 3.8.5 Degraded Voltage Protection 11/07/2013 B 3.8.6 Emergency Switchgear Room Cooling 06/11/2012 B 3.8.7 Battery Monitoring and Maintenance Program 05/29/2013 SUSQUEHANNA
-UNIT 2 TRM / LOES-6 SUSQUEHANNA STEAM ELECTRIC STATION Rev. 97 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) Section Title Effective Date B.3.9 REFUELING OPERATIONS BASES B 3.9.1 Decay Time 08/31/1998 B 3.9.2 Communications 08/31/1998 B 3.9.3 Refueling Platform 10/23/1998 B 3.10 MISCELLANEOUS BASES B 3.10.1 Sealed Source Contamination 08/3 'I /'1998 B 3.10.2 Shutdown Margin Test RPS Instrumentation 03/27/2007 8 3.10.3 Independent Spent Fuel Storage Installation (ISFSI) 08/23/1999 B 3.11 RADIOACTIVE EFFLUENTS BASES B 3.11.1.1 Liquid Effluents Concentration 04/28/2016 B 3.11.1.2 Liquid Effluents Dose 08/31/1998 B 3.11.1.3 Liquid Waste Treatment System 08/31/1998 B 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation 08/31/1998 B 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation 04/07/2000 B 3.11.2.1 Dose Rate 02/01/1999 B 3.11.2.2 Dose -Noble Gases 08/31/1998 B 3.11.2.3 Dose -Iodine, Tritium, and Radionuclides in Particulate Form 08/31/1998 B 3.11.2.4 Gaseous Radwaste Treatment System 04/02/2002 B 3.11.2.5 Ventilation Exhaust Treatment System 06/18/2013
.. B 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation 08/11/2016 B 3.1.1.3 Total Dose 08/31/1998 B 3.11.4.1 Monitoring Program 02/19/2015 B 3.11.4.2 Land Use Census 08/31/1998 B 3.11.4.3 lnterlaboratory Comparison Program 02/02/1999 B.3.12 LOADS CONTROL PROGRAM BASES B 3.12.1 Crane Travel -Spent Fuel Storage Pool 09/19/2007 B 3.12.2 Heavy Loads Requirements 11/29/2010 B 3.12.3 Light Loads Requirements 02/05/1999 SUSQUEHANNA
-UNIT 2 TRM / LOES-7 Rev. 7 TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY 3.0 3.0 TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TRO 3.0.1 TRO 3.0.2 TRO 3.0.3 TRO 3.0.4 TROs shall be met during the MODES or other specified conditions in the Applicability, except as provided in TRO 3.0.2. Upon discovery of a failure to meet an TRO, the Required Actions of the associated Conditions shall be met, except as provided in TRO 3.0.5 and TRO 3.0.6. If the TRO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated. When a TRO is not met, and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the following actions shall be taken: 1. Take compensatory actions as warranted for exiting TRO 3.0.3 commensurate with the safety significance of the condition.
Development and implementation of the compensatory actions and plan for exit of TRO 3.0.3 shall be pursued without delay and in a controlled manner and shall be documented in the TRO 3.0.3 entry Condition Report. 2. Initiate a TRO 3.0.3 entry Condition Report to document and appropriately evaluate the issue. When corrective measures are completed that permit operation in accordance with the TRO or the TRO actions, completion of the compensatory actions and plan for exiting TRO 3.0.3 is not required.
When a TRO is not met, entry into a MODE or other specified condition in the Applicability shall only be made: a. When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time; b. After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate; exceptions to this Requirement are stated in the individual TROs, or c. When an allowance is stated in the individual value, parameter, or other Requirement. (continued)
SUSQUEHANNA
-UNIT 2 TRM / 3.0-1 Rev. 7 TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY 3.0 3.0 TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TRO 3.0.4 (continued)
TRO 3.0.5 TRO 3.0.6 This Requirement shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit. Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY, the OPERABILITY of other equipment or variables to be within limits. This is an exception to TRO 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate OPERABILITY.
When a supported system TRO is not met solely due to a support system TRO or LCO not being met, the Conditions and Required Actions associated with this supported system are not required to be entered. Only the support system TRO or LCO ACTIONS are required to be entered. This is an exception to TRO 3.0.2 for the supported system. When a support system's Required Action directs a supported system to be declared inoperable or directs entry into Conditions and Required Actions for*a supported system, the applicable Conditions and Required Actions shall be entered in accordance with TRO 3.0.2. SUSQUEHANNA
-UNIT 2 TRM / 3.0-2 Rev. 7 TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY 3.0 3.0 Technical Requirement Surveillance (TRS) Applicability TRS 3.0.1 TRS 3.0.2 TRS 3.0.3 TRS shall be met during the MODES or other specified conditions in the Applicability for individual TROs, unless otherwise stated in the TRS. Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the TRO. Failure to perform a Surveillance within the specified Frequency shall be failure to meet the TRO except as provided in TRS 3.0.3. Surveillances do not have to be performed on inoperable equipment or variables outside specified limits. The specified Frequency for each TRS is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met. For Frequencies specified as "once," the above interval extension does not apply. If a Completion Time requires periodic performance on a "once per ... " basis, the above Frequency extension applies to each performance after the initial performance.
Exceptions to this Requirement are stated in the individual Requirements.
If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the TRO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater. In the event it is determined that a Surveillance cannot be performed within its specified Frequency, compliance with the requirement to declare the TRO not met may be delayed, from the expiration of the current Surveillance test interval, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater. This delay period is permitted to allow performance of the Surveillance.
A risk evaluation shall be performed for any Su1veillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed. ( continued)
SUSQUEHANNA
-UNIT 2 TRM / 3.0-3 Rev. 7 TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY 3.0 3.0 Technical Requirement Surveillance (TRS) Applicability TRS 3.0.3 (continued)
TRS 3.0.4 If the Surveillance is not performed within the delay period, the TRO must immediately be declared not met, and the applicable Condition(s) must be entered. When the Surveillance is performed within the delay period and t11e Surveillance is not met, the TRO must immediately be declared not met, and the applicable Condition(s) must be entered. Exceptions to this Requirement are stated in the individual Requirements.
Entry into a MODE or other specified condition in the Applicability of a TRO shall only be made when the TRO's Surveillances have been met within their specified Frequency, except as provided by TRS 3.0.3. When a TRO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with TRO 3.0.4. This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit. SUSQUEHANNA
-UNIT 2 TRM / 3.0-4