ML18191A230: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML18191A230
| number = ML18191A230
| issue date = 08/23/1977
| issue date = 08/23/1977
| title = Columbia Generating Station - General Electric Report NEDC-21581-P Final Report, In-Plant Safety-Relief Valve Discharge Load Test, Monticello Plant
| title = General Electric Report NEDC-21581-P Final Report, In-Plant Safety-Relief Valve Discharge Load Test, Monticello Plant
| author name = Sobon L J
| author name = Sobon L J
| author affiliation = General Electric Co
| author affiliation = General Electric Co

Revision as of 03:48, 1 April 2019

General Electric Report NEDC-21581-P Final Report, In-Plant Safety-Relief Valve Discharge Load Test, Monticello Plant
ML18191A230
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/23/1977
From: Sobon L J
General Electric Co
To: Stello V
Office of Nuclear Reactor Regulation
References
MFN-321-77
Download: ML18191A230 (4)


Text

STANDARD DIST.OF INC01'IING TOPI GENERIC LETTERS 8 TOPICAL REP S ON NARK I CONTAINIIIENT NRC FORM 195 12.76)1 US.NUCLEAR REGUI ATORV CO ATION WoP ic&<<NRC DISTRIBUTION FDR PART 50 DOCKET MATERIAL FILE NUMBER Mr.Vi Stello RELETTER ORIGINAL Q COP'V I DESCRIPTION QHCOTO R IZE D 0UNCLASSIFIED PROP XXX INPUT FORM ENCLOSURE FROM: General Electric Company San Jose, Cai L Z Sobon DATE OF DOCUMENT 8/23/77 DATE RECEIVED 8/23/77 NUMBER OF COPIES RECEIVED I I uM PLANT.NAME: Monticello gg5~46,~au/oC)SZ~V Ve d.t'I I SF.R~(2-P)Consists of the following:

AffidavtIti

~~~notorized 8/17/77-"Final Report, In-Plant Safety/Relief Valve Discharge Load'est, Monticello Plant"-~--+)gag(f(II fggg (1~1/2")BQÃ0'CENTRAL.FILES 2 NRC PDR LPIP OH'4 Y NSIC L.g Q O&t Y TIC LPfZ.os C ICE 7)ACRS 16 L.SHAO 4 G.LAINAS 4<J.P.IQJIGHT 2>4/BUTLE 4 FOR ACTION/INFORMATION INTERNAL Ol RIBUTION HHcr r8w W~QE YOUQ STOLZ W kV , ShJG.LL WS I L DAVIS LEAR 2 REID 4 47 MOORE M D.VASSALLO W 2 GOLLER QO SCHRODER W 3 TEDESCO 2.STELLO'33 EISENHUT SCHWA'/ENCER

~SIHWEIL~S J.GUIBERT (2 4-H IA/FR.W7 EXTERNAL OISTR ISUTION 2 CONTROL NUMBER@A~77>XXO ohio 69 GENERALELECTRIC NUCLEAR ENERGY GENERAL ELECTRIC COMPANY, 175 CURTNER AVE., SAN JOSE, CALIFORNIA 95125 HC 681, (408)925-3495 SYSTEMS DIVISION T DEPARTMENT August 23, 1977-'~jpj~Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555 Attention:

V.Stello, Director Gentlemen:

SUBJECT:

Division of Operating,Reactors.~,, ALUUEQ I UIIY gg PL,-, GENERAL ELECTRIC REPORT NEDC-21581-P"FINAL REPORT, IN-PLANT SAFETY/RELIEF VALVE DISCHARGE LOAD TEST, HONTICELLO PLANT"

Reference:

Letter L.J.Sobon to V.Stello dated January 28, 1977"In-Plant Safety Relief Valve Test-Preliminary Report" One hundred copies of the report"NEDC-21581-P, Final Report, In-Plant Safety/Relief Valve Discharge Load Test, Honticello Plant" are being provided by General Electric Company on behalf of the Hark I and II Owners Groups.As you are aware,-both of these Owners Groups have previously indicated that information obtained from safety/relief valve (SRV)tests performed at the Monticello Nuclear Generating Plant will be used to confirm and support portions of their containment evaluation programs.This report presents information on the structural and hydro-dynamic measurements obtained during the test and documents completion of Task 5.1.1 of the Mark I Program and Task B.3 of the Hark II Program.Separate Hark I utility correspondence will reference this General Electric transmittal for use on their docket.The applicability of this report to the Hark II program will be described in the report"Hark II Containment Supporting Program Report,".Revision 1, NEDO-21297 which is scheduled for issue in August 1977.This Final Report supersedes the reference Preliminary Report (NEDC-21465-P)entirely, therefore Preliminary Reports should be destroyed or returned to the General Electric Company.The report, NEDC-21581-P, contains information which General Electric Company customarily maintains in confidence and withholds from public disclosure.

The information has been handled and classified proprietary by General Electric as indicated in the attached affidavit.

The affidavit GENERALELECTRICAttention:

V.Stello Page 2 August 23, 1977 al,so contains proprietary commercial financial information.

Accord-ingly, we hereby request that NEDC-21581-P and the affidavit accompany-ing this letter be withheld from public disclosure in accordance with the provisions of 10CFR 2.790.A non-proprietary version of the report, NEDC-21581, will be provided on or before September 26, 1977.Sincerely L.J.Sobon, Manager BMR Containment Licensing LJS:LDS:at/65-66 Attachment

'c: L.S.Gifford (GE-Bethesda)

J.C.Guibert (NRC)R.L.Tesdesco (NRC)C.I Grimes (NRC)S.Miner (NRC),R.S.Boyd (NRC)R.C.DeYoung (NRC)H.C.Brinkmann (Mark II Owners Group) i.4A